Determination 493976

Adequacy of cash settlement and mould remediation after escape of liquid claim

FirmFinancial Firm (Unknown - Insurer)
Decided2018-04-03
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$11,300
Non-financial loss$1,000
Amount claimed—
SourceAFCA PDF

Summary

The applicant sought a larger settlement and further mould remediation after the FSP cash settled a water leak claim. AFCA ordered a further $8,500 for repairs, four more weeks of accommodation, a 70% FSP contribution to new mould remediation, and $1,000 non-financial loss.

Mould remediation by the FSP's expert was doubtful given the recurring mould, so the FSP must contribute to re-remediation and increase the cash settlement for residual risk; the $11,300 figure is $8,500 plus four weeks at $700.

Issues

Subjects and remedies

pay claimpay non financial lossrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 493976 Determination Page 1 of 10 Case number: 493976 22 March 2018 1 Overview 1.1 Dispute The applicant held a home building insurance policy with the financial services provider (FSP). He lodged a claim on 6 April 2017 after discovering a leaking pipe under his kitchen. The FSP accepted the claim. It conducted mould remediation works, and after first offering to either repair the house or cash settle, it cash settled. The applicant raised further concerns about mould, and requested additional remediation. He wants the FSP to increase the scope and settlement for the work. The case manager issued a recommendation which the applicant did not accept. 1.2 Issues and key findings Is the FSP required to increase its claim settlement? For the reasons outlined in section 2.1 below, it is fair that the FSP obtains a new actionable quotation for mould remediation work to both the building and contents, and cash settles 70% of the quoted costs, including GST and margins. The FSP‟s costings and scope of works were fair with regard to repairs previously identified; however the cash settlement for repairs should be increased by $8,500 to cater for possible further damage which might be identified, and to reflect the risk taken on by the applicant in having to deal with repairs himself. The accommodation component should be increased by a further 4 weeks to cover a reasonable likely timeframe for obtaining a quote and completing additional mould remediation. Is the applicant entitled to compensation? The applicant and his family have experienced serious upset and inconvenience during the claim experience. Some of that was due to the FSP‟s (and its agent‟s) handling of the matter, and so compensation for non-financial loss is payable. 1.3 Determination This determination is substantially in favour of the applicant. The FSP is required to promptly obtain an actionable quote from an accredited mould remediation expert (other than KA) for the necessary mould remediation works to the house and contents, and cash settle 70% of the total quoted costs. It must also increase the cash settlement for repairs by $8,500, as well as paying $1,000 compensation for non-financial loss. Case No: 493976 Determination Page 2 of 10 2 Reasons for determination I have decided this case on the basis of what I consider fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. For the purposes of this determination, I will deal with only those points considered relevant. 2.1 Is the FSP required to increase its claim settlement ? Applicant established a valid claim under the policy The applicant‟s policy provides cover for loss or damage to the property arising from certain incidents, including damage caused by an escape of liquid. In order for the applicant to establish a valid claim, he must demonstrate, on the balance of probabilities, that liquid escaped from one of the specific items listed in the policy. The parties agree the property sustained damage as a result of a leaking fixed pipe. Accordingly, the applicant has established a valid claim. FSP accepted and offered to settle claim The FSP accepted the claim and originally authorised repairs. However, the applicant raised concerns about the scope of work, as well as mould. Mould remediation was carried out and certified in July/August 2017. On 1 September 2017, the FSP offered to cash settle the claim in the amount of $62,465.03 (comprising $57,265.03 for repairs, less the $400 excess; and $5,600 for temporary accommodation, calculated at $700 per week for 8 weeks). The cash settlement was offered as an alternative to the FSP conducting repairs itself. This was because the applicant had not been prepared to accept the FSP‟s earlier offer to repair, unless a second mould remediation was conducted. It also appears that the relationship between the applicant and FSP had already become increasingly strained. Because the FSP did not hear back from the applicant in response to that offer, it cash settled for the stated amount, as it had indicated it would (and as it is entitled to do under the policy), although the applicant did not want a cash settlement. Parties agree mould was present at the property The FSP ‟s appointed mould specialist (KA) confirmed mould was present in the home after the water leak, and obtained samples for independent testing laboratory, ML, to identify the type and extent. KA then undertook mould remediation work to the building and contents, providing remediation certificates dated 17 August 2017. KA Case No: 493976 Determination Page 3 of 10 suggests some staining was left after the mould was removed, but maintained the mould was dead. The applicant, however, was not satisfied the mould had been fully removed. He obtained a report from his expert, IP , following an inspection on 6 October 2017 and samples being sent to ML for testing. The ML findings confirmed the presence of mould in the kitchen subfloor area. ML concluded that the property required further remediation by an accredited expert, using methods in accordance with the relevant mould remediation standards (IICRC s520), as well as re-testing after the further remediation to verify the outcome. At its inspection, IP also noted the property had a peculiar odour, which could not be definitively identified, but which might be attributable to the mould. IP recommended containing, removing and disposing of the entire kitchen area, including cabinetry and flooring. IP also said that after the demolition, and prior to reconstruction, additional air monitoring would need to be carried out to determine if the removal of floor and cabinets had removed the source of the mould and the potential for „off gassing‟. IP went on to point out that if the problem still existed after that work, then a specific remediation programme would need to be developed. At that stage (but subject to the results of the air monitoring), IP did not feel all floors throughout the property needed to be removed. In that initial report, IP did not directly comment on the appropriateness or otherwise of the mould remediation methods undertaken by KA. Subsequently, however, IP did provide an email to the applicant which specifically said: „The remediation process completed by the previous contractor [KA] would be considered inadequate based on the results achieved, especially when referenced to the IICRC methodology in the S520‟. FSP scope of works for identified repairs covers IP’s re commendations The FSP provided a scope of works which was prepared and costed by its builder (JP), dated 3 August 2017. An excerpt from the JP scope is included in section 3.2 below. The scope provided for repair/reinstatement works, including proposed carpentry and cabinet-making in the bedrooms and hallway. The JP scope also included the removal and replacement of floating and timber flooring, as well as removal and replacement of cabinetry. Having considered JP‟s scope of works and the IP recommendation s, I am satisfied JP‟s scope reasonably covers the necessary basic reinstatement works, including the mould-related component as identified in the IP report, at that point in time. However, in an email provided by the applicant, the FSP had given him a general guideline as to the steps involved in carrying out the initial mould remediation works. It was indicated that a final inspection by a hygienist would be carried out after the remediation process to confirm mould had been cleared; as well, it was noted that JP would conduct a re- inspection to „rescope damages [sic]‟ after the remediation Case No: 493976 Determination Page 4 of 10 process was completed. It is not clear, on the evidence, that either of these steps was taken. In any case, I consider the fact of the inclusion of these steps in the outline of what might reasonably be expected to occur, itself leaves open the possibility of further mould remediation being needed, and further damage being identified – as does IP‟s report. Fair that FSP ’s settlement for repair be increased I have seen nothing to suggest JP‟s initial scope or related costing (which includes a reasonable builder‟s margin) were unreasonable or inappropriate, so I accept that $57,265.03, including GST, for reinstatement work, is a fair reflection of the cost to the FSP of the necessary repairs identified at the time. The FSP also offered and paid the applicant $2,800 for temporary accommodation, to cover a repair period of eight weeks at $700 per week. The policy provides that the costs of alternative accommodation are payable if the home is damaged (as a result of an incident covered under the policy) and the insured is not able to live in it as a result. On the basis of the works proposed by JP, the applicant would not reasonably be able to live in the property while reinstatement occurs. I have seen nothing to indicate the reinstatement works originally identified would reasonably take longer than that. However, given that I consider that further mould remediation should be carried out (as explained below), the settlement for temporary accommodation should be increased by a further 4 weeks. This is to cater for the time reasonably likely to be needed to obtain a new quote and complete the mould remediation, including any additional air monitoring and final inspection/confirmation of its effectiveness. As well, I consider it fair in the circumstances that the cash settlement component for the repair work itself should be increased from the $57,265 already paid to the applicant. That is because, in calculating an appropriate cash settlement amount, it is necessary to consider all reasonable factors . Those factors would include whether the cash settlement will adequately ensure the applicant himself is able to properly complete all repairs, as well as allowing for contingencies such as unidentified additional damage, or anything further arising from a post- mould remediation „re - scope‟ (as suggested by the FSP in the email referred to above) . That also takes account of the fact that, with a cash settlement, the risk associated with the work passes to the applicant, who no longer has the benefit of the FSP‟s lifetime guarantee for the repairs. On that basis, I consider the FSP should pay a further $8,500 in respect of the repair/reinstatement component of the cash settlement. Parties to contribute to further mould remediation works KA certified that as at 17 August 2017, the property had undergone successful mould remediation. However, it is relevant that the area where mould was subsequently identified by IP (the kitchen subfloor area) is the same area previously treated by KA, and the mould IP identified is of the same genus as that which KA was said to have eradicated. It is also not clear that a subsequent inspection was conducted after the remediation to confirm its effectiveness. Case No: 493976 Determination Page 5 of 10 The FSP says it offered to conduct repairs on 18 August 2017, and again through its internal dispute resolution review on 1 September 2017. The FSP says that had repairs been undertaken by the FSP, or privately by the applicant at that time, the mould concerns would be a non-issue. I appreciate that the delays in dealing with repairs after the initial mould remediation allowed time for the mould to re-appear, and that the applicant did not immediately attend to repairs when the initial cash settlement was paid to him . However, given the reported concerns and experience of the applicant and his family that the mould had not been fully eradicated, I accept it was not unreasonable for the applicant to have queried and sought confirmation of the effectiveness of the mould remediation, and for repairs to have been delayed on that basis – particularly since the findings of IP and ML after the subsequent testing indicate the applicant‟s concerns were justified. In the circumstances, I consider it fair that the FSP contributes 70% towards the cost of further mould remediation works at the property (including GST and margins). Because of the doubt about the effectiveness of KA‟s treatment, and the risk of possible serious health impacts of any continuing mould, I consider it fair and reasonable and appropriate that the further remediation should apply to both t he building and contents. The FSP is to promptly obtain a quotation for mould remediation works from an accredited mould remediation expert other than KA, and the applicant will need to cooperate in allowing appropriate access to the property for this purpose. This expert must confirm they will undertake the works at the proposed cost privately for the applicant, and should also clearly indicate the steps involved and the expected realistic time that will be needed to carry out all aspects of the remediation work (including any additional air monitoring and final checks). 2.2 Is the applicant entitled to compensation? FOS may award compensation in certain circumstances Under paragraph 9.3(b) of the Terms of Reference, FOS may award compensation (capped at $3,000) for non-financial loss. FOS may decide an FSP should compensate an applicant for such loss only where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the applicant‟s expectation of en joyment or peace of mind. Compensation is not awarded for punitive purposes, but to compensate the applicant for their particular experience , given the FSP‟s handling of the claim. Compensation is warranted in this case I have considered the available material, and am satisfied of the following dates and key points: Date Key point 6 - 04 - 17 Clam lodged for leaking pipe Case No: 493976 Determination Page 6 of 10 21 - 04 - 17 JP estimator attends property 8 - 05 - 17 JP identifies further information required about scope and measurements 9 - 05 - 17 JP estimator re - attends property 23 - 05 - 17 FSP accepts JP estimate and authorises repairs 29 - 05 - 17 Applicant raises mould concerns with FSP 1 - 06 - 17 Mould testing conducted by another firm 9 - 06 - 17 JP appoints new trades after trades initially appointed request removal from job 10 - 07 - 17 FSP authorises repairs after receiving revised quote from new trades 18 - 07 - 17 KA attends property to address mould concerns 27 - 07 - 17 KA confirms mould remediation required 17 - 08 - 17 KA issues mould remediation certifica tion 18 - 08 - 17 FSP offers to cash settle claim based on JP scope and quotation 21 - 08 - 17 KA states it is unable to remove dead mould under floor but confirms spores are dead, and a smell in the building results from being closed up for months 1 - 09 - 17 FSP offers to repair or cash settle, says it will cash settle if it does not receive an authority by 18 - 09 - 17 21 - 09 - 17 FSP issues cash settlement via electronic funds transfer Having carefully considered the material, I accept it was appropriate for the FSP to obtain a mould specialist report to assist in determining whether mould was at the property, and the appropriate method of treatment. I accept the FSP was not aware of the presence of mould until such time as the applicant first alerted the FSP to this concern. I am satisfied the time between KA‟s initial attendance (18 July 2017), providing its report confirming the presence and type of mould (27 July 2017) and attending to treatment at the property (17 August 2017) is within acceptable industry standard. I also note the FSP offered to conduct repairs on a number of occasions, and (as it was entitled to do) ultimately issued cash settlement based on the previously identified required repairs. Case No: 493976 Determination Page 7 of 10 However, the applicant‟s queries about the quality and effectiveness of the mould remediation work carried out by KA appear to have been justified. Notwithstanding any delay by the applicant in effecting repairs after the cash settlement was made and the mould issues were first looked at, I consider it fair that the FSP pay $1,000 compensation for the significant upset and inconvenience caused to the applicant, his understandable concern about the health and well-being of his family, and the disruption to their living circumstances while this has been addressed. Case No: 493976 Determination Page 8 of 10 3 Supporting information 3.1 Expert reports Record Key points FSP’s expert ( KA ) Report 18 - 07 - 17 „We attended site on the 18/ 07 / 2017 … The Flooring and frames were soaked. Today the area is dry but clear evidence of Mould can be found wit h in the home and under the floor b o ards. […] From the evidence of site and the particle counts I believe there is Mould in the home and certainly on the underside of the floorboards which requires treatment.‟ [sic] FSP’s expert ( KA ) Report 27 - 07 - 1 7 „As per [ML] results from samples taken from site, mould is present at the property. Results show, as per our original report that the mould is predominately on the underside of the floorboards. The chart below shows that it mould is elevated in the hall way subfloor.‟ [sic] FSP’s expert ( KA ) Report 29 - 08 - 17 „We attended site on the 15 – 17th Aug 2017 … to perform Mould Remediation to the home following our previous visit which established the presence of, and extent of Mould within and under the Home. On arrival, we met with [applicant] where we explained the process and timings of the remediation. [Applicant] did ask us how we could get Mould out of wood as he believed it was within the wood itself. I explained the Mould could not live within the wood as he believed it needed Oxygen to live however, any Mould on the surfaces would be treated. Further I ex plained we would be running Ozone throughout & under the property and once we finish they would be able to smell the remnants for a day or so as the home was and would be shut up. […] We performed the remediation which included running Ozone with in the Home, Ozone doesn‟t kill Mould but rather Bacteria etc. which Mould may be living on. We then crawled under the floor boards and cleaned off any Mould we c ould see using scrubbers etc. Any Mould missed would not be an issue as the treatment will kill all Mould any way. Finally, and most importantly we then treated the underside and then internal areas of the Home with Fresche. This product adheres to all surf aces and kills any Moulds & Bacteria‟s as they come into cont act with the surfaces. The Kill is Mechanical Not Chemical which makes the treatment Hyper Allergenic. It is an ongoing treatment as well that would last many more months. Further we left for the ir use a bottle of surface spray which they could use just once a week on their Bench tops […]. On completion, we performed another Las er Particle Count Test… From the …res ults… I am confident there are no abnormal levels of Mould within the property. Applicant’s expert (IP) Report 26 - 10 - 17 „[IP] was requested to attend the site following concerns of the home owner regarding the presence of mould following an Escape of Liquid (EoL) event. The property had been remediated for mould by another Case No: 493976 Determination Page 9 of 10 company who certified the property as clear of mould but undertook no post re - mediation testing. The home owners are concerned that mould is still present and are experiencing health impacts which they feel may be from the mould .. . [ The home owners ] along with the c hildren have since started living in a caravan at the rear of the property but need to access the house from time to time to use toilets and bathroom. […] [ IP ] attended the property on the 6t h of October to carry out the inspection and obtain mould swab sampling for further testing. [ IP ] sent our samples to [ML] i n Sydney for culturing and analysis. The report from [ML] alerted us to positive readings in the kitchen, under the floor and the back side of the floor coverings. Other tests taken from areas w ithin the hallway indicate that there is … well below minimum acceptable standards for indoor environmental health standards. […] The type of mould indicated on the results from [ML] are “Penicillium”, this is a commonly found species of mould and can be pat hogenic when found in large volumes as indicated by the test results. Scope of Works Based upon our investigation and the mould sampling results we recommend that once appropriate cont ainment be installed and the entire kitchen area be stripped out this includes flooring and kitchen cabinetry removed and disposed from site. … we will als o install HEPA filters to control and assist in removing airborne particles and reduce the potential for spreading or cross contamination of mould. Applicant’s expert ( IP) Email 30 - 11 - 17 The remediation process completed by the previous contractor [KA] would be considered inadequate based on the results achieved, especially when referenced to the IICRC methodology in the S520. …there is an unknown contaminant in the property which may or may not relat e to the insured‟s event. the only way for this to be determined is for an indoor air monitoring program to be established. 3.2 Excerpt JP Scope of Works dated 3 August 2017 TRAD E SUMMARY DESCRIPTION OF WORKS KITCHEN at 3.7x4.3x2.4 METRES Carpenter Remove skirting boards and door architraves and dispose of. Cabinet Maker Remove and replace cabinetry in full, including base cabinets and associated benchtops, to best matching existing. Case No: 493976 Determination Page 10 of 10 Materials for above description. Carpenter Remove and dispose of floating timber flooring at approximately 16sq metres. Remove solid timber flooring at approximately 16sq met res. Inspect and report on condition of subfloor area. Timber Flooring Supply and install new solid timber flooring (Jarrah) to subfloor area at approximately 16sq metres to best match existing (PC Allowance at $90.00 per sq metres – supply only). Materials for above description. Prepare flooring area for new floating timber flooring. Supply and install new floating timber flooring, including underlay to best match existing at approximately 16sq metres. Materials for above description. Carpenter Supply and install new door architraves and skirting boards to best mat ch existing at approximately 20 lineal metres. Materials for above description. Painter Prepare and paint new skirting boards, door archit raves and door jambs to best match existing. Materials for above description