Text of the determination
Determination
Case No: 493952 Determination Page 1 of 4
Case number: 493952 25 May 2018
1 Overview
1.1 Dispute
The applicant lodged a claim under her Landlords Insurance Policy with the financial
services provider (FSP) for storm damage to the front deck attached to her house.
The claim was assessed by the FSP and liability was declined. The FSP found no
evidence of storm damage to the deck and says the damage was caused by factors
such as wear and tear and corrosion which were excluded under the policy.
The case manager provided the parties with a recommendation on the issues in
dispute. The recommendation was in favour of the applicant. A copy of the
recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
I have considered all submissions in this dispute including the further submissions
provided after the recommendation. I am satisfied that the findings contained in the
recommendation were correct and are adopted in this determination.
Is the FSP entitled to decline the applicant’s claim?
The FSP has not established exclusions apply to the applicant‟s claim.
It has been identified that a water proof membrane was not applied to the applicant‟s
deck. I am therefore satisfied the applicant has established a valid claim for
„accidental loss or damage‟ , which is defined as an unforeseen and uncontrollable
incident.
1.3 Determination
This determination is in favour of the applicant.
I agree with the case manager‟s reasons for the recommen dation and the
recommended outcome.
The FSP is required to pay $32,238.97 , based on the applicant‟s deck repair invoice
dated 30 March 2017.
In accordance with section 57 of the Insurance Contracts Act (the Act), the FSP is
required to pay interest from 30 March 2017.
Case No: 493952 Determination Page 2 of 4
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
recommendation. I am satisfied that the documentation I have relied on has been
provided to both parties.
I am satisfied that the case manager‟s recommendation contains an accurate
summary of the dispute, the issues to be determined, any applicable paragraphs of
the Terms of Reference and any relevant law.
Further submission provided after the recommendation
The FSP rejected the recommendation and where relevant, this material is referred
to in the determination.
2.2 Is the FSP entitled to decline the applicant’s claim?
The policy provides cover for accidental damage or loss
The applicant‟s policy provides cover for insured events and accidental loss or
damage, subject to conditions and exclusions.
Accidental loss or damage is defined as:
Damage to, loss or destruction of your buildings or contents caused by an unintentional act,
or an unforeseen or uncontrollable incident.
Based on this definition, I consider the applicant has established a prima facie claim.
Once so established, the onus shifts to the FSP to prove on the balance of
probabilities an exclusion applies if it seeks to deny or limit its liability for the loss.
FSP must establish policy exclusions relied on apply
In the context of this claim, the FSP must establish the damage was caused by:
gradual deterioration, wear and tear
rust and corrosion.
Alternatively, the FSP must establish the following exclusion can be applied:
inherent defect, faulty design, structural defects or poor workmanship.
FSP relies on its expert reports
The FSP had „BS‟ builders and „CR‟ en gineers attend the insured property to
determine the cause and extent of damage.
Both reports confirm:
t he deck to the applicant‟s property has incurred severe water damage as a
result of rainwater penetrating the deck
Case No: 493952 Determination Page 3 of 4
supporting timbers have decayed
water has leaked through fibre cement sub-straight fitted to joists which is tiled
over
there is no water proof membrane
the home was built in 1996
had a water proof membrane been installed, water ingress into the cavity of the
deck would not have occurred.
The FSP declined to the applicant‟s claim citing the following exclusions appl y to the
cause of the damage.
When we will not pay a claim under your policy
…
1. f. Wear and tear
arising out of depreciation, gradual deterioration, wear and tear ;
…
2. d. loss or damage which is caused directly or indirectly by:
…
rust, corrosion, algae, mould or mildew; or
…
The FSP says if accidental loss or damage is considered to be the cause of the loss,
then the following additional exclusion applies to the claim.
g. Inherent defects
caused directly or indirectly through inherent defect, faulty design, structural
defects or poor workmanship;
FSP have not established policy exclusions
When reviewing the information provided by the FSP, a common factor confirmed by
the parties is that a waterproof membrane has not been applied to the deck.
The FSP says in its additional response if „ accidental loss or damage ‟ is considered
the cause, the exclusions will still apply.
The FSP‟s further submission states the lack of a water proof membrane is only a
contributing factor, the dominant cause of the loss is the rust and steel beam.
I do not agree with this. As identified, the cause of the loss is not having the
waterproof membrane in place to stop the penetration of water. The co rrosion and
wear and tear have come after the cause has been identified.
CR in its report have confirmed;
5.4.6 It is our opinion that if a water proof membrane had been installed, water ingress into
the cavity of the deck would not have occurred.
The evidence does not support a finding that the damage was due to wear and tear
or loss or damage was caused by rust, corrosion, algae, mould or mildew
Therefore, I am satisfied the FSP has not established an exclusion applies to the
applicant‟s claim.
Case No: 493952 Determination Page 4 of 4
Additionally, the FSP say if the claim is to be considered as „accidental loss or
damage ‟ the claim can be excluded as the damage was the result of an inherent
defect, faulty design, structural defect or poor workmanship. However, a judgement
on this issue must be made considering of the standards that applied at the time of
the construction of the deck. There is no evidence that the deck was poorly
constructed, had a faulty design, structural defect or inherent defect other than the
lack of the waterproof membrane.
CR in its report has cited the current standard for the installation of a waterproof
membrane is AS4654.2-2009 Waterproof membrane systems for exterior use. This
standard did not exist when the home was built in 1996.
I am satisfied the deck was constructed in accordance with the standards that
applied at that point in time. Accordingly, the additional exclusion of an inherent
defect or poor workmanship does not apply.
As stated previously, „accidental loss or damage‟ is defined as an unintentional act,
or an unforeseen or uncontrollable incident. As the applicant was not aware that a
membrane was not in place, the damage could not have been foreseen and was
uncontrollable.
I am satisfied the FSP has not established any exclusion applies to the applicant‟s
claim and It is required to meet the applicant‟s loss.
Recommendation
Case No: 493952 Recommendation Page 1 of 11
Case number: 493952 26 February 2018
3 Overview
3.1 Dispute
A broker (PM) represents the applicant in this dispute. For simplicity, this
recommendation will refer to the applicant and her broker collectively as the
applicant.
The applicant says a storm damaged a deck at her insured property. She wants the
financial services provider (FSP) to pay for the cost to repair the deck damage.
The FSP declined her claim. It says the deck damage was not caused by a storm (or
any other insured event).
3.2 Issues and key findings
Has the applicant established a claim?
The applicant has established a valid claim within the terms of the policy. The policy
provides cover for accidental loss and damage and it is not in dispute the applicant
did not intend for the deck damage.
Is the FSP entitled to decline the claim?
The information shows the proximate cause of the deck damage was the lack of
waterproofing membrane. The FSP has not established wear and tear, rot and
corrosion (policy exclusions) proximately caused the deck damage.
As such the FSP is not entitled to decline the claim.
3.3 Recommendation
This recommendation is in favour of the applicant.
The FSP is required to pay:
$32,328.87, based on the applicant‟s deck repair invoice (dated 30 March 2017)
interest on this amount, from 30 March 2017 (date of the invoice) until the day
the amount is paid.
Case No: 493952 Recommendation Page 2 of 11
4 Reasons for recommendation
4.1 Has the applicant established a claim?
The applicant has established a valid claim under the terms of the policy
The applicant‟s policy provides cover for damage caused by insured events. It also
provides cover for accidental damage.
The product disclosure statement (PDS) sets out the term of cover. The relevant
sections are set out in section 3.1 of this recommendation.
The policy defines accidental loss and damage as damage caused by an
unintentional act, or an unforeseen or uncontrollable incident.
It is not in dispute:
the deck was damaged; rusted steel beam, rotted timber joists, etc
the applicant did not intend for this deck damage.
The FSP says the deck damage was not caused a storm event.
In considering whether the applicant has established a claim, it is unnecessary to find
whether a storm event caused the deck damage. This is because the applicant‟s
policy provides cover for accidental damage.
The applicant has established a valid claim.
4.2 Is the FSP entitled to decline the claim?
FSP say several exclusions apply in the circumstances
As the applicant has established a valid claim, the FSP bears the onus of
establishing, on the balance of probabilities that a policy exclusion applies.
The FSP is not denying the claim for faulty design or poor workmanship (final
decision letter dated 27 February 2017).
Instead, the FSP says it can decline the claim because of the application of following
policy exclusions:
wear and tear
rot
corrosion.
Information available does not support the application of the exclusions
The information available does not support the FSP‟s position that any of the above
policy exclusions apply.
There is much discussion between the parties as to whether wind from a 2010
severe storm could have flexed the deck. However I am not persuaded on the
information available this was the proximate cause of the water ingress.
Instead, the information shows it was more likely the proximate cause of the damage
was the lack of waterproofing membrane.
Both parties agrees water entered the decking cavity for many years.
Case No: 493952 Recommendation Page 3 of 11
The FSP‟s builder (RS) says water ingress occurred because there was no
installation of a water proofing membrane, or that membrane has failed due to age.
The FSP‟s engineer (CR) went further to confirm there was no water proofing
membrane installed. CR:
found there was no membrane against the wall of the residence, around the
steel posts, nor was the membrane visible from under the decking
says if there was water proofing membrane, then it should be evident
says if water membrane had been installed, then no water ingress into the deck
cavity would have occurred.
I am persuaded by CR‟s view of how the deck damage occurred. His report is
thorough and logical, and supported by many colour photographs.
Havi ng regard to CR‟s view, I am not satisfied the lack of waterproofing membrane
can be characterised as any of the policy exclusions relied upon by the FSP (wear
and tear, rot, corrosion).
FSP liable for the deck damage
Therefore, the FSP is liable to cover the applicant‟s claim for the deck damage. This
is because:
the applicant has established a valid claim, and
the proximate cause of the deck damage is not excluded by the policy
exclusions relied upon by the FSP.
The applicant has provided a repair invoice for the deck totalling $38,128.87 (dated
30 March 2017).
He accepts the work for the aluminium balustrades, painting of pitched ceiling above
the deck and waterproofing the deck is not covered (betterment). He agrees not to be
paid for these items. Adjusting for this, the applicant is claiming for $32,528.87 less
excess.
The FSP is required to cash settle the deck damage for $32,528.87 less $200 (the
applicable excess).
The applicant advised FOS he does not wish to claim for any other cost nor interest.
However, given the FSP is required to cash settle claim, in accordance with section
57 of the Insurance Contracts Act 1984 (the Act), the FSP is required to pay interest.
It is required to pay interest on the sum $32,328.87 from 30 March 2017 (date of the
invoice) until the day the amount is paid.
Case No: 493952 Recommendation Page 4 of 11
5 Supporting information
5.1 Key policy wording
Types of loss or damage your buildings are covered for
We will cover your buildings against loss or damage caused by one or more of the insured
events occurring during the period of insurance. We will also cover you for the other
benefits listed below. Details of the terms, conditions and exclusions which specifically
relate to each insured event and other benefits are detailed on the pages indicated.
…
Insured events we will pay
…
2. Accidental loss or damage
(Applicable whether you have buildings and/or contents cover)
We will pay for accidental loss or damage, unless it is caused by:
a. an event otherwise excluded under sections “Insured events we will pay” on pages 25
to 32 or “When we will not pay a claim under your policy” on pages 51 to 54
…
10. Storm, rainwater or run-off
(Applicable whether you have buildings and/or contents cover)
We will pay for loss or damage caused by storm, rainwater or run-off.
We will not pay for loss or damage:
…
g. caused by water seeping, percolating or otherwise
penetrating into the buildings as a result of:
• structural defects;
• faulty design of the buildings;
• faulty workmanship in the construction of the buildings; or
• you r failure to adequately maintain the buildings;
…
Words with special meanings
Some of the words in this policy have special meanings wherever they appear. These
words and their meanings are defined below.
“ accidental loss or damage” means damage to, loss or destruction of your buildings or
contents caused by an unintentional act, or an unforseen or uncontrollable incident.
…
“ storm ” means violent wind (including cyclones and tornadoes), thunderstorms and hail
which may be accompanied by rain or snow.
When we will not pay a claim under your policy
This policy does not cover loss, liability, injury or damage
Case No: 493952 Recommendation Page 5 of 11
...
f. Wear and tear
arising out of depreciation, gradual deterioration, wear and tear;
…
Unless we state differently in your policy, we will not pay for:
…
d. loss or damage which is caused directly or indirectly by:
…
• rust, corrosion, algae, mould or mildew; or
…
5.2 Key invoices
Invoices Key points
Applicant’s builder (NI)
Invoice
30 - 03 - 2017
Replace existing solid deck with open trex composite
decking ( 7.5 x 3.8m)
Remove existing floor tiles and FC sheet and joists,
remove existing steel reinforced ballustrade that
penetrates existing floor sheets, remove and replace 7.5
m long x310mm I beam, waterproof exterior where joists
penetrate brickwork and cladding facade.
Make good
- 310mm x7.5 I beam
- Remove and Replace subfloor structure and brace up
as required
- facia around deck and I beam
- Replacement of balustrade with white aluminium slats
(as per front fence)
- Set, sand and paint the pitched cei ling above deck
Remove and dispose of all waste
$34,200.00
QBCC Home Warranty Insurance $462.70
$38,128.97 in total
Applicant’s builder (NI)
Letter
13 - 10 - 2017
In relation to the repair/replacement of the deck, the cost
breakdown is listed below:
• Set, sand and paint pitched ceiling $1750 inc gst
• Aluminium balustrade instead of timber $2200 inc gst
Case No: 493952 Recommendation Page 6 of 11
5.3 Key reports
Record Key points
FSP’s builder (BS)
Report
2 - 02 - 2017
In my opinion, it would appear that damages have
been present for a period of up to 10 years. An
engineer maybe able to validate this if required by
the degree of damage to the steel beam and the
time hardwood timbers take to complet ely decay.
In my opinion, damages were caus ed by long term
exposure to wat er entering the cavity of the deck
and bulkhead surrounding the steel beam. It would
appear water proofing to the posts and
sheet joins was inadequate / failed due to age or
was never installed. It is likely every time it has
rained water has entered causing the gradual
deterioration o f the timber and steel components.
FSP’s builder (BS)
Report
2 - 02 - 2017
As the lining material to the underside of the deck
had been removed by [IA] it was easy to see what
has occurred.
It would appear by the damage sighted that water
has been ent ering th e decking cavity and that of
the supporting structural beam for many years
which has resulted in the decay of supporting
timbers and the rusting of the steel beam.
The rain water has entered around the supporting
posts to the building and handrail, there i s also
signs water has leaked through the joins of the
Fibre cement sub - straight fitted to the joists which
is tiled over. We suspect either a water proofing
membrane was not installed at the time of
construction or it has since failed due to age.
The stee l supporting beam which is a 300 x 165 I
Beam shows sever rust damage directly below the
penetrations in deck by the 100 x 100 steel post
supporting both the upper roof and handrail. The
hardwood joists (140 x 45) are also totally rotted
through in the aff ected areas.
The damage is such that the deck and supporting
beam will require removal and replacement. It is
likely the slider door and cladding to the external
wall of the dwelling will require removal and
reinstatement to allow for the installation of w ater
proof membrane to meet current building codes.
We believe the damage has been gradual in nature
and has occurred over a significant period of time.
Applicant’s engineer
(KC)
Letter
4 - 05 - 2017
An inspection was carried out on the existing beam
under th e front main deck on 3/3/2017. This beam
is excessively corroded and beyond repair. The
amount of corrosion to this beam would have been
Case No: 493952 Recommendation Page 7 of 11
occurring over at least the past 5 - 7 years.
The beam at the time of the inspection was clearly
visible as the facade ha d been removed by the
builder. The remaining framing around this beam
would indicat e that the beam was not visible before
the demolition works had commenc ed.
Applicant’s builder (NI)
Letter
13 - 10 - 2017
The existing tiled deck was most definitely affected
b y a severe storm or the like to inflict the level
initial damage to the subfloor. This would have
been caused by a flexing of the structure which in
turn cracked the tiles/glue and separat ed the
sealant from the steel posts.
This damage would not have been picked up by
any reas onable person whether it be a builder, or
an engineer until it was determined that further
inspection needed to occur and the sheeting
demolished from under the deck to expose the
joists and beam.
In relation to the integrity of t he existing deck, this
would have been designed and built to building
code of the time.
FSP’s engineer (CR)
Report
23 - 10 - 2017
Wind damage
It was claimed by the builder for the Insured (NI &
BS, 13 October 2016) that the tiled deck was „most
definitely a ffected by a severe storm or the like to
inflict the level initial damage to the subfloor. This
would have been caused by a flexing of the
structure which in turn cracked the tiles/glue and
separated the sealant from the steel posts‟.
We have reviewed the wind gust data documented
by the Bureau of Meteorology for 2010 - 11 in the
local area. The weat her station relative to the
residence is at „Brisbane Airport‟ (station number
40842) located 9. 4 kms away. The largest wind
gust recorded in the period from 1 De cember 2010
to 28 February 2011 was 72.4 km/hr on 17
December 2010 (see Appendix B, Tec hnical Data
Supplement ).
We have calculated the design wind speed for the
property as 186 km/hr (51.9 m/s) based on
AS1170. 2 Structural design actions Part 2: Wind
actio ns and a Terrain category of 2 for the location.
The design wind speed for the property is two and
a half times the wind speed for the wind event in
2010.
Calculation of the deflection of the floor joists due
to the level of wind loading received in 2010 g ives
a deflection of less than 1 mm at midspan, less
than span/300 = 11.5 mm, which is the accepted
deflection limit for timber floor joists. Similarly,
Case No: 493952 Recommendation Page 8 of 11
calculation of the deflection of the steel beam due
to the wind received in 2010 gives a deflection of
less than 1 mm at midspan, less than span /300 =
24 mm.
It is our opinion that the level of wind loading
received from the short term wind event in 2010
was much lower than the design wind loading. It is
our opinion that the wind event was not the cause
of damage to the deck and subsequent wat er
ingress into the deck.
We have taken into consideration the effects of
localised wind gusts which may be higher than the
maximum wind gust measured at „Brisbane
Airport‟. We are of the opinion a maximum wind
gust lo cated at the Insured property, during the
alleged storm event, was insignificant relative to
the design wind speed of the structure.
Water proof membrane
We have reviewed the reports and images from NI
BS and there were no signs of a waterproof
membrane in stallation observed on the original
deck i.e. turn up of the membrane against the wall
of the residence or around the steel posts or
installation visible from under decking.
The current standard for the installation of a
waterproof membrane is AS4654.2 - 200 9
Waterproof membrane systems for exterior use –
Above ground Part 2: Design and installation, is
applicable but did not exist when the residence
was constructed.
The Australian standard for installation of a
waterproof membrane at the time of construction of
the residence in about 1996 was AS CA55 - 1970
Design and Installation of bituminous roofing. AS
CA55 states: -
Timber 3.4.3 “The deck shall be rigid and so
designed as to minimize any effects of shrinkage,
warping and relative movements of the timber, an d
care shall be taken to guard against conditions
promoting decay, such as ingress of water”.
The top of the timber deck was clad with ceramic
tiles. The grout between the tiles is not waterproof.
The underlay to the tiles was fibre cement
sheeting. The sheeting joins were not sealed and
so the sheeting was not waterproof.
Deterioration of the cladding to the underside of
the deck was observed in October 2016 (see
Photograph 12) during the Nailed It inspection. The
damage was observed at various locations around
the deck. Corrosion damage from long term water
ingress was observed at the front of the deck
Case No: 493952 Recommendation Page 9 of 11
around the steel posts (see Photographs 7 & 11).
Previous repairs were observed at the cracked tiles
around the posts (see photographs 8 - 10). The tile
aro und the southeast steel post was observed to
be stepped vertically at the cracking and would
have been visible over the long term to vis ual
inspection. It is our opinion that water was
penetrating the deck over the long term due to the
ingress of water in to the deck and the damage to
the tiling on the deck and sheeting to the underside
of the deck was visible over the long term.
It is our opinion that if a water proof membrane had
been installed, water ingress into the cavity of the
deck would not have occ urred.
Applicant’s engineer
(KC)
Letter
5 - 12 - 2017
An inspection was carried out on the existing beam
under the front main deck on 3rd Marc h 2017. This
beam is excessively corroded and bey ond repair.
The amount of corrosion to this beam would have
been occ urring over at least the past six to seven
years.
The beam at the time of the inspection was clearly
visible as the facade had been removed by the
builder. The remaining framing around this beam
would indicat e that the beam was not visible before
the demol ition works had commenc ed.
A second inspection was carried out by a builder
on 5th December 2017 to investigate the base of
the existing columns to the front deck. These
columns were found to be buried below ground by
about 500mm and have a top fixing to a concrete
footing below. The orient ation of the base plate
and bolts is perpendicular to the beam above. The
columns are 100x4.0 SHS and main deck beam
running at deck level is 310UB40. The upper
columns are 2.7m long and the bottom columns
are 3 .2m long. The base fixing of the columns is
pinned and the fixing of the lower columns to the
main beam are also pinned.
Due to the pinned connections the stability of the
deck is wholly reliant on the bracing in the floor and
ceiling.
The resistance by the floorin g and ceiling, is a
similar action to wall bracing, which will trans fer the
wind load as a shear force back to the front wall of
the dwelling. This in tum creates local stresses in
the comers of the deck. As the upper columns are
within the comer they loca lly increase this stress
concentration due to the reduction in total area
where they are locat ed.
Without knowing how the tiles and FC sheeting
Case No: 493952 Recommendation Page 10 of 11
were fixed, we can only comment on a possible
cause. A severe storm event will impose loads and
the deck/ceiling must deflect to take up these
applied loads. As the flooring and tiles are brittle
any small amount of deflection could potentially
cause a fracture/crack in the tile and thus allow
water ingress into the floor cavity. The builder
before demolition notice d cracking locally around
the base of the upper columns in the tiles and
these could have pot entially been from these
movements. Once this has occurred any further
rain and/or storm events will allow continued wat er
ingress into the concealed floor space.
FSP’s engineer (CR)
Report
7 - 1 - 2018
The deck was 7.2 metres long across the front of
the residence and projects outwards approximately
3.5 metres from the fac e of the residence. The
deck was originally sheeted wit h fibre cement
sheeting under the tiling t o the top of the deck, and
under the floor joists. The floor joists are attached
to the residence at 450 mm centres. It is our
opinion that the structural configuration of the deck
cantilevering horizontally 3.5 metres while 7.2
metres deep, would not offe r any significant
deflection that would cause stress at the
connections of the support columns to the deck
from flex ure of the columns. The arrangement of
the deck attached to the face of the residence at
every joist and sheeted top and bottom has formed
a very stiff projection from the residenc e. There
was no damage noted at the face of the residence
that could be expected from horizontal movement
of the deck. It is our opinion that the deck did not
undergo any horizontal movement relative to the
residence due to the wind event. It is our opinion
that that there was no horizontal stress induced
into the columns during the wind event and that
there was no inc reas e in “local stresses in the
corners of the deck” during the wind event, due to
horizontal movemen t of the deck.
The initial CR report calculates the midspan
deflection of the floor joists due to the wind event
to be less than 1 mm, far less than the accept ed
design deflection limit for the timber floor joists, of
over 11 mm. It is our opinion that def lection of the
deck due to the storm event is not the cause of the
fractures in the tiles.
The Australian Standard for installation of a
waterproof membrane at the time of construction of
the residence in about 1996 was AS CA55 - 1970
Design and Installation of bituminous roofing. AS
Case No: 493952 Recommendation Page 11 of 11
CA55 states: -
Timber 3.4.3 “The deck shall be rigid and so
designed as to minimize any effects of shrinkage,
warping and relative movements of the timber, and
care shall be taken to guard against conditions
promoting decay, such as ingress of water”.
As stated in the initial CR report, it is our opinion
that water was penet rating the deck over the long
term due to the ingress of water in to the deck and
the damage to the tiling on the deck and sheeting
to the underside of the deck was visible over the
long term. It is our opinion that if care had been
taken during construction by the installation of a
water proof membrane (as recommended by the
Australian Standard), water ingress into the floor
cavity of the deck would not have occ urred.
The cracking to the tiles around the columns was
observed in the BS images (dat ed Feb 2017, see
Appendix A, Photographs 8 - 10) in the initial CR
report to have been subject to previous repair
attempts by the Insured using sealant.
Australian Standard AS3958.1 - 1991 Ceramic tiles -
Guide to the installation of ceramic tiles (relevant at
time of construction), requires the following:
“Intermediate movement joints should be provided
in evenly - spaced positions at approximately 4.5 m
centres, or at locatio ns where stress might
reasonably be expected in; internal floors, where
any dimension exceeds 9m or 6m if subjected to
sunlight; and external floors where any dimension
exceeds 4.5m”.
There were no movement joints in the tiling to the
deck observed in the photographs supplied. The
overall length of the deck was 7.2 metres and so
should have had at least one movement joint in
that length. It is our opinion that the cracking in the
tiles at the columns could have been caused by the
absence of movement jointin g in the tiling.