Home / Financial Firm (Unknown - Insurer) / Determination 493925

Determination 493925

Concrete pump boom weld defect: claim part-denied and FSP conduct in pursuing recovery

FirmFinancial Firm (Unknown - Insurer)
Decided2018-07-31
ProductGeneral Insurance · Business / commercial
OutcomeFor the complainant in part
Amount awarded$28,974
Non-financial loss$2,000
Amount claimed$100,000
SourceAFCA PDF

Summary

The applicant's concrete pump was damaged and the FSP denied the defective boom weld repairs, then pursued and abandoned a recovery action against the manufacturer. AFCA ordered $28,974 for direct repair costs, interest, and $2,000 non-financial loss, but refused consequential loss of revenue and interest.

Defective parts are excluded under the policy, but the FSP's conduct in initiating and abandoning recovery proceedings caused direct financial loss, while consequential loss was not covered by the schedule.

Issues

Subjects and remedies

small businesspay claimpay interestpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 493925 Determination Page 1 of 8 Case number: 493925 23 July 2018 1 Overview 1.1 Dispute The applicant held an Industrial Special Plant Policy with the financial services provider (FSP) and lodged a claim in May 2014 after the insured machine, a concrete pumping unit (CPU), sustained damage on 26 March 2014. The FSP identified that there were a number of boom welds that did not meet relevant Australian standards and required repair in addition to the claim related repairs. The defective boom welds were considered to be a manufacturing or design fault or defect for which the FSP denied liability. Repairs were eventually completed and the applicant resumed possession of the CPU on 25 February 2016. The applicant now seeks compensation due to the delay in completing the repairs and the FSP’s handing of the claim. The applicant claims to have suffered additional losses including additional repairs, interest and loss of revenue. The FSP says the additional repair work required was due to structural defects and defective design which are excluded under the terms of the policy. With respect to the loss of income and interest payments, the FSP denied liability as the policy schedule did not include ‘financial protection’ to cover the consequential losses claimed. 1.2 Issues and key findings Is the FSP liable for the additional repairs? Yes, the panel is satisfied that as a result of the FSP’s conduct of the claim the applicant has suffered a direct financial loss relating to the cost to repair the weld and sand blast and paint the pump chassis in the sum of $28,974. The FSP is otherwise entitled to deny liability for the balance of the uninsured repair cost. Is the FSP liable for the loss of income? No, the policy does not provide cover for consequential financial loss. Whilst the panel accepts there were delays in the repair process, the panel accepts that both parties contributed to those delays. Case No: 493925 Determination Page 2 of 8 Is the applicant entitled to compensation for non-financial loss? Yes, the panel accepts that the applicant has suffered an unusual degree of time taken in resolving this claim and considers an award of compensation for non- financial loss of $2,000 is appropriate. 1.3 Determination This determination is substantially in favour of the applicant. The FSP is to pay the applicant the sum of $28,974 plus interest calculated in accordance with section 57 of the Insurance Contracts Act 1984 (the Act) from 25 February 2016 to date of payment of the claim. In addition, the FSP is to pay the applicant the sum of $2,000 by way of compensation for non-financial loss pursuant to paragraph 9.3 of the Terms of Reference. The FSP is otherwise entitled to refuse liability for the applicant’s claim with respect to loss of revenue and consequential loss. Case No: 493925 Determination Page 3 of 8 2 Reasons for determination There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues that arise from the information exchanged. Due to the complexities involved in this dispute, it has been referred directly to a panel for determination in accordance with the Terms of Reference . In reaching this determination, the panel has taken into account all relevant information. This determination is based on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and prior determinations where applicable. 2.1 Did the FSP’s conduct result in the applicant suffering direct financial loss Policy does not cover damage caused by a defect of a part The applicant’s policy is an Industrial Special Plan Policy. The policy provides cover for damage to a machine. ‘Machine’ is defined under the policy as an item of machinery identifi ed in the schedule for the purposes of one or more of the sections 1 to 5 including any attachment acquired by the insured with or for the machine that:  is identified in the schedule  is permanently attached to the machine or… There is no dispute that the CPU was an insured machine for the purposes of the policy and insured under section 1 of the policy for damage. ‘Damage’ is defined as ‘1. Sudden and unexpected physical loss, damage or destruction of a machine, but excludes breaking, distortion, ceasing, failure or break down of a part of a machine caused by a defect of the part (whether Break down Damage or otherwise) or …’ The FSP notified the applicant in June 2014 that it would accept liability for the repairs. It was during the stress testing of the boom sections that the FSP identified through its engineer that around half of the boom welds did not meet Australian standard – AS1554. The panel accepts that the defect in the welds was a defect of a part and therefore not covered under the terms of the po licy. FSP acted fairly in offering to settle claim On 21 July 2014 the FSP notified the applicant’s broker that it would not be paying for the weld repairs and that the decision as to whether to seek recovery from the manufacturer be at their discretion. Case No: 493925 Determination Page 4 of 8 The following day, the FSP agreed to meet the repairs identified by FC ($49,500 plus GST) and CE ($28,000 plus GST). The FSP also notified the applicant that the cost of the repairs to the welds to be undertaken by CE which were non-compliant was $14,000 plus GST. The applicant accepted the offer however the repairs did not commence as the applicant did not pay the $14,000 for the repair of the defective welds. The panel accepts that up until this stage, the FSP had acted fairly and appropriately although acknowledges that there was some initial misleading information about the likely costs to repair the defective welds. The FSP prevented the applicant from resolving the dispute with the manufacturer Whilst the applicant had not paid the cost to repair the welding defects, the applicant was negotiating with ZE. On 21 November 2014 ZE made a without prejudice offer to the applicant as follows: ‘without any admission as to liability, the manufacturer (E) and the CPE are willing to settle this matter on the following terms: 1. the manufacturer will either repair or pay to have repair the non-compliant welds up to a maximum of AUD$14,000 2. the manufacturer will provide written confirmation that the repair to the boom is not acceptable and they will not warranty the repair as it stands 3. the manufacturer will provide a written recommendation that a new boom section be used 4. the manufacturer agrees that if for some unforeseen reason a new boom is not used, it will supply a proposal which shows a drawing of reinforcement and a procedure to adequately repair the old section 5. the manufacture agrees to supply too (II) upgraded rams free of charge for third and fourth stage 6. upon receipt of (applicant’s) written acceptance of this offer, (applicant releases and discharges E and CPE from any and all causes of actions, claims, demands and complaints that arise out of or are in any way connected with the boom failure which occurred on 26 March 2014.’ The applicant through his broker forwarded this email on to the FSP. The FSP replied on 27 November 2014 and said it was in receipt of an engineer’s report into the possible causes of the incident. It alleged that the faulty welds may have contributed to the incident and as such, the FSP would look to recover its costs from the manufacturer. The FSP asked the applicant to halt any further discussion with the manufacturer until such time as its lawyers provided a formal advice. Effectively, the FSP prevented the applicant from resolving the dispute with ZE in respect of the defective welds. Case No: 493925 Determination Page 5 of 8 FSP failed to protect the applicant’s interests Although the FSP’s lawyers wrote to ZE, the lawyers for ZE denied any liability and withdrew the without prejudice offer. This was communicated to the FSP lawyers on 19 February 2015. There was no clear communication to the applicant after that date as to whether any proceedings had commenced against ZE. In or around June 2015 the applicant agreed with the FSP that he would pay for the uninsured repairs. An email from the FSP’s lawyers dated 5 June 2015 ind icated that the FSP was still keen to further explore possible grounds of prosecuting a recovery against ZE. It was not until October 2016 that the applicant was informed by the FSP that it no longer intended to pursue a recovery action against ZE. It claimed the legal costs would be around $11,000 and there was not a decent chance of success. No explanation has been provided by the FSP for this delay in the process. The panel is satisfied that as a result of the FSP’s conduct, the applicant has been placed in a position where he has lost the opportunity to accept the settlement offer made by ZE. Although it may be still open for the applicant to bring legal proceedings against ZE, the FSP through its lawyers no longer considered that such proceedings had a decent chance of success. It is unreasonable in these circumstances to expect the applicant to commence proceedings against ZE. In the panel’s view, the FSP failed to properly protect the interest s of the applicant by initiating and then later abandoning the recovery action. As a result of the FSP’s actions, the applicant has suffered a direct financial loss. The FSP prevented the applicant from accepting the without prejudice offer that would have covered the cost of the uninsured repairs. The offer was withdrawn by ZE’s lawyers once the FSP became involved. If any negotiations occurred the details have not been disclosed. The panel determines the FSP should pay the applicant for the cost of the repairs to the defective welds in the sum of $17,479. The panel also determines that the FSP should pay the applicant’s costs for the sandblasting and painting of $11,495. In relation to the other repair costs claimed by the applicant, the panel is not satisfied there is any evidence linking those costs to the claim or the actions of the FSP. 2.2 Is the FSP liable for consequential loss including loss of revenue and interest repayments? Applicants policy does not cover financial protection The policy includes optional cover under section 4 cover for financial protection which is defined as the consequential loss that incurs during an indemnity period in the event of a damage or break down. The insurer is not liable to provide cover under the section unless it is shown in the policy schedule. The applicant’s pol icy schedule does not include cover under section 4 for financial protection. Case No: 493925 Determination Page 6 of 8 FSP’s conduct has not caused consequential financial loss The panel has considered whether the FSP’s conduct in this matter has caused direct financial loss. The panel accepts t he FSP’s conduct prevented the applicant from accepting a fair and reasonable offer that had been made by ZE to resolve his claim for the uninsured damage. However, the panel is not satisfied that the delays in repairing the CPU which caused consequential loss were due solely to the conduct of the FSP. The FSP had the CPU assessed within a reasonable timeframe. The applicant allegedly incurred hiring costs to complete jobs during the period from 27 March 2014 to 5 April 2014. This is prior to the claim lodg ed by the applicant’s broker. Further costs were incurred for a replacement truck purchased on 30 April 2014 for $134,000. Again, these costs were incurred prior to the claim being lodged. The FSP within approximately two months of the claim being lodged, had notified the applicant that it would accept liability for the repairs. It was only during further investigation that the FSP identified the defective welds. Nevertheless, the parties agreed to resolve the claim by 22 July 2014 with the FSP accepting liability for the damage subject to the applicant agreeing to pay $14,000 for the repairs of the uninsured welds. If the applicant had complied with this agreement, then the repairs could have been commenced and it is likely would have been completed within a reasonable timeframe. Whilst the panel accepts the applicant’s right to negotiate at that time with ZE, the applicant could have done this even if he paid for the uninsured repair costs. Again, whilst the panel acknowledges the FSP prevented the applicant from continuing with negotiations with ZE, this did not mean the applicant should not have completed the repairs. In fact, again, it is apparent that by June 2015 the parties have agreed to the completion of the repairs with the applicant again agreeing to cover the costs of the uninsured repair work required. Whilst the panel acknowledges there were delays in the repair process from June 2015, those delays were more related to the actual repairs rather than any conduct of the FSP. In fact, the repairs were completed in December 2015 but the applicant did not take possession of the CPU until approximately 25 February 2016 due to the applicant’s failure to pay for the non-insured repairs. In the panel’s view, the applicant’s conduct has contributed equally. The panel also notes that whilst the applicant has claimed a loss of $100,000, the applicant has not provided any information to substantiate this loss. In the panel’s view whilst the FSP’s handling of this dispute has been poor, in particular its negotiations with ZE, the panel is not satisfied that this conduct has caused the applicant consequential loss of revenue or interest payments. 2.3 Is the applicant entitled to compensation for non-financial loss? Under the Financial Ombudsman Service Terms of Reference paragraph 9.3 compensation may be awarded for non-financial loss where there is an unusual degree of physical inconvenience or time taken to resolve a claim. Case No: 493925 Determination Page 7 of 8 As the panel has indicated, the FSP acted reasonably when initially accepting the claim, but it appears following the intervention of the FSP’s lawyers, that confusion has arisen and delays have occurred. No explanation has been offered by the FSP for the apparent lack of communication with the applicant until the FSP’s decision in October 2016 to notify the applicant that it did not intend to seek recovery from ZE. Until that time, it is reasonable for the applicant to have expected the FSP to have pursued ZE for recovery of not only its costs but also the applicant’s costs as had been agreed. In the panel’s view, not only did the applicant suffer or lose the opportunity to settle its claim with ZE at an early stage but the applicant was also misled as to the events that were occurring. In the panel’s view, this has resulted in a considerable degree of inconvenience and time taken and the applicant should be entitled to compensation for non-financial loss. The panel determines that the FSP should pay the applicant $2,000 compensation for non-financial loss in accordance with the provisions of paragraph 9.3 of the Terms of Reference. Case No: 493925 Determination Page 8 of 8 3 Supporting information 3.1 Relevant law FOS Terms of Reference 9.3 Other compensation a) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial Services Provider compensate the Applicant for consequential financial loss or damage up to a maximum amount of $3,000 per claim made in the Dispute. b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial Services Provider compensate the Applicant for non-financial loss but only where: (i) an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Applicant’s expectation of enjoyment or peace of mind has occurred; or (ii) in the case of a Dispute pertaining to an individual’s priv acy rights - injury has occurred to the Applicant’s feelings or humiliation has been suffered by the Applicant. The maximum amount of compensation for non-financial loss will be $3,000 per claim made in the Dispute. c) Notwithstanding paragraphs 9.3 a) and b), FOS will not provide compensation for: (i) consequential financial loss; or (ii) non-financial loss, In a Dispute arising as a result of a claim on a General Insurance Policy that expressly excludes such liability. d) The cap on liability in paragraph 9.3 a) does not in any way restrict FOS’s ability to make an interest award under paragraph 9.5.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.