Text of the determination
Determination
Case No: 493438 Determination Page 1 of 14
Case number: 493438 1 October 2018
1 Overview
1.1 Dispute
The applicant lodged a claim under her home insurance policy with the financial
services provider (FSP) following a storm in March 2017.
The FSP accepted liability for internal water damage to the property caused by the
storm and cash settled the applicant for $22,485, based on the estimated cost of
repairing the damage. The FSP also paid the applicant $3,480 for temporary
accommodation costs during the repair period.
However, the FSP denied liability for the remainder of the damage to the property,
including deterioration of the waterproof membrane under the concrete slab. The
FSP says this damage was not caused by the storm in Marc h 2017, but by gradual
deterioration over an extended period of time.
The applicant disputes the FSP’s decision. She says the FSP was aware of the issue
with the waterproof membrane several years earlier but failed to notify her.
The applicant says the FSP should be required to repair all of the damage to her
property and pay her temporary accommodation benefits for the full twelve month
period provided under the policy. The applicant is also dissatisfied with the manner in
which the FSP handled her claim.
1.2 Issues and key findings
Is the FSP liable for the damage to the waterproof membrane?
The damage to the waterproof membrane was caused by gradual deterioration over
an extended period of time, due to the ongoing effects of stormwater run-off as a
result of the drainage issues affecting the property. Damage caused in this manner is
excluded from cover under the policy.
The FSP did not breach its obligations to the applicant by failing to advise her of
moisture issues affecting the property during an earlier claim in 2014. The FSP
obtained sufficient information to determine it was not liable for the claim. Further, its
builder’s report was inconclusive about the presence of rising damp at the property.
Accordingly, the FSP is not liable for the damage to the waterproof membrane.
Case No: 493438 Determination Page 2 of 14
Is the cash settlement fair and reasonable?
The cash settlement should be increased by 50% ($11,242.50) to better reflect the
costs of repairing the resulting damage to the property caused by the storm in March
2017.
Is the applicant entitled to compensation?
The applicant is entitled to compensation of $750 for non-financial loss suffered due
to the manner in which the FSP handled her claim.
1.3 Determination
This determination is partly in favour of the applicant.
The FSP is to pay the applicant:
an amount of $11,242.50 in full and final settlement of her building claim, and
an amount of $750 as compensation for non-financial loss.
Case No: 493438 Determination Page 3 of 14
2 Reasons for determination
2.1 Is the FSP liable for the damage to the waterproof membrane ?
Policy provides cover for storm damage subject to exclusions
The applicant is required to show that, on the balance of probabilities, she has
suffered a loss caused by a risk insured against under the policy. This is known as a
prima facie claim.
If the applicant is able to establish a prima facie claim, then the onus shifts to the
FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion
under the policy or is otherwise entitled to deny the claim.
The applicant’s po licy provides cover for damage caused by the insured events listed
in the policy (including storm), subject to the conditions and exclusions set out in the
policy.
The policy schedule confirms that the applicant had selected the optional cover for
accidental damage available under the policy. Under this cover, an incident that gives
rise to a claim for accidental damage (being damage that occurs without intent) is
treated as an insured event.
The policy states that an ‘insured event’ must be a single event , accident or
occurrence with the policyholder did not intend or expect to happen.
The policy contains a general exclusion for damage caused by gradual deterioration,
wear and tear, rising damp or climatic conditions.
Applicant has established a prima facie claim
The reports prepared by the various contractors who inspected the property confirm it
has sustained internal damage, as a result of water entry during the storm.
On this basis, I am satisfied that the applicant has established a prima facie claim for
storm damage.
The FSP has accepted liability for some (but not all) of the damage observed at the
property. The FSP says the remainder of the damage was not caused by the storm in
March 2017, but by factors which are excluded from cover under the policy (such as
gradual deterioration).
However, even if the disputed damage was not caused by the storm, I am satisfied
that the applicant has established a prima facie claim for this damage, given the
broad scope of cover for accidental damage provided under the policy.
In these circumstances, the FSP bears the onus of establishing that, on the balance
of probabilities, it is entitled to rely on a policy exclusion to deny the claim.
In order to do so, the FSP is required to show that the proximate cause of the
damage (that is, the real, effective or operative cause) was gradual deterioration over
an extended period of time.
Case No: 493438 Determination Page 4 of 14
FSP’s investigations identified ongoing drainage issues
When the applicant lodged her claim, she advised that stormwater had seeped
through the weep holes and perimeter walls of her home during the storm in March
2017, causing internal water damage and mould growth.
The engineer (DW) appointed by the FSP to determine the cause of the damage
advised that the applicant’s property was expose d to large volumes of stormwater
run-off on an ongoing basis.
DW noted that stormwater was being diverted from neighbouring properties as a
result of the drainage arrangements implemented by the local council.
Photographs taken over the course of the claim show that the soil around the building
was often saturated, while moisture was evident to the perimeter walls and the
concrete slab (both within and outside the building).
Given the extent of seepage observed, DW queried whether a waterproof membrane
had been installed to prevent moisture from the soil raising through the slab (as a
membrane was not evident during his initial inspection).
Further investigations carried out by the FSP’s builder (RC) confirmed there was a
waterproof membrane under the slab, but it was in a deteriorated condition.
RC excavated an area at the perimeter of the slab to expose a section of the
waterproof membrane. RC reported that the exposed section was flaking away from
the slab and had started to perish. The damage to the waterproof membrane is
apparent from the photographs included in RC’s report.
The FSP’s assessor (BH) considered that the waterproof membrane had rotted over
time due to the constant, high levels of moisture present in the foundation soils, as a
result of the ongoing drainage issues affecting the property. The breakdown of the
membrane resulted in moisture being absorbed through the concrete slab into the
home.
The applicant first contacted the local council about the drainage issues in 2015. The
council has agreed to take remedial works to the open drain near the property but
these works have not yet been carried out.
FSP accepted liability for internal water damage only
The FSP says the damage to the waterproof membrane was not caused by the storm
in March 2017 or by any other single incident (as is required for cover to be provided
under the policy).
The FSP says the damage to the membrane was caused by gradual deterioration
over an extended period of time, due to the ongoing effects of moisture in the
underlying soil. Accordingly, the FSP says it is not liable for the damage to the
waterproof membrane.
The FSP’s consultants reported that the bulk of the internal water damage to the
property was caused by the failure of the waterproof membrane (with the remainder
caused by water entering through the weep holes in the external walls).
Case No: 493438 Determination Page 5 of 14
However, the FSP accepted liability for the internal water damage, based on the
‘unknown defect’ provisions of the policy.
These provisions provide cover for resulting damage where an insured event (such
as a storm) damages the property and an unknown defect (such as the waterproof
membrane) was the cause or part of the cause.
Policy does not provide cover for damage to waterproof membrane
Based on the available information, I am satisfied that the damage to the waterproof
membrane was caused by gradual deterioration over an extended period of time, due
to the ongoing effects of stormwater run-off as a result of drainage issues affecting
the property.
As outlined above, the policy excludes cover for damage caused by wear and tear,
gradual deterioration and climatic conditions. Accordingly, under the terms of the
policy, the FSP is not liable for the damage to the waterproof membrane.
For completeness, I have considered whether the applicant may be entitled to cover
under the accidental damage provisions of the policy, on the basis that the drainage
issues at the property were caused by the actions of the local council (which could
potentially constitute an ‘insured event’ under the policy).
However, based on the information provided, it appears that the drainage
arrangements which resulted in the diversion of stormwater run-off towards the
applicant ’s property were implemented many years ago. Accordingly, these works did
not occur during the period the applicant owned the property or held cover under the
policy.
Applicant says FSP failed to advise her of issues in 2014
The applicant says the FSP should be liable for the damage to the waterproof
membrane because it breached its obligations to her in relation to a separate claim
she lodged in 2014.
The applicant says the FSP failed to properly assess the earlier claim and advise her
of the issues with the waterproof membrane. She says that, had the FSP made her
aware that the waterproof membrane was deteriorating, she would have been able to
rectify the issue and prevent any further damage.
The applicant’s earlier claim was lodged in March 2014, shortly after she purchased
the property. The claim records reflect that the applicant advised of drummy floor tiles
and cracked grout joints, as well as a musty smell during a recent storm.
The FSP’s builder (AJ) inspected the property and reported that, in his opinion, the
most likely cause of the damage to the floor tiles was the delamination of the
adhesive glue over an extended period of time. AJ considered this to be a
maintenance issue.
In his report, AJ noted that:
the tile damage could also be a result of rising damp through the concrete slab
due to drainage issues at the property
Case No: 493438 Determination Page 6 of 14
there was moss growing on the external brick wall below the damp course level,
which appeared to be unrelated to the drummy tiles, and
it was not possible to identify the exact cause of the damage without carrying
out further, invasive investigations.
The FSP concluded that no further investigations were required to determine the
exact cause of damage, as both of the potential causes identified in AJ’s report were
excluded from cover under the policy.
The claim notes indicate that the FSP called the applicant and discussed AJ’s report
with her, following which the applicant agreed to withdraw her claim.
The applicant says that, during this call, the FSP advised her about the delamination
of the tiles but did not tell her about the potential issue with rising damp. She says the
FSP should have carried out further investigations to determine the exact cause of
the damage or (at least) provided her with a copy of AJ’s report.
FSP is not liable for damage to waterproof membrane
Given the circumstances, I do not consider that the FSP breached its obligations to
the applicant in relation to its handling of the 2014 claim.
The primary purpose of the FSP’s assessment was to determ ine whether it was liable
for the damage under the terms of the policy.
As outlined above, the FSP’s builder (AJ) considered that the most likely cause of the
damage to the tiles was the delamination of the adhesive glue (although he also
noted that the property may be subject to rising damp).
In either case, the damage was excluded from cover under the policy. Accordingly,
the FSP did not require any additional information in order to reach a decision about
its liability for the claim.
Further, AJ noted that invasive investigations would be required in order to obtain
further information. Generally, it is not appropriate for an insurer to carry out invasive
investigations where this is unlikely to alter the outcome of the claim.
While AJ mentioned the possibility of rising damp, his report was by no means
definitive on this issue.
In any event, I am not satisfied that the applicant has suffered any material loss as a
result of the FSP’s actions.
The FSP has accepted liability for the resulting damage ca used by the storm, on the
basis that the applicant was not aware of the issues with the waterproof membrane.
While it is likely that the waterproof membrane has continued to deteriorate, I am not
satisfied that the rectification costs have increased significantly since the earlier claim
(given the nature of the damage and the period over which it occurred).
Further, there is information to suggest that the bare slab in the dining area appeared
wet during rainy periods, after the applicant removed the tiles (indicating ongoing
evidence of rising damp). The applicant was also aware of the stormwater run-off
issues affecting the property, as shown by her discussions with the local council.
Case No: 493438 Determination Page 7 of 14
For these reasons, I consider the FSP is not liable for the damage to the waterproof
membrane.
2.2 Is the cash settlement fair and reasonable?
Applicant is dissatisfied with cash settlement
As outlined above, the FSP accepted liability for internal water damage to the
property and cash settled the applicant for the estimated cost of the necessary
repairs.
The applicant says the amount of the cash settlement is not sufficient to repair all of
the resulting damage to the property caused by the storm. She wants the FSP to
repair the damage.
Policy outlines how claims will be settled
Under the terms of the policy, the FSP may settle a claim for damage to the
applicant’s property caused by an insured event by repairing the damage or paying
her the cost of doing so.
It is clear from the terms of the policy that the FSP has the discre tion to decide which
settlement method to adopt. However, FOS expects an insurer to act reasonably in
exercising its discretion, having regard to the circumstances of the claim.
FSP acted reasonably in deciding to cash settle claim
As outlined above, it is clear there are ongoing moisture issues with the property due
to its exposure to stormwater run-off and the failure of the waterproof membrane.
In these circumstances, it was not feasible for the FSP to repair the internal damage
to the property, until the moisture issues are resolved (as there is a risk that the
damage will reoccur).
Accordingly, I am satisfied that the FSP acted reasonably in deciding to cash settle
the claim.
However, in determining the amount of the cash settlement, the FSP was required to
ensure that this amount was sufficient to repair all of the damage to the property for
which it was liable under the policy.
Cash settlement was based on approved scope of works
The FSP cash settled the applicant for $22,485 for the cost of repairing the internal
damage water to the building.
The cash settlement amount was based on a scope of works and quotation prepared
by the FSP’s builder (RC) in August 2017.
The scope of works was finalised following a joint inspection of the damage carried
out by RC and the FSP’s assessor (BH) and further investigations carried out by the
FSP’s restoration contractor (RX).
Case No: 493438 Determination Page 8 of 14
The scope of works includes the removal and replacement of the plasterboard wall
linings in the bedrooms, laundry, lounge, kitchen and office to a height of 1.2 metres.
It also provides for the sanitising of the timber wall frames in these rooms to address
mould growth.
The applicant says the scope of works does not include all of the damage to the
building caused by the storm in March 2017.
Among other things, the applicant says the scope of works should include:
remediation of mould damage to the bathroom, as well as drying,
dehumdification and fogging to the remainder of the house
replacement of the kitchen wall tiles and cupboards, and
repair of subsidence to the south end of the property caused by the erosion of
the underlying soil during the storm.
The applicant has provided the following quotations:
a quotation for $58,350 for the internal repairs
a quotation of $4,800 for mould remediation, and
a quotation of $11,550 for underpinning to address the subsidence damage.
FSP is required to increase the cash settlement amount
Having reviewed the available information, I am satisfied that RC’s scope of works
generally provides an accurate assessment of the internal water damage to the
property caused by the storm in March 2017.
The repairs included in the scope of works are generally consistent with the damage
to the property, as identified in the reports provided (and the photographs taken) by
the contractors who attended the property.
The applicant says there is mould growth in the bathroom, due to water entering
through the weep holes in the perimeter wall during the storm.
However, swab testing and CCTV investigations carried out by the FSP’s restoration
contractor (RX) failed to identify any mould growth in the bathroom which required
remediation. Testing of the external weep holes did not reveal evidence of mould
beyond normal levels.
The quotation provided by the applicant’s builde r (OH) includes extensive repairs to
the bathroom and kitchen, including the replacement of the fixtures and fittings
(which is not included in RC’s scope of works). Given the nature of the damage, I am
not satisfied that these additional repairs are required.
The applicant’s mould specialist (MC) has advised that drying and dehumidification is
required as there is a high level of moisture present in the slab and the walls. It is
difficult to determine to what extent this was caused by the storm in March 2017 (as
compared to the ongoing moisture issues).
Nevertheless, I accept that some allowance for drying etc is appropriate. Further,
additional water and mould damage to the property may be identified once the
repairs are commenced (for example, when the kitchen cabinets are removed).
Case No: 493438 Determination Page 9 of 14
The quotation provided by the applicant’s underpinning contractor (MM) states that
the floor slab has subsided by up to 25 millimetres at the southern end, as a result of
the underlying soil being washed away by the large volumes of storm water run-off
which affected the property during the storm.
MM’s quotation was not provided until November 2017, approximately 18 months
after the storm occurred. Accordingly, it is not clear to what extent the subsidence of
the slab was caused by the storm (given the property was susceptible to ongoing
stormwater run-off).
Nevertheless, the nature of the damage described by MM is consistent with the
significant volumes of stormwater run-off experienced during the storm in March
2017. Accordingly, it is likely that the storm contributed to the subsidence observed at
the property.
During his initial inspection in April 2017, the FSP’s engineer (DW ) noted that soil
had been washed away from the edge of the slab in various areas. While DW did not
observe any significant movement damage, he does not appear to have conducted
any floor level surveys to confirm whether the slab had subsided.
In these circumstances, I consider it is appropriate that the cash settlement amount
be increased to reflect the possibility that the storm in March 2017 contributed to the
subsidence of the slab.
In addition, the cash settlement should also be increased to allow for:
any volume discounts reflected in the quotation provided by RC (noting that his
quotation was provided for cash settlement purposes only and therefore was
not actionable),
project management or supervision costs (which were omitted from RC’s
quotation but are likely to be incurred by the applicant in undertaking the
repairs)
the additional risk assumed by the applicant due to the absence of the lifetime
guarantee, and
the passage of time (including any increase in costs since RC’s quotation was
provided).
Having regard to the matters outlined above, I consider it is fair in the circumstances
that the cash settlement amount be increased by an additional 50% ($11,242.50).
The FSP is not required to pay interest on this amount.
Amount paid for temporary accommodation is fair and reasonable
The policy provides for the payment of temporary accommodation benefits where the
applicant’s home is unable to be lived in as a result of damage caused by an insured
event.
When the applicant lodged her claim, she advised there was mould growth at the
property. Accordingly, the FSP arranged for temporary accommodation for the
applicant and her family until the claim was resolved.
When the claim was cash settled in October 2017, the FSP paid the applicant an
amount of $3,480 for 6 weeks of temporary accommodation. This reflected the time
Case No: 493438 Determination Page 10 of 14
period of 4 weeks to comple te the internal repairs (as estimated by the FSP’s
assessor (BH)), plus an additional 2 week buffer.
In the circumstances, I consider the amount paid by the FSP for temporary
accommodation was fair and reasonable.
The FSP is not required to pay temporary accommodation benefits for any period
during which the property remains uninhabitable as a result of the damage to the
waterproof membrane (or the ongoing drainage issues), as this damage is not
covered under the policy.
2.3 Is the applicant entitled to compensation?
FOS may award compensation for non-financial loss
Under the Terms of Reference, FOS may award compensation for non-financial loss
(capped at $3,000) where an applicant has suffered an unusual degree or extent of
physical inconvenience, time taken to resolve the situation or interference with the
applicant’s expectation of enjoyment or peace of mind.
However, FOS adopts a conservative approach to the award of compensation for
non-financial loss. FOS expects applicants to be moderately robust a nd bear the
usual inconvenience associated with an insurance claim.
Applicant is dissatisfied with claims handling
The applicant is dissatisfied with the manner in which the FSP managed her claim.
Among other things, the applicant says the FSP:
failed to undertake core drilling of the slab, as recommended by its engineer
did not undertake mould testing at the property until five months after the claim
was lodged, and
delayed repairs to the property, allowing further damage to occur.
The applicant has also raised concerns about additional damage to her contents
items caused by the actions of the FSP’s contractors. However, this damage is the
subject of a separate FOS dispute (537783).
Applicant is entitled to compensation of $750
Having carefully reviewed the claim history, I am satisfied that the FSP managed the
claim reasonably overall.
It was unnecessary for the FSP to arrange for core drilling of the slab. The sole
purpose of this process was to confirm whether a waterproof membrane had been
installed. However, RC was able to confirm this by excavating an area near the slab.
While the FSP did not carry out mould testing until several months after the storm,
this delay was not unreasonable in the circumstances.
The claim notes indicate that the FSP delayed undertaking any mould testing or
remediation until the cause of damage could be established because it considered
Case No: 493438 Determination Page 11 of 14
that any remediation was unlikely to be effective while the property continued to
experience ongoing moisture issues.
In the interim, the FSP paid for temporary accommodation for the applicant and her
family to address health concerns arising from mould growth at the property.
While there may have been some delays during the initial stages of the claim, the
scope of works prepared by the FSP’s builder in August 2017 sought to address any
additional damage which had occurred up to that point.
To the extent the repairs have been delayed following payment of the cash
settlement, this has largely been due to the need to rectify the ongoing moisture
issues at the property.
However, for the reasons outlined above, I consider that the cash settlement paid by
the FSP was not sufficient to allow the applicant to engage her own contractors to
undertake the necessary repairs.
This was exacerbated the stress and inconvenience experienced by the applicant
during the claims process. In the circumstances, she is entitled to $750 as
compensation for non-financial loss.
Case No: 493438 Determination Page 12 of 14
3 Supporting information
3.1 FOS approach to this dispute
This dispute was the subject of a recommendation issued on behalf of the Financial
Ombudsman Service (FOS) Australia on 22 February 2018. The recommendation
was rejected by the applicant.
This dispute has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this Determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary to those issues that considered directly relevant to
the outcome only.
3.2 Scope of determination
Current dispute is limited to building damage
During the course of this dispute, the applicant has raised a range of other matters.
This determination is limited to the e xtent of the FSP’s liability for the damage to the
building. It does not address:
the damage to the in ground fiberglass swimming pool and pool pump slab
(which have been dealt with separately by the FSP),
any additional damage to the property due to the F SP’s failure to rectify the
excavation works carried out by RC in order to investigate the waterproof
membrane (which is the subject of FOS dispute 518446)
the applicant’s claim for damage to contents items caused by the storm and the
actions of the FSP’s repairer (which are the subject of FOS disputes 510620
and 527783), or
the concerns raised by the applicant about the FSP’s cancellation or non -
renewal of her policy for the 2017/18 period of insurance.
3.3 Key policy terms
Subject Terms
Cover for
insured events
If you have a …. insurance policy, we cover your home and contents when
covered under this policy for loss or damage at the insured address caused by
an insured event during the period of insurance.
Insured event means:
the insured events on pages [ xx] to [xx]
Case No: 493438 Determination Page 13 of 14
Subject Terms
if you have … the [xx] level of cover with optional Accidental damage at the
home, it also means accidental loss or damage to your home or cont ents
that is not excluded by your policy ..
In addition, an insured event is always a single event, a ccident or occurrence
which you did not intend or expect to happen.
Insured event –
storm
We cover
Loss or damage caused by a storm
Cover for
accidental
damage
When you have home insurance, we cover your home for accidental loss (e.g.
losing something) and accidental damage (e.g. dropping something) at the
insured address during the period of insurance …
Note: Accidental loss or damage not excluded by your policy is an ‘insured
event’. If we accept a claim under this optional cover, the incident giving rise to
the claim is an insured event.
Accidental loss or damage means loss or damage that occurs without inte nt.
Defects If an unknown defect is the cause of the damage
If an incident covered by your policy damages your home and an unk nown
defect was the cause or part of the cause, we will pay for the resulting damage.
If the unknown defective part of your home is also damaged by the same
incident, we will fix this as well.
General
exclusions
You are not covered under any section of this policy for damage, loss, cost or
legal liability that is caused by, arises from or involves …
Wear, tear and gradual deterioration
Wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of
light, atmospheric or climatic conditions or gradual det erioration such as but not
limited to …
Obligations of
policyholder
Your re sponsibilities
You must:
keep your home and contents well maintained and in good condition …
Not meeting your responsibilities
If you do not meet your responsibilities, it may lead us to do one or both of the
following:
reduce or refuse to pay your claim;
cancel your insurance policy …
Well maintained and in good condition means your home or unit and
contents do not have any faults or defects that might cause loss or damage to
your home and contents …
Settlement of
claims
We choose how we settle home claims
If we agree to pay a claim for loss, theft or damage to your home, we will
decide if we will:
repair damage to your home;
rebuild your home;
pay you what it would cost us to repair or rebuild your home;
Case No: 493438 Determination Page 14 of 14
Subject Terms
pay you the sum insured for your home;
give you a voucher, store credit or store d value card for the amount it would
cost us to repair or rebuild an item.
Temporary
accommodation
When an ins ured event damages your home to the extent you cannot live
there, and we agree, we will pay for your reas onable temporary
accommodation costs for the time it will take to repair or rebuild your home to a
liveable condition.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.