Cash settlement amount for impact damage to laundry and fence
Summary
A neighbour's vehicle hit the applicants' home, and the FSP cash settled the impact damage on its repair scope. The applicants sought a $27,900 rebuild of the laundry, and AFCA ordered an extra $2,500 for the laundry plus the $237.60 recommended contents payment, rejecting the rebuild.
The policy pays to repair impact damage and does not cover betterment, so rebuilding the laundry is not required on the evidence.
Issues
- Claim amount dispute primary · upheld
“I believe that an additional $2,500 is payable in respect to the repair of the laundry.”
- Claim denial secondary · not upheld
“The applicants have not established that it is necessary for the laundry to be demolished and rebuilt.”
Subjects and remedies
home or building damagemotor vehicle collisionpay claim
Text of the determination
Determination
Case No: 493406 Determination Page 1 of 4
Case number: 493406 18 June 2018
1 Overview
1.1 Dispute
The applicants lodged a claim under their home buildings policy with the financial
services provider (FSP) after the neighbour’s vehicle collided with the insured
property.
The claim was assessed by the FSP and settled based on its builders cost to repair
the damage.
The applicants have rejected this settlement as they consider the FSP’s quote does
not adequately cover all damage. The applicants seek for their builder’s quote to be
approved as it includes the cost to demolish and rebuild the laundry.
The case analyst provided the parties with a recommendation on the issues in
dispute. The recommendation was in favour of the FSP. A copy of the
recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
I have considered the further submissions provided after the recommendation. The
findings contained in the recommendation were substantially correct and are adopted
in this determination other than for an additional payment that I find to be fair and in
the circumstances.
Has the FSP adequately assessed the applicants’ claim?
I am satisfied the FSP has adequately assessed the claim. The FSP’s liability is to
the repair the laundry only. I believe that an additional $2,500 is payable in respect to
the repair of the laundry.
The applicants have not established that it is necessary for the laundry to be
demolished and rebuilt.
The FSP upon payment of the amount specified in the recommendation and the
additional $2,500 will have met its obligation under the terms and conditions of the
policy.
1.3 Determination
This determination is partially in favour of the applicant.
Case No: 493406 Determination Page 2 of 4
I agree with the case analyst’s reasons for the recommendation and the
recommended outcome other than in respect to the payment of $2,500 for repairs to
the laundry.
Case No: 493406 Determination Page 3 of 4
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have considered
all the material submitted by the parties, both before and after the recommendation.
I am satisfied that the documentation I have relied on has been provided to both
parties.
I am satisfied that the case analyst’s recommendation contains an accurate summary
of the dispute, the issues to be determined, any applicable paragraphs of the Terms
of Reference and any relevant law.
The recommendation was written in favour of the FSP and was rejected by the
applicants.
2.2 Has the FSP adequately assessed the applicants’ claim?
Coverage of the policy
The cover provided by the applicants’ policy is in respect to loss or damage caused
by an insured event and is subject to the terms and condition contained within the
policy.
The applicants seek for the laundry to be demolished and either one of their quotes
accepted to reinstate the laundry.
Differing opinions on the extent of work required
The FSP requested the applicants provide two quotes to reinstate damage to the
insured property.
The applicants submitted two quotes $27,900 and $34,750. Both quotes included
costs to demolish and rebuild the laundry.
The FSP obtained its own quote by ‘ AJ ’. This quote was substantially less than the
applicants ’ quotes as it confirmed the damage caused by the vehicle did not warrant
a complete demolition of the laundry.
AJ further added that it did not consider the structure had moved/dislodged from the
slab because of the impact event as indicated by the applicants.
Photos provided by AJ have identified construction issues with the laundry. Images
show missing eaves lining and gutter indicating it was in poor condition.
The FSP had a building consultant attend and comment. He confirmed a complete
knockdown and rebuild was not warranted from the impact event.
The applicants have not provided any expert evidence as such that persuades me
why the quote submitted for $27,900 should be accepted. However, I accept the
applicants have provided opinions and quotations from qualified builders.
Case No: 493406 Determination Page 4 of 4
Expert evidence is only opinion evidence which is not determinative of the issues in
dispute. I must take it into account in reaching my decision along with all the other
available evidence.
I am satisfied, on the available evidence provided by the parties that the impact of the
collision caused damage to the laundry. In these circumstances it is fair that the FSP
be required to increase its settlement offer to the applicants by $2,500 to cover
damage to the laundry.
Further submission by applicants does not warrant rebuild
The applicants rejected the recommendation and in doing so provided further
commentary.
This commentary suggests that the structural integrity of the laundry has been
compromised by the impact of the vehicle.
I am satisfied the FSP has thoroughly assessed the claim and established for the
claimed event, the laundry is not required to be demolished.
The applicants have not provided any evidence to show why the FSP should accept
either of the quotes provided for the complete demolition of the laundry.
I am satisfied the FSP has made the correct decision in allowing the cost to repair the
laundry as opposed to demolishing and rebuilding. As I have indicated an additional
payment of $2,500 should be allowed in this regard.
I accept the FSP is entitled to cash settle the applicants the cost to repair the
damage and is not required to carry out the repairs to the laundry.
Recommendation
Case No: 493406 Recommendation Page 1 of 5
Case number: 493406 20 February 2018
3 Overview
3.1 Dispute
The applicants lodged a claim under their home contents insurance policy with the
financial services provider (FSP) for impact damage to the boundary fence and rear
laundry (the structure) caused by a third party vehicle collision. The FSP cash settled
$13,189.96 (less policy excess) the applicant for the impact related damage because
it says the structure is poorly constructed.
The applicants dispute the settlement amount because:
the structure has more damage not considered by the FSP
the FSP should rebuild the structure based on the advice they received from
trades they engaged
the FSP’s own builder will not commit to the repairs.
The applicants are seeking the FSP pay a total of $27,900 based on their quote so
that they can rebuild the structure.
3.2 Issue and key findings
Is the FSP obliged to increase its settlement?
The FSP is required to pay the applicants an additional $237.60 for the removal and
reinstatement of laundry contents. It is however not obliged to make any other
payment because:
the FSP is liable for impact damages as reflected in its scope of works
no expert states the structure cannot be repaired and requires rebuild
the applicants’ quotes include items not damaged by impact event
the FSP is not liable for any defects with the structure
the FSP is not obliged to rebuild the structure.
The FSP builder will not commit to repairs, however in view of the underlying issues
with the structure, it is fair in the circumstances the FSP can cash settle the
applicants based on its quote.
3.3 Recommendation
This recommendation is in favour of the FSP.
The FSP should settle a further $237.60 for the removal and reinstating of contents in
the laundry. It is not required to take any further action.
Case No: 493406 Recommendation Page 2 of 5
4 Reasons for recommendation
4.1 Is the FSP obliged to increase its settlement?
FSP cannot guarantee repairs
The FSP provided a quotation from its builder for $10,417.95. The FSP later
accepted the floor tiles and the settlement increased to $13,189.96 (less $1,000
policy excess). The FSP has settled for the floor tiles based on the applicants’ quote
which the applicant has not disputed.
The FSP’s builder says they cannot commit to repairs because:
the structure was an add-on to the home and the initial building works were
never completed
a substantial amount of extras will apply at the applicants’ cost
they are uncertain whether the structure is council compliant (or if a
development application was submitted)
they cannot guarantee the works.
The FSP has not provided sufficient information confirming the above, however I also
note the applicants have also not provided any information to refute the FSP’s
statements or confirm the structure was council approved.
The applicants provided two quotes which the FSP says includes items/areas not
damaged from the impact and for the rebuilding of the structure. The applicants
request the FSP settle on the cheaper of the two quotes being $27,900.
The FSP’s builder is confident their quoted amount will bring the structure to its pre -
loss condition and does not agree the structure requires rebuilding.
Having reviewed the photographs of the structure, it is evident there are underlying
defects unrelated to the damage caused by the impact.
Applicant says FSP should pay to rebuild structure
The applicant says both trades he engaged recommended a rebuild because:
they would only know the true extent of the damage once repairs unfolded
a ‘patch -up job ’ is more time consuming and more expensive.
However, I am not satisfied this establishes the applicants cannot repair the
damag es to the structure caused by the impact based on the FSP’s quote. If
anything, it supports the FSP’s builder’s comments the applicants would need to pay
additional costs unrelated to the impact damages.
The applicants are dissatisfied with the FSP’s scop e of works because it only allows
repairs to the right hand side of the structure (which is where the impact damage
occurred). The applicants say the impact has shifted and dislodged the entire
structure because:
there is a fine tile crack on the wall on the front side of the laundry
window tilted on right side of laundry
roof is tilted.
Case No: 493406 Recommendation Page 3 of 5
The applicants have not provided any expert evidence to support this view. The
FSP’s builder and the building consultant reinspected the structure to address the
applicant s’ concerns. The FSP says there is no movement to the structure from the
impact because:
the stud walls propped up by timber packers have not moved
a qualified builder attended and did not identify any movement
impact load was absorbed by the damaged fence
damage caused by impact was relatively minor.
FSP liable only for damage caused by impact
By accepting the claim, the FSP is not liable for underlying issues or apparent
defects with the structure. It is only liable for the damages caused by the insured
event claimed under the policy.
The policy does not allow for an insured to be put in a better position they were in
before damages arose from an event claimed under the policy. The FSP has said the
rebuild of the structure would amount to betterment and, based on the condition of
the structure, I agree with this view.
FSP quote fair and reasonable
The policy allows for the FSP to either pay:
the reasonable cost of repair, or
the reasonable costs of replacement, or
a cash amount which would reasonably cost to repair or replace the property.
The FSP builder has also confirmed an additional $237.60 will be paid for the
removal and reinstatement of laundry contents.
I am satisfied the scope of works provided by the FSP’s builder is complete and
covers t he damages caused by the impact. I accept the FSP’s quote is reflective of
the scope of works.
The applicants also disputed the labour hours as the FSP builder allowed for 96
hours for works to be completed and later said approximately three weeks. I have
reviewed the unit hours specified in the scope of works and I am satisfied that the
approximate timeframe to complete the works amounts to three weeks.
I acknowledge the applicants dispute the scope of works, however the applicants’
quotes do not explain how the damages from the impact would require the structure
to be rebuilt. Further, there is no information from either party to show the repairs to
only the impact related damages will not put the structure to its pre-loss condition.
While the FSP quote is not actionable, given the underlying issues with the structure,
on balance I accept it would be difficult for either party to find a builder willing to carry
out the work for only the impact damages. In saying this, I am not of the view the
FSP is liable to rebuild the structure.
Rather, I am satisfied that it is fair in all the circumstances that the FSP is entitled to
cash settle on its quote which is represents its liability under the claim.
Case No: 493406 Recommendation Page 4 of 5
5 Supporting information
5.1 Key references
Record Key points
P olicy wording
Product Disclosure Statement
Page 4
Impact
Covered
Loss or damage caused by collision with your building and/or
contents by:
…
• any vehicle or its load
Policy wording
Product Disclosure Statement
Page 4 9
7.3 How we settle your claim
Repairing or replacing
When w e agree to pay a claim for loss or damage:
We may choose to pay:
• the reasonable cost of repair, or
• the rea sonable costs of replacement… or
• a cash a mount. If we agree to pay cash, we’ll pay the amount it
would reasonably co st to repair or replace the property. …
FSP’s building
consultant
Commentary
6 June 2017
Therefore I am of the opinion that the fair and reasonable costs for
reinstating the back room/laundry to pr e - event condition are
$7,892.39 [FSP builder] + $2,100.00 for tiling as per Insured’s
quote= $9,992.39 + 20% builder margin $1,998.48 =$11, 990. 87 +
GST= $1,199.09. Total including 20% builder’s margin
+GST=$13,189.96
FSP’s builder
FSP submission
11 October 2017
[FSP builder] will not commit to the wor ks at hand as a substantial
amount of extras will apply at the insureds cost.
[FSP builder] are unsure if the rear structure is council compliant or
whet her a D/A was submitted for the laundry add on.
There is evidence of cracking to the floor tiles which is not related to
the motor vehicle impact.
This is normally associated wit h concrete slab movement / cracking –
replacement of floor tiles will resultant in imminent failure in the future.
[FSP builder] have scoped damages only relating to the impact event
as per the policy at hand.
No variations as such have been allowed for as all claim relat ed
damages are visible.
As per the policy any unforeseen damages that are found during the
repair process and a re deemed to be event related (under impact)
would be presented to the IC for their review and consideration.
The present ed quotes from the insured are for full knock down / re -
build which includes new laundry tubs, new roof, re tiling of the floor
…
Case No: 493406 Recommendation Page 5 of 5
FSP’ s building
consultant
Commentary
18 October 2017
I do not believe from the evidence provided that the structure has
moved/dislodged. The only damage that I can see is that is
relatively minor in nature.
As you can see from the photographs the poorly bui lt stud walls
that have been propped up by timber packers have not moved.
Therefore it is my opinion from viewing all the evidence that the
structure has not moved.
I importantly note that the [builder] who visited the site did not
mention this and most i mportantly there is also no visual evidenc e
to support the Insured’s unqualified opinion.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.