Hardship arrangement, acceleration of loan, default interest, and repossession and sale of security property
Text of the determination
Determination
Case No: 492839 Determination Page 1 of 7
Case number: 492839 9 August 2018
1 Overview
1.1 Dispute
The applicants in this dispute are a company which had a loan facility with the
financial services provider (FSP) secured by a commercial building it owned and the
director (Mr R) who guaranteed the loan. The loan fell into default and, in January
2018, the FSP took possession of the property and sold it.
The applicants claim that the FSP:
Should not have charged default interest and other costs
Made an error by taking possession of the property when it did
Should not have sold the property when it did and
Has unlawfully sold goods left on the p roperty.
The Case Manager provided the parties with a recommendation dated 30 May 2018
on the issues in dispute. The recommendation was substantially in favour of the
applicants. A copy of the recommendation is attached to this determination.
The FSP rejected the recommendation for the reasons set out in section 2.1 below.
1.2 Issues and key findings
Were the findings of the recommendation correct?
Based on all the available information, the findings in the recommendation were fair
in all the circumstances, subject to my further comments in section 2.2 below. This
determination otherwise adopts the recommendation attached.
Further submissions provided after the recommendation have been considered.
Do the further submissions affect the outcome?
The further submissions have been considered, but only affect the outcome to the
extent set out below in relation to the amount of compensation payable to the
applicants. The FSP should compensate the applicants for the losses incurred as a
result of the FSP failing to meet its obligations. The amount of compensation that is
fair in all the circumstances is set out in section 1.3 below.
Case No: 492839 Determination Page 2 of 7
1.3 Determination
This determination is substantially in favour of the applicants.
If the applicants accept this determination within 30 days, then within 14 days of
acceptance, the FSP is to reimburse the applicants the following financial loss:
Legal fees, repossession costs including delivery fee and valuation fee, totalling
$15,965.22 as set out in detail in section 3.2 below
Commission and advertising costs for the property sale of $20,630.20 and
Conveyancing expenses of $2,600.84.
In addition, the FSP must also compensate Mr R $3,000 in non-financial loss for
stress and inconvenience.
All compensation should be paid into an account nominated by the applicants.
Case No: 492839 Determination Page 3 of 7
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
The recommendation was accurate
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
recommendation. I am satisfied that the documentation I have relied on has been
provided to both parties.
The recommendation provided an accurate description of the dispute although it
should have included the company applicant as a party, as the company was re -
registered before the recommendation was issued.
Based on the available information, the findings on merit in the recommendation
were fair in all the circumstances and are adopted into this decision, subject to the
clarifications set out in section 2.2 below. Accordingly, they will not be repeated in
this determination and the recommendation is attached.
The FSP rejected the recommendation
The FSP rejected the recommendation on the following grounds:
It met its financial difficulty obligations by entering into a variation agreement
which allowed the applicants a further 12 months interest only repayments,
subject to a property in Tasmania being sold
It then allowed an extra seven months of interest only repayments subject to the
security property being sold, and made written offers of assistance, but the
applicants refused to engage with it
It was obliged to freeze the accounts in June 2017 because the borrower
company was de-registered
It disputes that it breached the FOS Terms of Reference when the security
property was sold and says that, in any event, it informed FOS of the sale of the
property in the week prior and FOS did not seek to prevent the sale.
2.2 Do the further submissions affect the outcome?
The deregistration of the company was rectified
The company applicant was deregistered on 23 November 2015. On 25 November
2015, the FSP emailed its letter of offer to vary the loan contract to the company.
The company executed the document on 7 December 2015. It appears that neither
party were aware that the company had been deregistered prior to the execution of
the documents.
It wasn’t until a year and half later that the FSP froze the accounts in June 2017 and
called in the entire loan on the basis that the company applicant had been
Case No: 492839 Determination Page 4 of 7
deregistered. Once Mr R became aware that the company had been deregistered,
he took steps to have it re-registered. This was completed at the end of July 2017.
The effect of the re-registration under section 601AH(5) of the Corporations Act, set
out in section 3.1 below, is that the company is taken to have continued in existence
as if it had not been deregistered.
The FSP should have provided more assistance in 2017
The FSP discovered in June 2017, that the company applicant had been de-
registered. This constitutes a breach under the terms and conditions of the loan
contract. Rather than giving the applicants an opportunity to rectify this breach, the
FSP accelerated the debt and on 6 June 2017, demanding payment $180,783.01
within seven days.
I consider it would have been good industry practice for the FSP to give the
applicants a reasonable period of time to rectify this default in mid 2017, rather than
sending a demand calling in the whole debt.
The FSP says the account was also in arrears in mid 2017. However, as set out in
the recommendation, this appears to have been due in part to:
the F SP’s error in treating the loan as requiring “interest only” repayments, and
the reasonable assumption on the part of the applicants that the hardship
arrangement had been extended (based on the FSP’s lack of response earlier
in the year).
The applicants were entitled to expect fair treatment in the circumstances where they
reasonably believed the hardship arrangement with the FSP was still on foot
requiring “ interest only ” repayments. The FSP’s lack of formal documentation around
hardship decisions contributed to the situation. Accordingly, it was not reasonable for
the FSP to make an immediate demand for payment of the whole debt at this time. It
also appears the FSP did not send any demands for the arrears prior to accelerating
the debt in mid 2017.
In August 2017 the FSP advised the applicants that no further hardship assistance
was possible, although it had not conducted any assessment or review. Further, it
said it had been charging default interest due to the hardship arrangement being
“ broken ” . This was likely to have been confusing for the applicants where there
appears to have been no formal documented hardship agreement for the period.
Nevertheless, the applicants had substantially complied with the repayment
obligations during 2017, setting aside the default interest.
It is acknowledged that the FSP provided an offer to assist the applicants on 29
August 2017, by way of a reversal of default interest. This was in response to a
dispute lodged by the applicants at FOS on 14 August 2017 about the default
interest. At that time the arrears were only $1,250.98 excluding default interest
costs. The dispute was closed for non-response on 10 October 2017. It transpires
that Mr R was receiving cancer treatment and too unwell to respond. On 16 October
2017, the FSP sent another demand notice for $182,104.72 payable within seven
days, and a further solicitor’s demand on 10 November 2017 .
Case No: 492839 Determination Page 5 of 7
From June 2017 there appears to have been no atte mpt by the FSP to try and
understand the applicants ’ positi on as customers experiencing financial difficulty.
Had the FSP documented the hardship arrangement with certainty in 2017 and dealt
with the arrears and deregistration in a different manner, it is possible that the
applicants would have been able to continue to meet the repayments or been given
further time to sell the property on their own behalf, once Mr R had recovered.
Because the FSP did not fully meet its financial difficulty obligations, all legal fees
and repossession costs should be reimbursed to the applicants. These costs were
potentially avoidable. This also applies to the eventual sale costs which I deal with
further below.
The FSP’s conduct would have also caused undue stress to Mr R who is entitled to
$3,000 in non-financial loss compensation.
The FSP was in possession of the property prior to the FOS dispute being
lodged
The FSP took possession of the security property on 19 January 2018 and sold it on
23 March 2018.
Under paragraph 13.1 a) of the FOS Terms of Reference, a member is prohibited
from debt recovery action while a dispute is open at FOS. Debt recovery action
includes taking possession of a security property. However, when the applicant
lodged his dispute at FOS on 13 February 2018, the FSP had already taken
possession of the property.
Accordingly, the FSP was not in breach of section 13.1 a) in relation to the
repossession of the property.
However, FOS generally expects a member to obtain written consent where the
member proposes to sell a security asset in the circumstances where it already has
possession. This ensures all parties are aware of what is happening and affords FOS
the opportunity to prevent the sale in exceptional circumstances . FOS will generally
consent to such a sale where the repossessed property in question is not the primary
place of residence of the applicant. It is likely in this instance that FOS would not
have prevented the sale of the property in any event.
I do not accept the FSP’s claim that a telephone conversation with a FOS employee
on 16 March 2018, constituted sufficient consent in the circumstances. However, I do
not consider this claim warrants payment of non-financial loss to the applicants in the
circumstances. Non-financial loss in relation to the sale is already provided for above.
The applicant is entitled to additional costs
Not all costs associated with the selling of the security property had been disclosed
to FOS when my case manager issued the recommendation on 30 May 2018.
For the reasons set out in the recommendation and above , whereby the FSP should
not have taken possession of the property when it did, the FSP should reimburse
repossession and sale costs to the applicants as it was not inevitable that the
property be sold.
Case No: 492839 Determination Page 6 of 7
In my view, the applicants are entitled to be reimbursed the following costs in addition
to the sums set out in the recommendation in relation to the enforcement costs. The
following costs relate to the property sale :
Commission and advertising costs of $20,630.20
Conveyancing expenses of $2,600.84.
I note that the applicants also wish to be reimbursed the value of the goods left on
the premises. However, I am satisfied that the applicants were given a reasonable
and adequate opportunity to arrange for the collection of the goods before they were
removed or disposed of. The applicants chose not to remove them. It is not
appropriate to award compensation for that avoidable loss.
It has not been shown the applicants incurred a capital loss on the sale
Although I have found that the FSP should not have taken possession of the property
at the time and its sale was not inevitable, it has not been shown that the applicants
incurred a capital loss on the sale of the property.
This is because the FSP obtained an independent valuation for the property on 19
January 2018, indicating that the market value of the property was $270,000. The
real estate agent recommended a reserve of $295,000 based on feedback during the
marketing campaign, and the FSP set a n adequate reserve of $290,000.
The property sold at auction on 23 March 2018 for $498,000 which was well in
excess of any valuation and well above the land tax nominal value issued in early
2018. Accordingly, the applicants received the benefit of a very good sale price for
the property and it has not been shown that they incurred any capital loss because of
the sale of the property.
Case No: 492839 Determination Page 7 of 7
3 Supporting information
3.1 Section 601(AH)(5) of the Corporations Act:
If a company is reinstated, the company is taken to have continued in existence as if
it had not been deregistered. A person who was a director of the company
immediately before deregistration becomes a director again as from the time when
ASIC or the Court reinstates the company. Any property of the company that is still
vested in the Commonwealth or ASIC revests in the company. If the company held
particular property subject to a security or other interest or claim, the company takes
the property subject to that interest or claim.
3.2 Summary of expenses
Date Expense
(Legal fees have been
reduced by input tax credit)
Amount
4 December 2017 Legal fees $4,830.40
19 December 2017 Legal fees $3,059.31
8 February 2018 Valuation fee $1,100
8 February 2018 Change locks $243.64
8 February 2018 Legal fees $3,541.50
26 February 2018 Legal fees $824
5 March 2018 Legal fees $1,836.37
10 May 2018 Moving items $90
10 May 2018 Boxed records $440
Total $15,965.22
Recommendation
Case No: 492839 Recommendation Page 1 of 11
Case number: 492839 30 April 2018
4 Overview
4.1 Dispute
The applicant is the director of a company which had a loan facility secured by a
commercial building. The applicant guaranteed the loan. The financial services
provider (FSP) took possession of the property and sold it.
The applicant is disputing default interest applied to the loan, legal fees, and other
charges including the cost of a valuation. The applicant also says the FSP ought not
to have taken possession of the property when it did; should not have sold the
property when it did; and has unlawfully sold goods left on the premises.
4.2 Issues and key findings
Did the FSP meet its financial difficulty obligations?
No. The FSP failed to give genuine consideration to the applicant’s circumstances
from 2016, failed to request information from the applicant, failed to properly assess
the applicant and failed to respond in writing.
Was the FSP entitled to take possession of the security property as mortgagee
in possession?
No. Had the FSP entered into an appropriate hardship arrangement, it should not
have been necessary for the FSP to take possession of the property. All legal fees
and repossession costs, including the valuation fee, should be reimbursed to the
applicant. The applicant is also entitled to $3,000 in non-financial loss compensation.
Should the FSP have sold the security property when it did?
No. At the time of sale, there was a FOS dispute open. The FSP should not have
sold the property without seeking FOS’s consent. The applicant is entitle d to $3,000
in non-financial loss compensation for this breach to be paid into his nominated bank
account.
Did the FSP unlawfully dispose of the applicant’s goods?
No. The FSP gave the applicant an opportunity to collect the applicant’s goods left at
the security property. The applicant did not collect the goods. The FSP boxed up
papers and documents and delivered these to the applicant on 11 May 2018.
However, as the FSP should not have been in possession of the property, it ought
not pass on the costs to the applicant.
Case No: 492839 Recommendation Page 2 of 11
Did the FSP breach any other duty or obligation?
No.
4.3 Recommendation
This recommendation is substantially in favour of the applicant.
If both parties accept this recommendation, then within 14 days of the closure of the
FOS dispute, the FSP is to reimburse the applicant all legal fees, repossession costs
including delivery fee and the valuation fee, being a total refund of $17,350.08. At
the same time, it should also pay him $6,000 in non-financial loss compensation. All
compensation should be paid into an account nominated by the applicant.
Case No: 492839 Recommendation Page 3 of 11
5 Reasons for recommendation
5.1 Did the FSP meet its financial difficulty obligations?
An FSP should give consideration to hardship requests
Financial services providers have obligations to work with and try to assist customers
who are experiencing financial difficulty. A customer should also be willing to work
with their credit provider and propose a realistic repayment plan that will result in the
repayment of the debt within a reasonable timeframe.
Where a credit provider declines to provide assistance, it should write to its customer
and provide reasons for its decision. These reasons should be accurate and reflect
legitimate considerations.
The parties entered into an agreement in 2008
The applicant’s company entered into a commercial business loan with the FSP for
$170,000 in August 2008 for the purpose of purchasing a commercial property in
Victoria. The term of the loan was seven years expiring on 1 September 2015.
Repayments were to be on an interest only basis at the rate of $1,459.17 per month.
The obligations of the company under the loan were personally guaranteed by the
applicant and a third party who is not an applicant in this dispute (the 2008
agreement).
The initial loan term of the 2008 agreement was seven years, following which the
loan would be renegotiated on a principal & interest basis for a further 18 years.
Default interest, fees and charges
FOS can investigate a dispute about interest, fees and charges. An applicant would
need to show that the FSP misrepresented, failed to adequately disclose or has not
applied the fee or interest correctly in accordance with an agreement. In the absence
of any specific breach of obligation, contract or arrangement, any decision by t he
FSP about whether to charge interest is a commercial or policy decision which FOS
is unable to review.
A review of the information provided by the FSP shows that the applicant did not
always make the contractual repayments in full and on time under the 2008
agreement, and was charged default interest. However, the FSP has also provided
information to show that all default interest charged to the end of the 2008 agreement
has been reversed. This was a commercial decision of the FSP made to assist the
applicant. As all default interest was reversed, it is not necessary to further
investigate this issue in relation to the 2008 agreement.
The applicant requested assistance in November 2015
On 4 November 2015, the applicant wrote to the FSP saying that the FSP had
neglected to set up internet access to his account, and that “you have also neglected
to respond to a prior email regarding the new payment you have dictated to us which
is not affordable”. It appears that the applicant was referring to the increas ed
Case No: 492839 Recommendation Page 4 of 11
payment required due to the loan reverting to principal & interest from 1 September
2015.
The contract was varied in November 2015
In response to the applicant’s hardship request, the FSP agreed to extend the term of
the loan by a further 18 years, with repayments for the first 12 months to be paid on
an interest only basis and fixed at 4.6% per annum. This meant that repayments for
2016 were $662.60 per month. The first payment was due on 1 January 2016.
Repayments for the remainder of the term were to be variable and on a principal &
interest basis from 1 January 2017. The arrangement was documented in a variation
agreement (the 2015 agreement).
The 2015 agreement was said to be conditional upon the company selling a property
in Tasmania within 12 months with the intention of clearing the debt in full. Special
Conditions 6, 7 and 8 of the 2015 agreement are set out in full in Section 3.1 below.
Interest at a higher rate was payable if payment was more than three days late
The applicant disputes that he was ever in default under the loan contract and says
that the FSP was not entitled to default interest.
The way that interest is calculated under the facility is set out under clause 7 of the
General Commercial Conditions set out in Section 3.2 below, and Special Condition
4 of the 2015 agreement. Special Condition 4 states that “Interest only payable
monthly in arrears on the last day of each month. Payments received later than 3
DAYS after the due date will incur additional interest at the HIGHER rate”.
The higher interest rate is defined as 2% above the lower interest rate. The lower
interest rate is 4.6% - so interest charged on late payments was to be charged at the
rate of 6.6%. I note that the FSP refers to the higher interest rate being charged as
“default interest” on its account statements and correspondence.
The applicant did not make all payments on time
A review of the account statements shows that the applicant failed to make four
monthly payments during 2016 and all payments that were made were late. This is
set out in more detail in Section 3.3 below.
The FSP reversed all default interest charged from January 2016 to May 2016 and
capitalised outstanding arrears on 17 June 2016. On that date, therefore, the
account was in order. The applicant was more than three days late making payments
in July and August 2016, but the FSP did not charge default interest in those months.
The FSP charged default interest in each month from September 2016 to December
2016. As the applicant made the September 2016 three weeks late, and no
payments at all in October, November and December 2016, the FSP was entitled to
charge default interest and the applicant is liable for these charges.
Case No: 492839 Recommendation Page 5 of 11
The applicant requested further assistance in December 2016
Under the terms of the 2015 agreement, principal and interest repayments were to
begin from 1 January 2017. The account statement for December 2016 shows that
the FSP raised the interest rate on 1 December 2016 to 5.25%.
The FSP says despite the loan reverting to principal and interest on 1 January 2017,
it continued to require payments on an interest only basis until 1 September 2017.
This, it says, was a bank error.
The applicant disputes this and says that he was only obliged to continue to pay
interest only at the fixed rate of $662.60 per month and that he made all repayments
required.
The hardship period was extended
A review of the contact notes shows that on 6 December 2016, the applicant
requested further financial difficulty assistance. He requested the FSP to extend the
hardship arrangement on the same terms. His difficulty was caused because the
property in Tasmania had not yet sold and he had problems with tenants leaving and
damaging the property in Victoria.
The FSP has not provided me with any information to show that it assessed the
applicant for financial difficulty assistance in December 2016, it does not appear to
have asked for any information from the applicant, and there does not appear to have
been any response in writing to the applicant’s req uest.
It appears that the applicant understood that his request for the interest only period to
be extended until the property was sold had been accepted by the FSP, and acted
accordingly. Further it is apparent that the FSP continued to treat the account as
being payable on an interest only basis.
I note that the transaction statement provided by the FSP notes on 1 July 2017 and 1
August 2017 that the “payment amount due” is $662.60. This further supports the
applicant’s assertion that the earlier hardsh ip arrangement had been extended.
I am therefore of the view that, on the balance of probabilities, the FSP did agree to
extend the hardship arrangement but cannot say for how long. It appears the FSP
gave him at least eight months from January to August 2017.
The FSP did not respond appropriately to the applicant’s request
Although an extension to the hardship arrangement was a reasonable course of
action, the FSP failed in its obligation to properly assess the applicant’s
circumstances and give a written response to the applicant’s hardship request. Had it
done so, there would have been certainty and clarity for both parties in relation to the
arrangement and further collection activity may have been avoided.
Further, as noted above, the applicant had missed some payments at the end of
2016. Repayment of the arrears were not addressed formally by the FSP. The
applicant had said in an email that he expected to clear the arrears in early January
2017, and then the FSP followed him up in an email in January 2017. The applicant
responded that he was expecting a payment, a new tenant was moving into the
Case No: 492839 Recommendation Page 6 of 11
security property and the property (presumably the Victorian property) was going to
be put on the market. There was no arrangement put in place, no deadlines
negotiated, no review of circumstances, and the applicant was not contacted until
June 2017.
The FSP demanded repayment of the full loan amount on 6 June 2017
FOS expects that when a customer is on an arrangement, that they be given at least
seven days to rectify any breach. Although it is clear that the applicant missed some
further payments to June 2017, I have not been provided with any written breach
notices giving him a chance to rectify the breach.
The FSP discovered in June 2017, that the applican t’s company had been de -
registered. This constitutes a breach under the terms and conditions of the contract
as set out in section 3.5 below. Again, rather than giving the applicant an opportunity
to rectify this breach, it accelerated the debt and on 6 June 2017 demanded payment
$180,783.01 within seven days.
The applicant responded by trying to make payments online (but was unable to do
so) taking steps to re-register his company, and lodging a FOS dispute.
FOS closed the applicant’s dispute on 31 July 2017 as at that stage the company
had not been re-registered and so had no standing to bring a dispute.
The FSP required principal & interest payments from 1 September 2017
The next day, on 1 August 2017, the FSP wrote to the applicant to advise that
payments were revert to principal & interest on 1 September 2017. The FSP also
noted that company had now been re - registered. It said the “hardship period has
expired…. The Bank has provided a further seven (7) months at Interest Only but
cannot extend the hardship period any further. The loan has incurred default interest
due to the hardship agreement being broken”.
The applicant says that this action was contrary to his arrangements with the bank
and reversed what had previously been agreed. Without any fo rmal arrangement in
place, as noted above, it is difficult to know if this is so. A formal arrangement may
have documented what was to happen at the end of the hardship period – such as a
review of the applicant’s circumstances. Instead, the bank said no further hardship
assistance was possible without doing any assessment or review.
Having accepted that the hardship arrangement had been extended, and putting
aside default interest charges, the applicant was required to make total repayments
from January 2017 to 1 September 2017 (not including the September payment) of
$5,300.80. He actually paid $5,288.80 – being $2 short. This is set out in Section 3.4
below. By this stage the applicant’s situation had improved, he was receiving rent
from the security property and presumably had the property on the market.
Had the FSP documented the hardship arrangement, and dealt with the arrears
appropriately, it is possible that the applicant would have been able to continue to
meet the payments or been given time to sell the property himself. As well, given the
applicant’s financial situation had apparently improved, it would have been
appropriate to undertake a review at this time.
Case No: 492839 Recommendation Page 7 of 11
5.2 Was the FSP entitled to take possession of the security property as
mortgagee in possession?
I note that the applicant lodged a dispute at FOS on 14 August 2017. At that time the
arrears were only $1,250.98 excluding default interest costs. The dispute was closed
for non-response on 10 October 2017. It transpires that the applicant was receiving
cancer treatment and too unwell to respond.
On 16 October 2017, the FSP sent a demand notice for $182,104.72 payable within
seven days, and a further solicitor’s demand on 10 November 2017. The applicant
emailed the FSP on 12 November and 21 November 2017 saying he could not make
payments online. The FSP responded that it had restricted the way in which the
applicant could use online banking, but he could transfer funds from other lender
accounts or go to a branch to make payments.
The bank made a further demand for payment, this time for $189,171.22 within seven
days on 4 December 2017. The applicant made a payment by cheque for $1,987.80.
The FSP made a further solicitor’s demand on 13 December 2017, and sent a notice
to the applicant’s tenant on 15 December 2017 saying that it was entitled to take
possession and intended to sell the property. The tenant vacated on 18 January
2018, and the FSP took possession of the property by changing the locks on 19
January 2018.
As there was no current FOS dispute at the time of repossession, the FSP did not
breach the FOS Terms of Reference when it took possession of the property. It also
appears to have met its legal requirements by sending demands prior to this action.
However, as discussed, had the FSP entered into appropriate formal arrangements
in December 2016 or in 2017, or given the applicant time to sell the property himself,
rather than continue to demand full repayment of the entire debt and apply mounting
legal costs, it would not have become inevitable that the FSP repossessed the
property.
Because the FSP failed to meet its financial difficulty obligations, all legal fees and
repossession costs should be reimbursed to the applicant. These costs were
avoidable. The applicant is also entitled to $3,000 in non-financial loss compensation.
Valuation fee
A financial services provider’s valuation is an assessment of the value of the property
in the event that the financial services provider has to realise the security to recover
the debt. The property value suggested by a valuation undertaken by a financial
services provider may differ markedly from the current market value of the property
or the property purchase price.
Although, generally a bank is entitled to pass on the fee charged for the valuation
under the terms and conditions of the contract, in this case the fee was incurred in
error and should not be passed on to the applicant.
Case No: 492839 Recommendation Page 8 of 11
The FSP charged default interest appropriately
A review of the account statements for the end of 2016, 2017 and 2018 show that the
applicant was invariably late making payments or failed to make payments at all in
some months. The FSP was entitled to charge default interest in accordance with its
terms and conditions as discussed above. The FSP did use its discretion to reverse
these charges in some cases, and it is evident that the FSP reversed considerable
amount of default interest from 2011 to 2016. But this was a commercial decision for
the FSP and it was not obliged to do so.
We will not require the FSP to reverse the default interest applied to the account.
5.3 Should the FSP have sold the security property when it did?
At the time of sale, there was a FOS dispute open. The FSP should not have sold the
property without seeking FOS’s consent. This is a breach of the FOS Terms of
Reference. The applicant is entitled to $3,000 in non-financial loss compensation for
this breach to be paid into his nominated bank account.
5.4 Did the FSP unlawfully dispose of the applicant’s goods?
The FSP issued the required notices to the applicant and gave him an opportunity to
collect the applicant’s goods left at the security property. The applicant did not collect
the goods. The FSP boxed up papers and documents and delivered these to the
applicant on 11 May 2018. However, as the FSP should not have been in possession
of the property, it ought not pass on the delivery costs to the applicant.
5.5 Did the FSP breach any other duty or obligation?
Customer service
The applicant has raised further issues about customer service and his interactions
with staff members at the FSP which we will not consider.
The role of the Financial Ombudsman Service is to consider specific types of
complaints about financial services provider’s errors. We do not punish or censure an
FSP for its actions or have the power to consider disputes about the policies or
practices of an FSP, or the level of service quality it provides to customers.
Land Tax and Water rates
On 18 August 2017, the State Revenue Office demanded payment from the FSP for
unpaid land tax in the amount of $1,261.24. The FSP was obliged to make this
payment and did so on 12 September 2017. It was entitled to pass this cost on to the
applicant.
If the applicant has a dispute with a former tenant about these fees, he should take
the matter up with the tenant. Similarly, the applicant says he was in dispute with a
former tenant about water bills. This is a matter between the applicant and the
former tenant.
Case No: 492839 Recommendation Page 9 of 11
6 Supporting information
3.1 Special conditions in the 2015 agreement
Special Condition 6:
“Please note that on the expiration of the fixed interest rate period your loan will
automatically revert to a variable interest rate, and therefore reinstate your right to
repay the loan (on notice) should a change in the interest rate be unacceptable to
you”
Special Condition 7:
“ [the FSP] have approved Borrowers request for Interest Only repayment calculation
to be applied for the fixed period offered. Upon expiry of this fixed period, repayments
will revert to Principal & Interest repaym ents”.
Special Condition 8:
“This offer is conditional upon [the FSP] receiving copy of signed Sales Agreement
between Borrower and Real Estate Agent for the sale of security property
[Tasmanian property] with the intention to sell property within 12 months and clear
the debt in full.”
3.3 General Commercial Conditions
Clause 7:
“Interest payable under a Facility shall be computed from the date any amount
agreed to be lent under the Facility is drawn down with monthly rests (calculated from
the first Drawdown under the Facility) at the Higher Interest Rate provided that if any
Instalments are paid on or before or within seven days of the due date for payment
and the Borrower and any Security Provider is not then otherwise in default under
any of the Facilities or any Securities, the Lender shall accept interest computed at
the Lower Interest Rate in lieu of interest at the Higher Interest Rate in respect of any
such Instalment”.
3.2 2016 payments and default interest charges
Payments $662. 60
due
Amount and date actually paid Default interest
1 January 2016 $662.60 paid on 4 January 2016 Charged and reversed
1 February 2016 $662.60 paid on 6 February 2016 Charged and reversed
1 March 2016 $662.60 paid on 23 March 2016 Charged and reversed
1 April 2016 $662.60 paid on 30 April 2016 Charged and reversed
1 May 2016 $662.60 paid on 27 May 2016 Charged and reversed
1 June 2016 Payment not made Not charged
Case No: 492839 Recommendation Page 10 of 11
17 June 2016 FSP capitali ses $2, 457. 77 arrears Account in order
1 July 2016 $662.60 paid on 10 August 2016 Charged and reversed
1 August 2016 $662.60 paid on 10 August 2016 Not charged FSP contact note says
“have refunded default interest fee
to assist borrower as payments
received to bring UTD”
1 September 2016 $662.60 paid on 21 September 2016 $ 291.26 charged
1 October 2016 Payment not made $291.74 charged
1 November 2016 Payment not made $293.36 charged
1 December 2016 Payment not made $294.96 charged
3.4 2017 payments and default interest charges
Payments due Amount and date actually paid Default interest
1 January 2017 $662.60 paid on 9 January 2017 $295.66 charged
1 February 2017 $662.60 paid on 1 February 2017 $296.37 charged
1 March 2017 $660.60 paid on 20 March 2017 $298.06 charged
1 April 2017 Payment not made $298.78 charged
1 May 2017 $660.60 paid on 4 May 2017 $299.47 charged
1 June 2017 Payment not made $301.31 charged
1 July 2017 Payment not made $303.11 charged
1 August 2017 $660.60 paid on 2 August 2017
together with three further payments
of $660.60 each on 2 August 2017
and a payment of $660. 60 on 10
August 2017
(total: $3,303)
$299.46 charged
1 September 2017 $660.60 paid on 5 September 2017 $291.26 charged
1 October 2017 $662.60 paid on 5 October 2017 $303 charged
1 November 2017 Payment not made $304.86 charged
1 December 2017 $1,987.80 paid on 14 December 2017 $311.42 charged
1 January 2018 Payment not made
(Propert y repossessed on 19 January
2018)
$318.44 charged
Case No: 492839 Recommendation Page 11 of 11
1 February 2018 Payment not made $328.53 charged
1 March 2018 Payment not made $334.83 charged
1 April 2018 Payment not made $336.88 charged
1 May 2018 Payment not made $338.90 charged
3.5 Default event
Clause 2
In addition to any other event of default, however described, it is an event of default if
any event occurs or circumstance arises which may have in the opinion of the Lender
a material and adverse effect on the :
(a) Financial position of the Borrower, a Guarantor or a Security Provider; or
(b) value of any Security or the ability to sell any Security;
(c) priority, validity or enforceability of any Documentation or the ability of the
Borrower, a Guarantor or a Security Provider to perform any of its obligations
under any Documentation.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.