Cyclone-related inundation claim declined under flood exclusion
Summary
The business owners claimed for cyclone-related inundation of their premises, and the FSP relied on the flood exclusion. AFCA found initial stormwater damage up to 200mm was covered and the balance was flood damage, and ordered a cash settlement of the initial damage with the amount to be agreed.
Water escaping a modified natural watercourse falls within the policy's flood definition, but stormwater damage occurring before floodwater arrived was covered.
Issues
- Claim denial primary · upheld
“I am satisfied the FSP is liable to cover the loss sustained to the building... on the basis of inundation to a level of 200mm but is otherwise entitled to decline.”
- Product terms interpretation secondary · not upheld
“I accept that Browns Creek is a natural watercourse that has been modified and therefore fits within the definition under the terms of the policy.”
Subjects and remedies
natural disastersmall businesspay claim
Text of the determination
Determination
Case No: 492810 Determination Page 1 of 4
Case number: 492810 30 January 2018
1 Overview
1.1 Dispute
The applicants held a business insurance policy with the financial services provider
(FSP).
A claim was lodged under the policy after the business premises were inundated with
water on or about 30 March 2017 following heavy rain from Cyclone Debbie.
The FSP maintains the inundation was caused by flood which is excluded from cover
under the terms of the insurance policy.
The applicants maintain the initial inundation of the property was caused by
stormwater and seek a review of the FSP’s decision.
1.2 Issues and key findings
Is the damage covered under the terms of the policy?
Based on the available information, I am satisfied that stormwater runoff initially
inundated the insured property to a minor degree prior to the inundation of the
property by floodwater.
I am satisfied the FSP is liable to cover the loss sustained to the building assessed
on the basis of inundation to a level of 200mm but is otherwise entitled to decline the
remaining loss due to flood.
1.3 Determination
This determination is partially in favour of the applicants.
The FSP is liable to meet the applicants’ claim for inundation caused by stormwater
runoff up to a level of 200mm within the building. The FSP is otherwise entitled to
deny liability with respect to the applicants’ claim as the balance of the damage was
due to flood.
Case No: 492810 Determination Page 2 of 4
2 Reasons for determination
2.1 Is the damage covered under the terms of the policy?
The applicants ’ policy is a commercial insurance plan providing cover for business
property damage including damage to buildings , stock, and other property.
The policy is a defined events policy that provides cover for damage caused by 10
separate insured events, including wind, rain, hail, snow, or escape of liquid. The
policy specifically excludes loss or damage directly or indirectly caused by or arising
from flood. On page 13 of the policy, ‘flood’ is defined as:
the covering of normally dry land by water that has escaped or being released from the
normal confines of:
any lake, or any river, creek or other natural watercourse, whether or not altered
or modified or
any reservoir, canal, or dam.
Browns Creek is a modified natural watercourse
The applicants’ hydrologist ‘ GS ’ says that Browns Creek has been so heavily
modified that it should no longer be classified as a natural watercourse. The FSP’s
hydrologist ‘ WM ’ says that Browns Creek is a heavily modified natural watercourse. I
have observed the area and I agree that Browns Creek has been heavily modified.
Major sections of the creek are diverted into drainage pipes.
Nevertheless, the definition of ‘flood’ under the policy refers to the escape or release
of water from any lake, any river, creek or other natural watercourse whether or not
altered or modified.
I accept that Browns Creek is a natural watercourse that has been modified and
therefore fits within the definition under the terms of the policy.
Rainwater damage before floodwater arrived
I am satisfied based on the available information that some damage was likely
caused to the applicants’ property prior to the arrival of the floodwaters.
The applicants’ property is located in D Street Lismore within the Central Basin area
of Lismore approximately 150m from Browns Creek. According to the initial hydrology
report provided by WM, the ground level of the property is estimated at between
6.4mAHD to 6.7mAHD.
In a subsequent report, WM has suggested the ground level could be 7.5mA HD. I
can find not information to support that view and prefer the estimate of 6.4mAHD to
6.7mAHD.
WM considered the initial inundation of the applicants’ property was caused by the
overflow of water from Browns Creek. WM considered:
the maximum depth of inundation was caused by water escaping Wilsons River
the initial inundation to a height of approximately 1.25m was caused by Browns
Creek
local storm water would not have inundated the property above floor level.
Case No: 492810 Determination Page 3 of 4
In a supplementary report, WM acknowledged that a lot of water would have been
flowing past the applicants’ property at 4.00pm on 30 March 2017 . WM says the
water could not have been knee deep at the applicants’ property at 5.00pm and could
not have been waist deep at 8.00pm (as claimed). This assessment was based on an
estimated floor level of the building of 6.8mAHD.
WM says due to the height of the office floor, it would not have been inundated until
8.30pm on 30 March 2017.
Video evidence inconsistent with report from WM
I had the opportunity o f discussing the circumstances with the applicants’ owners.
The owners provided a video taken from the front of the office building at 2.56pm on
30 March 2017 showing water running freely and rapidly towards Browns Creek. This
is around the time the flood gates were closed.
I note from the information exchanged that the Browns Creek flood gates were
closed at approximately 3.00pm on 30 March 2017. This would have meant that
Browns Creek had limited drainage capacity and the stormwater/rainwater runoff
would have had limited capacity to drain into Browns Creek.
A second video taken at 7.09pm on 30 March 2017 shows water about 200mm to
300mm high inside the office building. The building was ultimately inundated to
approximately roof height. The videos are inconsistent with the view expressed by
WM that the water could not have inundated the office until 8.30pm.
Hydrologist report from GS persuasive
The applicants’ hydrologist GS considered the initial inundation of the property was
not caused by floodwaters but caused by the overland flow of stormwater which
could not drain into Browns Creek.
According to GS, the rainfall event exceeded the capacity of the Browns Creek pipe
system and, as a result, it was unable to drain quickly enough. This caused a choking
of the stormwater drainage system and a surcharge of the pipes, resulting in the
overland flow and runoff ponding.
GS considered the initial inundation was caused by stormwater/rainwater runoff
occurring during the peak rainfall.
Initial inundation on balance caused by rainwater/stormwater run off
The applicants’ comments are consistent with the comments of GS and consistent
with the peak rainfall occurring from early afternoon on 30 March 2017 until 7.00pm
on 30 March 2017.
The observation of the stormwater runoff is consistent with eye witness comments
about the water being clear water, which is not consistent with normal floodwater or
water escaping from a creek.
I accept based on the available information that it is fair in the circumstances to
determin e that the initial inundation of the applicants’ car yard and office was a result
Case No: 492810 Determination Page 4 of 4
of rainwater/stormwater runoff. I accept that this would have caused some initial
damage to the applicants’ property.
Peak inundation caused by flood
There is no dispute that the peak level of inundation was caused by flood.
The hydrology reports whilst differing as to the cause of the initial inundation of the
applicants’ property, acknowledge that the property was ultimately inundated by
floodwaters.
I acknowledge that water escaping from Browns Creek once combined with the
stormwater runoff would be considered floodwater. I accept that the floodwaters from
Browns Creek would have inundated the applicants’ property and ponded to a level
of 8.05mAHD prior to the floodwaters arriving from Wilsons River in the early hours of
31 March 2017.
FSP is liable for the initial rainwater damage
The FSP is liable for the initial loss and damage that occurred prior to the floodwater
arriving.
It is difficult to determine at what point the stormwater runoff impacting on the
applicants’ property mixed with the water escaping from Browns Creek to become
floodwater. Without precise information on which to determine the level of the initial
inundation, I can only do what is fair in all the circumstances.
In the absence of precise measurements and with the benefit of the video material
provided, I am satisfied it is fair in the circumstances to allow for the initial inundation
to a level of approximately 200mm above floor height in the office. Such inundation is
likely to have caused damage to flooring, plaster some furnishings and electrical
wiring.
Within 30 days of the applicants’ acceptance of this determination, the FSP should
arrange for a scope of works to be obtained to identify the likely loss and damage
would be sustained by such inundation.
The parties are asked to work cooperatively to determine a suitable settlement figure
based on the scope of works obtained.
The FSP is entitled to cash settle the applicants’ claim for this damage. If t he parties
are unable to reach agreement then the parties may return to the Service for
determination as to any cash settlement. The FSP is entitled to refuse payment of the
balance of the loss or damage sustained due to flood in accordance with the terms
and conditions of the policy.