Home / Financial Firm (Unknown - Insurer) / Determination 492278

Determination 492278

Bathroom leak claim denied after pre-claim remediation; claims handling compensation

FirmFinancial Firm (Unknown - Insurer)
Decided2018-07-13
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$350
Amount claimed—
SourceAFCA PDF

Summary

The applicant's home leak claim was denied because she authorised bathroom remediation before lodging the claim, preventing the FSP inspecting the damage, and the leak was not shown to be sudden. AFCA upheld the denial but ordered $350 for stress and inconvenience from the claims process.

The policy requires the insured to allow inspection before repairs and to obtain consent, and the insurer may refuse a claim where pre-lodgement works prejudiced its position, while unusual inconvenience in claims handling warrants modest compensation.

Issues

Subjects and remedies

home or building damagepay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 492278 Determination Page 1 of 5 Case number: 492278 18 June 2018 1 Overview 1.1 Dispute The applicant held a home and contents insurance policy with the financial services provider (FSP). On or about 27 May 2016, the applicant lodged a claim for damage caused by a leak in her bathroom. The FSP denied the claim on the basis it was not provided the opportunity to assess the original damage and determine the extent of its liability. The applicant disagreed with the FSP’s decision. The Case Analyst provided the parties with a recommendation on the issues in dispute. The recommendation was in favour of the FSP. A copy of the recommendation is attached to this determination. 1.2 Issues and key findings Were the findings of the recommendation correct? The findings contained in the recommendation were correct and are adopted in this determination. No new material was provided after the recommendation was issued which affected the outcome of this dispute. Was the FSP entitled to deny the applicant’s claim? The applicant has not established that the escape of liquid which caused damage to her property was covered under the terms and conditions of the policy. Further, the FSP was not able to assess the initial damage to determine its liability, as the applicant began remediation works prior to lodging the claim. Therefore, the applicant has failed to comply with the terms and conditions of the policy. The FSP is entitled to deny the claim. Were there issues with the FSP’s service a nd handling of the claim? The FSP’s conduct in the claims handling process warrant s compensation of $350. 1.3 Determination This determination is in favour of the FSP. Case No: 492278 Determination Page 2 of 5 I agree with the Case Analyst’s reasons for the recommendation and the recommended outcome. The FSP is required to pay $350 in compensation. Case No: 492278 Determination Page 3 of 5 2 Reasons for determination 2.1 Were the findings in the recommendation correct? I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have considered all the material submitted by the parties, both before and after the recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. I am satisfied that the Case A nalyst’s recommendation contains an accurate summary of the dispute, the issues to be determined, any applicable paragraphs of the Terms of Reference and any relevant law. 2.2 Is the FSP entitled to deny the claim? The policy provides cover for damage caused by listed events The applicant’s policy provides cover for loss or damage caused by specific events, subject to the various conditions and exclusions set out in the policy. One event is ‘ s udden and unexcepted escape of liquid’ . There is no dispute that the applicant’s pr operty sustained damage and there were signs of a water leak. However, the available information does not establish that the escape of liquid was sudden or unexpected from one or multiple listed items under the insured event. The applicant further submitted that the policy also provided coverage for gradual leaks. In reviewing the policy terms and conditions such coverage is conditional upon the following: [..] unless it is reasonable that you could not have known about the liquid escaping. Conflicting opinions have been provided by the parties as to when the applicant had first become aware of the damage. In the statutory declaration provided by the applicant’s plu mber SB, he confirmed that there was large bulge in the kitchen ceiling under the bathroom and that the damage was extensive. T he FSP’s builder, in their report noted that such damage would appear to have been present for a period of up to 6-8 months. In reviewing the parties’ submissions, including the expert reports in line with the product disclosure statement, I accept that the extent of such damage would have been visible on the kitchen ceiling. Further, the applicant was completing renovations to the property at the time. Therefore, I do not accept the applicant would have not known that there was some sort of leak or issue present at the property. On balance, I accept the applicant has not established a valid claim under terms of the policy. Case No: 492278 Determination Page 4 of 5 The applicant has not complied with policy terms and conditions The FSP says when its builder attended property to inspect the damage, remediation works had commenced, resulting in an inability to assess the loss and identify the source of the damage. As a result, the FSP says the applicant did not comply with the policy conditions because FSP could not inspect the damage prior to any repairs or disposal of the damaged items. On attendance to the property the FSP’s builder, noted the following:  due to extent of renovation works that have commenced they could not determine the true extent of damages  the bathroom that had leaked was completely stripped with all plumbing removed  majority of the material associated with the claim was removed prior to FSP’s builder attending. The applicant disputes the above and says the FSP could have assessed the damage. The applicant also says she was never informed by the FSP to stop work/repairs from commencing. In the absence of any substantive information to support this argument or refute the FSP’s builder’s findings , I accept the FSP was unable to thoroughly inspect the initial damage. I find the policy clearly and unambiguously outlines the following conditions which an insured must comply with:  contact the FSP and provide full details of what has happened  give the FSP the opportunity to inspect the damaged goods or property before conducting any repair or disposal  obtain the FSP’s consent before you authorise or commence repairs, or incur any costs, unless the repair or cost is necessary to prevent further loss. Importantly, the policy says if you do not comply with the above conditions, the FSP can reduce or refuse to pay the claim. In reviewing the material provided, I accept the applicant did not complete all the required repairs prior to lodging the claim. However, supporting invoices provided by the applicant’s experts confirm that prior to claim lodgement the following occurred:  bathroom had been stripped  ceiling in the kitchen had been removed  building debris was removed. I therefore, accept this sup ports the FSP’s builder’s findings and photographs from its initial assessment which was conducted on the day the claim was lodged. FSP is entitled to deny the claim I have considered all the expert reports, photos and submissions in line with the policy terms and conditions. The policy is subject to conditions and exclusions and therefore the FSP is required to undertake necessary investigations to identify cause of the claimed damage to determine its liability based on what the policy covers. Case No: 492278 Determination Page 5 of 5 Whilst the reports provided by the applicant establish there was damage due to a leak, on balance I accept this is insufficient for the FSP to accept the claim under the defined events policy. Further, I accept the applicant’s actions prior to claim lodgement has pr ejudiced the FSP’s position because it could not:  determine the extent of the damage  view the damaged materials removed from the kitchen/bathroom  apply the terms and conditions of the policy. The policy is clear in stating the FSP can refuse to pay a claim if the insured has not complied with the conditions mentioned above. On balance, I find that the applicant has failed to comply with the policy conditions and has not established a valid claim under the policy. I am therefore satisfied the FSP is entitl ed to deny the applicant’s claim. 2.3 Were there issues with the FSP’s service and handling of the claim? Compensation warranted in the circumstances This issue was not dealt with in the recommendation. The applicant has expressed dissatisfaction as to how long the claims process took and states there were too many representatives from the FSP handling her dispute. In limited circumstances FOS can award compensation for stress or inconvenience caused by an FSP’s conduct. However, FOS will only award compensati on if there has been an unusual degree of or extent of inconvenience. I note the claims process has been somewhat protracted which resulted in frustration for the applicant. However, part of this was due to the applicant having undertaken remediation work prior to lodging the claim which therefore prevented the FSP from assessing the initial damage and loss. This resulted in the need for further investigation to determine the exact cause of damage and the extent of the FSP’s liability. FOS expects applicants to be moderately robust and bear the normal degree of inconvenience experienced when a problem occurs. However, I accept the applicant had grounds to be dissatisfied with the claims process. Therefore, I award $350 to the applicant as compensation. Recommendation Case No: 492278 Recommendation Page 1 of 7 Case number: 492278 20 February 2018 1 Overview 1.1 Dispute The applicant made a claim under her home and contents insurance policy (the policy) with the financial services provider (FSP) for damage caused by a leak in her bathroom. Before lodging the claim, she engaged trades to perform a make safe and commence remediation of the bathroom. The FSP denied the claim because it was not given the opportunity to assess the original damage and determine the extent of its liability (if any). The applicant disagrees with this and believes the FSP had ample opportunity to assess the damage. She also says the policy covers damage caused by the escape of liquid where the insured did not know about the liquid escaping. She is seeking 75% of the cost of the works authorised because the remaining 25% represented her decision to upgrade her bathroom. 1.2 Issues and key findings Has the applicant established a valid claim? The applicant has not established a valid claim because:  no evidence confirms the leak was sudden and unexpected.  she was uncertain about the source of the leak when she lodged the claim.  she first noticed the leak six to eight months ago and the leak was gradual and ongoing. Has the applicant complied with terms and conditions of the policy? The applicant has not complied with the policy terms and conditions because:  she authorised remediation works three days prior to lodging the claim  the FSP could not assess the initial damages or determine its liability. Can the FSP deny the applicant’s claim ? The FSP is entitled to deny the claim because the applicant has not complied with the terms and conditions of her policy and has failed to establish the property sustained damage as a result of an insured event. 1.3 Recommendation This recommendation is in favour of the FSP. The FSP need take no further action in respect of the claim and was entitled to deny it. Case No: 492278 Recommendation Page 2 of 7 2 Reasons for recommendation 2.1 Has the applicant established a valid claim? Onus on applicant to establish damage caused by an insured event The policy contains a list of the insured events that are covered. The applicant lodged a claim under the insured event of ‘Sudden and unexpected escape of liquid at the insured address’. The onus is on the applicant to show on the balance of probabilities the claimed damage is a result of that insured event. Once this is established, the onus shifts to the FSP to prove the damage is excluded or otherwise not covered. The claim lodgement call recording from 1 minute and 16 seconds to 1 minute 38 seconds confirms the applicant did not know where the leak had originated from when she lodged the claim. She goes on to say the trades ‘did not know either when they pulled it up’ and the leak was either from the toilet or the shower base or associated with waterproofing ‘or something like that’. She also mentions the timber was rotten and that she has been living in the home for nine years and ‘never had a problem’. The information submitted by both parties establishes the following:  the expert reports do not confirm whe ther the leak was sudden and unexpected  the applicant was uncertain about leak source at claim lodgement  the applicant authorised remedial works prior to claim lodgement  the applicant refers to the leak as gradual in her submissions to FOS  the applicant’s trades believe the leak was ongoing. The FSP builder says the floor joists needing replacement would indicate the leak had been occurring for an extended period of time (over six months), however is unable to confirm a timeframe. The applicant’s plumber S B in his report says:  water was escaping from the drainage pipe connected to the toilet  the leak was not visible in the bathroom  the leak was obvious in the kitchen ceiling directly below the bathroom  there was extensive water damage under floor including floor joists. The applicant’s plumber SB also provided a statutory declaration which, in part says, he could not say how long the leak was ongoing and confirms the extensive damage to floor joists. In a conversation with the FSP, SB advised:  the leak was ‘constant’  the bathroom looked ‘fine’  the leak could be seen from the kitchen ceiling  condition of kitchen was ‘bad’ and had mould  leak could have been present for a year. Case No: 492278 Recommendation Page 3 of 7 The FSP also contacted the applicant’s builder who stripped out the bathroom who confirmed the ceiling was ‘mouldy’ and needed replacing. The FSP’s builder in his report also says while the full extent of the leak was not discovered until 24 May 2016, the applicant stated she first noticed the water damage to the kitchen wall/ceiling approximately six to eight months ago. The applicant denies saying this, however she has not provided any information to refute this. On balance, given the extent of the damage and the timeframes of the leak given by the experts, I accept it is likely the applicant would have noticed the damage in her kitchen prior to 24 May 2016. I am not satisfied the applicant has established a valid claim because there is no evidence the escape of liquid was sudden and unexpected from one of the listed items under the insured event. The applicant submits the policy covers damage where the insured did not know about the liquid escaping. While the policy provides coverage of gradual leaks conditional upon an insured not being reasonably aware of the damage occurring, the available information confirms:  the damage was visible from the kitchen  kitchen ceiling was mouldy  she first noticed the leak in the kitchen six to eight months ago. As such, I remain satisfied the applicant has not established a valid claim under the policy terms. 2.2 Has the applicant complied with policy terms and conditions? Applicant authorised bathroom remediation before claim lodgement The FSP says when its builder attended the site on the day of claim lodgement, remediation works had commenced. As a result he was unable to assess the original damages and identify the source of the damage. The applicant is of the view no remedial work had commenced when she lodged the claim. She says the FSP should pay the claim because:  the plumber cut the kitchen ceiling below bathroom for FSP to assess damage  the FSP could have assessed the damage  the FSP did not advise her to stop works from commencing  the source of the leak was confirmed  the FSP could have undertaken moisture testing of the timber beams  the tiles around the toilet were still intact when FSP builder attended.  the FSP did not investigate the leak. The FSP’s builder says when they att ended the day of claim lodgement, they could not identify whether an insured event had occurred because:  the bathroom had been stripped with the plumbing removed  leak detection not viable due to plumbing removal  builders onsite had already removed materials associated with claim  they could not identify the extent of the damage Case No: 492278 Recommendation Page 4 of 7  they could not identify where the leak originated. The claim lodgement call recording confirms that she had already arranged a make safe and ‘gutted the bathroom’. This is su pported by the itemised invoices provided by the applicant for works before claim lodgement on 27 May 2016: Date Action 23 May 2016 to 24 June 2016  Project Management Services 24 May 2016 to 23 June 2016  Plumbing servic es. 24 May 2016  Removal & replacement of kitchen ceiling  Removal toilet  Replacement of rotted joists  Jack hammering bat hroom tiles  Rendering, replacement of tiles & bathroom facilities  Waterproofing 25 May 2016  Complete strip out bathroom  Ceiling removal in kitchen (disposal)  Removal of building debris It is clear the applicant authorised complete restatement of the bathroom before lodging the claim rather than a make safe. I accept the above supports the FSP’s builder’s findings on the day of the assessment. The applicant says the FSP did not tell her to stop repairs. There is no information presented which confirms the FSP advised the applicant that it would pay her trades for repairs given the FSP could not assess the damage to determine its liability. Applicant has not complied with policy terms and conditions The FSP says the applicant did not comply with policy conditions because it could not inspect the damages before any repairs or disposal of the damaged items. The policy also sets out what an insured must do in the event of a claim. The policy clearly and unambiguously says if your home is damaged or an incident occurs which may result in a claim the insured, among other conditions, must:  contact the FSP and provide full details of what has happened  give the FSP the opportunity to inspect the damaged goods or property before conducting any repair or disposal  obtain the FSP’s consent before authorising or commence repairs, or incur any costs, unless the repair or cost is necessary to prevent further loss Importantly, the policy says if you do not comply with the above conditions, the FSP can reduce or refuse to pay your claim. I acknowledge the applicant’s position the bathroom repairs had not commenced, however the photographs show the bathroom stripped bare in preparation for reinstatement. This meant the FSP was unable to assess the original damage. Case No: 492278 Recommendation Page 5 of 7 While the applicant says she engaged and authorised trades before lodging a claim due to the urgency of the damage, I accept the applicant did not:  contact the FSP when the damage occurred/ was identified (she called three days later)  give the FSP an opportunity to inspect the damaged property before repairs or disposal  obtain the FSP’s consent before authorising repairs to her bathroom. Therefore, I accept the applicant did not comply with the terms and conditions of the policy. 2.3 Can the FSP deny the claim? FSP prejudiced by applicant’s actions Without assessment of the damage, the FSP has been prejudiced in its ability to properly assess the damage and determine its liability. The policy is subject to conditions and exclusions and therefore the FSP is required to undertake necessary investigations to identify cause of the claimed damage to determine whether it has liability based on what the policy covers. The reports provided by the applicant, on balance, establish the leak was gradual from the toilet drainage pipe. However, this is insufficient for the FSP to accept the claim. The applicant’s actions prior to claim lodgement has prejudiced the FSP’s position because the FSP could not:  determine the extent of the damage  undertake leak detection  view the materials removed from the kitchen/bathroom  apply the terms and conditions of the policy. The policy is clear in stating the FSP can refuse to pay a claim if the insured has not complied with the conditions mentioned above. On this basis, and also because the applicant has not established a valid claim under the policy, the FSP is entitled to deny the applicant’s claim. Case No: 492278 Recommendation Page 6 of 7 3 Supporting information 3.1 Key points Key points Record Key points Product Disclosure Statement Page 11 Insured event We will NOT cover : 9. Sudden and unexpected escape of liquid at the insured address from:  …  baths, sinks, toilets, basins or any  fixed plumbing apparatus  drainage or sewage systems  …  pipes and taps  the cost of repair or replacement of the item that the liquid escaped from, including the cost of repairs to a leaking shower floor, base, walls, glass screening, doors, tiles or grouting  loss or damage caus ed by leaking shower floors or bases, tiled roman baths or shower recess walls  loss or damage caus ed by water splashing from baths, basins, recesses or tubs dur ing use  loss or damage caus ed by liquid that has escaped slowly over a period of time, unless it is reasonable that you could not have known about the liquid escaping. Applicant’s plumber ( S B) Report 10 June 2017  Water escaping from the drainage pipe connected to toilet  Not visible in the bat hroom  There was obvious vision in the kitchen ceiling FSP’ discussion with applicant’s plumber Claim file not es 22 September 2017  S ADVISED THE CONDITION OF THE KITCHEN WAS PRETTY BAD AS IT HAD SOME MOULD ON IT  H E ADVISED THE BATHROOM LOOKED LIKE IT WAS FINE BUT THE WATER WAS GETTING OUT UNDERNEATH  HE ADVISED YOU COULD ONLY SEE THE LEAK FROM THE KITCHEN CEILING AND  IT WASN'T UNTIL THEY CUT OUT THE CEILING THAT THEY SAW WHERE IT WAS COMING THROUGH AS THEY WERE LOOK ING FOR IT IN THE BATHROOM ORIGINALLY  S ADVISED THE CONDITION OF THE KITCHEN WAS PRETTY BAD AS IT HAD SOME MOULD ON IT  HE ADVISED THE WATER WAS GETTING OUT BEHIND THE TOILET AND RUNNING DOWN BEHIND THE WALL Case No: 492278 Recommendation Page 7 of 7  HE ADVISED THEY COULD FIX THE LEAK BUT THE WHOLE FLOOR HAD TO BE REPLACED AS WELL AS THE DRAINAGE  S ADVISED THE LEAK WASN'T THAT BIG BUT WAS CONSTANT AND BELIEVES IT COULD HAVE BEEN THERE FOR A YEAR FSP’ discussion with applicant’s plumber Claim file not es 22 September 2017  [builder] ADVISED [applicant] ARRANGED THE WORK BECAUSE THE FLOOR BOARDS WERE ROTTEN AND DUE TO HAVING TO STRIP THE FLOOR IT AFFECTED THE WATERPROOFING MEMBRANE AND THE WHOLE BATHROOM HAD TO BE RE - DONE  HE ALSO CONFIRMED THE KITCHEN CE ILING WAS ALL MOULDY AND NEEDED REPLACING FSP ’s builder Report 27 May 2016  The insured stated that water damage to the kitchen wall/ceiling was first noticed approx. 6 to 8 months ago. The insured however stated that the full extent of the water leak was not discovered until Tuesday the 24.05.16  In my o pinion, it would appear that damages have been present for a period of up to 6 - 8 months  The insured advised that they had damaged (sic) caus ed to their bathroom and kitchen due to a water leak coming from the toilet in the bathroom.  Due to the damages cau sed by the leak the ins ured stated she had renovation works started to the bathroom and kitchen. This was evidence at the time of my inspection. The insured advised she has been at the property 9 years and this would be the first time something of this nat ure has occurred.  After my inspection, I can confirm the following were damaged by water: kitchen. Plasterboard ceiling and wall. Bathroom. Timber floor joists.  Yes there is water damaged items, however due to extent of renovation works that have commence d onsite I cannot determine the true extent of damages and can only go off what still can be seen.