After water damage to his home, the applicant disputed the FSP's cash settlement of $1,318.96 and sought reimbursement of flashing repairs and brickwork cracking. AFCA ordered the cash settlement increased to $2,000 and rejected the other claims.

The insurer may cash settle under the policy but must base settlement on an actionable quotation that includes the painting, and unrelated brickwork damage is excluded from cover.

Issues

Subjects and remedies

home or building damagepay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 491851 Determination Page 1 of 5 Case number: 491851 22 January 2018 1 Overview 1.1 Dispute The applicant holds a home building policy underwritten by the financial services provider (FSP) covering his home address. On 8 January 2017, the applicant returned home from holidays to find water damage to the property, and lodged a claim under the policy. The FSP accepted the claim and arranged for builder “UB” to undertake the necessary repairs. UB completed some of the works required, but during the course of repairs it discovered an unrelated issue with the bedroom ceiling which meant that work could not be warrantied. The FSP subsequently cash settled for this aspect of the claim. The applicant is dissatisfied with the cash settlement amount, stating it is inadequate to complete the necessary repairs. He also maintains UB incorrectly identified the source of the water ingress, leading to him incurring unnecessary costs to repair a non-existent issue. He seeks reimbursement of this cost. 1.2 Issues and key findings Has the FSP fulfilled its obligations under the policy? The FSP is to increase its cash settlement offer to $2,000. This amount will reasonably discharge its obligations under the policy. The FSP is not obliged to cover the external cracking under the claim as the material shows this is unrelated to the claimed event. The FSP is not liable to reimburse the applicant for the flashing repairs, as it has not been demonstrated these repairs were unnecessarily undertaken. 1.3 Determination This determination is substantially in favour of the FSP. The FSP is not obliged to reimburse the applicant for the flashing repairs or to include the brickwork in the repairs. However, the FSP is to increase its cash settlement offer to $2,000, which will reasonably discharge its liability under the policy. The FSP is to remit this payment (or the balance) to the applicant within 14 days of the date of the applicant’s acceptance of this determination. Case No: 491851 Determination Page 2 of 5 2 Reasons for determination 2.1 Has the FSP fulfilled its obligations under the policy terms? Applicant has established a prima facie claim The applicant carries the initial onus to show the relevant insurance policy covers the loss. This is known as a prima facie claim. Once the applicant establishes a claim, the onus shifts to the FSP to demonstrate the loss is not covered. This is either by way of one of the policy exclusions or on some other basis. Establishing a claim entails showing both the cause and extent of the loss. There is no dispute the applicant suffered a loss from a risk insured against or that the FSP accepted the claim and arranged for the damage to be either repaired or cash settled. However, a dispute has arisen between the parties over the FSP’s settlement and the management of the claim. There are several contentious issues in dispute. For the sake of clarity, each item will be addressed separately below. Source of water ingress is disputed When inspecting the property, UB considered the sources of the water ingress was from inadequate flashing around the air conditioning unit, and from inadequate flashing around a balcony post. The applicant does not dispute that water was entering through the balcony post or that this area required rectification. However, he maintains the source of the water to the bedroom was a split hose pipe in the air conditioning unit as opposed to the external flashing. In support of his position, the applicant has presented an invoice from technician “B” for the repair of the hose, which is dated 13 January 2017. The applicant accepts the cost to repair the hose is not covered by the policy terms. The applicant says he appointed plumbing firm “PF” to repair the flashing and was informed this was completely unnecessary as it was watertight. However, because of the insistence of the FSP, he completed repairs regardless and incurred costs in doing so. As these repairs were not necessary, he seeks reimbursement for them. Insufficient evidence to show flashing repairs not required The applicant’s position does appear to have some merit. It would seem very contemporaneous to the leak that B attended and repaired the split hose. Further, the flashing was not reportedly repaired until May, and there is no evidence of leaks in between that time. This would suggest the split hose was the source of the water. However, when reviewing PF’ s quotation for the works, there is nothing on there to suggest the repairs undertaken were not necessary. On the contrary, it suggests the works were necessary to better cope with stormwater dispersal. Therefore, the Case No: 491851 Determination Page 3 of 5 probability of either two sources of water ingress or future ingress cannot be discounted. I also note the only document from PF supplied is a quotation as opposed to an invoice, which would demonstrate the repairs had been undertaken. The applicant was invited to provide a further report from PF in support of his position that the repairs to the air conditioning unit were unnecessary. However, he has not done so. Therefore, in the absence of compelling evidence showing the repairs to the flashing were wholly unnecessary, or that these were actually undertaken, it is not open to me to conclude that the FSP is liable to reimburse these costs to the applicant. Applicant says cash settlement amount is insufficient When commencing repairs on the bedroom ceiling, UB discovered it was sagging. This was unrelated to the claimed event but was due to the installation of a ceiling fan at some point in the past. As UB was not able to warrant the work, the FSP offered a cash settlement of $1,318.96. This was for the replacement plaster, ceiling fan, downlights and painting the window frame in the lounge room. The applicant says the amount is inadequate because it does not include any allowance for insulation, painting of the ceiling or carpet cleaning. He also says UB caused further damage to the ceiling, and left several holes in it, which will now cost him more to repair. The applicant also says the FSP has settled on its trade prices, which he is unable to access. He will need to pay retail prices for the repairs. FSP entitled to alter method of settlement The applicant also raises issue with the FSP’s decision to alter from repair to cash settlement for the bedroom ceiling. The policy states that the FSP retains the right to choose the method of settlement it uses. Therefore, the FSP was entitled, under the terms of the policy, to cash settle. Whilst FOS expects an insurer to exercise its discretion to cash settle reasonably, as doing so can affect other policy entitlements, the material before me suggests this was reasonable in the circumstances. Where there is a pre -existing issue which affects the ability to warranty work undertaken, a cash settlement in lieu of repairs is a reasonable approach. I accept the applicant is disappointed with the change and with the fact that the issue with the ceiling was not noted earlier. However, there is nothing in the material to suggest UB could, or should, have been aware of the issue with the ceiling until it commenced repairs. Cash settlement is insufficient to discharge FSP obligations Having reviewed the original scope of work (SOW), there is no allowance for insulation or carpet cleaning. The applicant has not presented any evidence to show these were required as a result of the event, therefore I do not accept them as part of the claim. Case No: 491851 Determination Page 4 of 5 Although the FSP has not commented on the allegation of damage to the ceiling, the original SOW allows for its replacement. Therefore, I am not persuaded the applicant has or will incur additional costs to repair this as its replacement was already allowed for. However, the original SOW does include painting of the ceiling, which does not appear to have been factored into the cash settlement amount. The FSP has not addresse d this issue and therefore I accept the applicant’s position that it has been left off the calculations for the repairs. FSP unable to rely on UB’s quotation for its settlement The FSP has not commented on whether the estimate it based its cash settlement on is a trade or retail price and the policy is silent on how the FSP deals with such matters. However, in my view the issue is moot. The FSP is required to base its settlement on an actionable quotation, that is, one the applicant could utilise to repair the property if they so choose. In this instance, UB has flatly refused to undertake any more work for the applicant. Accordingly, its quotation cannot be used as the basis for settlement. Whilst the applicant has not provided any alternative quotations, I am mindful that the relationship between the parties has deteriorated to such an extent that it would not be in either party’s interests to undertake further quotes or assessments. Therefore, in the interests of bringing this matter to a conclusion, I co nsider it fair in all the circumstances that the FSP increase its settlement offer to $2,000. I consider this reasonable to cover the painting required, any ancillary costs and offset any trade discount the FSP may have used. In the circumstances, an award of interest is not appropriate. Insufficient evidence to show crack in brickwork related The applicant also seeks cracking to the external brickwork to be included in the claim. He maintains it was damaged as a result of the claimed event. UB inspected the cracking and determined the stepped crack was more consistent with ground movement and settlement, as opposed to this event or any other scenario which would be covered by the policy. The applicant was invited to provide evidence in support of his position that this was claim related, such as a report from a suitably qualified person. However, he did not do so. Accordingly, in the absence of any contradictory information the FSP is entitled to rely on UB’s findings that this damage was unrelated to the claimed event. As causes of such damage are specifically excluded from cover, the FSP was entitled to exclude this aspect of the claim. Case No: 491851 Determination Page 5 of 5 3 Supporting information 3.1 FOS approach to this dispute A full exchange of the relevant information has taken place between the respective parties. Each party has had the opportunity of addressing any issues raised. All of the provided material has been reviewed and considered. The parties have raised numerous issues in their submissions to the Service. However, commentar y in this determination is restricted only to those issues considered relevant to the outcome.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.