Flood inundation and roof and ceiling water damage claims declined
Summary
Applicant's home was inundated during Cyclone Debbie and roof and ceiling water damage was also claimed. The FSP declined both; AFCA found the inundation was flood and the roof damage was excluded for deterioration and poor workmanship.
Flood is excluded where no flood cover was held, and roof and ceiling damage resulted from long-term maintenance and design issues, which are excluded.
Issues
- Claim denial primary · not upheld“The policy specifically excludes flood, and the applicant did not have flood cover. The roof and ceiling damage was due to poor workmanship and gradual deterioration.”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 491734 Determination Page 1 of 8
Case number: 491734 29 May 2018
1 Overview
1.1 Dispute
The applicant held a home building and contents insurance policy with the financial
services provider (FSP).
The applicant lodged a claim under the policy, after the property was inundated by
water between 30 and 31 March 2017, following heavy rain from cyclone Debbie. He
also claimed for stormwater damage to the property’s roof and ceilings.
The FSP says neither the inundation nor the damage to the roof and ceiling were
caused by events insured under the policy.
The FSP says the inundation was caused by flood and the damage to the roof and
ceiling was due to various causes (eg, wear and tear, gradual deterioration, etc). The
FSP argues these causes of damage are all excluded from cover under the policy.
The applicant disputes this outcome and considers all damage was caused by storm
water. He wants payment of the claim in full and also for temporary accommodation.
1.2 Issues and key findings
Is the inundation damage covered under the terms of the policy?
Based on the available material, the FSP is entitled to decline the claim for
inundation damage to the home building and contents. This loss is excluded from
cover because:
the policy specifically excludes loss or damage caused by flood
on balance, the water that caused the loss was flood water.
Is the damage to the roof and ceilings covered under the terms of the policy?
The FSP is entitled to decline the claim for damage to the roof and ceilings because
it has established, on balance, the damage was due to causes excluded from cover
under the policy, such as poor workmanship and gradual deterioration.
1.3 Determination
This determination is in favour of the FSP.
The FSP i s entitled to decline the applicant’s claim and is not required to take any
further action.
Case No: 491734 Determination Page 2 of 8
2 Reasons for determination
2.1 Is the inundation damage covered under the terms of the policy?
Applicant is not covered for flood
The applicant’s policy covers loss or damage caused by an insured event, including
storm, rainwater or run-off and escape of liquid. The policy schedule shows cover
can be upgraded to ‘accidental damage’, but this option was not taken.
The supplementary product disclosure statement provides the definition of flood:
flood means the covering of normally dry land by water that has escaped or been released
from the normal confines of any of the following:
a lake (whether or not it has been altered or modified);
a river (whether or not it has been altered or modified);
a creek (whether or not it has been altered or modified);
another natural watercourse (whether or not it has been altered or modified);
a reservoir;
a canal; or
a dam.
However, loss or damage caused by flood is not covered where an insured does not
have flood cover.
The relevant policy schedule confirms the applicant did not have cover for flood
during the policy period in which the loss occurred.
Limited evidence of stormwater inundation
The exchanged material confirms there was a significant weather event across
Australia during the latter part of March 2017. A substantial amount of rain fell in the
area local to the applicant’s insured property during that time.
The available submissions from the parties indicate the dwelling was first inundated
by water approximately between 10.30pm and 11.00pm on 30 March 2017.
At the applicant’s request, the Financial Ombudsman Service (FOS) has considered
a hydrology report from MH, dated 30 June 2017, provided by the NSW Small
Business Commissioner. While this report is helpful, it is general in nature and not
specific to the applicant’s site or the area where the site is located.
The FSP provided a report from its hydrologist WR, dated 7 May 2017, following a
site inspection of the insured premises on 3 May 2017. A supplementary letter was
provided by WR on 6 September 2017, in response to information regarding the
inundation at the property provided by the applicant.
WR’s report and images show the dwelling i s high-set (except for the garage which is
at ground level), approximately 1.3m above ground. An open channel runs adjacent
to the site on the south and east sides. B Creek is located 300m north of the site.
Case No: 491734 Determination Page 3 of 8
WR explains, given the relatively small area of the local stormwater catchment,
stormwater runoff would not have caused above floor inundation without water
overflowing from the open channel and water from B Creek.
As to the garage, WR notes it is set well back from T Way and stormwater would
have drained to the open channel at the northeast corner rather than inundating the
garage above floor level.
The applicant says rain did not stop until approximately 5am on 31 March 2017. Data
captured in WR’s hyetograph confirms there was no rain in the area after 5am. The
data indicates peak rainfall intensities occurred between 12 midnight and 1am on 31
March 2017. At the time of initial inundation, the rainfall had not reached its peak yet.
B Creek water level gauge (about 2.1km west northwest of the site) recorded water
levels peaking at 18.32mAHD at 1.45am on 31 March 2017. WR explains inundation
of the property above floor level would have commenced about 1 -2 hours before this.
WR says water levels at the property would have peaked a short time later. This is
consistent with the applicant’s statement that water started to recede around 3.00am -
4.00am on 31 March 2017.
Loss was caused by flood
Having reviewed the available material, including information from the Bureau of
Meteorology, WR concluded the inundation at the insured premises was likely
caused by floodwaters overflowing from B Creek and the open channel at the south
and east of the property.
The applicant says there is no canal, dam or channel in the vicinity. He considers the
feature to the south and e ast of his property is a ‘trench’.
Images from the council’s publicly available interactive map and WR’s photographs
show this feature carries water. The panel is satisfied this feature would be
considered ‘another natural watercourse’ or ‘canal’ under the ‘flood’ definition.
The applicant has also argued the stormwater runoff would have come from the hills
and inundated his property before B Creek was in flood.
However, the images of the area show stormwater runoff from hills to the north and
south cannot reach the property without first going into B Creek or the open channel
and then overflowing onto adjacent land. This circumstance is also considered ‘flood’.
The applicant says water that reached the property was clear, which shows it was not
from the cre ek. The photograph provided by the applicant, in the panel’s view, does
not show clear water. The water is slightly murky and the fact it was carrying debris is
also confirmed by the flood marks within the building as seen in other photographs.
The panel accepts stormwater runoff is generally associated with intense rainfall
periods. However, according to the information to hand, the peak one -hour intensity
(69mm/hr) did not occur until 60 to 90 minutes after the initial inundation.
There is no other expert material in this dispute that challenges the conclusions of
WR.
Case No: 491734 Determination Page 4 of 8
Having reviewed the parties’ material, the panel is satisfied the cause of inundation
was a result of flood waters overflowing from the open channel adjacent to the
property and B Creek.
On this basis, the FSP is entitled to rely upon its policy exclusion for flood to deny the
applicant’s claim for water damage to his buildings and contents as a result of
inundation.
2.2 Is the damage to roof and ceilings covered under the policy?
Applicant has established prima facie claim
The applicant is required to show, on the balance of probabilities, he has suffered a
loss caused by an event insured for under the policy. This is known as a prima facie
claim. If he can establish this, the FSP is then required to show, on the balance of
probabilities, the claim is not covered or is otherwise excluded under the policy.
As per section 2.1 above, the policy provides cover for listed insured events.
Relevantly, the policy provides cover for the insured event of ‘st orm, rainwater or
run- off’. The applicant has made a claim for water damage to roof and ceilings,
following cyclone Debbie.
Based on the policy definitions of ‘storm’ and ‘rainwater’, the panel is satisfied, on
balance, the circumstances of the claimed loss are captured by the insured event of
‘storm, rainwater or run - off’.
Therefore, the applicant has established a prima facie claim. The FSP now must
establish any exclusion or condition on which it seeks to rely to decline the claim.
FSP has established loss is excluded from cover
In its notice of response, the FSP mainly relies on an exclusion for ‘depreciation,
gradual deterioration, wear and tear’. However, it also mentions a general exclusion
for ‘inherent defects, faulty design, structural defects or poor workmanship’.
The FSP also relies on two specific exclusions, under the insured event of ‘storm,
rainwater or run- off’, for loss or damage caused by:
‘water seeping, percolating or otherwise penetrating into the buildings as a
result of structural defects, faulty design of the buildings, faulty workmanship or
failure to maintain the buildings’
‘wind, rainwater, hail or snow entering the buildings through an open window or
door or any opening not made by the storm, unless the loss or damage is
caused by run- off’.
After careful review of the building reports and photographs, the panel is satisfied, on
balance, the roof has several maintenance and design issues, such as loose lap
joints and no barge capping, which would allow constant water ingress. The panel
notes the maintenance issues are characteristic of a long term deterioration process.
Further, the internal damage (including holes in the ceiling and at the top of walls) is
consistent with long term damage rather than the result of a single event.
Case No: 491734 Determination Page 5 of 8
In the absence of evidence to the contrary, the panel is satisfied the FSP has
established the exclusions for poor workmanship, gradual deterioration and rainwater
entering the building through an opening not made by the storm apply to the
circumstances of the loss.
Therefore, t he panel is satisfied the FSP is entitled to decline the applicant’s claim for
water damage to his roof and ceilings.
Temporary accommodation cost not payable
The applicant is also seeking payment for temporary accommodation. However, for
this benefit to be activated, the policy requires the buildings to have been damaged
by an ‘insured event’ to such an extent the insured cannot live in them.
As to the damage to roofs and ceilings, even if it were accepted the cause of damage
was the cyclone event, the panel is not satisfied this event caused damage to an
extent the applicant could not live in the property. Previous damage to the roof and
ceilings had not prevented the applicant from living in the premises.
As to the inundation, the panel accepts this was caused by flood and not by storm.
As flood is not an insured event under the applicant’s policy, the panel is satisfied the
benefit for payment of temporary accommodation would not have been activated.
Accordingly, the FSP is not required to make any payments for temporary
accommodation.
3 Supporting information
3.1 FOS approach
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any iss ues
raised by the other.
This dispute has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions (which are not binding).
Rainwater that mixes with flood water is flood
The courts have established that once rainwater mixes with flood water, it is all
considered flood water. Where rainwater mixes with flood water and causes damage,
a flood exclusion will usually apply to defeat the claim.
Accordingly, when deciding disputes, consideration has been given to whether any
rainwater runoff damage occurred before the flood water arrived at the insured
property.
Case No: 491734 Determination Page 6 of 8
3.2 Key points on relevant expert material
Record Key points
FSP’s hydrologist
(WR)
Report
7 May 2017
The house is built on stumps and has a floor level about 1.3m above
ground level. It was inundated to a depth of about 730mm above floor
level. The garage, which has a floor level slightly above ground level,
was inundat ed to a depth of more than 2m above floor level.
An open channel flows east, at the rear of the property, then nort h under
T Way and the railway, via culverts. This channel drains a significant
hillslope catchment on the sout hern side of the property.
B Creek flows in an easterly direc tion about 300m north of the property.
The property is subject to flooding from this creek, which can back up
through culverts under the railway and T Way.
B rainfall station is the closest (2.1km west northwest of the property) and
likely repres entative o f the total rainfalls at the property. It shows rainfall
totals to 9am of 86.2mm on 30 March, 356.4mm on 31 March and 0mm
on 1 April 2017.
B rainfall station also recorded a peak one - hour rainfall int ensity of
69mm/hr, which occurred in the hour to 1am on 31 March.
Rainfall intensities between 29 March and 1 April were varied . Rainfall
durations of one hour were 14 year average recurrence interval ( ARI )
events. Other durations ranging from 2 to 48 hours had more significant
intensities (bet ween 26 and 79 year ARI events).
B Creek water level gauge is the closest (2.1km west northwest of the
property). Recorded wat er levels peaked at 18.32mAHD at 1.45am o n 31
March. Water levels at the property would have peaked a short time later.
The applicant says there were 500mm of rain in 24 hours. At 9pm on
Thurs day (30 March), there were no problems. It was very windy and
some wat er leak ed in through the roof. Wate r first came above floor level
at about 11pm. In 53 years they were never inundated above floor level.
The peak wat er level at the property was caused by floodwat er from B
Creek that backed up through culverts under the railway line and T Way.
B Creek floo dwater would have combined with floodwater overflowing
from the open channel along the southern and eastern boundaries of the
property. Waters in the open channel would not have been able to drain
freely due to the elevated water levels in B Creek.
Stormwa ter drainage along T Way (in front of the property) is poor.
However, the house floor level is elevat ed well above ground level and
stormwat er runoff would not have reached sufficient dept h to inundate
the house before inundation by floodwaters.
The garage is set well back from T Way and stormwater would have
drained to the open channel at the nort heast corner of the property rather
than inundating the garage above floor level.
The inundation of the house and garage were caus ed by floodwat ers
from B Creek, combined with floodwater overflowing from the open
channel at the rear of the property.
FSP’s builder
(AW)
Report
The insured advised during heavy rains from cyclone Debbie, water
entered in the home through the ceiling, causing damage. He also said
the property had extensive damage due to floodwaters.
Case No: 491734 Determination Page 7 of 8
17 May 2017 There is damage to several ceilings within the home. In the lounge room
and main bedroom there is pre - existing damage to plasterboard ceilings.
Damage to bedrooms and end section of the lounge room is as a direct
result of water ingress. This is attributed by the 5.2º pitch of the iron roof
on the side extension. With high volumes of rain, water has lapped over
the joints in the roof sheets into the ceiling below.
The laps over the joints were poorly finished with potential roof leaks
from the day it was installed.
High winds most likely drove rain up and into the roof cavity via these
joints. Further, it was evident the fixings, which are made of a lead top
and steel nail have broken due to the nail rusting away at its head. These
fixings have allowed roofing iron to lift during high winds, allowing rain in.
The roof has been poorly fitted with the potential for water to enter. There
have been several attempts to try and stop water leaks. There are
multiple locations with a heavy application of silicone.
AW believes the roof has been leaking for some time. The [cyclone]
event only increased the problem.
FSP’s builder (S)
Report
15 June 2017
Ceilings and walls are generally in poor condition. The damage to
ceilings in various locations is consistent with long term water ingress
easily identified by the extent of damage to the fibre component of the
plaster, along wit h extensive discolouration.
Damage relates to a minimum of 3 - 4 years of ongoing wa ter ingress.
Damage is consistent and apparent to all ceilings and walls in the house.
The roof is corrugated galvanised metal in extremely poor condition,
displaying large numbers of pedestrian indent ations, loosened lap joints
and fastenings. The skillio n roof to the western elevation is in poor
condition and pitched at approximately 5º.
There are corroded fastenings and evidence of previous repairs (large
quantities of flexible sealing compound to cappings and sheet junctions).
The gable overhang from th e main roof onto the skillion is poorly flas hed,
with no barge capping.
Timber barge boards finish hard down on the apron flashing. There are
gaps allowing the ingress of wind driven rain. Due to the low pitch, the
gaps at the base of the boards and apron flashing will easily allow wind
driven rain to access the roof area.
The underlap of the loosened lap joints displays weathering consistent
with roof surface, which indicates roof sheets having been loose for a
considerable time. Loosened lap joints throug hout the main plane of the
roof are consistent throughout the entire roof.
The roof has reached the end of its serviceable life and requires
replacement. There are no visible storm created openings or storm
related damage that would have allowed ingress of water.
The cause of ingress of wat er and damage to ceilings relates primarily to
a poorly maintained roof. The extent of damage to ceilings is consistent
with long term water ingress.
Case No: 491734 Determination Page 8 of 8
FSP’s hydrologist
(WR)
Letter
6 September 2017
Based on the shape of B Creek’s hydrograph, inundation of the property
above floor level would have commenced about 1 - 2 hours before the
peak of the flood.
Further, the house has a floor level that is about 1.3m above ground
level. The house floor would be well above the crown l evel of T Way.
Given the relatively small area of the local stormwater catchment, it is not
possible above floor inundation was caused by local stormwater runoff
without water overflowing from the open channel at the rear of the
property and water from B C reek.
Properties at 6075 and 6077 T Way are 1.6km west of the subject
property. Stormwater behaviour at these properties is different to the
subject property and is not relevant to what occurred to it.