Cash settlement of water damage claim and contents values
Summary
The complainant's home suffered water damage from a burst hose and she disputed the insurer's cash settlement for building repairs and contents. The panel found the insurer reasonably cash settled, the settlement matched her own builder's quote, and no compensation was payable.
An insurer may choose its settlement method under the policy but must exercise that discretion reasonably and ensure the cash amount covers the claim-related damage.
Issues
- Claim amount dispute primary · not upheld
“The panel is satisfied that the cash settlement amount is sufficient and that the contents cash settlement is fair and reasonable.”
- Poor claim handling secondary · not upheld
“The panel is satisfied that the insurer managed the claim reasonably overall.”
- Repairs or contractors secondary · not upheld
“The damage to the garage slab and driveway was not caused by the actions of the insurer's contractors.”
Subjects and remedies
home or building damageno remedy
Text of the determination
Case number: 491638 15 November 2018
1 Determination overview
1.1 Complaint
The complainant lodged a dispute under her home insurance policy with the financial
firm (insurer) for water damage to her home and contents items caused by a burst
hose in the upstairs vanity in May 2017.
The insurer accepted the claim and appointed its contractors to assess the damage
and prepare a scope of works for the necessary repairs. However, after identifying
pre-existing damage to the property, the insurer decided to cash settle the claim.
The complainant says the amount paid by the insurer is not sufficient to carry out the
necessary repairs to the property. She also considers the insurer has failed to settle
her for the full value of her damaged contents items.
The complainant is also dissatisfied with the level of service provided by the insurer
during the claim process.
1.2 Issues and key findings
Is the insurer entitled to cash settle the claim?
The insurer acted reasonably in deciding to cash settle the claim, due to the pre -
existing termite and water damage discovered in the areas affected by the burst pipe.
Is the insurer required to increase the cash settlement amount?
The cash settlement for the building repairs reflects the cost of repairing the damage
to the property caused by the burst hose. The settlement amount was based on a
quotation pr ovided by the complainant’s repairer.
The cash settlement for the contents claim fairly reflects the value of the
complainant’s damaged contents items.
Is the complainant entitled to compensation?
The complainant is not entitled to compensation because the insurer managed the
claim reasonably overall.
Determination | Case number: 491638 Page 2 of 7
1.3 Determination
This determination is in favour of the financial firm (insurer).
The insurer is not required to increase the cash settlement amount paid for the
building repairs and the damaged contents items. The complainant is not entitled to
compensation.
Determination | Case number: 491638 Page 3 of 7
2 Reasons for determination
2.1 Is the insurer entitled to cash settle the claim?
Policy outlines how claims will be settled
Under the terms of the policy, the insurer may settle a claim for damage to the
complainant ’s property caused by an insured event by:
repairing the damage to the property; or
paying the complainant the cost (to the insurer) of doing so.
It is clear from the terms of the policy that the insurer has the discretion to decide
which settlement method to adopt.
However, AFCA expects an insurer to act reasonably in exercising its discretion,
having regard to the circumstances of the claim.
Property had pre-existing damage unrelated to current claim
The reports prepared by the insurer’s assessor confirm that water from the burst pipe
affected several rooms on the first floor of the complainant’s property (including the
bathroom, toilet, hall and bedroom). The escaping water also travelled downstairs,
damaging the garage and storage areas.
The insurer appointed its contractors to carry out mould remediation works at the
property, to address mould growth resulting from the burst pipe
However, during these works, the insurer’s builder (AB) discovered termi te damage to
three separate parts of the timber framing in the downstairs section of the property.
The complainant has confirmed that she had previously had issues with termites.
The insurer’s builder (AB) also identified damage caused by long -term water entry to
the downstairs area. AB reported that rainwater was entering through the failed
waterproofing on the front deck located immediately above.
The termite damage and longer-term water entry issues are not related to the
complainant’s claim (which relat es solely to damage caused by the burst pipe).
Accordingly, the insurer was not required to repair the damage to these areas.
Insurer acted reasonably in deciding to cash settle claim
The reports and photographs provided confirm that the pre-existing damage was
present in the downstairs areas which had also been affected by the burst pipe.
Due to the nature and location of this damage, the insurer’s builders were unable to
complete the claim-related repairs (and the insurer was unable to guarantee the
repairs, as provided under the policy).
Determination | Case number: 491638 Page 4 of 7
In these circumstances, the panel is satisfied that the insurer acted reasonably in
deciding to cash settle the claim. The panel notes that the insurer offered the
complainant the option of having its builder complete the upstairs repairs, which were
not affected by the pre-existing issues with the property.
However, in determining the amount of the cash settlement, the insurer was required
to ensure that this amount was sufficient to repair the damage to the property caused
by the burst hose in May 2017.
2.2 Is the insurer required to increase the cash settlement amount?
Approved scope of works reflects claim-related repairs
The cash settlement paid by the insurer for the building repairs was based on a scope
of works prepared by its builder (AB) for the repair of the damage caused by the burst
hose.
The panel is satisfied that the repairs set out in AB’ s scope of works accurately reflect
the works required to repair the damage caused by the burst pipe.
As outlined above, the insurer is not responsible for repairing the pre-existing damage
to the property caused by termites and long-term water entry. Damage caused in this
manner is not covered under the policy.
The insurer appointed an engineer (JH) to investigate after the complainant advised
that equipment used by its mould remediation contractors (ST) had damaged the
garage slab and concrete driveway.
However, based on the findings in JH’s report, the panel is satisfied that the damage
to the garage slab and driveway w as not caused by the actions of the insurer’s
contractors.
JH concluded that the damage had been caused by factors which are excluded from
cover under the policy, such as naturally occurring earth movement and gradual
deterioration.
The insurer has acknowledged that mould remediation to the upstairs floorboards
may be required. However, the claim records reflect that the complainant would not
allow the insurer’s contractors to remove the carpet to confirm whether any additional
works were required.
In these circumstances, the insurer was not required to include an allowance for
additional mould remediation of the floorboards.
Building repairs were cash settled based on complainant’s quotation
The insurer initially cash settled the complainant for the amount quoted by its
contractor (MT) to undertake the repairs. However, when the complainant provided a
Determination | Case number: 491638 Page 5 of 7
higher quotation from her own builder (GC), the insurer agreed to increase the cash
settlement to match GC’s quotation.
On this basis, the panel is satisfied that the cash settlement amount is sufficient to
ensure that the complainant is able to engage her own builder to complete the
necessary repairs.
During the claim process, the complainant raised a number of issues in relation to the
building repairs and the cash settlement. However, the panel is satisfied that the
insurer has satisfactorily addressed each of the issues raised.
Cash settlement for contents items was fair and reasonable
The escape of water from the burst hose damaged a number of the complainant’s
contents items, including many items stored in the downstairs garage and storage
room.
The insurer’s restoration contractors (ST) sought to restore the salvageable contents
items and cash settled the complainant for the value of the non-salvageable items.
ST prepared an itemised list of the non- salvageable items and the insurer’s claims
manager worked with the complainant to identify the appropriate value for each item.
The complainant says the cash settlement paid for her contents items significantly
underestimates the value of some items. However, based on the reports, photographs
and other information provided, the panel is satisfied that the cash settlement amount
is fair and reasonable.
2.3 Is the complainant entitled to compensation?
AFCA may award compensation for non-financial loss
Under the Terms of Reference, a complainant may be awarded compensation for
non-financial loss (capped at $3,000) where they have suffered an unusual degree or
extent of physical inconvenience, time taken to resolve the situation or interference
with their expectation of enjoyment or peace of mind.
However, AFCA adopts a conservative approach to the award of compensation for
non-financial loss. AFCA expects a complainant to bear the usual stress and
inconvenience associated with an insurance claim.
Complainant is dissatisfied with insurer’s claims handling
The complainant is dissatisfied with the manner in which the insurer handled her
claim. Among other things, she says the insurer and its contractors:
unreasonably delayed the resolution of her claim
failed to provide her with appropriate temporary accommodation
Determination | Case number: 491638 Page 6 of 7
bullied her into accepting a cash settlement for the repairs, and
refused to arrange ongoing storage of her contents items.
Complainant is not entitled to compensation
The panel accepts that the resolution of the claim has been protracted and the
process has been extremely stressful for the complainant.
However, having carefully reviewed the claim records, the panel is satisfied that the
insurer managed the claim reasonably overall.
Many of the issues which arose were attributable to the nature of the claim itself,
rather than any unacceptable conduct on the part of the insurer or its contractors.
The claim records reflect that the insurer carried out a thorough assessment of the
claim and worked conscientiously to address the issues raised by the complainant
during the claim process.
In relation to some of the key concerns raised by the complainant, the panel notes
that:
the insurer was in regular contact with the complainant during the claim process
and sought to resolve issues promptly when they arose
the insurer attempted to arrange temporary accommodation for the complainant
(after she initially rejected its offer to do so). Any difficulties encountered were
primarily due to the need to meet the complainant’ s specific requirements and the
limited accommodation options available in the area,
as outlined above, the insurer sought to cash settle the claim due to the extent of
pre-existing damage in the affected areas and offered to repair the areas where
there was no pre-existing damage, and
the insurer only sought to return the complainant’s restored contents items to her
property (from the temporary storage container on the front lawn) once the claim
had been cash settled. The insurer ultimately agreed to extend the storage period.
For the reasons outlined above, the panel considers that the circumstances of the
claim do not justify the award of compensation for non-financial loss.
Determination | Case number: 491638 Page 7 of 7
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
3.2 Our approach to this dispute
This complaint was the subject of a recommendation issued on 6 June 2018. The
recommendation was rejected by the complainant.
Due to the nature of the dispute, it has been referred to a panel for determination. The
panel consists of an Ombudsman and two representatives with consumer and
insurance experience.
The panel has decided this case based on what is fair in all the circumstances, having
regard to the relevant law, good industry practice, codes of practice and previous
decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
The panel has reviewed and considered all of the material provided by the parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination the panel has restricted its commentary to those issues that it
considers directly relevant to the outcome only.