Home / Financial Firm (Unknown - Insurer) / Determination 491630
Determination 491630
Cash settlement of water damage repairs considered insufficient
Summary
After a burst hose caused water damage, the FSP stopped repairs and cash settled $14,316.49. AFCA found the cash settlement was reasonable but ordered an additional $4,859.78 to match the applicant's quotes, plus interest, and rejected the lintel and floorboard claims.
Once an insurer elects to repair and then cash settles mid-repair, the cash amount must be sufficient for the policyholder to complete the repairs, while pre-existing and wear-and-tear damage is not covered.
Issues
- Claim amount dispute primary · upheld
“I consider it is fair in the circumstances that the cash settlement amount be increased by $4,859.78 to reflect the total cost of the repairs.”
- Repairs or contractors secondary · not upheld
“The FSP was not liable for repairing the damage to the timber lintel, which prevented its builder from guaranteeing the repairs.”
Subjects and remedies
pay claimpay interest
Text of the determination
Determination
Case No: 491630 Determination Page 1 of 6
Case number: 491630 26 July 2018
1 Overview
1.1 Dispute
The applicant lodged a claim under her home insurance policy with the financial
services provider (FSP), after her home suffered water damage due to a burst hose
in the upstairs bathroom.
The FSP accepted the claim and authorised its contractors to commence repairs
(including the replacement of the damaged ceiling underneath the bathroom).
However, the FSP stopped work after its contractors identified structural issues
affecting the ceiling repairs.
The FSP cash settled the applicant for $14,316.49 for the estimated costs of
completing the outstanding repairs, based on a scope of work and quotation provided
by its builder (A).
The applica nt disputes the FSP’s decision to cash settle her claim. She says the
cash settlement amount is not sufficient to allow her to carry out the necessary
repairs.
1.2 Issues and key findings
Can the FSP cash settle the claim?
The pre-existing damage to the timbe r lintel meant that the FSP’s builder was unable
to guarantee the repairs. In these circumstances, it was reasonable for the FSP to
cash settle the claim.
Is the FSP required to increase the cash settlement amount?
The FSP is required to increase the cash settlement amount by $4,859.78 to ensure
the applicant is able to engage her own contractors to carry out the necessary
repairs.
1.3 Determination
This determination is substantially in favour of the applicant.
The FSP is to pay the applicant an additional amo unt of $4,859.78, plus interest on
this amount calculated in accordance with section 2.2 below.
Case No: 491630 Determination Page 2 of 6
2 Reasons for determination
2.1 Can the FSP cash settle the claim?
Insurer is generally bound by election to repair
Under the terms of the applicant’s policy, the FSP may settle a claim by:
repairing the damage to her home (on a ‘new for old’ basis), or
paying her the cost (to the FSP) of doing so.
It is clear from the terms of the policy that the FSP has the discretion to decide which
settlement method to adopt.
In the present case, the FSP elected to repair the damage to the applicant’s home
caused by the water leak. Accordingly, the FSP appointed its contractors to
undertake restoration works and arranged for its builder to prepare a scope of works
and quotation for the necessary repairs.
Once an insurer makes an election to repair the insured property (rather than to cash
settle the policyholder for the cost of the repairs), it is generally obliged to complete
the repairs in accordance with the terms of the policy.
However, particular circumstances may arise which make the conduct of repairs by
an insurer untenable.
In such cases, it is reasonable for the insurer to seek to settle the claim by way of a
cash settlement, provided that the cash settlement amount is sufficient to allow the
policyholder to engage their own contractors to complete the necessary repairs.
FSP ceased works due to issues with ceiling joists and lintel
As outlined above, the claim-related repairs included the replacement of the
plasterboard ceiling in the downstairs kitchen/dining area. The ceiling in this area had
been removed during make safe works carried out shortly after the escape of water
occurred.
The FSP’ s contractors installed a replacement ceiling. However, the new ceiling was
later found to be uns table and had to be removed. The FSP’s contractors advised
that the ceiling could not be installed correctly as the existing ceiling beams had
distorted.
The FSP’s builder (A) also raised concerns about excessive sagging of the timber
lintel above the sliding door in the dining room.
A advised that, due to the structural issues identified, he was unable to guarantee the
repair of the damage caused by the water leak .
FSP has accepted liability for upgrading ceiling joists
The FSP’s engineer (DS) and the applicant’s builder (AB) confirmed that the ceiling
joists had deflected due to the absence of support from a hanging beam and the lack
of stability from blocking. However, the parties disagree about how this issue arose.
Case No: 491630 Determination Page 3 of 6
Both DS and AB reported that the hanging beam had been removed so that the floor
joists for the second storey extension could be installed.
However, the applicant has provided photographs which suggest that the FSP’s
plasterers (PP) may have removed some additional supports for the ceiling when
carrying out the make safe works.
In any event, the FSP has agreed to accept liability for the cost of installing upgraded
ceiling joists to provide additional support for the ceiling in the absence of a hanging
beam.
The FSP acknowledges that it is liable for these costs under the terms of the policy.
Accordingly, the issues with the ceiling joists would not prevent the FSP from
completing the necessary repairs.
FSP is not liable for repairs to lintel
The FSP’s engineer (DS) confirmed that ther e was a significant bow to the lintel
above the sliding door in the dining room.
DS advised that the current lintel had been designed for the original single storey
building and was inadequate to support the additional loads imposed by the second
storey e xtension. The applicant’s building surveyor (AB) confirmed DS’s findings.
The bowing damage to the lintel occurred prior to the escape of water. The lintel did
not suffer any additional damage as a result of the water leak.
Given the pre-existing damage to the lintel, the FSP’s builder could not reasonably
be expected to guarantee repairs in this area. In these circumstances, the FSP was
entitled to cash settle the claim.
The applicant says the FSP is obliged to complete the repairs to the lintel, under
section 7.20 of the General Insurance Code of Practice (the Code).
Section 7.20 of the Code provides that, where an insurer has directly authorised
repairs, it is required to accept responsibility for the quality of the workmanship and
materials.
However, section 7.20 does not operate to make the FSP liable for damage which
pre-existed and was unrelated to the current claim.
The damage to the timber lintel was not caused by the escape of water from the
upstairs bathroom (or by any other event insured against under the policy).
Accordingly, the FSP is not liable for this damage.
The applicant says the issue with the lintel only became relevant because the FSP’s
contractors removed the dining room ceiling as part of the make safe works. She
says this section of the ceiling was not water damaged and therefore did not need to
be removed.
However, having reviewed the photographs provided, I am satisfied that it was
reasonable for the FSP’s contractor s to remove the ceiling in the dining room (as well
as the water damaged section in the kitchen).
Case No: 491630 Determination Page 4 of 6
The kitchen and dining room were part of a relatively small open plan area and the
removal of the ceiling throughout this area prevented the risk of any further collapse.
FSP acted reasonably in cash settling claim
For the reasons outlined above, I am satisfied that it was reasonable for the FSP to
cash settle the applicant for the cost of completing the outstanding repairs.
The FSP was not liable for repairing the damage to the timber lintel, which prevented
its builder from guaranteeing the repairs to the surrounding area.
Nevertheless, in circumstances where repairs had already commenced, the FSP was
required to ensure that the cash settlement amount was sufficient to allow the
applicant to complete the repairs.
2.2 Is the FSP required to increase the cash settlement amount?
FSP is not liable for damage to floorboards
The cash settlement amount of $14,316.49 paid by the FSP was based on a scope of
works and a quotation prepared by its builder (A) for the outstanding repairs. This
amount includes the cost of upgrading the ceiling joists.
The applicant says the scope of works is inadequate because it does not provide for
the costs of re-sanding and polishing the timber floorboards in the dining room.
The applicant says the polish on the floorboards was damaged when water pooled
on the floor following the leak. She says th e FSP’s contractors caused further
damage to the floorboards by moving furniture around.
The FSP’s contractors have denied damaging the floors.
The FSP’s flooring specialist (AC) advised that the fading, discolouration and scratch
marks to the floorboards had not been caused by the pooling water, but was
consistent with age and wear and tear.
AC noted that the legs of the dining room table and chairs did not have soft
protectors which would have contributed to the damage caused.
Having carefully reviewed the reports and photographs provided, I am not satisfied
that, on the balance of probabilities, the damage to the floorboards was caused by
the leaking water or the actions of the FSP’s contractors.
I consider the nature of the damage is more consistent with it having been caused by
wear and tear over the life of the flooring. Accordingly the FSP is not liable for the
cost of sanding and polishing the floorboards.
FSP is required to increase cash settlement amount
I am satisfied that A’s scope of works generally provides an accurate assessment of
the repairs required to address the claim-related damage.
However, the applicant says that the claim settlement amount of $14,316.49 is not
sufficient to allow her to carry out the necessary repairs. She has provided quotations
Case No: 491630 Determination Page 5 of 6
totalling $19,176.27 (including costs of $506 for re -installing electrical fittings
following the ceiling repairs , which were not itemised in A’s scope of works ).
Having carefully reviewed the applicant’s quotations , I consider they are not
excessive and reasonably reflect the actual cost to her of undertaking the necessary
repairs.
In part, the applicant’s quotations are higher than those provided by the FSP’s builder
(A) because of the need for her to engage separate contractors to carry out each
aspect of the repairs.
In the present case, the FSP has cash settled the claim part way through completing
the repairs. While it was reasonable for the FSP to do so, in these circumstances it is
particularly important to ensure the applica nt is able to complete the repairs herself.
Further, in calculating the amount of the cash settlement, the FSP has not made any
allowance for the additional risk transferred to the applicant as a result of being
unable to rely on the lifetime guarantee pro vided under the policy.
For the reasons outlined above, I consider it is fair in the circumstances that the cash
settlement amount be increased by $4,859.78 to reflect the total cost of the repairs
as quoted by the applicant’s contractors.
The FSP is required to pay the interest on the increased amount at the rate
calculated in accordance with section 57 of the Insurance Contracts Act 1984 (Cth),
from 28 September 2017 until the payment date.
Case No: 491630 Determination Page 6 of 6
3 Supporting information
3.1 FOS approach to this dispute
This dispute was the subject of a recommendation issued on behalf of the Financial
Ombudsman Service (FOS) Australia on 5 March 2018. The recommendation was
rejected by the applicant.
This dispute has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered (whether or not it is expressly referenced in this determination).
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.