Complainant sought footing upgrade, further building repairs and driveway and parking bay reinstatement after storm claim
Text of the determination
Case number: 490186 31 Oct 2018
1 Determination overview
1.1 Complaint
A storm event in October 2013 damaged the complainant ’s property’s foundations. In
June 2014, the complainant lodged a claim under his home insurance policy with the
financial firm (insurer), for damage to his property caused by the storm.
The insurer accepted liability for damage caused by movement of the concrete pier
footings which occurred when the sub-floor was inundated during the storm. The
insurer authorised works which included the replacement of the affected footings and
the repair of internal cracking and movement damage to the property.
The complainant says these works were not completed to an adequate standard,
which has resulted in further damage to the property. In particular, he says the insurer
should have replaced all of the original footings to prevent further movement in the
future.
The complainant wants the insurer to upgrade all of the pier footings and rectify the
additional damage to the property which has occurred since the original repairs were
completed. He also seeks cover for damage to the driveway and parking bay, on the
basis that this damage was caused by the storm.
The complainant is dissatisfied with the manner in which the insurer handled his claim
and seeks compensation for losses incurred as a result.
1.2 Issues and key findings
Is the insurer liable for the disputed damage to the building?
The insurer is not liable for the disputed damage to the building as this damage was
not caused by the storm in October 2013 (or the repairs carried out by the insurer ’s
contractors). The disputed damage was caused by factors which are exc luded from
cover (such as gradual deterioration and naturally occurring earth movement).
Is the insurer required to upgrade the original footings?
The insurer is not required to upgrade the original, undamaged footings. The partial
replacement of the footings did not cause or contribute to any differential movement
at the property. The available information does not establish that the pier and footing
works were otherwise defective.
Determination | Case number: 490186 Page 2 of 20
Is the insurer liable for the damage to the driveway and parking bay?
The insurer has accepted liability for damage to localised sections of the driveway. An
additional allowance should be made as it is likely that the parking bay also suffered
some damage during the storm. However, the insurer is not liable for any subsequent
deterioration of the bitumen surfaces.
How should this complaint be settled?
The insurer is required to repair the damage to the en suite bathroom and the chipped
pier, in accordance with the lifetime guarantee provided under the policy. However, it
is reasonable in the circumstances that the claim for damage to the driveway and
parking bay be cash settled.
Is the complainant entitled to any additional amounts?
The complainant is entitled to compensation of $750 for non-financial loss due to the
insurer ’s handling of his claim. The complainant is not entitled to reimbursement of
professional fees.
1.3 Determination
This determination is substantially in favour of the insurer.
The insurer is required to:
carry out the repairs set out in IM’s scope of works for the repair of the en suite
bathroom and the chipped pier
cash settle the complainant ’s claim for damage to the driveway and parking bay for
$12,144, and
pay the complainant the amount of $750 for non-financial loss.
The insurer is not required to take any other action.
Determination | Case number: 490186 Page 3 of 20
2 Reasons for determination
2.1 Is the insurer liable for the disputed damage to the building?
Insurer carried out repairs following storm in 2013
The complainant ’s home is a timber framed building with external cladding, which was
relocated from another site in 2006. Following its relocation, the building was installed
on concrete block piers with pad footings, in accordance with council approved plans.
In June 2014, the complainant lodged a claim for cracking and movement damage to
the property caused by a storm in October 2013. The complainant advised that,
during the storm, large volumes of stormwater run- off diverted from his neighbour’s
property had flowed under his house, causing the footings to move.
The engineer (MC) appointed by the insurer confirmed that the cracking and
movement damage to the complainant ’s property had been caused by the effects of
stormwater run-off.
MC advised that, while the majority of the fifty or so concrete piers under the house
remained stable, several of the piers had lifted (due to heave caused by the effects of
water on the clay foundation soils), while others had sunk (due to supersaturation of
the surrounding soils).
Based on MC’s report, the insurer accepted liability for the damage to the home and
authorised the rectification of the footings and the repair of the internal cracking and
movement damage.
The initial scope of works prepared by MC provided for the replacement of six to
seven unstable piers at the south-eastern corner of the building and the repacking of
three piers on the northern side. MC advised that the replacement piers should be
‘upgraded’ - that is, they should be of a greater diameter and fo unding depth than the
existing piers.
MC’s scope of works also provided for the re -levelling of the floors and the repair of
the internal damage. The most extensive works were required to the en suite
bathroom, which was located in the area where the piers needed to be replaced.
The scope of works was subsequently varied, including to provide for the replacement
of several additional piers on the northern side of the house, a ‘complete strip - out’ of
the en suite bathroom and the repair of cracking and movement damage to additional
rooms.
The pier works were completed and the floors re-levelled in December 2014. A
‘settling period’ (to allow for any additional movement) was provided before the
internal repairs were commenced in April 2015.
Determination | Case number: 490186 Page 4 of 20
The internal repairs were completed in or around May 2015 and a final inspection was
undertaken several months later, as a result of which the insurer agreed to cash settle
the complainant for the cost of attending to several minor outstanding issues.
Complainant says repairs were inadequate and caused further damage
In June 2016, the complainant contacted the insurer to express concern that the
repairs to the pier footings had not been carried out properly.
In his submissions to us, the complainant says that:
the insurer ’s contractors installed hollow piers which were then core filled with
slurry (instead of the solid piers provided for in MC’s scope of works)
the house was jacked up so that the core filling could occur, causing further
cracking and movement damage to the property, and
the differences between the features of the replacement footings and the original
footings has made the property susceptible to ongoing earth movement.
The complainant says that the inadequate repairs carried out by the insurer ’s
contractors have caused additional damage to the building, including:
damage to the waterproof membrane of the shower in the main bathroom
cracks in the tiles around the en suite windows
movement of the spa bath in the en suite bathroom
cracking to the plasterboard wall linings in areas including the living room
warping of the floorboards and popping of the nails, and
bowing of the window casings and architraves.
The complainant wants the insurer to repair the additional damage to the property and
upgrade all of the original footings, to prevent any differential movement occurring in
the future. Alternatively, he says the house should be demolished and rebuilt.
Policy provides a lifetime guarantee of repairs
The policy provides a lifetime guarantee for any claim-related repairs authorised by
the insurer. The insurer guarantees the quality of the materials used and the standard
of workmanship for the lifetime of the building.
Accordingly, if the insurer ’s contractors failed to carry out the repairs to an appropr iate
standard, then the insurer will be liable for any additional damage which occurs as a
result.
However, the insurer is not liable for damage to previously repaired areas of the
property which occurs as result of the gradual deterioration of the building in the
ordinary course (or is caused by factors which are excluded from cover under the
policy).
Determination | Case number: 490186 Page 5 of 20
Insurer has accepted liability for some of additional damage only
After investigating the additional damage, the insurer accepted liability for the
movement of the in-built spa bath in the en suite bathroom.
The insurer ’s engineer (IM) concluded that the jacking of the house would have
caused some movement in the immediate areas where the piers were replaced
(including the en suite in the south-east corner).
Accordingly, IM considered that the bond between the spa bath and its mortar
bedding had loosened during this process. He noted that the wall tiles may also have
been affected.
In order to reaffix the spa bath, it is necessary to strip out and replace t he tiles and
waterproofing in the en suite bathroom.
Accordingly, the cracked wall tiles will be replaced as part of this process, which will
also address the concerns raised by the complainant about the partial waterproofing
undertaken during the original repairs.
The insurer has also accepted liability for the cost of repairing chipping damage to
one of the existing pier footings, on the basis that this damage may have occurred
during the repair process.
However, the insurer says it is not liable for the additional damage to the building as
this damage was not caused by the storm in October 2013 or the subsequent repairs
carried out by the insurer ’s contractors.
The insurer says the additional damage identified by the complainant has been
caused by factors which are excluded from cover under the policy, such as naturally
occurring earth movement and gradual deterioration.
Disputed damage was not caused by jacking and core filling process
As outlined above, the complainant has identified a number of concerns about the
manner in which the repairs to the concrete piers were carried out.
During the course of this complaint, both parties have provided copies of numerous
reports prepared by various consultants appointed to review the footing works and
inspect the damage to the property. Many of the views expressed in these reports are
conflicting.
The panel has carefully considered these reports (and all of the other information
provided), in order to determine the cause of the disputed damage.
Having done so, the panel is not satisfied that the disputed damage was caused by
the works carried out by the insurer ’s contractors.
Determination | Case number: 490186 Page 6 of 20
While MC’s scope of works provided for the use of solid block piers, both the insurer ’s
engineer (IM) and the complainant ’s engineer (SC) advised that the use of core filled
materials was reasonable, given the height of the piers.
Further, IM confirmed that core-filled piers perform in the same manner as the solid
piers specified in MC’s scope of works.
The complainant says that the jacking up of the house in isolated areas to allow the
installation and core filling of the replacement piers imposed substantial stress on the
building, causing further damage.
The claim records confirm that additional cracking damage to the plasterboard wall
and ceilings occurred during the initial pier replacement and re -levelling works.
However, it is not unusual for additional damage to internal building components to
occur during works of this nature. The insurer repaired the damage as part of the
internal repairs completed in mid-2015 (after allowing for an appropriate settling
period).
As noted above, the insurer ’s engineer (IM) concluded that additional damage to the
en suite had occurred during the jacking and core filling process, noti ng that the en
suite was located in the immediate vicinity of the replaced piers.
However, IM considered that the remainder of the damage had not been caused by
the jacking process, as it was too remote from the area where the piers were
replaced.
While one of the engineers (DW) engaged by the insurer concluded that the disputed
damage had been caused by the jacking process, DW’s findings were based on
inaccurate information about the manner in which the works were carried out.
In his report, DW states that the house was lifted by between 70 and 100 mm in
isolated areas to allow the hollow block piers to be core filled using a pump hose. DW
advised that, in these circumstances, the house should have been lifted uniformly to
prevent further damage.
However, the insurer ’s builder (RC) has advised that the core filling was carried out
using a wheelbarrow and a small plastic container. Accordingly, the house only had to
be jacked up by approximately 5 to 10 mm to enable this to occur.
The information provided by RC is reflected in a quotation provided by the re-stumper
(TK) when the pier works were being carried out. TK’s quotation noted that the house
‘would need to be jacked up slightly’ to allow core filling to occur.
The report provided by the complainant ’ s engineer (SC) suggests that even a small
degree of jacking may have resulted in additional damage.
Determination | Case number: 490186 Page 7 of 20
The complainant says that jacking of the house by even a small amount in isolated
areas would have caused damage throughout the house, due to the translation of
movement through the braced timber frame.
However, when it was first relocated to the site, the building was cut in half and then
re-joined using a system of paired timber bearers along the north-south axis, with the
joins between the bearers functioning as articulation joints.
The panel accepts the findings of IM that, due to the manner of construction, jacking
to one corner of the house will not result in a transfer of movement to other areas.
The panel notes that this aspect of the construction was not addressed by SC (who
did not carry out his own inspection of the property but conducted a desktop review of
documentation).
The panel also notes the relative absence of damage in rooms close to where the
jacking occurred.
In these circumstances, the panel considers it unlikely that the jacking of the house in
the manner described and core filling process would have caused damage in areas
which are remote from the location where the jacking occurred (such as the main
bathroom, which is located in the centre of the western wall).
Disputed damage was caused by excluded factors
Having carefully reviewed the available information, the panel is satisfied that the
disputed damage was caused by factors which are excluded from cover under the
policy (namely, gradual deterioration and naturally occurring earth movement).
The panel considers that the damage to the waterproof membrane in the main
bathroom was caused by gradual deterioration over time, as a result of the manner in
which the membrane was installed.
The available information indicates that the waterproof membrane was installed over
ten years before the damage occurred. The membrane was applied directly to the
floorboards, following which concrete screed was installed over the top of the
membrane as a bed for the tiles.
The insurer ’s consultants have advised that this method does not reflect good
industry practice, which requires the use of an underlay or fibre cement sheet
between the timber floor boards and the water proof membrane. This was confirmed
by the complainant ’s engineer (SC).
Photographs taken at various stages during the claim process indicate that the hot
water system and air conditioner outlets were discharging moisture directly onto the
foundation soils underneath the bathroom.
Determination | Case number: 490186 Page 8 of 20
The discharge of moisture into the soil around the footings can result in localised
movement damage. This was identified as an issue which may need to be addressed
in the pre-purchase reports obtained by the complainant in 2013.
The panel acknowledges that the complainant says the leak was not apparent when
he installed insulation under the floor boards in February 2014.
However, this does not of itself confirm that the waterproof membrane was damaged
by the pier replacement process (particularly as the leak was not identified until some
time later).
The panel considers that the remainder of the disputed cracking and movement
damage to the property (including the walls and windows) was caused by naturally
occurring earth movement due to variations in the moisture content of the foundation
soils.
The available information confirms that the property is situated on highly reactive clay
foundation soils. The insurer ’s geotechnical engineer (RG) classified the site as Class
E (extremely reactive), in accordance with the applicable Australian Standard.
RG advised that the site would be susceptible to characteristic surface movement of
60 millimetres (and up to 85 millimetres in the south-east corner, due to a nearby
hedge being located within the zone of influence).
Consistent with RG’s findings, several of the engineers (MC, DW and IM) noted that
the building would be subject to some degree of ongoing differential movement due to
the reactive nature of the clay foundation soils.
As outlined above, the complainant says that any recent differential movement has
been caused by the differences between the original pier footings and t hose which the
insurer ’s contractors replaced.
The complainant says the insurer should be required to replace all of the existing
footings so as to prevent damage to the property caused by ongoing differential
movement.
2.2 Is the insurer required to upgrade the original footings?
Policy provides for repair of damaged areas only
Under the terms of the policy, the insurer is required to repair the damage to the
complainant ’s property caused by the storm in October 2013.
The policy states that, where the insurer elects to repair the damage (rather than cash
settle the claim), it may choose to repair the damage on a ‘new for old’ basis or repair
the building to a similar condition to that which it was in before the damage occurred.
Determination | Case number: 490186 Page 9 of 20
However, in either case, the insurer is not required to repair the property to a better
standard or specification than when it was new.
Further, the insurer is only obliged to repair undamaged parts of the property in
certain limited circumstances where additional repairs are required to create a uniform
appearance. These obligations do not apply in the present case.
However, the insurer is subject to an overarching obligation to ensure that any claim-
related repairs are completed to an appropriate standard.
Accordingly, where the repairs to a damaged part of the property result in an outcome
which is unsatisfactory, the insurer may be required to extend the scope of the repairs
to undamaged areas.
Replacement footings were ‘upgraded’
As outlined above, the plans for the original footings were approved by the local
council in 2003, in anticipation of the property being relocated to its current site.
The original footing system consisted primarily of 200mm x 200mm concrete block
piers, supported by 450mm x 450mm pad footings installed to a depth of 250mm.
Larger piers were installed at the corners of the house and along the central line.
When the insurer ’s engineer (MC) prepared the scope of works for the initial repairs,
he suggested that the footings for the piers should be ‘upgraded’ to provide greater
stability (given the height of the piers).
Accordingly, the scope of works specified pad footings of 600mm in diameter,
installed to a depth of at least 450mm. However, based on subsequent investigations
it appears to the footings were installed to a depth of only 410mm.
Complainant says upgrade to footings has caused differential movement
As outlined above, the complainant says that the combination of the original and the
new footings has resulted in the property experiencing differential movement.
The complainant has advised he is not disputing that the replacement footings comply
with applicable building standards. However, he says that:
the differences between the footings has resulted in non-uniform forces being
applied, with the greater mass of the new footings multiplying the effects of any
differential movement, and
the insurer should have given greater consideration to the consequences of
upgrading some of the footings only (in accordance with guidelines issued by the
Australian Building Codes Board).
Determination | Case number: 490186 Page 10 of 20
However, having carefully reviewed the available information (including the various
engineers’ reports provided), the panel is not satisfied that the differences between
the footings has had any material effect on the differential movement at the property.
Engineers have provided conflicting opinions
The various engineers engaged by the parties have provided conflicting opinions
about the adequacy of the original footings and the effect of the partial upgrade.
The engineer (OW) who inspected the property on behalf of DK advised that the
differential movement to which the property was exposed would be slightly
exacerbated by differences in the bearing area of the original and replacement
footings. However, OW did not provide any further analysis to support his
conclusions.
The insurer ’s engineer (IM) advised that the differences between the footings would
not result in additional movement at the property. IM noted that the extent of vertical
movement would be determined by the reactivity of the clay soils, regardless of the
footing mass.
The insurer ’s geotechnical engineer (RG) advised that, given the site conditions, the
footings should be designed based on an allowable bearing pressure of 100kPa. His
investigation of two original and two new footings confirmed that the design satisfied
this requirement.
Based on the results of RG’s investigations, IM confirmed that both the existing and
new footings were suitable for the site (despite the new footings having only been
installed to a depth of 410mm).
However, the complainant ’s engineer (SC) advised that the original footings did not
comply with the relevant Australian Standard for residential slabs and footings in force
at the time the building was relocated to the current site.
SC considered that the partial replacement of the existing footings created differential
movement between the two footing systems. He considered that the use of new,
upgraded footings exacerbated the issues arising from the inadequacy of the original
footings.
The Australian Standard for residential footings (as referred to by SC) states that on
reactive clays, concentrated loads from columns should be supported directly on an
edge or internal beam or edge footing (rather than a pad footing).
The insurer ’s engineer (IM) disputes that the Australian Standard referred to by SC
applies to the pad footings at the site.
Determination | Case number: 490186 Page 11 of 20
IM says that, because the footings support a relocated timber frame house, they are
subject to the Australian Standard for residential timber-framed constructions (with
which they are compliant).
Having carefully reviewed the available information, the panel is not satisfied that the
original pad footings were inadequate.
The footings were approved by the council at the time they were installed and
geotechnical assessment has found them to be appropriately designed. Further, the
complainant has confirmed the footings performed adequately prior to the storm.
Upgrade of footings has not caused differential movement
Based on the available information, the panel is not satisfied that the partial
replacement of the original footings has resulted in differential movement at the
property.
For the reasons outlined above, the panel is satisfied that the original footings were
adequate.
In these circumstances, the panel does not consider that the replacement of a
relatively small number of the original footings has had any material increase in the
extent to which the property is susceptible to differential movement.
The panel is not satisfied that the location of the further damage identified by the
complainant supports his position that this damage has been caused by relative
differences in the mass of the original and replacement footings.
All of the engineers engaged by the parties agree that the property is located on
reactive clay soils which are subject to differential movement due to changes in the
moisture content of the foundation soils.
During his initial inspection of the property in August 2014, MC observed that the
property appeared to have been re-levelled in the past (as shown by the presence of
packers between the tops of the piers and the bearers). This is indicative of prior
differential movement.
The panel acknowledges that the pre-purchase building report obtai ned by the
complainant in June 2013 did not identify any cracking and movement damage at that
time. The complainant also says past residents of the property did not observe any
such damage.
Nevertheless, the nature of the reactive soils at the site mean that the property is
inherently susceptible to differential movement. The nature of such movement means
that it is subject to seasonal changes and therefore occurs on an irregular basis.
Determination | Case number: 490186 Page 12 of 20
Further, the available information indicates that the site has been subject to various
alterations which may have affected the levels of moisture in the foundation soils.
In particular:
the non-compliant drains installed by the complainant ’s neighbour were removed
during the first half of 2014, and
the complainant installed retaining walls and associated drainage pipes at some
stage between 2016 and 2018.
Insurer is not required to upgrade the original footings
As noted above, the policy does not require the insurer to repair or replace any
undamaged parts of the property (unless necessary for the effective repair of the
claim-related damage).
For the reasons outlined above, the panel is not satisfied that the works undertaken
by the insurer ’s contractors (in replacing some of the original footings only) has
resulted in further damage to the property.
The panel is satisfied that the repairs set out in MC’s scope of works (as subsequently
varied) were appropriate to address the damage to the building caused by the storm
in October 2013.
MC has inspected the completed works to the footing system and has confirmed that
they have been carried out to a satisfactory standard and in accordance with his
scope of works.
Based on the available information, the panel is not satisfied that the works are
otherwise deficient (including in relation to the use of crusher dust).
Accordingly, the insurer is not required to undertake any rectification works to the
footings (either by upgrading the original footings or altering the replacement footings
to match the original footings).
2.3 Is the insurer liable for the damage to the driveway and parking bay?
Complainant seeks cover for damage to driveway and parking bay
The complainant says the driveway and parking bay at the property were damaged by
the effects of stormwater run-off during the storm in October 2013. He says the
stormwater flows washed away the sub-strate under the bitumen surface,
compromising the integrity of the driveway and parking bay.
The complainant has provided a quotation from his repairer for $36,745.50 for the full
reinstatement of the driveway and the parking bay.
Determination | Case number: 490186 Page 13 of 20
Insurer has accepted liability for localised damage to driveway
The insurer ’s claim records reflect that, when the complainant lodged his claim, he
advised that the brick pier footings had moved and there was internal damage to the
property. There is no reference to any damage to the driveway and parking bay.
Further, there is no reference to this damage in the reports prepared by the insurer ’s
builder (LS) and engineer (MC) following their initial assessments of the property
(although MC took photographs of various sections of the driveway).
Accordingly, it is unclear to what extent the damage to the driveway and parking bay
was assessed at this time.
The complainant raised concerns about the omission of the driveway from the initial
scope of works prepared by MC in August 2014.
However, the insurer declined liability for this damage, based on advice from its
builder (RC) that the bitumen used was of poor quality and the deterioration of the
driveway was unrelated to the storm.
The insurer ’s engineer (IM) initially advised that the damage to the driveway was not
caused by the one-off effects of the storm in October 2013. IM considered that an
adequately sealed driveway was designed to be exposed to the elements and would
have been able to withstand surface run-off.
However, IM revised his opinion after the complainant provided photographs of the
driveway prior to the storm (which showed it to be in good condition, consistent with
the findings in the pre-purchase inspection report).
In his supplementary report, IM reiterated his view that the general wear and tear
evident to the driveway had occurred over an extended period of time.
However, IM also accepted that localised sections of the driveway may have been
damaged by the concentrated cross- flow of water from the neighbour’s non -compliant
stormwater pipes during the storm.
The insurer has accepted liability for the repair of those sections of the driveway
identified in IM ’s report. These sections show significantly greater damage than other
areas and were in the direct pathway of the storm water flows.
The insurer has offered to cash settle the complainant for the cost of repairing these
sections of the driveway, based on quotations provided by its contractors.
Parking bay may have been damaged by stormwater run-off
The complainant has advised that he generally agrees with the views expressed in
IM’s supplementary report regarding the localised effects of stormwater flows on the
driveway.
Determination | Case number: 490186 Page 14 of 20
However, the complainant says that IM failed to consider that the parking bay would
have also been affected by the stormwater flows.
The complainant notes that the photographs on which IM based his analysis of
stormwater flows showed the parking slab, retaining wall and associated drainage
installed near the parking bay, which were not in place at the time of the storm.
It is difficult to determine with certainty the extent to which the parking bay was
affected by the storm in October 2013, given the limited photographic evidence
available and the amount of time which has passed since the storm occurred.
Nevertheless, the surface of the parking bay (as shown in recent photographs) shows
signs of significant deterioration.
Further, the location of the parking bay suggests that (absent the retaining wall), it
may have been exposed to the water flows from the neighbour’s drainpipes identified
in IM’s report.
On this basis, the panel considers it is fair in the circumstances that the cash
settlement include an appropriate allowance for damage to the parking bay.
Insurer is not liable for subsequent deterioration of driveway and parking bay
The complainant says that the insurer ’s failure to provide cover for the driveway and
parking bay during the initial stages of the claim has caused these areas to
deteriorate further, such that they now require complete replacement.
The panel accepts that it is likely that the initial damage from the storm in 2013 would
have compromised the sub-strate layer, resulting in further damage during rainfall
events in subsequent years.
However, the panel is not satisfied that the insurer is responsible for the subsequent
deterioration of the driveway and parking bay.
After raising concerns about this damage in September 2014, it appears the
complainant did not pursue the issue again until mid-2017. The panel considers the
complainant was responsible for mitigating any additional damage during this period.
2.4 How should this complaint be settled?
Insurer is required to repair en suite and chipped pier
For the reasons outlined above, the panel considers that the insurer ’s liability in
respect of the building is limited to repairing the damage to the en suite bathroom and
the chipped block pier.
Determination | Case number: 490186 Page 15 of 20
The insurer has offered to cash settle the complainant for the cost of these repairs,
based on a quotation provided by its builder (DA) in accordance with a scope of works
provided by (IM).
The complainant has rejected the cash settlement offered by the insurer. He says the
insurer should be required to carry out the repairs, so that he can obtain the benefit of
the lifetime guarantee provided under the policy.
The complainant also says the amount of the cash settlement is insufficient and does
not reflect the specifications of the fixtures and fittings in the en suite bathroom.
Under the terms of the policy, the insurer can settle a claim by repairing the damage
to the complainant ’s property or paying him the cos t of doing so.
However, once an insurer makes an election to repair (rather than cash settle), it is
generally obliged to complete the repairs in accordance with the terms of the policy.
In the present case, the repairs set out in IM’s scope of works are necessary in order
to rectify damage resulting from the original repairs. In these circumstances, it is not
appropriate that the insurer can elect to cash settle the claim.
Accordingly, the insurer is required to carry out the repairs set out in IM’s sco pe of
works for the repair of the en suite bathroom and the chipped pier. The quality of the
materials used should reflect the existing materials.
Insurer is required to cash settle complainant for repairs to driveway and
parking bay
The cash settlement offered by the insurer includes an amount of $8,096 (including
builder’s margin and GST) for the repair of the localised sections of the driveway
identified in IM’s supplementary report.
The panel considers it is appropriate that this aspect of the repairs be cash settled.
This will allow the complainant to appoint his own contractor to reinstate the driveway
and parking bay in their entirety (as he has advised is required).
As outlined above, the panel considers the amount of the cash settlement should be
increased to reflect an allowance for damage to the parking bay caused by the storm
(noting the extent of this damage is unclear).
The cash settlement amount should also be increased to allow for:
any volume discounts reflected in the quotation provided by the insurer ’s builder,
and
the additional risk assumed by the complainant due to the absence of the lifetime
guarantee.
Determination | Case number: 490186 Page 16 of 20
Having regard to the factors outlined above, the panel considers the cash settlement
amount should be increased by 50% (to a total of $12,144). The insurer is not
required to pay interest on this amount.
Complainant is entitled to compensation of $750
Under the FOS Terms of Reference, we may award compensation for non-financial
loss (capped at $3,000) where a complainant has suffered an unusual degree or
extent of physical inconvenience, time taken to resolve the situation or interference
with the complainant ’s expectation of enjoyment or peace of mind.
However, we adopts a conservative approach to the award of compensation for non-
financial loss.
The complainant is dissatisfied with the manner in which the insurer managed his
claim.
Among other things, the complainant says that the insurer:
unreasonably delayed the resolution of the claim
tried to settle the claim based on incomplete scopes of work and quotations, and
failed to respond to his concerns about the adequacy of the initial repairs.
For the reasons outlined above, the panel considers that the insurer is not liable for
the bulk of the additional damage to the property which has occurred since the initial
repairs were completed.
However, during the course of the complaint process, the insurer has accepted
liability for some of the additional damage. The complainant raised concerns about
these aspects of the damage relatively early in the process.
In the circumstances, the panel considers the insurer should be required to pay the
complainant the amount of $750 as compensation for non-financial loss.
Complainant is not entitled to reimbursement of professional fees
Under the FOS Terms of Reference, we may decide that the insurer contribute to
professional costs incurred by the complainant in the course of the complaint.
The complainant incurred fees in obtaining a report from his engineer (SC). However,
the panel does not consider that SC’s report altered the outcome of the complaint.
Accordingly, the insurer is not required to contribute to the costs incurred by the
complainant in obtaining SC’s report.
Determination | Case number: 490186 Page 17 of 20
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
3.2 Our approach to this complaint
This complaint has not been the subject of a recommendation. Due to the nature of
the complaint, it has been referred directly to a panel for determination, in line with the
Operational Guidelines to the FOS Terms of Reference. The panel consists of an
Ombudsman and two representatives with consumer and insurance experience.
The panel has decided this case based on what is fair in all the circumstances, having
regard to the relevant law, good industry practice, codes of practice and our previous
decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
The panel has reviewed and considered all of the material provided by the parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination the panel has restricted its commentary to those issues that it
considers directly relevant to the outcome only.
3.3 Key policy terms
Subject Terms
Determination | Case number: 490186 Page 18 of 20
Subject Terms
Cover for building What we cover – the building
The building that you own or are responsible for and use primarily
for domestic purpos es … including the following at the insured
address: …
driveways or sealed roads …
Insured event – storm We cover
Loss or damage to the building caused by a storm.
We do not cover …
loss or damage caus ed by erosion, vibration, subsidence,
landslip, landslide, mudslide, collapse, shrinkage or any other
earth movement, but we will cover loss or damage to the building
caused by a landslide or subsidence that occurs within 72 hou rs
of, and directly because of, a storm and not because of erosion
over time, structural fault or design fault …
resultant cracking to paths, driveways, any outdoor surfaces, but
we will cover them if they are washed away by the storm …
General exclusions You are not covered under any section of your policy for damage,
loss, cost or legal liability that is caused by, arises from or involves:
…
Ground movement
erosion, vibration, subsidence, landslip, landslide, mudslide,
collapse, shrinkage or any other earth movement, but we will
cover landslide or subsidence that is specifically covered under
the following insured events:
> ‘Storm’ …
Wear, tear and gradual deterioration
Wear, tear, ... or gradual deterioration …
Settlement of claims If we agree to pay a claim for loss, theft or damage to the building,
we will decide if we will:
repair damage to the building;
rebuild the building;
pay you what it would cost us to repair or rebuild the building …
If we repair (or pay you what it would cost us to repair), we will at
our option repair on a `new for old’ basis or repair to a similar
condition to what the building was in before the loss or damage
occurred.
We will not:
pay extra to repair or rebuild the building to a better standard,
Determination | Case number: 490186 Page 19 of 20
Subject Terms
specification or quality t han it was before the loss or damage
occurred except as stated in the following meaning of ‘new for
old’;
fix a fault that existed before the loss or damage occurred …
‘New for old’ means:
New materials, new items
we rebuild or repair with new items or ne w materials that are
available at the time of replacement or repair from Australian
suppliers
New for old, regardless of age
we rebuild or repair regardless of age, with no allowance for
depreciation
Same type, standard and specification a s when new
We re place or repair to the same type, standard and specification
as when new. If the same is not available, it means of a similar
type, standard and specification when new. It can be a different
brand.
‘New for old’ does not …
mean of a better standard, specif ication or quality than when new
…
When we will repair or rebuild undamaged parts
If we cannot match the mat erials with the undamaged parts, we will
pay extra to create a uniform appearance when:
wall tiles are damaged …
other wall coverings are damaged …
floor coverings are damaged …
kitchen cabinets, cupboards or benchtops are damaged …
Lifetime guarantee of repairs Lifetime guarantee on building repairs
When we repair or rebuild the building, we guarant ee the quality of
materials and workmanship of that work for the lifetime of the
building if we … authorise, … arrange … and pay the building or
repairer directly for this work.
What we guarantee
We guarantee the material used and the standard of the
workmanship to be free of defects. If a defect arise s in the lifetime
of the building as a result of poor quality workmanship or use of
incorrect materials, then we will rectify the problem.
This guarantee does not apply: …
to wear and tear consistent with normal gradual deterioration of
Determination | Case number: 490186 Page 20 of 20
Subject Terms
the building (e.g. paint peeling off after its expected life cycle,
wood rotting from moisture in the air or ground, roofs weathering
or a hot water tank leaking after its guaranteed life) …
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.