Summary

Owners of an investment property claimed for water inundation after heavy rain in March 2017 and sought compensation for claims handling. AFCA found the water was flood water excluded by the policy and that no non-financial compensation was warranted.

On balance the inundation came from flood water rising from the river, which the policy excludes, and the claim timeframes and contact were not unusual enough to warrant compensation.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: «reference_id» Determination Page 1 of 10 Case number: 489377 18 July 2018 1 Overview 1.1 Dispute The applicants hold a policy of insurance with the financial services provider (FSP) covering an investment property. On 31 March 2017 the applicants made a claim arising from water inundation to the property following heavy rain from Cyclone Debbie. The FSP declined the claim on the basis the inundation was caused by flood which is excluded from cover under the terms of the insurance policy. The applicants dispute the claim declinature on the basis it was storm water which damaged the property. The applicants further seek compensation due to poor claims handling service. 1.2 Issues and key findings Was the damage covered under the terms of the policy? Based on the available material the FSP is entitled to decline the claim as the claimed loss is excluded from cover because:  the applicants ‟ policy specifically excludes loss or damage caused by flood,  on balance, the water that caused the loss was flood water. Are the applicants entitled to non-financial compensation? There is insufficient evidence to establish that compensation should be ordered against the FSP. 1.3 Determination This determination is in favour of the FSP. The FSP is entitled to rely upon the terms and conditions of the policy to decline the applicants ‟ claim. Case No: 489377 Determination Page 2 of 10 2 Reasons for determination 2.1 Is the damage covered under the terms of the policy? The applicants ‟ policy covers loss or damage due to listed events, including storm, rainwater or run-off. The policy terms confirm that cover will not extend under storm cover to include flood water combined with run-off and/or rainwater. Unless the insured had selected flood cover, the policy specifically excludes loss or damage directly or indirectly caused by flood. Flood is defined in the policy as: the covering of normally dry land by water that has escaped or been released from the normal confines of any of the following: • a lake (whether or not it has been altered or modified); • a river (whether or not it has been altered or modified); • a creek (whether or not it has been altered or modified); • another natural watercourse (whether or not it has been altered or m odified); • a reservoir; • a canal; or • a dam. The certificate of insurance (COI) for the relevant period indicates the applicants did not select flood cover. The loss was caused by flood rather than stormwater The exchanged material confirms that there was a significant weather event across Australia and in particular the area of the insured premises during the latter part of March 2017. A substantial amount of rain fell during this time. The rainfall data provided suggests that between 29 March 2017 and 1 April 2017 324mm-432mm of rain fell. The available submissions from the FSP indicate the insured premise was first inundated by water at approximately 4.00am on 31 March 2017. As the premise was tenanted, the applicants rely on a neighbour for witness evidence to suggest that the inundation occurred at approximately 3.00am. The Panel has considered a report regarding the cause of the inundation from the applicants ‟ engineer (RA). RA provided a reports dated 16 May 2017, 5 September 2017 and 14 June 2018. RA was of the opinion that stormwater had backed up and inundated the relevant properties. He considered the inundation was not caused by the main arm of the Brunswick River system and was due to the inadequacy of the local Council stormwater drainage system to carry the water away. He says if it were flood, then properties closer to the river banks would have been affected rather than the insured property which was at a higher elevation. The FSP has provided reports from its hydrologist (W) dated 26 April 2017, 24 May 2017, 12 June 2017 and 30 August 2017. W‟s reports were prepared after a site inspection, interview with a neighbour and review of meteorological/hydrological data. Case No: 489377 Determination Page 3 of 10 The Panel notes the criticisms of the 2016 flood mapping but is not persuaded that the mapping as a simulation has no evidentiary value. Having reviewed the available material the following is noted:  both experts agree that the storm water inlet is inadequate but they dispute the cause of inundation  several ground height levels are given by both experts. The ground height levels range from 6.1mAHD to 6.81mAHD  the flood level height was 7.1mAHD (and a flood planning height of 7.3mAHD) . It is noted the flood mapping indicated a flood level at the insured property of about 7mAHD  the peak rainfall had finished by 1.30am and the rain had stopped at approximately 2.30am  the river level commenced peaking between 4am - 6am , however the data suggests the river was not far off its peak at 3am  the inundation occurred at either 3am or 4am based on witness evidence. W concluded that above floor inundation at the insured premises commenced at approximately 4.00am on 31 March 2017, as the level of the river peaked. W says that if rain water caused the inundation that inundation would have occurred shortly after the peak rainfall. However, the evidence indicates inundation did not occur until after the rain had ceased at 2.30am. As such, the inundation at 3.00am or 4.00am on 31 March 2017, occurred sometime after the peak rainfall intensity. The Panel accepts that storm water runoff is generally associated in time with intense rainfall periods and that some pooling of water likely occurred due to the inadequate storm water inlet. This raises an additional issue for the applicants. If water could not drain away properly and discharged back out of the stormwater drain, this would still be considered flood. This is because the definition of flood includes escape from a „canal‟ which the Courts have previously interpreted to include stormwater drains. Unfortunately RA has not provided any clarification as to why the timing of the inundation occurred after the peak rainfall, after the rain had ceased and when the river level was increasing. There has further, been no expert explanation regarding whether, if he considered the topography excluded flooding, the cul de sac would also avoid surcharging drainage systems given the stormwater flows. This is particularly in circumstances where the stormwater flow appears to be directed toward the applicants‟ property. Having reviewed the exchanged material, the Panel is satisfied that the cause of the inundation at the property was a result of flood water rather than rainfall. On this basis, the FSP is entitled to rely upon its policy exclusion for flood to decline the applicants ‟ claim. 2.2 Are the applicants entitled to non-financial compensation? The applicants have sought compensation on the basis of their claims handling experience. Case No: 489377 Determination Page 4 of 10 Under 9.3(b) of the Terms of Reference there must be an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the applicants‟ expectation of enjoyment or peace of mind has occur before compensation for non-financial loss may be determined. The time frame for assessment and claim declinature was reasonable The claim was lodged on 31 March 2017 and the applicants received an initial claims decision on 11 May 2017. During this period the FSP was required to obtain an assessment of the damage as well as an expert hydrology report. This timeframe does not appear to be excessive given the need to arrange a hydrologist specialist in the aftermath of a flood event. The contact time frames do not give rise to a claim for compensation The Panel has reviewed the contact times and frequency of contact between the parties. There appears to have been an expectation of more direct contact from the FSP where in circumstances the FSP had delegated to its assessor. Whilst it is unclear whether this was communicated by the FSP, it does appear that there was regular contact between the FSP or its assessor and the applicants. In the circumstances, the Panel is not persuaded there was an unusual degree of inconvenience which is required to consider compensation for non-financial loss. Accordingly, the FSP is not required to pay the applicants compensation. Case No: 489377 Determination Page 5 of 10 3 Supporting information 3.1 FOS approach to this dispute There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. This dispute has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions (which are not binding). Rainwater that mixes with flood water is flood The Courts have established that once rainwater mixes with flood water, it is all considered flood water. Where rainwater mixes with flood water and causes damage, a flood exclusion will usually apply to defeat the claim. Accordingly, when deciding disputes, consideration has been given to whether any rainwater runoff damage occurred before the flood water arrived at the insured property. 3.2 Witness Evidence Record Key points Witness “JW” Statutory Declaration 15 May 2017  On 31 March 2017 JW had no flood water or threat of flood water where he resides.  JW lives opposit e the B runswick River and at no time did the river rise above the river bank in the vicinity of his residence. Witness “AM” Statutory declaration 12 May 2017  AM resides at an address in the area but not the street of the Applicants‟ damaged property.  AM had no water encroach or rise in the vicinity of his property or on the road where his property is situated.  There was apparent threat of flood waters at his property on 31 March 2017.  Mapping shows AM‟s property appears to be closer to the river. Witn ess “LR” Statutory declaration 12 May 2017  LR provides her address which appears to be near a watercourse.  On the morning of 31 March 2017 there was no water entering her dwelling or neighbouring dwellings from the surrounding creek or river.  There was no threat of any flood at the above property on that day. Witness “RF” Statutory declaration 20 September 2017  RF lives in close proximity to the Applicants in the cul de sac.  At 3am water was coming into the house.  RF‟s insurance covered the claim despite her not having flood Case No: 489377 Determination Page 6 of 10 cover. 3.3 Expert Evidence Record Key points Applicant’ s expert (RA) 14 June 2018  It is my considered opinion that the water damage sustained by the property …. on the night of March 30 in 2017 was caused by storm water, due to the inadequacy of the local council storm water drainage system to carry water away and not by flood waters ri sing from the Maln Arm of the Brunswick River. FSP expert (W) H y drologist Report 26 April 2017  The topography of the cul de sac and surrounding areas is flat. The ground level in the vicinity of the property is 6.7mAHD.  Storm water from the front of the p roperty drains North to the head of the cul de sac and is collected in a stormwater system via a stormwater inlet.  Much of the area in which the insured residence is located is on the floodplain of the B runswick River which „meanders‟ through the town.  The flood studies s how the cul de sac is not affected by small flood events. However, for large events floodwater breaks out of the river channel to the west and flows east through the residential areas of town, including the cul de sac. The flood study indicates these results for a 100 ARI flood event.  The flood mapping indicates the Applicants area would be covered by flood waters although some neighbouring homes would not be.  The version of events from M W (a resident at the nei ghbouring property to the insured premise) provided the following information regarding the property and inundation: - At 1.30am on 31 March 2017 M W drove to another street in the East of town and brought them back to his place. He arrived back at the insured property at 1.45am. At this time there was inundation of A Street but no significant inundation of the cul de sac. - At about 4am on 31 March 201 7 there was water above floor level in his house. Depth was about two inches (50mm) above floor level. This was close to the peak level . - The water was muddy and quite still and did not rush through the property. - The water receded quickly and the yard may h ave been under water for a few hours.  The rainfall records record bet ween 324mm and 432mm between 29 March 2017 and 1 April 2017. The peak 1 hour intensity of 68mm/hr was recorded at 1am on 31 March 2017. Case No: 489377 Determination Page 7 of 10  The recorded levels of the B runswick river commence d reaching its absolute peak between 4am and 6am. At 6am the recorded level of the gauge was 4.28mGH on 31 March 2017.  Given the insured property‟s floor level is elevated above ground level, significant inundation of the cul de sac would be required befor e the house was inundated above floor level. It is unlikely the rainfall alone could have caused sufficient depth of inundation to affect the house above floor level, even if the stormwater pipe system was completely ineffective.  The observed time of inund ation was 3 hours after the peak rainfall int ensity and corresponds to the peak of the flood in the B runs wick River.  The hydrologist concluded the inundation of the subject property above floor level was caused by floodwat er overflowing from the B runswick River. Applicants’ Expert (RA) Engineer 16 May 2017  There was a 1 in 100 year flood level (6.8m)AHD.  The flood planning height is (7.3)AHD. The ground level is (6.54m) and the floor level in the dwelling was (6.835m). The art studio floor level is (6.675m).  The insured dwelling was inundated wit h stormwater on 30 th March 2017 and the wat er reached a level of 0.1m above the floor slab of the dwelling at 0.25m in the studio.  The stormwater runoff from heav y rain was not able to drain quickly enough fr om the roadway which caused water level to rise above the road and inundate several homes in the street.  This occurred previously on 3 rd June 2016 but a neighbour managed to unblock the leaf debris from the drain which allowed water to drain more freely. A t this time damage to the kerb inlet pit was noted. The aperture of the pit had closed significantly which was reported to the Council. No action was taken to rectify the pit.  Damage to the inlet of the only drain in the cul de sac reduced the flow capacit y of the drain and allowed foliage debris from the storm to block the inlet, preventing free drainage of stormwater from the road.  The stormwater drainage systems are required to be designed to accommodate rainfall of a 1 in 20 year storm. The run off fro m rainfall in excess of 1 in 20 is required to be accommodated by an overflow pat h with a capacity equivalent to 1 in 100 year event. No such overflow path was incorporated into the design of the drainage in the cul de sac.  The inundation was not caused by floodwater rising from the main arm of the B runswick River system. If this were the case then properties closer to the river banks would have been affected, rather than this localised area, well back from the river and at a higher elevation. Case No: 489377 Determination Page 8 of 10 FSP Expert (W) S upplement ary Report 24 May 2017  The material provided by the Applicants is no t consistent with flood mapping published on Council website.  The witnesses and their properties are all outside the mapped flood extent for the 100 year ARI event. The fac t that the properties were not affected by flooding consistent with the flood mapping.  The maximum stormwater flow in the cul de sac would occur within minutes of peak rainfall intensity.  M W provided evidence that the property had no noticeable inundation when he returned to the property at 1.45am on 31 March 2017 and was not inundated until 4am on 31 March 2017.  By 1.35am 370mm of rain had fallen with no impact on the property, accordingly if the street was not inundated by 1.45am it could not have been inundat ed by stormwater at a later time because the volume and intensity of rainfall was less than it was prior to 1.45am. Further, the inundation of the home at 4am occurred at the time the river was approaching its peak level. FSP Expert (W) 2 nd Supplementary Report 12 June 2017  The minimum ground level of the cul de sac is 6.1mAHD and the flood level would have been about 7.1mAHD  W agrees the stormwat er pipe inlet is undersized.  The flood mapping indicates a flood level at the insured property of about 7mAHD.  The council‟s flood mapping indicates high flood veloci ties in the main waterway channels and lower velocities on the floodplain. This is consistent with M W‟s observation of muddy water which is typical of floodwater.  The property was only inundated to a shallow depth above floor level and would have occurred at the peak of the flood.  The Applicants said the rain stopped at 2.30am but the property was not inundat ed until 4am, which is three hours after the peak rainfall and 1.5 hours after the rain stopped. Stormwater from the local catchment of the cul de sac has to travel less than 100m to pond at the lowest point. It would only take minutes to travel this distance.  The timing of the inundation, combined with flood mapping shows that water overflowed the B runs wick River and inundated the insured property. FSP Expert (W) 3 rd Supplementary Report 30 August 2017  W disputes the findings of the Applicant‟s engineer.  W states the findings of the engineer make no reference to hydrologic or hy draulic calculations or consider the timing of the rainfall and inundation.  W states the available topographical information indicates that the insured property is lower than other properties in the street.  W confirms the neighbour was interviewed for his version of events during a site inspection on 21 April 2017. Case No: 489377 Determination Page 9 of 10 Ap plicants’ Expert (RA) Engineer 5 September 2017  The engineer provides the following information: - 1 in 100 year flood level 6.8mAHD - Flood Planning Height is 7.3mAHD - Ground level height is 6.81mAHD - Floor levels of the dwelling 6.84mAHD  The insured premise was inundated with stormwater on the night of 30 March 2017. The water reached a level of 0.1m above the house floor slab.  Stormwater runoff from heavy rain event that night was unable to drain quickly enough from the roadway causing the water leve l to rise well above the road and inundate several houses in the cul de sac.  There were known issues with the storm water inlet.  The Applicants‟ dwelling and neighbouring property were inundated with stormwater on 30 Marc h2017 as a result of blockage to th e road drainage system and the omission of an adequate overflow path.  The inundation was not caused by flood water rising from the B runswick River, if it were, properties closer to the river banks would have been affected rather than the localised area wel l back from river and at a higher elevation. 3.4 Miscellaneous Information recorded in claim file notes regarding the inundation eve nt:  the insured dwelling is located 400m from the B River on level ground  water has risen during the night and entered the dwelling which is 300mm above ground level to a depth of 30mm after back up in the street  the storm water drain at the end of the street could not handle storm water runoff supposedly due to blockages. FSP provided the following contact points:  1 April 2017 unsuccessful call to the Applicants. Return call received the same day and appointment confirmed  4 April 2017 a site inspection and meeting with the Applicants was arranged  6 April 2017 letter to customer advising of progress and providing tips to prepare scope of loss and seeking insurer instructions  on or about 19 April 2017 a phone call occurred with the Applicants noting the hydrologist had been appointed to inspect the premise  26 April 2017 receipt of hydrology report  28 April 2017 an assessor report recommending denial was sent to claims  The assessor was advised of the claim denial on 12 May 2017. Further contact dates/times with the applicants are recorded as follows:  31 March 2017 the applicants were contacted by the assessor (C)  5, 6, 13 and 18 April 2017 the applicants were contacted by the FSP or C Case No: 489377 Determination Page 10 of 10  7, 10, 11, 16, 18, 25 and 26 May 2017 the applicants were contacted by the FSP or C  2 and 14 June 2017 the FSP emailed the applicants  4 July 2017 the FSP records it emailed the applicants.