Refusal to cover retaining wall damage and embankment soil restoration after landslip
Summary
An individual's claim for landslip damage to a retaining wall and embankment soil after a severe storm was declined. AFCA decided in favour of the FSP, finding no compensation was warranted despite some poor communication.
The storm-damage exclusion for retaining walls applies regardless of mechanism, and landscaping cover excludes storm, rainwater or run-off damage.
Issues
- Claim denial primary · not upheld“the FSP is entitled to rely on the policy exclusion for storm damage to retaining walls to deny the applicant's claim.”
- Delay secondary · not upheld“the panel does not consider that the timeframe was unreasonable.”
- Poor communication secondary · upheld“The panel considers that the FSP's consultants could have communicated more clearly with the applicant.”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 489339 Determination Page 1 of 9
Case number: 489339 28 February 2018
1 Overview
1.1 Dispute
The applicant lodged a claim under her home insurance policy with the financial
services provider (FSP), after her property was damaged by a landslip following
heavy rainfall associated with ex tropical cyclone Debbie in March 2017.
The FSP accepted liabi lity for the repair of minor damage to the applicant‟s home
and undertook make safe works. However, the FSP denied cover for damage to a
retaining wall and the restoration of soil to the embankment affected by the landslip.
The applicant disputes the FSP‟s decision and is dissatisfied with the manner in
which the FSP has handled her claim.
1.2 Issues and key findings
Is the FSP liable for the disputed damage?
The FSP is not liable for the damage to the retaining wall because the policy
excludes cover for storm damage to retaining walls, regardless of the specific
mechanism by which the damage is caused.
The FSP is not liable for the restoration of soil to the embankment because the
additional benefit provided for damage to landscaping excludes cover where the
damage has been caused by storm, rainwater or run-off.
Is the applicant entitled to compensation?
The circumstances do not justify the award of compensation.
1.3 Determination
This determination is in favour of the FSP.
The FSP is not liable for the damage to the retaining wall or the restoration of soil to
the embankment. The applicant is not entitled to compensation.
Case No: 489339 Determination Page 2 of 9
2 Reasons for determination
2.1 Is the FSP liable for the disputed damage?
Policy provides cover for accidental damage subject to exclusions
The applicant has the onus of establishing that, on the balance of probabilities, she
has suffered a loss caused by an even insured against under the policy. This is
known as a valid (or prima facie ) claim.
If the applicant is able to establish a prima facie claim, then the onus shifts to the
FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion
under the policy or is otherwise entitled to deny the claim.
The applicant‟s policy provides cover for accidental loss or damag e to her home
building or contents, subject to the conditions and exclusions set out in the policy.
Applicant has established a prima facie claim
The landslip affected the steep embankment which comprises the rear portion of the
applicant‟s property. A sec tion of the embankment approximately six metres wide
and two metres high detached from the slope, resulting in a large volume of topsoil
being deposited on the applicant‟s rear patio.
The collapsing earth damaged a section of the block retaining wall which had been
constructed at the base of the slope. There was also damage to a water pump and
stormwater downpipe at the rear of the home.
On this basis, the panel is satisfied that the applicant has established a prima facie
claim under the policy for accidental damage to her property.
The FSP has accepted liability for the damage to the water pump and downpipe but
has denied cover for the cost of repairing the retaining wall and restoring the
collapsed soil to the embankment.
In these circumstances, the FSP is required to show that, on the balance of
probabilities, it is entitled to rely on a policy exclusion to deny the applicant‟s claim for
the disputed damage.
FSP says damage was caused by excluded factors
The FSP says it is not liable for the disputed damage because the policy contains
general exclusions for loss or damage caused by:
inherent defects, faulty design, structural defects or workmanship
hydrostatic pressure
storm, rainwater or runoff damage to retaining walls.
In order to be entitled to deny the claim on this basis, the FSP is required to show
that the proximate cause of the damage was one or more of the excluded factors
listed above.
Case No: 489339 Determination Page 3 of 9
It is well established at law that the proximate cause of a loss is not necessarily the
first (or the last) or the sole cause of the loss. It is the effective or dominant or
operative cause.
In any particular case, the proximate cause of the loss is a question of fact to be
determined based on the surrounding circumstances. Where there are several
causes operating, each must be examined for the qualities of predominance and
efficacy in relation to the resultant damage.
Storm was proximate cause of damage
The panel has carefully reviewed the available information (including the reports
provided by the various engineers) to determine the proximate cause of the damage
to the applicant‟s property.
Having done so, the panel is satisfied that the proximate cause of the damage was
the extreme rainfall (associated with ex tropical cyclone Debbie) which affected the
property in the period leading up to the landslip.
The area in which the applicant‟s property located experienced 324 millimetres of
rainfall over a 24 hour period. The landslip occurred within 72 hours of the storm.
The geotechnical engineers (SU and ES) engaged by the applicant and the FSP
advised that the landslip had occurred due to the elevated moisture content of the
soil caused by the extreme rainfall event.
SU and ES noted that the effects of the storm had been exacerbated by rainwater
run- off draining from a flat platform on the neighbour‟s property (located upslope) into
the soil of the steep embankment at the rear of the applicant‟s property. T he
cumulative effects of rainfall on the soil eventually triggered its collapse.
The FSP says the landslip (and resultant damage to the retaining wall) occurred
because of structural defects in the way the property was constructed. The engineer
(CR) appointed by the FSP concluded that the property had been built in a manner
which compromised the long term stability of the embankment.
In particular, CR advised that the retaining walls at the applicant‟s property had not
been properly designed to withstand the additional forces from the sloping hillside, in
circumstances where a platform for the house had been cut into the slope.
However, the panel is not satisfied that the FSP has established that the manner in
which the property was constructed was the proximate cause of the loss.
The applicant has provided information which establishes that both the home and the
retaining walls were designed by an engineer and approved by the local council
when constructed in or around 2010. The FSP has not established that the manner of
construction failed to comply with the building standards in force at that time.
While hydrostatic forces may have contributed to the landslide and the collapse of
the retaining wall, any increase in hydrostatic pressure occurred as a result of the
saturation of the soil due to the heavy rainfall experienced during the storm.
Case No: 489339 Determination Page 4 of 9
For the reasons outlined above, the panel is satisfied that the proximate cause of the
damage to the embankment and retaining wall was the severe storm event
experienced on or around 30 March 2017.
Policy excludes cover for storm damage to retaining walls
The FSP says it is entitled to deny the applicant‟s claim because the policy expressly
excludes cover for damage to retaining walls caused by storm, rainwater or run-off.
However, the applicant says the claim should be covered because the damage was
caused by a landslip which occurred within 72 hours of the storm.
The applicant has referred to a separate policy exclusion which states that damage
caused by a landslip is not covered unless it occurs in these circumstances.
FSP can rely on exclusion for storm damage to retaining wall
As outlined above, the applicant has established a prima facie claim for accidental
damage under the policy. The proximate cause of the damage was the storm.
The cover provided under the policy is subject to a number of exclusions. These
exclusions operate by reference to the manner in which the damage is caused and/or
the nature of the item damaged.
Each of the exclusions operates separately and independently to provide the FSP
with the right to deny indemnity based on the criteria specified in the exclusion.
The exclusion relating to landslip referred to by the applicant excludes cover for
damage where the proximate cause is the storm but the damage occurs through the
mechanism of landslip. This exclusion contains an exception for damage that occurs
within 72 hours of a storm.
However, the exception to this exclusion does not mean that all such damage is
necessarily covered – only that the particular exclusion does not apply. The FSP
remains entitled to apply any of the other policy exclusions.
The exclusion for storm damage to retaining walls operates by reference to the
particular item damaged, regardless of the specific mechanism by which the damage
occurred. This exclusion operates separately and independently to the other
exclusions and is not subject to any exceptions.
Accordingly, the FSP is entitled to rely on the policy exclusion for storm damage to
retaining walls to deny th e applicant‟s claim.
Embankment falls outside policy cover for buildings
As outlined above, the applicant‟s policy provides cover for her home building.
For the purposes of the policy, the expression „building‟ is defined to mean „ the fully
enclosed building or buildings at your risk address, primarily used as a place of
residence ‟ .
The policy contains a further, more expansive definition for non-strata properties
such as the applicant‟s property. This definition states that „buildings‟ also includes
Case No: 489339 Determination Page 5 of 9
„all structural domestic improvements‟ including, for example, paved paths and
driveways, terraces, walls, gates, fences, tennis courts and built-in barbecues.
Having carefully reviewed the available information (including the various
photographs provided), the panel considers that the embankment at the rear of the
applicant‟s property does not fall within the definition of „buildings‟ for the purposes of
the policy.
The applicant‟s property has been built on a platform cut into the existing hillside. The
ret aining walls constructed to retain the sloping earth are „structural improvements‟
and therefore fall within the scope of cover for „buildings‟. However, the embankment
itself does not.
Policy does not cover storm damage to landscaping
The policy provides an additional benefit (over and above building cover) for
„landscaping‟ damaged by an event covered under the policy.
However, this benefit expressly excludes cover for loss or damage caused by storm,
rainwater or run-off.
For the reasons outlined above, the panel is satisfied that the proximate cause of the
loss of soil to the embankment was the storm in March 2017.
Accordingly, the FSP is not liable for the costs of earthworks required to restore the
soil to the embankment.
2.2 Is the applicant entitled to compensation?
FOS may award compensation for non-financial loss
Under paragraph 9.3(b) of the Terms of Reference, FOS may award compensation
(capped at $3,000) for non-financial loss where an applicant has suffered an unusual
degree or extent of physical inconvenience, time taken to resolve the situation or
interference with their expectation of enjoyment or peace of mind.
However, FOS takes a conservative approach to the award of compensation for non-
financial loss.
Applicant is dissatisfied with FSP‟s cl aims handling
The applicant is dissatisfied with the manner in which the handled her claim.
Among other things, the applicant says that:
the claim process was unreasonably delayed
the FSP‟s consultants provided conflicting information during the claim pro cess
the engineer (CR) engaged by the FSP was a related entity of the FSP‟s loss
adjuster (CC).
Claim was not unreasonably delayed
Having carefully reviewed the claim history, the panel does not consider the
resolution of the applicant‟s claim was unreason ably delayed.
Case No: 489339 Determination Page 6 of 9
There was a short delay early on in the claim process due to a misunderstanding by
the FSP‟s contractors that the damage had been caused by flood. However, once
this was clarified, the FSP arranged for its builder (KB) to attend the property on 27
April 2017 (within a month of the claim having been lodged).
After KB recommended that an engineer be appointed, the FSP arranged for a civil
engineer (CR) and geotechnical engineer (ES) to attend the property in late May
2017.
Following receipt of the engineers‟ reports, the FSP emailed the applicant to advise
of the claim outcome on 9 June 2017 (noting that the retaining wall was excluded
from cover). The FSP‟s contractors undertook make safe works in mid -June 2017.
The following month, the FSP clarified that soil restoration works would not be
covered.
The panel accepts that the time taken to resolve her claim has exacerbated the
stress suffered by the applicant, particularly given the obligations imposed on her by
the local council to complete the works (in order to ensure the ongoing stability of the
slope) and the significant costs involved in doing so.
However, having regard to the circumstances of the claim, the panel does not
consider that the timeframe was unreasonable.
The claim was triggered by a significant weather event which caused extensive
damage to a large number of properties across a wide area. Specialist engineering
input was required to determine the proximate cause of the damage in order for the
FSP to determine its liability.
Circumstances do not justify award of compensation
The applicant says she believed the FSP had accepted liability for the repair of the
retaining wall and earthworks to the embankment because the engineers‟
investigations focussed on how best to complete the restoration of the soil. She notes
that the FSP initially advised that only the retaining wall would be excluded.
The panel accepts that it was appropriate for the FSP‟s engineers to consider how
the damage to the applicant‟s property could be repaired (in addition to identifying the
cause of damage).
The role of the engineers was not to determine the FSP‟s liability for the claim but to
provide the FSP with the information it required in order for it to do so. In these
circumstances, it will often be appropriate for contractors to prepare a scope of
works, which can be adopted by the FSP in the event it accepts the claim.
Accordingly, investigation into possible remediation measures (and/or the preparation
of a scope of works) does not indicate that an insurer has decided to accept a claim.
The panel considers that the FSP‟s consultants could have communicated more
clearly with the applicant during the claim process, particularly regarding the
exclusion of cover for earthworks and the nature of the relationship between the
engineer (CR) and the loss adjuster.
Case No: 489339 Determination Page 7 of 9
However, there is no information to suggest that the applicant has relied on the
information provided by the FSP to her detriment, or has suffered any significant
additional loss as a result.
For the reasons outlined above, the panel does not consider the award of
compensation for non-financial loss is justified in the circumstances.
Case No: 489339 Determination Page 8 of 9
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS recommendation. Due to the nature
of the dispute, it has been referred directly to a panel for determination, in line with
the Operational Guidelines to the FOS Terms of Reference. The panel consists of an
Ombudsman and two representatives with consumer and insurance experience.
The panel has decided this case based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
The panel has reviewed and considered a ll of the material provided by the parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, the panel has restricted its commentary to those issues that it
considers directly relevant to the outcome only.
3.2 Terms of policy
Subject Terms
Cover for
accidental
damage
This insurance will cover you if you suffer accidental loss or damage to the
buildings, unless we state otherwise under the headings “When we will not pay a
claim on pages [xx] to [xx]” or “When we will not pay a claim under your policy” on
pages [yy] to [yy] …
We will also cover you for the other benefits listed below. Details of the terms,
conditions and exclusions that specifically relate to each benefit are provided on
the pages indicated.
Other benefits …
Landscaping
Meaning of
„buildings‟
“building” or “buildings” both mean the fully enclosed building or buildings at
your risk address, primarily used as a plac e of residence.
If you have selected buildings cover, the term “build ings” also includes: …
when the buildings are not part of a strata title property, the term “buildings”
also includes all structural domestic improvements which belong to you
including g… paved paths, paved driveways, terraces, walls, gates, fences,
masts, aerials, satellite dishes, tennis courts, clothes lines and built - in
barbecues …
Other
benefits -
landscaping
Landscaping ...
We will pay the cost of landscaping including the replacement of fixed trees,
plants and shrubs that have been lost or damaged by an event covered by this
policy, up to a maximum amount of $5, 000 in any one period of insurance.
Case No: 489339 Determination Page 9 of 9
Subject Terms
We will not pay for:
loss or damage caus ed by storm, rainwat er or run - off …
General
exclusions
When we will not pay a claim …
This policy does not cover l oss, liability, injury or damage:
caused by or arising from soil movement including erosion, landslide, mudslide
or subsidence unless it is directly caused by and occurs within 72 hours of an
… explosion, earthquak e or storm …
caused by or arising from sto rm, rainwater or runoff damage to retaining walls
…
caused by or arising from hydrostatic pressure …
When we will not pay a claim under your policy
This policy does not cover loss, liability, injury or damage: …
caused directly or indirectly though inherent defects, faulty design, structural
defects or workmanship.