Text of the determination
Determination
Case No: 478921 Determination Page 1 of 12
Case number: 489021 2 May 2018
1 Overview
1.1 Dispute
The applicants lodged a claim under the home buildings policy with the financial
services provider (FSP) for movement damage to their home and patio slab.
The applicants say broken storm water and sewer pipes, along with heavy rain
events caused cracking to plaster walls, doors to stick, cracks to external brickwork,
and movement to concrete paths and slabs surrounding the home.
The FSP denied the claim as it considers the damage pre-exists the commencement
of the policy. It also says exclusions of subsidence, tree roots and settling are the
cause of damage to the home.
The applicants claim the cracking pipes saturated the soil which in tur n caused the
movement.
1.2 Issues and key findings
Is FSP entitled to deny the applicants’ claim?
The FSP is not entitled to deny all of the claim as the available material establishes
the movement of the patio slab and the damage nearby in the home in the master
bedroom, ensuite and walk-in robe was caused by broken stormwater pipes found
under the grass adjacent to the patio.
Otherwise, the available material establishes the other movement and cracking
damage to the home and surrounding paths was caused by foundation settlement.
As this is excluded from cover, the FSP is entitled to deny the balance of the claim.
Are the applicants’ entitled to compensation?
The applicants are not entitled to compensation as the handling of the claim,
including time taken, was not unreasonable in the circumstances.
1.3 Determination
This determination is partly in favour of the applicants.
If the applicants accept this determination, then within seven days of acceptance, the
FSP is to assess the damage to the patio slab and the adjacent damage in the home
in the master bedroom, ensuite and walk-in robe and any underpinning required
because of this damage.
Case No: 478921 Determination Page 2 of 12
When undertaking this assessment, if the FSP is unable to make an assessment
regarding underpinning, the FSP is to further assess this aspect of the claim within
12 months of completion of the remedial repairs.
Otherwise, the FSP is not required to take any further action in relation to the claim or
the dispute.
Case No: 478921 Determination Page 3 of 12
2 Reasons for determination
2.1 Is the FSP entitled to deny the appli cants’ claim
Applicants must establish a prima facie claim
The applicants must establish on the balance of probabilities they have suffered a
loss caused by an event to which the policy responds. This is known as a prima facie
claim.
The applicants hold a home insurance policy with the FSP. The policy provides cover
for accidental damage described as mishaps around the home which are caused
unintentionally.
However, if the damage is covered under a listed event, then the accidental damage
cover does not apply.
The FSP’s policy also provides cover under a number of listed events. The listed
events include loss or damage caused by storm or by water leaks.
Parties rely on expert reports
The applicants claim water escaping from stormwater pipes and sewerage pipes
caused damage to the insured property. They are unable to identify the exact date of
the damage but say they first noticed damage in the period following significant
rainfall on 1 May 2015. They say the patio slab between the house and pool began to
move and crack midway through 2015. They claim there was further significant rain
in June 2016 and damage worsened and new cracking damage occurred in the
house.
As a result, the applicants engaged the engineer (IC) with whom they consulted prior
to the purchase of the house. IC provided a report in May 2014. The applicants took
up residence in the home in July 2014.
When the applicants noted the claimed damage they consulted with the engineer
again but have not provided a further report from him. They say they are unable to
afford a report from their engineer. As a result of the engineer’s advice, the
applicants made plumbing investigations. The material provided shows the applicants
engaged a number of plumbers to advise them and to undertake remedial work.
No plumbing reports are provided but the FSP’s engineer consulted with the
applicants’ plumbers.
As a result of this consultation, the FSP’s engineer reports blockages were found
within the stormwater lines and they were noted to have a number of roots in them.
The stormwater line nearest the pool could not be inspected.
The FSP’s engineer also relay ed the information that plumbers found three fractures
in the sewer pipes. The engineer reports there was a break in the junction near the
pool, a snap bend on the laundry branch line and a break at the junction for the
Case No: 478921 Determination Page 4 of 12
inspection opening where the sewer passes under the house. This final break was
not able to be seen with the camera.
Applicants provided photographs of leaking pipes
In correspondence with FOS, the applicants advised excavations commenced to
locate and repair the leaking stormwater and sewer pipes in August 2017.
The applicants said stormwater pipes were uncovered directly next to the lower patio
slab and pool about 30cm underneath the grassed area and also in a separate area
directly next to the house along the western side. The applicants explain this position
by saying after the pool was built in 2012, stormwater lines were redirected.
The applicants provided photographs of the pipes. The photographs show
significantly damaged pipes which would cause significant saturation to adjacent soi l.
Although it rained the night before, the applicants say the pipes were not holding
water.
Not only has the slab moved but the area of the house adjacent to the pipes has
settled significantly in a relatively short period of time.
Applicants have established a prima facie claim for damage to the slab and
adjacent room
In the circumstances, I am satisfied the available material establishes a prima facie
claim for damage to the slab and adjacent room.
FSP must establish policy exclusion applies
Once so established, the onus shifts to the FSP to prove on the balance of
probabilities an exclusion applies if it seeks to deny the claim for damage to the slab.
Prior to moving into the home in July 2014, the applicants arranged for their engineer
IC to conduct an inspection due to cracks identified in a pre-purchase inspection
which took place in May 2014.
The pre-purchase report identified:
slight hairline cracking to wall joins at door and window heads around the house
slight movement to the door of the main bedroom
hairline cracking in the brickwork and window frame of the left-hand side front
bedroom
movement to the concrete slab at the left-hand side rear
cracking to the concrete slab of the driveway.
No damage was identified to the patio slab.
IC inspe cted and photographed the damage in May 2014. IC’s report noted the
above damage and also identified other minor cracking. He said the house was in
good general condition. He noted articulation joints have not been provided to the
external brickwork.
IC took photographs which included a photograph of the external patio area which
shows no damage.
Case No: 478921 Determination Page 5 of 12
IC undertook internal floor measurements which recorded, amongst other
measurements, a fall of 25mm to the rear wall of the master bedroom (bedroom 1).
He said the floor levels were still within acceptable tolerances.
Because of the “slight cracking” to the external brickwork and “moderate internal
cracks”, IC concluded the footing and slab system has experienced minor settlement
since it was built. The available material indicates it was built in about 1994.
He said the slight cracks located at window corners have been made worse by the
failure to construct with articulation joints to the brickwork.
IC concluded the observed damage was not “detrimental to the str uctures immediate
overall integrity”. He said all buildings undergo minor movement during their lifespan
due to seasonal effects or minor settlement after construction. He said minor
movement may continue in the future but that he did not expect significant changes
to occur.
IC did not give an opinion about the cause of the minor settlement of the home.
The extent of damage as described in these reports was confirmed by the people
who owned the house before the applicants. They swore a statutory declaration
saying there was no damage to the patio slab next to the pool.
Before the subject claim, the applicants also claimed earthquake damage to the
property. As a result the FSP engaged a builder to inspect the home. The builder
provided a report dated 29 August 2016.
The report included photographs which showed damage. Some of the damage is
referred to in the earlier reports summarised above. Notably, the builder refers to and
photographs movement to the concrete slab on the rear patio.
The available material does not establish why this claim was withdrawn.
Because of the increased cracking damage, and after engaging plumbers, the
applicants lodged the subject claim in March 2017.
FSP’s appointed a builder and an engineer
The FSP immediately appointed a bui lder to inspect the applicants’ damage.
The builder confirmed the patio slab was moving. He noted and photographed
external cracking damage and cracking damage in the main bedroom, ensuite, walk-
in robe, bedroom two, hall, laundry and kitchen. He estimated repair costs at
$11,594.54 but said he was not able to warrant repairs.
The builder recommended further investigation by an engineer to determine the
cause of the structural damage.
The FSP arranged for an engineer (CR) to provide a causation report. The engineer
inspected and photographed the damage on 22 March 2017.
As set out earlier in this determination, the engineer had access to the applicants’
plumber and plumbing reports.
Case No: 478921 Determination Page 6 of 12
He also obtained the original geotechnical investigation dated August 1994 which
classified the soil type as S which is slightly reactive.
An internal floor level was surveyed. A survey plan is attached to his report. The
survey shows there was a fall of 67mm from bedroom 4 to the master bedroom. The
engineer described a sharp fall of 42mm in the north-east corner of the master
bedroom. This corner is near to the movement in the patio slab which the engineer
measured at around 30mm.
CR made a number of observations. He noted separation of up to 10mm between the
brick veneer and door frame of the sliding door to the patio. He confirmed hairline
cracking in external brick veneer cladding and hairline cracking to the plaster in the
lounge room, hallway, rear left bedrooms, laundry, master bedroom and ensuite.
Evidence of attempted repairs to some areas was noted.
CR reported the left side pathway and rear concrete slab shows evidence of
settlement and lateral movement.
Noting the settlement in the patio slab and the rear section of the house, the engineer
discounted the possibility of surface water drainage from the 2015 and 2016 rainfall
events as the applicants confirmed surface water does not reach the patio.
CR concluded the settlement movement occurred slowly. He said:
moisture absorption from mature trees at the rear of the property caused
shrinkage and settlement in the soils
because of the long-term settlement in the foundation soils, there has been
settlement and lateral movement in the concrete path slab to the rear and rear
left side of the house
the settlement in the paths and slab has cause compressive stress onto the sub
surface storm water pipes to the rear left and rear sides of the house evidenced
by a photograph of pipe containing an oval shape and the detached rear left
downpipe
the sewer pipe near the laundry fractured because of settlement of the concrete
pathway slab
the ground movement in the foundation soil underneath the patio slab fractured
a sewer pipe evidenced by the oval shape of the PVC pipe
the fractures have typically occurred at bends in the pipe which are susceptible
to fracture following slight vertical or lateral movement
Relying on evidence tree roots entered and blocked the stormwater pipes, he said,
following fracture of the storm water and sewer pipes, water escaped which further
encouraged the root system of the trees to the source of water.
The engineer said the damage did not occur from the fracture of multiple storm water
and sewer pipes causing the soils to become wet and lose bearing capacity as
apparently posited by the applicants’ engi neer.
He says this because the visible fractures in the sewer pipes are fine and the
stormwater pipes are blocked. Because of these observations, he says water would
remain in the pipes. However, the FSP’s engineer did not excavate to identify tree
Case No: 478921 Determination Page 7 of 12
roots near the slab and he has not commented on the photographs of the excavated
pipes.
Relying on the engineer’s report, the FSP considered its policy did not respond to the
applicants’ claim.
Applicants’ photographs show severely damaged excavated pipes
The applicants provided further information and photographs taken in August 2017
when the pipes were excavated. The FSP has not commented on this material.
The photographs do not show the kind of minor damage to these pipes described by
the FSP’s engineer. Moreover, the applicants’ uncont ested evidence is these pipes
were not under the patio and therefore could not have been fractured by crushing as
described by the FSP’s engineer.
The FSP’s engineer relies on circumstantial evidence which he says indicat es
fracture of the stormwater pipes occurred before the house was purchased. He relies
on the level surveys taken by the applicants’ engineer. He also relies on the
presence of a broken downpipe to the left-hand side of the garage.
However, the applicants ’ engineer said the floor levels in 2014 were within
acceptable tolerance. Furthermore, a comparison of the floor level surveys
undertaken by the engineers shows a further significant subsidence in the master
bedroom adjacent to the patio damage.
The uncontested evidence of the applicants is the broken downpipe referred to by the
FSP’s engineer was damaged by impact and repaired in 2014.
Photographs provided show the slab had not moved at the time of purchase in 2014.
However, movement was noted in photographs taken in August 2016 after storm
events in 2015 and 2016.
Damage to the slab and adjacent rooms probably not caused by settlement
Taking all matters into account, I am not satisfied the available information
establishes on the balance of probabilities the proximate cause of the damage to the
patio slab and the damage nearby in the home in the master bedroom, ensuite and
walk-in robe was caused by foundation settlement.
In the circumstances, I am not satisfied the FSP is entitled to deny the applica nts’
claim for damage to the patio and the adjacent master bedroom, walk -in robe and
ensuite.
Policy does not respond to other claimed damage
However, I consider the available material establishes a different result in relation to
the claim for the internal and external cracking damage in other areas of the home
and the damage to the path at the rear and left hand rear of the house.
This is because the further photographs provided by the applicants after they
excavated the pipes deals substantially with the pipes uncovered adjacent to the
slab. Further, other photographs show much of the internal and external cracking
Case No: 478921 Determination Page 8 of 12
damage was present when the house was purchased. Finally, the available material
does not establish the kind of significant subsidence caused by significant saturation
of these foundation soils unlike the grass area adjacent to the patio.
The applicants have not provided any material from their plumbers. In the
circumstances I rely on the description of the plumbers’ material by the FSP’s
engineer in his report and his lengthy letter to the FSP in May 2017.
The engineer refers to visible fractures visible in the sewer pipes as being very fine.
The engineer also refers to material from the applicants’ plumber regarding
blockages found within the stormwater pipe at the rear of the residence.
Even if I were to accept the applicants’ contentions that “even a minuscule leak can
be enough to saturate a clay foundation”, I am not satisfied on the balance of
probabilities the available material establishes either a storm event or escape of
liquid from these pipes was the real or dominant cause of the damage in these other
areas in the home and at the rear and left hand side of the home.
This is because the other pipes and other areas of damage are nearer to the large
trees at the rear of the property and the probable impact of the tree roots on the soil
and on the pipes from these trees.
Further, unlike the pipes adjacent to the pool, which the applicants say were under
grass, I consider the available information establishes on the balance of probabilities
the other pipes were fractured because of settlement of soil and the impact on the
pipes by the concrete paths or slabs above them.
In the circumstances, even if it were to be accepted an insured event occurred, I am
satisfied the available material establishes settlement caused compression of these
pipes causing them to leak which in turn encouraged the root systems of the trees
adjacent to these other claimed areas of damage.
In the circumstances, for the reason stated I am satisfied the available material
establishes the FSP is entitled to deny this aspect of the applicants’ claim.
Contentions regarding the FSP’s engineer and policy not determinative
I note the applicants’ contentions regarding the contradiction in the FSP’s engineer’s
report and their criticisms of the FSP’s engineer’s investigations about the pipes.
However, even if these contentions were accepted, I do not accept these matters are
determinative of the issues in dispute.
The applicants say the FSP has not articulated the clauses it relies on to deny the
claim. The applicants also say the FSP accepted in a telephone call there was a
listed event of escape of water. The FSP has not specifically responded.
However the FSP’s correspondence and Notice of Response clearly sets out the
exclusions it relies on. Further, the FSP’s submissions and correspondence is clear
and unambiguous. The FSP argues not only an insured event has not occurred but,
relying on its engineer’s report , it is entitled to rely on the policy exclusions set out
therein.
Case No: 478921 Determination Page 9 of 12
The applicants say the FSP’s policy terms are not clear. However, while noting the
difference in the clauses highlighted by the applicants, I do not accept the policy
operates as argued by the applicants. I consider the commercial intent of the policy is
to exclude loss or damage arising from all the exclusions listed in policy.
The FSP is to immediately assess the accepted damage
The applicants claim costs in the sum of $27,229.25. No invoices or quotations have
been provided.
Further, some of the costs claimed relate to matters which are excluded from cover.
Moreover, the FSP’s policy does not cover costs to repair or replace the pipes.
The applicants also claim $25,000 to underpin the house. The document provided is
annotated saying this requirement is unknown until at least 12 months after remedial
repairs.
The FSP’s engineer said the damage to the residence has not compromised the
structural integrity of the footing. At the time of inspection in March 2017, the FSP’s
engineer did not consider underpinning was required but remedial repairs were not
commenced until August 2017.
If the applicants accept this determination, then within seven days of acceptance, the
FSP is to assess the damage to the patio slab and the adjacent damage in the home
in the master bedroom, ensuite and walk-in robe and any underpinning required
because of this damage.
If at the time of this assessment, the FSP is unable to make an assessment
regarding underpinning, the FSP is to further assess this aspect of the claim within
12 months of completion of the remedial repairs.
The FSP is to otherwise settle the claim in accordance with the policy terms and
conditions. FOS encourages the parties to settle the quantum of the claim by
agreement but if the parties are unable to agree on the amount of settlement, the
parties can bring the matter back to FOS to make a further determination about the
quantum of the claim.
2.2 Are the applicants entitled compensation?
Compensation may be paid in some circumstances
The applicants complain about stress and delay. They say they lodged the initial
dispute on 21 April 2017 but did not receive a final response until 4 July 2017.
In its final response letter, the FSP apologised for the level of service.
Otherwise, the FSP has not addressed this aspect of the dispute.
FOS’s Terms of Reference allow the payment of compensation (capped at $3,000)
for non-financial loss. FOS may decide an FSP should compensate an applicant for
such loss only where there has been an unusual amount of physical inconvenience,
Case No: 478921 Determination Page 10 of 12
time taken to resolve a situation, or interference with the applicant’s expectation of
enjoyment or peace of mind.
In this dispute, I note the following timeline:
6 March 2017 claim made
FSP sent both a builder and an engineer to inspect and assess the damage
6 April 2017 claim denied
21 April 2017 applicants provided a lengthy letter rejecting the denial
FSP provided this letter to its engineer
19 May 2017 applicants followed up FSP for response
21 May 2017 FSP telephoned engineer for response
23 May 2017 engineer apologised for the delay and said the dispute letter was
very long which had contributed to the delay
23 May 2017 engineer responded to the app licants’ letter
8 June 2017 FSP proposed plumbing repairs be completed and then damage
assessed after 12 months
9 June 2017 applicants reiterated their position
13 June 2016 FSP reiterated its position
13 June 2016 applicants requested the dispute be considered by the FSP’s
internal dispute resolution department
4 July 2017 IDR letter provided
The applicants submits these timeframes breach the FSP’s guidelines and breach
undertakings made by the FSP to the applicants in the course of the dispute. The
applicants submit this is unacceptable and unreasonable treatment particularly as
they had already indicated they were suffering anxiety, stress and adverse health
impacts because of the denial of the claim.
FOS takes a conservative approach to compensation for non-financial loss. Taking
into account this conservative approach, I am not satisfied there has been an
unusual amount of time taken to resolve the situation in the circumstances. While the
claims management may not have been optimum, I do not acce pt the FSP’s
responses were unreasonable particularly in view of the complexity of the claim and
the necessity of obtaining further expert opinion.
Further, while I accept claims and insurance disputes are stressful, I am not satisfied
FSP’s conduct and r esponse was unreasonable in view of the available material and
complexity of the dispute.
Taking all matters into account, I am not satisfied the available material warrants an
award of compensation.
Case No: 478921 Determination Page 11 of 12
3 Supporting information
3.1 FOS Approach
As advised to the parties, FOS has considered it appropriate to expedite this dispute
in accordance with the Operational Guidelines to the FOS Terms of Reference, due
to the nature of the dispute. Accordingly, this dispute has not been the subject of a
FOS recommendation and has proceeded directly to determination.
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered for the purposes of this determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
It is an accepted principle of general insurance law an ins ured bears the onus to
establish on the balance of probabilities they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities an
exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy extracts
The relevant policy extracts are referred to in correspondence between the parties
and in the FSP’s Notice of Response dated 3 August 2017 . Both the policy document
and the Notice have been exchanged with the applicants.
The applicants say the policy document relied on by the FSP is incorrect. However,
the policy document relied on by the FSP was prepared in 2012. The policy
document relied on by the applicants was prepared on 3 March 2017. The relevant
policy is not the policy document in existence at the time of the claim but the policy
document in existence at the time of the claimed damage. The applicants claimed the
damage occurred in 2015 and 2016. In the circumstances, the policy document relied
on by the FSP is correct.
3.3 Case law and proximate cause
Case law establishes:
The proximate cause of the loss is the dominant or effective or operative cause
of the loss whether or not that be the last in time or the sole cause.
If there are several causes operating contemporaneously, each must be
examined for the qualities of reality, predominance and efficiency as the active,
efficient cause that sets a relevant chain of events in action. If one cause would
Case No: 478921 Determination Page 12 of 12
have caused the harm in any case, and the other would not have done so in the
absence of the first, the first is the proximate cause.
A common sense approach is taken to determine proximate cause.
3.4 Other relevant material considered and relied on
Parties’ submissions, emails, photographs and all attachments to all
submissions
Statutory declaration from applicants’ neighbours
Expert reports and letter, photographs and attachments to those reports
Correspondence between the parties
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.