Home / Financial Firm (Unknown - Insurer) / Determination 489021

Determination 489021

Home movement damage claim partly denied as settlement and tree-root related

FirmFinancial Firm (Unknown - Insurer)
Decided2018-05-03
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$52,229
SourceAFCA PDF

Summary

Homeowners claimed under their home buildings policy for movement damage, attributed to broken stormwater and sewer pipes, and the FSP denied it as settlement-related and excluded. AFCA found the patio slab and adjacent room damage was covered and must be assessed, but the other cracking and path damage was excluded, and it declined compensation for claim handling.

Once an insured establishes a prima facie claim, the insurer must prove an exclusion applies on the balance of probabilities, and proximate cause is the dominant effective cause, here pipe leakage for the patio damage and settlement for the other damage.

Issues

Subjects and remedies

home or building damagepay claimreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 478921 Determination Page 1 of 12 Case number: 489021 2 May 2018 1 Overview 1.1 Dispute The applicants lodged a claim under the home buildings policy with the financial services provider (FSP) for movement damage to their home and patio slab. The applicants say broken storm water and sewer pipes, along with heavy rain events caused cracking to plaster walls, doors to stick, cracks to external brickwork, and movement to concrete paths and slabs surrounding the home. The FSP denied the claim as it considers the damage pre-exists the commencement of the policy. It also says exclusions of subsidence, tree roots and settling are the cause of damage to the home. The applicants claim the cracking pipes saturated the soil which in tur n caused the movement. 1.2 Issues and key findings Is FSP entitled to deny the applicants’ claim? The FSP is not entitled to deny all of the claim as the available material establishes the movement of the patio slab and the damage nearby in the home in the master bedroom, ensuite and walk-in robe was caused by broken stormwater pipes found under the grass adjacent to the patio. Otherwise, the available material establishes the other movement and cracking damage to the home and surrounding paths was caused by foundation settlement. As this is excluded from cover, the FSP is entitled to deny the balance of the claim. Are the applicants’ entitled to compensation? The applicants are not entitled to compensation as the handling of the claim, including time taken, was not unreasonable in the circumstances. 1.3 Determination This determination is partly in favour of the applicants. If the applicants accept this determination, then within seven days of acceptance, the FSP is to assess the damage to the patio slab and the adjacent damage in the home in the master bedroom, ensuite and walk-in robe and any underpinning required because of this damage. Case No: 478921 Determination Page 2 of 12 When undertaking this assessment, if the FSP is unable to make an assessment regarding underpinning, the FSP is to further assess this aspect of the claim within 12 months of completion of the remedial repairs. Otherwise, the FSP is not required to take any further action in relation to the claim or the dispute. Case No: 478921 Determination Page 3 of 12 2 Reasons for determination 2.1 Is the FSP entitled to deny the appli cants’ claim Applicants must establish a prima facie claim The applicants must establish on the balance of probabilities they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. The applicants hold a home insurance policy with the FSP. The policy provides cover for accidental damage described as mishaps around the home which are caused unintentionally. However, if the damage is covered under a listed event, then the accidental damage cover does not apply. The FSP’s policy also provides cover under a number of listed events. The listed events include loss or damage caused by storm or by water leaks. Parties rely on expert reports The applicants claim water escaping from stormwater pipes and sewerage pipes caused damage to the insured property. They are unable to identify the exact date of the damage but say they first noticed damage in the period following significant rainfall on 1 May 2015. They say the patio slab between the house and pool began to move and crack midway through 2015. They claim there was further significant rain in June 2016 and damage worsened and new cracking damage occurred in the house. As a result, the applicants engaged the engineer (IC) with whom they consulted prior to the purchase of the house. IC provided a report in May 2014. The applicants took up residence in the home in July 2014. When the applicants noted the claimed damage they consulted with the engineer again but have not provided a further report from him. They say they are unable to afford a report from their engineer. As a result of the engineer’s advice, the applicants made plumbing investigations. The material provided shows the applicants engaged a number of plumbers to advise them and to undertake remedial work. No plumbing reports are provided but the FSP’s engineer consulted with the applicants’ plumbers. As a result of this consultation, the FSP’s engineer reports blockages were found within the stormwater lines and they were noted to have a number of roots in them. The stormwater line nearest the pool could not be inspected. The FSP’s engineer also relay ed the information that plumbers found three fractures in the sewer pipes. The engineer reports there was a break in the junction near the pool, a snap bend on the laundry branch line and a break at the junction for the Case No: 478921 Determination Page 4 of 12 inspection opening where the sewer passes under the house. This final break was not able to be seen with the camera. Applicants provided photographs of leaking pipes In correspondence with FOS, the applicants advised excavations commenced to locate and repair the leaking stormwater and sewer pipes in August 2017. The applicants said stormwater pipes were uncovered directly next to the lower patio slab and pool about 30cm underneath the grassed area and also in a separate area directly next to the house along the western side. The applicants explain this position by saying after the pool was built in 2012, stormwater lines were redirected. The applicants provided photographs of the pipes. The photographs show significantly damaged pipes which would cause significant saturation to adjacent soi l. Although it rained the night before, the applicants say the pipes were not holding water. Not only has the slab moved but the area of the house adjacent to the pipes has settled significantly in a relatively short period of time. Applicants have established a prima facie claim for damage to the slab and adjacent room In the circumstances, I am satisfied the available material establishes a prima facie claim for damage to the slab and adjacent room. FSP must establish policy exclusion applies Once so established, the onus shifts to the FSP to prove on the balance of probabilities an exclusion applies if it seeks to deny the claim for damage to the slab. Prior to moving into the home in July 2014, the applicants arranged for their engineer IC to conduct an inspection due to cracks identified in a pre-purchase inspection which took place in May 2014. The pre-purchase report identified:  slight hairline cracking to wall joins at door and window heads around the house  slight movement to the door of the main bedroom  hairline cracking in the brickwork and window frame of the left-hand side front bedroom  movement to the concrete slab at the left-hand side rear  cracking to the concrete slab of the driveway. No damage was identified to the patio slab. IC inspe cted and photographed the damage in May 2014. IC’s report noted the above damage and also identified other minor cracking. He said the house was in good general condition. He noted articulation joints have not been provided to the external brickwork. IC took photographs which included a photograph of the external patio area which shows no damage. Case No: 478921 Determination Page 5 of 12 IC undertook internal floor measurements which recorded, amongst other measurements, a fall of 25mm to the rear wall of the master bedroom (bedroom 1). He said the floor levels were still within acceptable tolerances. Because of the “slight cracking” to the external brickwork and “moderate internal cracks”, IC concluded the footing and slab system has experienced minor settlement since it was built. The available material indicates it was built in about 1994. He said the slight cracks located at window corners have been made worse by the failure to construct with articulation joints to the brickwork. IC concluded the observed damage was not “detrimental to the str uctures immediate overall integrity”. He said all buildings undergo minor movement during their lifespan due to seasonal effects or minor settlement after construction. He said minor movement may continue in the future but that he did not expect significant changes to occur. IC did not give an opinion about the cause of the minor settlement of the home. The extent of damage as described in these reports was confirmed by the people who owned the house before the applicants. They swore a statutory declaration saying there was no damage to the patio slab next to the pool. Before the subject claim, the applicants also claimed earthquake damage to the property. As a result the FSP engaged a builder to inspect the home. The builder provided a report dated 29 August 2016. The report included photographs which showed damage. Some of the damage is referred to in the earlier reports summarised above. Notably, the builder refers to and photographs movement to the concrete slab on the rear patio. The available material does not establish why this claim was withdrawn. Because of the increased cracking damage, and after engaging plumbers, the applicants lodged the subject claim in March 2017. FSP’s appointed a builder and an engineer The FSP immediately appointed a bui lder to inspect the applicants’ damage. The builder confirmed the patio slab was moving. He noted and photographed external cracking damage and cracking damage in the main bedroom, ensuite, walk- in robe, bedroom two, hall, laundry and kitchen. He estimated repair costs at $11,594.54 but said he was not able to warrant repairs. The builder recommended further investigation by an engineer to determine the cause of the structural damage. The FSP arranged for an engineer (CR) to provide a causation report. The engineer inspected and photographed the damage on 22 March 2017. As set out earlier in this determination, the engineer had access to the applicants’ plumber and plumbing reports. Case No: 478921 Determination Page 6 of 12 He also obtained the original geotechnical investigation dated August 1994 which classified the soil type as S which is slightly reactive. An internal floor level was surveyed. A survey plan is attached to his report. The survey shows there was a fall of 67mm from bedroom 4 to the master bedroom. The engineer described a sharp fall of 42mm in the north-east corner of the master bedroom. This corner is near to the movement in the patio slab which the engineer measured at around 30mm. CR made a number of observations. He noted separation of up to 10mm between the brick veneer and door frame of the sliding door to the patio. He confirmed hairline cracking in external brick veneer cladding and hairline cracking to the plaster in the lounge room, hallway, rear left bedrooms, laundry, master bedroom and ensuite. Evidence of attempted repairs to some areas was noted. CR reported the left side pathway and rear concrete slab shows evidence of settlement and lateral movement. Noting the settlement in the patio slab and the rear section of the house, the engineer discounted the possibility of surface water drainage from the 2015 and 2016 rainfall events as the applicants confirmed surface water does not reach the patio. CR concluded the settlement movement occurred slowly. He said:  moisture absorption from mature trees at the rear of the property caused shrinkage and settlement in the soils  because of the long-term settlement in the foundation soils, there has been settlement and lateral movement in the concrete path slab to the rear and rear left side of the house  the settlement in the paths and slab has cause compressive stress onto the sub surface storm water pipes to the rear left and rear sides of the house evidenced by a photograph of pipe containing an oval shape and the detached rear left downpipe  the sewer pipe near the laundry fractured because of settlement of the concrete pathway slab  the ground movement in the foundation soil underneath the patio slab fractured a sewer pipe evidenced by the oval shape of the PVC pipe  the fractures have typically occurred at bends in the pipe which are susceptible to fracture following slight vertical or lateral movement Relying on evidence tree roots entered and blocked the stormwater pipes, he said, following fracture of the storm water and sewer pipes, water escaped which further encouraged the root system of the trees to the source of water. The engineer said the damage did not occur from the fracture of multiple storm water and sewer pipes causing the soils to become wet and lose bearing capacity as apparently posited by the applicants’ engi neer. He says this because the visible fractures in the sewer pipes are fine and the stormwater pipes are blocked. Because of these observations, he says water would remain in the pipes. However, the FSP’s engineer did not excavate to identify tree Case No: 478921 Determination Page 7 of 12 roots near the slab and he has not commented on the photographs of the excavated pipes. Relying on the engineer’s report, the FSP considered its policy did not respond to the applicants’ claim. Applicants’ photographs show severely damaged excavated pipes The applicants provided further information and photographs taken in August 2017 when the pipes were excavated. The FSP has not commented on this material. The photographs do not show the kind of minor damage to these pipes described by the FSP’s engineer. Moreover, the applicants’ uncont ested evidence is these pipes were not under the patio and therefore could not have been fractured by crushing as described by the FSP’s engineer. The FSP’s engineer relies on circumstantial evidence which he says indicat es fracture of the stormwater pipes occurred before the house was purchased. He relies on the level surveys taken by the applicants’ engineer. He also relies on the presence of a broken downpipe to the left-hand side of the garage. However, the applicants ’ engineer said the floor levels in 2014 were within acceptable tolerance. Furthermore, a comparison of the floor level surveys undertaken by the engineers shows a further significant subsidence in the master bedroom adjacent to the patio damage. The uncontested evidence of the applicants is the broken downpipe referred to by the FSP’s engineer was damaged by impact and repaired in 2014. Photographs provided show the slab had not moved at the time of purchase in 2014. However, movement was noted in photographs taken in August 2016 after storm events in 2015 and 2016. Damage to the slab and adjacent rooms probably not caused by settlement Taking all matters into account, I am not satisfied the available information establishes on the balance of probabilities the proximate cause of the damage to the patio slab and the damage nearby in the home in the master bedroom, ensuite and walk-in robe was caused by foundation settlement. In the circumstances, I am not satisfied the FSP is entitled to deny the applica nts’ claim for damage to the patio and the adjacent master bedroom, walk -in robe and ensuite. Policy does not respond to other claimed damage However, I consider the available material establishes a different result in relation to the claim for the internal and external cracking damage in other areas of the home and the damage to the path at the rear and left hand rear of the house. This is because the further photographs provided by the applicants after they excavated the pipes deals substantially with the pipes uncovered adjacent to the slab. Further, other photographs show much of the internal and external cracking Case No: 478921 Determination Page 8 of 12 damage was present when the house was purchased. Finally, the available material does not establish the kind of significant subsidence caused by significant saturation of these foundation soils unlike the grass area adjacent to the patio. The applicants have not provided any material from their plumbers. In the circumstances I rely on the description of the plumbers’ material by the FSP’s engineer in his report and his lengthy letter to the FSP in May 2017. The engineer refers to visible fractures visible in the sewer pipes as being very fine. The engineer also refers to material from the applicants’ plumber regarding blockages found within the stormwater pipe at the rear of the residence. Even if I were to accept the applicants’ contentions that “even a minuscule leak can be enough to saturate a clay foundation”, I am not satisfied on the balance of probabilities the available material establishes either a storm event or escape of liquid from these pipes was the real or dominant cause of the damage in these other areas in the home and at the rear and left hand side of the home. This is because the other pipes and other areas of damage are nearer to the large trees at the rear of the property and the probable impact of the tree roots on the soil and on the pipes from these trees. Further, unlike the pipes adjacent to the pool, which the applicants say were under grass, I consider the available information establishes on the balance of probabilities the other pipes were fractured because of settlement of soil and the impact on the pipes by the concrete paths or slabs above them. In the circumstances, even if it were to be accepted an insured event occurred, I am satisfied the available material establishes settlement caused compression of these pipes causing them to leak which in turn encouraged the root systems of the trees adjacent to these other claimed areas of damage. In the circumstances, for the reason stated I am satisfied the available material establishes the FSP is entitled to deny this aspect of the applicants’ claim. Contentions regarding the FSP’s engineer and policy not determinative I note the applicants’ contentions regarding the contradiction in the FSP’s engineer’s report and their criticisms of the FSP’s engineer’s investigations about the pipes. However, even if these contentions were accepted, I do not accept these matters are determinative of the issues in dispute. The applicants say the FSP has not articulated the clauses it relies on to deny the claim. The applicants also say the FSP accepted in a telephone call there was a listed event of escape of water. The FSP has not specifically responded. However the FSP’s correspondence and Notice of Response clearly sets out the exclusions it relies on. Further, the FSP’s submissions and correspondence is clear and unambiguous. The FSP argues not only an insured event has not occurred but, relying on its engineer’s report , it is entitled to rely on the policy exclusions set out therein. Case No: 478921 Determination Page 9 of 12 The applicants say the FSP’s policy terms are not clear. However, while noting the difference in the clauses highlighted by the applicants, I do not accept the policy operates as argued by the applicants. I consider the commercial intent of the policy is to exclude loss or damage arising from all the exclusions listed in policy. The FSP is to immediately assess the accepted damage The applicants claim costs in the sum of $27,229.25. No invoices or quotations have been provided. Further, some of the costs claimed relate to matters which are excluded from cover. Moreover, the FSP’s policy does not cover costs to repair or replace the pipes. The applicants also claim $25,000 to underpin the house. The document provided is annotated saying this requirement is unknown until at least 12 months after remedial repairs. The FSP’s engineer said the damage to the residence has not compromised the structural integrity of the footing. At the time of inspection in March 2017, the FSP’s engineer did not consider underpinning was required but remedial repairs were not commenced until August 2017. If the applicants accept this determination, then within seven days of acceptance, the FSP is to assess the damage to the patio slab and the adjacent damage in the home in the master bedroom, ensuite and walk-in robe and any underpinning required because of this damage. If at the time of this assessment, the FSP is unable to make an assessment regarding underpinning, the FSP is to further assess this aspect of the claim within 12 months of completion of the remedial repairs. The FSP is to otherwise settle the claim in accordance with the policy terms and conditions. FOS encourages the parties to settle the quantum of the claim by agreement but if the parties are unable to agree on the amount of settlement, the parties can bring the matter back to FOS to make a further determination about the quantum of the claim. 2.2 Are the applicants entitled compensation? Compensation may be paid in some circumstances The applicants complain about stress and delay. They say they lodged the initial dispute on 21 April 2017 but did not receive a final response until 4 July 2017. In its final response letter, the FSP apologised for the level of service. Otherwise, the FSP has not addressed this aspect of the dispute. FOS’s Terms of Reference allow the payment of compensation (capped at $3,000) for non-financial loss. FOS may decide an FSP should compensate an applicant for such loss only where there has been an unusual amount of physical inconvenience, Case No: 478921 Determination Page 10 of 12 time taken to resolve a situation, or interference with the applicant’s expectation of enjoyment or peace of mind. In this dispute, I note the following timeline:  6 March 2017 claim made  FSP sent both a builder and an engineer to inspect and assess the damage  6 April 2017 claim denied  21 April 2017 applicants provided a lengthy letter rejecting the denial  FSP provided this letter to its engineer  19 May 2017 applicants followed up FSP for response  21 May 2017 FSP telephoned engineer for response  23 May 2017 engineer apologised for the delay and said the dispute letter was very long which had contributed to the delay  23 May 2017 engineer responded to the app licants’ letter  8 June 2017 FSP proposed plumbing repairs be completed and then damage assessed after 12 months  9 June 2017 applicants reiterated their position  13 June 2016 FSP reiterated its position  13 June 2016 applicants requested the dispute be considered by the FSP’s internal dispute resolution department  4 July 2017 IDR letter provided The applicants submits these timeframes breach the FSP’s guidelines and breach undertakings made by the FSP to the applicants in the course of the dispute. The applicants submit this is unacceptable and unreasonable treatment particularly as they had already indicated they were suffering anxiety, stress and adverse health impacts because of the denial of the claim. FOS takes a conservative approach to compensation for non-financial loss. Taking into account this conservative approach, I am not satisfied there has been an unusual amount of time taken to resolve the situation in the circumstances. While the claims management may not have been optimum, I do not acce pt the FSP’s responses were unreasonable particularly in view of the complexity of the claim and the necessity of obtaining further expert opinion. Further, while I accept claims and insurance disputes are stressful, I am not satisfied FSP’s conduct and r esponse was unreasonable in view of the available material and complexity of the dispute. Taking all matters into account, I am not satisfied the available material warrants an award of compensation. Case No: 478921 Determination Page 11 of 12 3 Supporting information 3.1 FOS Approach As advised to the parties, FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the FOS Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS recommendation and has proceeded directly to determination. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law an ins ured bears the onus to establish on the balance of probabilities they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy extracts The relevant policy extracts are referred to in correspondence between the parties and in the FSP’s Notice of Response dated 3 August 2017 . Both the policy document and the Notice have been exchanged with the applicants. The applicants say the policy document relied on by the FSP is incorrect. However, the policy document relied on by the FSP was prepared in 2012. The policy document relied on by the applicants was prepared on 3 March 2017. The relevant policy is not the policy document in existence at the time of the claim but the policy document in existence at the time of the claimed damage. The applicants claimed the damage occurred in 2015 and 2016. In the circumstances, the policy document relied on by the FSP is correct. 3.3 Case law and proximate cause Case law establishes:  The proximate cause of the loss is the dominant or effective or operative cause of the loss whether or not that be the last in time or the sole cause.  If there are several causes operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would Case No: 478921 Determination Page 12 of 12 have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause.  A common sense approach is taken to determine proximate cause. 3.4 Other relevant material considered and relied on  Parties’ submissions, emails, photographs and all attachments to all submissions  Statutory declaration from applicants’ neighbours  Expert reports and letter, photographs and attachments to those reports  Correspondence between the parties

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.