Rumpus room ceiling collapse claim declined; applicant alleged faulty 2008 storm repairs by FSP's authorised repairers
Text of the determination
Determination
Case No: 488815 Determination Page 1 of 4
Case number: 488815 20 July 2018
1 Overview
1.1 Dispute
The applicant holds a home and contents policy with the financial services provider
(FSP). He lodged a claim against his policy, saying the collapse of his rumpus room
ceiling was due to the poor workmanship of the FSP’s authorised repairers following
a previous storm damage claim in 2008.
The FSP assessed the damage and denied the claim. The FSP said the ceiling
collapse was not a result of the 2008 repairs. Instead, the ceiling collapsed because
of the load on the timber roof trusses over time. The applicant disputes this and has
produced reports from an expert in support.
The case analyst provided the parties with a recommendation on the issues in
dispute. The recommendation was in favour of the FSP. A copy of the
recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct and are adopted in this
determination. Further submissions provided after the recommendation have been
considered. These submissions have not warranted a change in the outcome.
Has the applicant established a valid claim?
The applicant has not shown the FSP’s previous repairs caused the damage. Nor
has he otherwise established a valid claim to which the policy responds. This means
the FSP is entitled to deny the claim.
Is the applicant entitled to compensation for non-financial loss?
The applicant has not established an entitlement to compensation.
1.3 Determination
This determination is in favour of the FSP.
I agree with the case analyst ’s reasons for the recommendation and the
recommended outcome.
The FSP is not required to undertake any further action with respect to the claim.
Case No: 488815 Determination Page 2 of 4
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I ha ve taken into
account all the material submitted by the parties, both before and after the
recommendation. I am satisfied the documentation I have relied on has been
provided to both parties.
I am satisfied the case analyst ’s recommendation contains an accurate summary of
the dispute, the issues to be determined, any applicable paragraphs of the Terms of
Reference and any relevant law.
2.2 Has the applicant established a valid claim?
Policy covers insured events subject to exclusions
The applicant bears the onus of establishing a valid claim (also called a prima facie
claim) to which the policy responds. The policy covers loss or damage from insured
events.
The applicant had previously lodged a claim against his policy in 2008 after a storm.
On that occasion, rainwater had entered his home as a result of damage to the roof.
The FSP authorised repairs, which included part of the rumpus room ceiling near the
front entrance.
The applicant says a far larger area of the rumpus room ceiling collapsed in
December 2016 , as a result of the FSP’s previous repairs . The FSP is responsible for
the quality of any repairs it carries out or authorises under the policy. However, it is
for the applicant to show that those repairs were inadequate or otherwise caused the
later damage.
Alternatively, the applicant needs to show, on balance, the damage was caused by a
specific insured event under the policy.
Conflicting information provided by the parties’ experts
The FSP’s engineer ( F) concluded in a report dated 5 January 2017 that the later
damage was not from inadequate repairs to the ceiling in 2008. F said it was the
result of excessive loading on the roof framing, causing long-term deflections in the
timber trusses. This placed additional stresses on the ceiling lining fixings and
resulted in the ceiling failure.
The applicant obtained a report dated 8 May 2017 from an architect (IN), disagreeing
with F. IN said the applicant had reported a ‘significant sag in the ceiling’ starti ng in
the area of the previous repair. IN said the plasterboard would have become heavier
the more it sagged and would have ultimately led to the collapse of the other
plasterboard within the room.
Case No: 488815 Determination Page 3 of 4
F provided a further report dated 15 June 2017 in response to IN. F noted the repairs
had been carried out eight years before the collapse and it was not possible to
determine which section of the ceiling had initially become detached. F also pointed
out that IN was not an engineer, and questioned IN’s explanatio n of the effect of the
loading of the attic and solar panels on the roof trusses. F explained that s tructural
engineering principles suggest the solar panels on the applicant’s house would
impact the ceiling over the rumpus room; and the roof trusses would have been
designed to carry only the original weight of the roof finishes and the plasterboard
ceilings of the house.
F said timber had the propensity to ‘creep’ under long term static loads , and that
‘creep’ is the time -dependent deformation of loaded members undergoing elastic
deformation. F indicated the long term deflection of the roof trusses caused the
gradual detachment and sudden collapse of the plasterboard linings only from the
trusses subject to additional load from the solar panels.
The applicant then also obtained a further report from IN in February 2018. IN said
the plasterboard patch repair in 2008 had been fixed to the underside of roof trusses
using screws, and there was no evidence of the use of glue. IN said the screw-only
installation does not comply with the plasterboard manufacturer’s guidelines, and
concluded the installation of the plasterboard eight years previously was substandard
because of incorrect nail installation and lack of back blocking.
On balance, F SP’s experts’ findings are more compelling
IN has relied, at least in part, on the applicant’s comments in reaching their
conclusions. However, there is no evidence to confirm the location of the initial ceiling
sag. IN has also referred to the manufactur er’s manual and concluded a failure to
follow the guidelines means the repairs must have been defective (because of the
use of screws only, and not adhesive as well) On the available evidence, however, I
am not satisfied the installation of that particular part of the ceiling was defective, or
that a clear link has been shown between that installation and the overall damage
which took eight years to occur.
F, on the other hand, persuasively explained how the loading of solar panels and the
attic operated over that time frame to ultimately cause the ceiling collapse. I consider
F is appropriately qualified to comment on the structural and engineering issues
affecting the house, and am satisfied F’s rep orts compellingly explained the effective
cause of the collapsed ceiling: F ruled out the 2008 repairs, and concluded the cause
was pressure exerted over time by issues including the solar panels and attic.
So, I accept the effective cause of the ceiling collapse eight years after the 2008
repairs was more likely than not the additional cumulative loading on the roof trusses
from the attic and solar panels (which then placed further stress on the ceiling lining
fixings), as explained by F.
I am therefore not persuaded the FSP should reasonably be responsible for the
damage. That is because the evidence does not establish the FSP’s previous repairs
caused the later ceiling damage; nor has that been shown to be the result of any
other insured event. Instead, it is reasonable to regard it as being the result of
gradual deterioration.
Case No: 488815 Determination Page 4 of 4
2.3 Is the applicant entitled to compensation for non-financial loss?
The applicant has not proved an entitlement to compensation
Our Terms of Reference allow FOS to require an FSP to pay an applicant
compensation for non-financial loss in certain situations. However, this will only occur
where the applicant has suffered an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with their
expectation of enjoyment or peace of mind. Compensation is not warranted where an
applicant suffers inconvenience that is reasonably to be expected as a normal part of
a claims process.
I acknowledge that the claims process can be stressful, upsetting and time-
consuming. I also appreciate that the applicant was experiencing health issues over
that time.
However I am not satisfied that the FSP’s handling of the claim has been such that
compensation is warranted in this case.
Recommendation
Case No: 488815 Recommendation Page 1 of 6
Case number: 488815 15 January 2018
3 Overview
3.1 Dispute
In 2008, the applicant lodged a home claim with the financial service provider (FSP)
for storm damage his property, and repairs were completed. However in 2016, the
applicant lodged a claim as his ceiling collapsed.
The applicant says the damage was caused by the FSP not completing the works
correctly in 2008, and provided an expert report to support his position.
The FSP assessed the claim, but denied liability because it says the claimed damage
was not related to storm damage repairs completed by the FSP in 2008. It says the
damage does not relate to a single insured event.
To resolve this dispute, the applicant is seeking compensation and for the claim to be
accepted.
3.2 Issues and key findings
Is the FSP entitled to deny the claim?
The FSP was entitled to decline the claim because the damage has not arisen as a
result of an insured event, or from any subsequent works undertaken by the FSP in a
prior claim. Rather, it arose from events which are specifically excluded from cover.
Is the applicant entitled to compensation?
Whilst I acknowledge the claims process may have been stressful for the applicant,
there is no entitlement to non-financial loss.
3.3 Recommendation
This recommendation is in favour of the FSP.
The FSP is not required to take any further action.
Case No: 488815 Recommendation Page 2 of 6
4 Reasons for recommendation
4.1 Was the FSP entitled to deny the claim?
Applicant has the onus to establish a claim
It is established insurance law the applicant carries the initial onus to show that the
terms and conditions of the relevant insurance policy covers the loss. This is known
as a valid or prima facie claim.
Once the applicant establishes a prima facie claim, the onus then shifts to the FSP to
demonstrate the loss is not covered, either by way of one of the policy exclusions or
on some other basis.
The applicant’s policy is an insured events policy. Therefore, the policy only responds
where one or more of the listed events causes the damage, subject to any
exclusions. The policy provides cover for storm.
The FSP does not dispute the policy provides cover for loss or damage to buildings
as the result of a storm event. However, the FSP says the damage was not as a
result of any listed event. Rather, the FSP says the damage was caused by gradual
deterioration and wear and tear.
In circumstances where an applicant calls upon a policy benefit, such as a repair
guarantee, the onus is the same as if they were establishing a claim. That is, the
applicant must demonstrate, on the balance of probabilities, the current issues at the
property resulted from either the initial event, or any subsequent repairs.
Different opinions on the cause of damage
The FSP appointed an engineer (F) to inspect the applicant’s home and identify if the
damage is related to repairs completed in 2008, or if it’s another cause. F concluded
damage is unrelated to repairs in 2008, and says damage is caused by the ceiling
collapsing due to excessive loading on the roof framing.
F states the roof trusses were not designed to support the additional cumulative
loads added by the fitting of the attic framing, and installation of the solar panels.
The applicant claims the ceiling has collapsed due to faulty workmanship from a
previous repair done by the FSP in 2008. The applicant stated significant sagging
occurred where repairs were initially competed.
To support his position, the applicant provided correspondence outlining his view on
why the exclusion does not apply, and also engaged an engineer (IN) to respond to F
and determine the cause of damage.
IN says the cause of the ceiling collapse was due to an incorrectly or poor ly installed
plaster patch that was part of the repairs commissioned by the FSP in 2008. Extracts
of F’s and IN’s findings are included in section 3.2 below.
The FSP however says this is insufficient, as the Australian standards for installation
during 2008 stated that installation by screws only is one of the accepted methods of
Case No: 488815 Recommendation Page 3 of 6
installation. It says the use of screws instead of screws and glue as adhesion is a
difference in finishing requirement rather than a safety requirement.
No information to suggest faulty workmanship
The applicant disagrees with F’s findings and maintains the damage was caused by
3 screws holding up 13mm plasterboard with no glue. IN’s report addresses faulty
workmanship and states:
screw fixing 13mm thick ceiling plaster without application of glue is prone to
failure because of the inherent brittleness and weight of the plasterboard
the plaster patch joint line was placed between roof trusses with a timber batten
installed to back block this joint back blocking is performed by gluing plaster
along the joint line. Timber would be too heavy in particular along a joint line
potentially resulting in delamination of the plaster joint
installing plaster patch with the long joint placed in between roof trusses is not
correct installation procedure
the plaster patch installation therefore deemed to be substandard and
inadequate, not complying with standard industry standards for plasterboard
installation.
However, the FSP argues the above information is insufficient to show the FSP is
liable for the ceiling collapse in 2017. The FSP has obtained information showing
adhesive practices recognised in the industry for plasterboard installation. The
information shows that repairs done by installation by screws on is an acceptable
method.
Accordingly, in the absence of any information, it appears, on the balance of
probabilities, the FSP adopted or complied with the correct standards.
As such, I am not satisfied the applicant has established an entitlement under any
repair guarantee.
Applicant has not established a prima facie claim
The applicant needs to establish on the balance of probabilities, that his property was
damaged by an event for which the policy provides cover during the period of
insurance.
The applicant’s policy is a defined events policy with no cover for accidental damage
to his property. On the information provided, I am not satisfied the applicant has
established a prima facie claim for the damage to his property.
In light of the above, I accept the FSP was entitled to decline t he applicant’s claim.
4.2 Is the applicant entitled to compensation?
FOS expects the applicant to bear some stress and inconvenience
Under paragraph 9.3(a) of the Terms of Reference, FOS may award an amount of
compensation (capped at $3,000) for non-financial loss where an applicant has
suffered an unusual degree or extent of physical inconvenience, time taken to
Case No: 488815 Recommendation Page 4 of 6
resolve the situation or interference with their expectation of enjoyment or peace of
mind.
However, FOS expects an applicant to be moderately robust and bear the usual
stress and inconvenience associated with an insurance claim.
Applicant is not entitled to compensation
The applicant is seeking compensation due to the inconvenience and stress he has
experienced. The applicant says the FSP’s actions caused him inconvenience.
I accept stress and inconvenience can be suffered as a consequence of lodging a
claim. As information suggests damage did not occur as a result of an insured event
or from any repairs under the previous claim, the FSP is not liable for any
compensation.
Case No: 488815 Recommendation Page 5 of 6
5 Supporting information
5.1 Other matters considered but which did not change the outcome
The FSP has also raised other concerns in relation to the collapse of the ceiling. The
FSP states the cause of the collapse was due to additional loads added by the attic
framing, and installation of the solar panels causing excessive loading on the roof
framing.
As the applicant has not established faulty workmanship has been conducted, there
is no need to consider in detail the other issues raised as it does not change the
outcome.
5.2 Key Reports
Record Key points
FSP’s expert ( F )
Report
5 - 1 - 17
‘ It is F’s opinion that the damage to the house was not caused by
inadequate repairs to the ceiling from a previous claim in 2008.’
‘It is F’s opinion that the damage to the subject house has been
caused by excessive loading on the roof framing, causing undesirable
long - term deflections in the timber tr usses, thereby placing additional
stresses on the ceiling lining fixings, contributing to the ceiling failure.’
‘It is F’s opinion that the local repair of the ceiling from a previous
claim did not cause, nor contribute to, the damage to the subject
house because the maximum ceiling damage was observed at the
east side of the Rumpus room, remote from the area of ceiling locally
repaired over the Front Entry.’
‘The (collapsed) ceiling lining in the house was installed with screw
fixings in combination with p laster adhesive which is the correct
method of construction for plasterboard lining.
Furthermore, F obs erved remnants of the ceiling lining at the screw
fixings and at the plaster adhesive locations [8], indicating the
adhesive was properly attached to the ceiling lining. The ceiling has
been in place for approximately 30 years (except for the potion of
ceiling repaired in 2008) and there is no indication of moisture ingress
as discussed in Paragraph 4.4. Furthermore, the owner noted that the
ceiling lining in the house was dry with no signs of deterioration
and/or moisture/wat er stains prior to its collapse. ’
Applicant’s expert ( IN )
Report
8 - 5 - 17
‘The incorrectly / poorly installed plaster patch being part of ceiling
repairs performed in 2008 following wat er damage inside this building
because of water entry during a storm event that dislodged a number
of roof tiles located within this area of the building, is deemed to be
area where the plasterboard collaps e started to occur. It is within this
area along t he plasterboard patch installed in 2008 that the property
owner instructed the author of this report that he noticed significant
Case No: 488815 Recommendation Page 6 of 6
sag in the ceiling. The more the plasterboard sagged, the heavier the
plasterboard would have become, with the sagging plasterb oard
eventually becoming too heavy as the plasterboard continued to sag
along the plaster patch splice point eventually letting go pulling down
the other plasterboard within this room as the plasterboard
delaminated from the underside of the bottom chord o f the roof
trusses.’
‘The property owner does not use the attic space. Considering that
the attic space is located partially over the south side of the house, on
the side of the Rumpus room, & partially over the North side of the
house, with no signs of de flections, sag, damage, or deterioration to
any of the ceilings along the north side of the building or ceilings
adjacent the Rumpus room, the attic space is not considered to be a
factor in the most recent ceiling collapse within the Rumpus room.’
‘Consid ering that the solar panels are actually installed over the
northeast side of the house which is away from the Rumpus room,
loading of the roof trusses would not have impacted the ceiling over
the Rumpus room, particularly considering that the plasterboard
ceilings located along the north side of the house, in particular directly
under the Solar panels are in good order with no signs of; deflections,
sag, damage, or deterioration. The solar panel installation is therefore
not considered to be a factor in th e most recent ceiling collapse within
the Rumpus room. ’