Text of the determination
Determination
Case No: 488741 Determination Page 1 of 10
Case number: 488741 21 August 2018
1 Overview
1.1 Dispute
The applicants dispute the outcome of a claim lodged with their financial services
provider (FSP).
In November 2013 a truck, insured by another insurer, X, collided with the south-
eastern corner of the applicants’ property, causing significant damage.
X, accepted liability and the applicants were prepared to proceed with X rather than
the FSP. Ultimately however, the applicants were not satisfied with the outcome
offered by X and so returned to the FSP to pursue the claim in September 2014.
The parties have not been able to agree to finalise the claim. The applicants maintain
the amounts offered by the FSP were insufficient to repair their property and say the
FSP’s delays have led to further damage and inconvenience.
1.2 Issues and key findings
Are the FSP’s offers to settle the claim fair?
After review of the available information, the panel is satisfied the amounts previously
offered by the FSP to finalise the claim are not fair as the offers do not fully cover the
cost of repairs. To meet its liability under the policy, the FSP is to cancel the
previously issued cheques and pay the applicants $287,471.25.
The FSP is also to pay to the applicants $8,000 for temporary accommodation.
Are the applicants entitled to compensation?
The FSP is to pay the applicants compensation for the stress and inconvenience
suffered during the claim process and a contribution towards the cost of their expert
reports.
1.3 Determination
This determination is in favour of the applicants.
Within seven days of the applicants accepting this determination, the FSP is to pay:
$287,471.25 for the cost of repairs
$8, 000 for temporary accommodation
$3,000 compensation for the applicants’ claims experience
$4,699.55 towards the cost of the applicants’ expert reports.
Case No: 488741 Determination Page 2 of 10
2 Reasons for determination
2.1 Are the FSP’s offers to settle the claim fair?
The dispute concerns the extent and method of repairs
The applicants claim under a home building policy which responds to accidental loss
or damage at the insured property during the policy period. Cover was provided
subject to the terms and conditions set out in the policy documents.
The FSP accepts the applicants have a valid claim. The FSP tried to settle the claim
by way of two cheques: the first for $180,439.85 in December 2015 and a second
cheque for $1,699.50 in June 2016.
The applicants maintain the FSP’s offer does not cover the cost to repair their
property to its pre-collision state because:
the scope of works used to calculate the settlement offer in December 2015
was prepared after an inspection by the FSP’s builder about a year earlier
which means it was no longer an accurate reflection of the work required when
the offer was made
further damage occurred in the interim which has not been costed
the settlement offers did not make any allowance for unforeseen costs which
may arise during repairs.
Further, the applicants say the amount offered for temporary accommodation (to be
used during the repair period) was inadequate. The FSP offered $5,000 to cover 10
weeks of temporary accommodation but the applicants require 16 weeks.
The main issue from which all others flow is the disagreement between the parties
regarding the structural int egrity of the property’s roof. The applicants say:
the lack of repairs means the roof continues to pull towards the point of impact
the exact nature of the repairs required cannot be determined without removing
the roof
the condition of the property conti nues to worsen with new cracking and water
damage manifesting as the roof continues to move and twist
there are now other damages including pest entry and mould growth.
The FSP maintains its offer exceeds its liability for the claim. The FSP also says
ong oing damages result from the applicants’ failure to mitigate their loss and are not
a direct consequence of the impact.
The available material shows the roof was structurally damaged
Three engineers attended the property and provided reports on the extent and nature
of the damages arising from the impact as well as the appropriate method of redress.
FM, appointed by X, attended the property in December 2013, about one month after
the collision. FM was specifically instructed to determine the extent of the damage
and report on its structural integrity.
Case No: 488741 Determination Page 3 of 10
FM observed:
Damage:
The masonry to the pier east corner has been demolished together with the north -east
window and timber framed panel.
The second and third masonry piers have also been damaged.
The roof framing is now dropped at the east corner and a number of timber members
have broken and split.
Sliding doors in the north-east elevation and adjacent window were also damaged.
The south-west elevation was twisted and is out of alignment with the external canopy.
A portion of the attached sheet metal garage was also damaged.
The truck impacted the eastern pier and pushed the south-east elevation towards the
south-west. Movement of the structure has twisted the roof framing and damaged a number
of timber members. The garage is attached to the eaves at this location and damage has
occurred to the roof sheets and adjacent to the roller door.
A subsequent report by FM, prepared in August 2014, noted:
Water damage was observed on the walls in the hall and the living room.
Water damage was observed on the ceilings in the hall, dining, living room, son’s bedroom
and study.
Recent cracking was observed at the top of the walls in the living room, dining, hall, study
and son’s bedroom.
Historic cracking was observed above the kitchen window at the south of the residence and
in the laundry (these existed at the previous inspection).
Water staining on the roof framing, gaps between the roof tiles and water damage to
the ceiling insulation were observed. FM explai ned the cracking and moisture
staining appeared following the earlier inspection. FM concluded the impact, which
occurred at the north-east corner of the residence, forced the roof framing towards
the south. He concluded the widening of the gaps between the roof tiles and the
recently internal cracking at the eastern side of the residence were caused by the
collision. He referred to historic cracking in the main bedroom, kitchen and laundry.
He prepared scopes of works to repair the damage seen at both inspections.
This was because after the first inspection, the applicants complained the roof was
moving causing ongoing water ingress and new cracks to appear throughout.
After receiving the claim in September 2014, the FSP appointed its own engineer,
MP, to provide a scope of works for the damages arising from the impact as well as
to comment on the reported ceiling damage and cracking throughout the property.
MP observed hairline cracks and some water staining in various rooms but
concluded these damages were not related to the vehicle impact. MP did not observe
any signs the impact caused the roof to move towards the south and explained the
impact was unlikely to have transferred significant load into the property’s walls which
would then cause movement or cracking.
MP concluded the cracking damage was probably due to general house movement,
shrinkage and environmental changes. He said the ceiling damage and water
Case No: 488741 Determination Page 4 of 10
staining was due to an already leaking roof and there were no ongoing structural
integrity issues.
In response, the applicants engaged their own engineer, TM, who submitted a report
which mostly agreed with FM’s findings. TM noted stresses within the timber roof
framing were causing cracking and moisture damage beyond the area originally
affected by the vehicle impact. TM said he saw signs of damage generally consistent
with the areas noted by FM but there were also similar signs of damage in other
areas of the property. Because of the impact, TM concluded there was distortion of
the timber roof structure as a whole.
TM recommended accepting FM’s scopes of works, modified to include a substantial
rebuild of the roof.
The FSP asked MP to respond to the reports prepared by FM and TM. MP
maintained its position the impact would not have damaged the entire roof.
MP noted the roof was connected to the home’s north eastern and south -western
walls at the rafter locations, spread approximately every 600mm and to the internal
walls at strut locations. MP explained given the number of connections between the
roof and the walls it would expect there to be significant cracking throughout the
home, were the entire roof structure moving and pulling. MP concluded the fact the
cracks continued to worsen over time indicated a seasonal or environmental cause.
The applicants note MP did not re-attend the property to make these findings but
relied on photographs taken by FM in 2014.
The p anel does not find MP’s findings sufficiently persuasive when:
MP did not re- attend the property to directly examine the applicants’ clai m the
property was continuing to deteriorate
the applicants continued to complain of significant new cracking throughout the
property, exactly as MP predicted would occur if the roof was indeed moving
two other engineers made different findings to MP.
The ongoing physical deterioration of the property, as catalogued in the applicants’
ongoing complaints, submissions and building consultant’s report support the
conclusions reached by FM and TM. The panel is satisfied the vehicle impact
damaged the structural integrity of the roof, leading to further damage continuing to
occur while the extent of repairs required was disputed.
The applicants could not mitigate their loss after receiving the cheques
The FSP sent the applicants a settlement offer, including a cheque for $180,439.85
in December 2015. Having carefully considered the available material including the
FSP’s claim file notes, the panel is satisfied this figure was based on the scope of
works approved and augmented by TM, which itself was a modification of FM’s
scopes of works from FM’s two earlier inspections.
The FSP says this cheque allowed the applicants to mitigate further loss and so they
are responsible for the continued deterioration of the property from this time.
Case No: 488741 Determination Page 5 of 10
The FSP’s decision letter dated 17 December 2015 says :
In total I have decided that we will cash settle your claim in accordance with the terms and
conditions of the policy by making a payment of $180,439.85 to you. You will shortly
receive a cheque for $180,439.85 in full and final settlement of your claim.
I also enclose a release for you to sign and return to me as soon as possible.
Having taken into account all of the available information, you should take this as our fin al
decision.
The second decision letter dated 21 June 2016 says :
I therefore confirm the total value of our full and final cash settlement for this matter is
$182,139.40, with a second cheque for $1,699.50 to be issued to you shortly. Again we
recommend you bank both cheques to ensure any further loss is prevented.
I again enclose an amended release to be signed by you and returned to me at your
earliest convenience.
Each letter was accompanied by a deed of release stating:
Each Releasor unconditionally releases and forever discharges the insurer from all Claims
by or on behalf of the Releasors relating to or arising out of the Events.
The p anel is not persuaded by the FSP’s argument. While the secon d letter informs
the applicants they can use the cheques to mitigate further losses, the deeds of
release the applicants were required to sign placed them in an untenable situation,
given their position was the amounts offered were inadequate to repair the property.
Had the applicants accepted these amounts and signed the deeds, while they could
have commenced some of the repairs, the terms of the deeds did not enable the
applicants to pursue the FSP for any of the additional costs which they expected
would have been incurred once repairs started.
This is particul arly relevant when the FSP’s offer was made in December 2015 but
was based on a scope of works augmented in September 2014 but originally
prepared in January 2014. The panel agrees with the applicants when they say the
offer, when made, could not have covered the full cost to reinstate the property at the
time, especially when the available information shows the cracking and water
damages continued.
The FSP is liable for further damages arising from delay
The panel does not accept the FSP is entitled to app ly policy exclusions to avoid
liability for damages caused by pests or the growth of mould. This is because the
panel considers the available information establishes this damage was caused by the
FSP’s management of the claim.
The panel also does not accept the applicants were at any time able to mitigate
further damages, for the reasons set out above. For this reason, the panel does not
accept the applicants have breached the policy terms by failing to take reasonable
steps to prevent any further damage or by failing to repair within six months of the
damage occurring.
The panel is satisfied the FSP remains liable to reinstate the applicants to their pre-
claim position, according to the terms and conditions of the policy.
Case No: 488741 Determination Page 6 of 10
The FSP is to pay the applicants $287,471.25 for repairs to the property
The FSP’s policy provides the FSP has the option to decide whether it will repair or
pay the insured the cost to repair the damage. Both parties want to cash settle.
In the circumstances of the deteriorated relations hip between the parties, the panel is
satisfied a cash settlement is fair in the circumstances.
The most recent quote available is the applicants, prepared by JRH and dated 20
May 2016 in the sum of $249,975 including GST.
Although this quote is no longer actionable, it provided for the full internal and
external reinstatement of the property, including the improvements required to
comply with the applicable bushfire attack level standards (covered by the policy’s
replacement benefit).
The FSP has made some criticisms of the quote relied on by the applicants. The
applicants have provided lengthy submissions, explanations and photographs. They
say their builder did his costings from the scope of works provided by FM and TM
and a visual and lengthy inspection of all the damage.
In addition, the panel accepts the property would have deteriorated further. The panel
also notes while the building consultant allowed for a new colour bond steel roof, the
building quote provides for the installation of a timber roo f frame only.
Considering the nature of the damage and the time which has elapsed since the
damage occurs, the panel accepts the ultimate cost of repairs remains uncertain and
it is likely additional costs will be incurred when repairs commence. Moreover, all the
risk of further costs being incurred during the repair process are transferred to the
applicants.
Considering the transfer of the risk, the elapsed time since the damage occurred, the
elapsed time since the quote was prepared by JRH, the likelihood the property has
continued to deteriorate and the possibility of further unforeseen costs which may
arise during repairs, the panel is satisfied it is fair in circumstances to allow the
applicants’ quote plus a further 15% loading (calculated at $37,496) to take into
account the risk and factors described. The further loading includes the applicants’
claim for additional future engineering costs.
Should the applicants accept this determination, the FSP is to cancel the cheques
already issued and pay the amount of $287,471.25 to the applicants to finalise the
FSP’s liability for the claim.
The FSP is to pay $8,000 for temporary accommodation
The FSP offered the applicants $5,000 for 10 weeks of temporary accommodation,
calculated at $500 per week. The applicants say it will take them 16 weeks to repair
the property during which time the property will be unliveable.
Having reviewed the available information, the report prepared by BC and the quote
prepared by JRH, the panel is satisfied the required repairs are extensive and that
variations may be required as repairs progress. Further, because of the nature of the
Case No: 488741 Determination Page 7 of 10
damage and resulting extensive repairs, the panel is satisfied during repairs there will
be periods the applicants are unable to live in the home.
The FSP did not challenge the figure of 16 weeks except to say new pest and water
damages were a result of the applicants’ failure to mitigate further loss. For the
reasons set out above, the panel does not accept this position.
Should the applicant accept this determination, the FSP is to pay the applicants
$8,000 for temporary accommodation.
2.2 Are the applicants entitled to compensation?
The FSP is to pay the applicants $3,000 compensation
Under paragraph 9.3 of its Terms of Reference, FOS can award compensation to
applicants when, because of an act or omission of the FSP, they suffer an
unreasonable degree of stress, physical inconvenience, time taken to resolve a claim
or loss of enjoyment of their asset.
Awards of compensation are limited to $3,000 and are made conservatively. FOS
expects applicants to bear the usual degree of inconvenience and delay common to
an ordinary insurance claim.
The panel carefully reviewed all the information provided by both parties. The written
submissions from both parties, the claim decision letters prepared and the claim file
notes were particularly helpful for understanding the events which led to this dispute.
The property remains unrepaired several years after the collision. It is clear the
applicants’ enjoyment of their home was significantly disrupted during this period. For
example, the applicants were unable to entertain guests and their son was forced to
move away, because of his damaged room. Living in their home while it deteriorated
around them would have caused the applicants significant worry.
For the reasons stated above, the panel is not satisfied the applicants were able to
mitigate further losses.
The panel accepts the FSP made genuine attempts to try to resolve the dispute. The
panel also accepts the applicants delayed bringing the dispute before FOS and so
some responsibility for the time taken to finalise the dispute rests with them.
Taking all matters into account, the panel is satisfied the applicants’ claim experience
warrants an award of compensation of $3,000.
The FSP is to pay $4,699.50 for expert reports
Under paragraph 9.4 of its Terms of Reference, FOS may direct an insurer to
reimburse applicants up to $3,000 towards the cost of an expert report. FOS only
applies this discretion when the dispute is sufficiently complex to warrant obtaining
the report and the content of the report assists FOS to decide.
The panel notes the FSP previously sent the applicants a cheque for TMK’s report
but the cheque was not presented by the applicants. Should the applicants accept
Case No: 488741 Determination Page 8 of 10
this determination, the FSP is to cancel the cheque already issued and pay the
amount of $1,699.50 for TMK’s report.
The p anel is satisfied BC’s report was relevant to the outcome of this dispute. This
report assisted the applicants in considering the FSP’s settlement offer and clarified
for the panel the quantum of the claim as the property continues to deteriorate. The
panel is satisfied it is fair in the circumstances the FSP pay the applicants $3,000
towards the cost of BC’s report.
Case No: 488741 Determination Page 9 of 10
3 Supporting information
3.1 FOS approach
FOS considered it appropriate to expedite this dispute in accordance with the
Operational Guidelines to our Terms of Reference . In view of the complexities
involved it was referred directly to a panel for determination.
The panel consists of an ombudsman and two panel members with extensive
experience in insurance industry matters and consumer complaints.
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All the material provided by the parties has been reviewed and
considered for the purposes of this determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
It is an accepted principle of general insurance law that an insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Policy terms
Accidental Damage Cover
We will cover your building or contents for any accidental loss or damage.
How we settle a buildings claim
We will decide how we settle your claim
If your buildings suffer loss or damage, we will decide whether to
repair
rebuild, or
pay you the cost to repair or rebuild that part of your buildings that suffered loss or
damage.
If we do, we will
pay up to the buildings sum insured, as listed on your schedule
only repair, rebuild or pay you for the part or parts of the building that actually sustained
loss or damage, including damaged portions of fixed coverings to walls floors and
ceilings only in the room, hall or passage where the damage occurred
try to match any material used to repair your buildings with the original materials or
nearest equivalent available to the original materials
If we decide to repair or rebuild your buildings and your current schedu le shows
‘including replacement benefit’
We will repair or rebuild the part of your buildings that suffered the loss or damage to a
condition as close as possible to when new, but not better.
Case No: 488741 Determination Page 10 of 10
If we rebuild your buildings, we will also pay the amounts that you need to pay to ensure
your buildings comply with government legislation and local authority by laws…
3.3 Other material considered and relied upon
The parties’ submissions and all attachments to all submissions.
Correspondence between the parties.
FSP’s engineers’ reports.
Applicants’ engineers report and building consultant’s report.
Quotations provided by the applicants and the FSP.
Photographs provided by the parties and attached to reports.
FSP’s file notes.
Call recordings.