Insurer denied business premises inundation claim under flood exclusion
Summary
The business owner's premises were inundated in the March 2017 floods and the insurer declined the claim under the flood exclusion. AFCA found the inundation was floodwater from an overtopped river levee, and the policy documents disclosed the lack of flood cover, so nothing was ordered.
Water backing up from a flooding river through drains is floodwater, which the policy excludes, and the applicant was told via policy documents that flood was not covered.
Issues
- Claim denial primary · not upheld
“I am satisfied in the circumstances that the FSP is entitled to rely upon the policy exclusion for flood to deny the applicant's claim.”
- Failure to disclose secondary · not upheld
“I am satisfied that the applicant was made aware through provision of the policy documents that flood coverage was not provided for under the policy.”
Subjects and remedies
natural disastersmall businessno remedy
Text of the determination
Determination
Case No: 488269 Determination Page 1 of 4
Case number: 488269 13 February 2018
1 Overview
1.1 Dispute
The applicant held a business insurance policy with the financial services provider
(FSP).
A claim was lodged under the policy after the business premises were inundated with
water on or about 31 March 2017, following heavy rain from Tropical Cyclone
Debbie.
The FSP says the inundation was caused by flood which is excluded from cover
under the terms of the insurance policy.
1.1 Issues and key findings
Was the damage covered under the terms of the policy?
Based on the available material, the FSP is entitled to deny the claim as the claimed
loss is excluded from cover because:
the policy specifically excludes loss or damage caused by flood
on balance, the water that caused the loss was flood water.
1.2 Determination
This determination is in favour of the FSP.
The FSP is entitled to deny the applicant’s claim.
Case No: 488269 Determination Page 2 of 4
2 Reasons for determination
2.1 Is the damage covered under the terms of the policy?
Policy excludes losses caused by flood
The applicant’s policy covers property against physical loss or damage occurring
during the policy period. Included in this is damage caused by accidents and wind,
rain or the escape of liquid.
The policy excludes “l oss or damage directly or indirectly caused by or arising out of
Flood”
As such, there was no coverage for flood under the policy.
The policy documentation defines flood as:
“… the covering of normally dry land by water that has escaped or been released from the normal
confines of:
any lake, or any river, creek or other natural watercourse, whether or not altered or
modified; or
any reservoir, canal, or dam.”
The exchanged material confirms the policy was incepted by the applicant directly
through the FSP in or about 2005.
The applicant recalls no discussion at this time as to flood cover but was aware he
had storm cover and thought this would be sufficient to include any flood related
event.
Having reviewed all of the exchanged material, I am satisfied that the applicant was
made aware through provision of the policy documents that flood coverage was not
provided for under the policy.
The loss was caused by flood
The exchanged material confirms that there was a significant weather event in
Australia and the local area in the latter part of March 2017.
In addition, the exchanged material confirms that a great deal of rainfall occurred at
or about the applicant’s premises in the latter part of March 2017.
The available submissions from the applicant and FSP indicate the insured premises
were first inundated by water at or about 6.45am to 7.15am on 31 March 2017. The
owner of the business blamed the build-up of stormwater in the basin for the
inundation.
I have had the opportunity of reviewing the hydrology report prepared by MH, dated
30 June 2017 and submitted by the Small Business Commissioner.
Whilst the report is helpful, it is not specific to the applicant’s premises.
Case No: 488269 Determination Page 3 of 4
On the other hand, the FSP has provided a report from WR dated 25 May 2017,
which was prepared following general area inspection by staff from WR and a phone
interview with the owner of the applicant’s business.
Later, WR prepared a second report on 16 June 2017 after a site -specific visit on 9
June 2017.
WR says the owner of the business confirmed there had been no inundation of the
premises as of 6.30am on 31 March 2017. He travelled to the nearby levee wall and
confirmed it had not been breached. By about 7.00am, the owner observed water
coming from stormwater drains and pipes surrounding the property and beginning to
inundate the premises.
Following the site inspection and review of Bureau of Meteorology data together with
water level data, WR concluded that the initial and maximum depth of inundation
above floor level of the subject property was caused by flood water overflowing from
the Wilsons River.
The insured property was noted to be situated at a height of 9.6m AHD near the front
and 9.8m AHD at the rear.
WR suggests above floor inundation from the Wilsons River would have commenced
after 4.00am on 31 March 2017 as flood water drained into the central area due to
the overtopping of the flood protection levee system on the Wilsons River.
This is not to suggest WR is of the view the inundation of the premises occurred prior
to what is reported by the applicant. It merely reflects a time when the levee
overtopped. I accept this would not have occurred at all areas simultaneously,
therefore accounting for the observations of the owner of the business.
Significantly, WR concluded that stormwater runoff alone would not have inundated
the subject property above floor level prior to the arrival of Wilsons River flood water.
In this regard, I note there was no recorded rainfall in Lismore at the time the
appl icant’s property was inundated. All major falls occurred the previous day.
As such, the inundation at about 7.00am on 31 March 2017, occurred a significant
time after the peak rainfall intensity (43mm/hr between 1.00pm and 2.00pm on 30
March 2017).
I accept that stormwater runoff is generally associated in time with intense rainfall
periods.
Having reviewed all of the exchanged material, I am satisfied that the report from WR
is thorough and logical and its conclusions are compelling.
I am satisfied that the water coming from the drains is likely a backup of water
through the stormwater system, as a result of the rising Wilson’s River. This back up
and escape of water from the drains is floodwater, for the purposes of the policy.
I am satisfied in the circumstances that the FSP is entitled to rely upon the policy
exclusion for flood to deny the applicant’s claim.
Case No: 488269 Determination Page 4 of 4
3 Supporting information
3.1 FOS approach to this dispute
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
This dispute has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice a nd
previous FOS decisions (which are not binding).
Ombudsmen visited affected communities
In September 2017, Ombudsmen from the Financial Ombudsman Service visited
affected communities in Lismore, Murwillumbah and surrounding areas. They
reviewed the areas and spoke with many of the affected business owners during the
visits.
The visits allowed the Ombudsmen to better understand the topography of the
affected areas and the events leading to the inundation of properties in the areas.
The knowledge gained from the visits and discussions with local business owners
has been considered across all disputes in the affected communities.
Rainwater that mixes with flood water is flood
The Courts have established that once rainwater mixes with flood water, it is all
considered flood water. Where rainwater mixes with flood water and causes damage,
a flood exclusion will usually apply to defeat the claim.
Accordingly, when deciding disputes, consideration has been given to whether there
was any rainwater runoff damage occurred before the flood water arrived at the
insured property.