Flood damage to business stock and contents refused under flood exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2017-12-06
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A business insured for contents and stock sought payment after floodwater from Cyclone Debbie inundated its premises. The FSP refused under the flood exclusion and AFCA agreed the loss was caused by flood.

Rainwater that mixes with floodwater is flood, which the policy expressly excludes; the alleged broker failure to offer flood cover was not decided.

Issues

Subjects and remedies

natural disastersmall businessno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 488250 Determination Page 1 of 5 Case number: 488250 5 December 2017 1 Overview 1.1 Dispute The applicant held a Business Insurance Policy with the financial services provider (FSP) covering contents and stock. A claim was lodged under the policy after the business premises was inundated with water on or about 31 March 2017 following heavy rain from Cyclone Debbie. The FSP maintains the inundation was caused by flood which is excluded from cover under the terms of the insurance policy. 1.2 Issues and key findings Was the damage covered under the terms of the policy? The policy provides cover to contents and stock arising from a catastrophe. The event was a catastrophe within the terms of the policy. The policy however specifically excludes cover for flood. The FSP is entitled to deny the claim as the loss is excluded from cover because:  on balance the water that caused the loss was floodwater  the policy specifically excludes loss or damage caused by flood. 1.3 Determination This determination is in favour of the FSP. The FSP is entitled to rely upon the terms and conditions of the policy to deny payment of the applicant’s claim. Case No: 488250 Determination Page 2 of 5 2 Reasons for determination 2.1 Is the damage covered under the terms of the policy? Policy covers a catastrophe but excludes flood The applicant’s policy provided cover in respect of property damage to the applicant’s stock and contents including damage arising from a catastrophe. A catastrophe is defined under the terms of the policy as an event declared a catastrophe by the Insurance Council of Australia. There is no dispute Cyclone Debbie was declared a catastrophe by the Insurance Council of Australia. However, the policy specifically excludes loss or damage caused by flood. Flood under the policy is defined as: ‘ Flood: means the covering of normally dry land by water that has escaped or been released from the normal confines of:  any lake, or any river, creek or other natural watercourse, whether or not altered or modified; or  any reservoir, canal, or dam. ’ Applicant not offered flood cover The applicant has advised that the insurance was originally obtained some time ago and when obtained he was not offered flood cover by his broker. The broker has since informed him that he did not offer the flood insurance because it would have been too expensive. The applicant believes the figure would be close to $70,000. I accept that in the normal course of business a broker should inform an insured when arranging for insurance of the relevant terms and conditions of the policy. In circumstances where a property is in a flood related area (the building was in a flood related area) it would be prudent for the broker to have discussed the issue of flood insurance with the applicant. The applicant may not be able to establish any loss as a result of the failure of the broker to discuss flood insurance if it would not have taken out the insurance because it was too expensive. This however is a matter for discussion between the broker and the applicant. If there is a dispute between the applicant and the broker with respect to this, then it is a matter that could be dealt with separately by the Service. It is not a matter that is subject of this determination. The loss was caused by flood The available submissions from the applicant and FSP indicate the insured premises was first inundated by water at approximately 2.00am on 31 March 2017. I conducted a site inspection of the premises on 14 September 2017 and was able to speak with one of the business directors. I was shown a drainage system at the rear of the factory which drains down to a nearby creek. Behind that are fields of sugarcane and then there is the built up area of South Murwillumbah. Case No: 488250 Determination Page 3 of 5 The applicant described the water as having rushed through and across the cane fields before entering the building. He described it as a torrent of water. He took me to a nearby drain and explained water was overflowing from there as well as from a creek creating a whirlpool that sucked out a numbe r of heavy moulds and moved them across the property. He described the force of the water, such that it caused damage to sheeting at the rear of the property, as well as the damage to the stock. Hydrology identifies inundation due to flood The FSP provided a site specific hydrology report from WRM. WRM attended the property and identified that the building was inundated to a level of between 1.4m above floor level and 1.6m above floor level. The main building is built on top of a concrete slab and the ground level at this point is about 4.0mAHD. WRM considered the initial and maximum inundation of the buildings on the property above floor level was caused by water overflowing from the South Murwillumbah Basin. The water would have been a combination of floodwaters from the Condong Creek and the Tweed River via the South Murwillumbah Basin. The applicant provided a report from MHL dated 30 June 2017. The report is not a site specific but identifies that the peak rainfall in the Murwillumbah area fell on 30 March 2017. On the Thursday afternoon, the South Murwillumbah Levee on the Tweed River overtopped. This resulted in floodwaters through the South Murwillumbah Basin with the peak flood occurring on Friday morning. MHL considered that South Murwillumbah would have been flooded after the levee overtopped. The information provided by the hydrologists is consistent with the applicant’s comments as to the water flowing from the South Murwillumbah area. The reports are consistent with the loss or damage to the appl icant’s contents and stock being caused by flood. No evidence of stormwater/rain inundation prior to flooding I have considered whether there is any possible inundation of the property prior to the arrival of the floodwater as a result of stormwater or rai nwater runoff. I accept, given the height of the property that it was unlikely there was any inundation of the property by stormwater runoff or by water escaping from the drains at the rear of the property prior to the impact of the floodwaters. I am satisfied in the circumstances that the FSP is entitled to refuse payment of the claim. Case No: 488250 Determination Page 4 of 5 3 Supporting information 3.1 FOS approach to this dispute There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. This dispute has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions (which are not binding). Ombudsmen visited affected communities In September 2017, Ombudsmen from the Financial Ombudsman Service visited affected communities in Lismore, Murwillumbah and surrounding areas. They reviewed the areas and spoke with many of the affected business owners during the visits. The visits allowed the Ombudsmen to better understand the topography of the affected areas and the events leading to the inundatio n of properties in the areas. The knowledge gained from the visits and discussions with local business owners has been considered across all disputes in the affected communities. Rainwater that mixes with flood water is flood When deciding disputes, consideration has been given to whether there was any rainwater runoff damage occurred before the flood water arrived at the insured property. Once rainwater mixes with flood water, it is all considered flood water. Where rainwater mixes with flood water and causes damage, a flood exclusion will usually apply to defeat the claim. 3.2 Relevant expert reports Record Key points FSP’s expert (WRM ) Hydr ology Report 13 July 2017  The initial and maximum inundation of the buildings on the subject properties above floor level was caused by water overflowing from the South Murwillumbah Basin .  Elevated Tweed River water levels would have caused the Condong Creek floodgates to close and Condong Creek water to flow to the Sout h Murwillumbah Basin from sometime early on the morning of Thursday 30 March 2017 Point 3 .  Tweed River floodwaters overt opped the South Murwillumbah Levee sometime around 1500 hours to 17 30 hours and overtopped Tweed Valley Way at Blacks Drain sometime before about 1745 hours on 30 March 2017 . Case No: 488250 Determination Page 5 of 5  L ocal catchment draining to the subject properties is not significant, and the period of most intense rainfall did not occur until about 2300 hours on 30 March 2017 aft er both Condong Creek and Tweed River floodwaters started overflowing to the South Murwillumbah Basin . Applicant’s expert (MHL) Storm Event Review 30 June 2017  One hour peak rainfall intensity late Thursday 30 March 2017 .  Thurs day aft e rnoon South Murwillumbah Levee overtopped .  Flood peak around mid night Friday morning at 6.3mAHD.  South Murwillumbah Levee provides some protection but begins to overtop when levels at the Murwillumbah Bri dge reach approximately 4.8mAHD.  High intensity rainfall observed at Murwillumbah on Thursday 30 March 2017. The flood levee at Murwillumbah Bridge exceeded 4.8mAHD that afternoon.  Henc e it is expected the South Murwillumbah Levee would have overtopped and flooded South Murwillumbah.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.