Determination 488241
Business premises inundation claim declined as flood damage
Summary
A business's premises were inundated by rainwater and then floodwater after Cyclone Debbie, and the FSP offered $49,000 and declined the rest as flood damage. AFCA found the rainwater portion was covered, the post-2.56am floodwater damage excluded, and ordered $93,500 in total.
Rainwater that entered before floodwater arrived is covered, while damage after floodwater inundation is excluded under the flood exclusion, with the covered loss assessed as fair in all the circumstances.
Issues
- Claim denial primary · upheld
“I am satisfied that there was an inundation of the applicant's property through rainwater entering via the ceiling and walls, and the FSP is liable for that loss.”
- Claim amount dispute secondary · upheld
“I consider it fair that the FSP pay the applicant $93,500, being approximately 50% of the amount claimed.”
Subjects and remedies
home or building damagenatural disasterpay claim
Text of the determination
Determination
Case No: 488241 Determination Page 1 of 6
Case number: 488241 21 March 2018
1 Overview
1.1 Dispute
The applicant held a business insurance policy with the financial services provider
(FSP).
A claim was lodged under the policy after the business premises were inundated with
water on or about 31 March 2017 following heavy rain from Cyclone Debbie.
The FSP maintains the inundation was caused by flood which is excluded from cover
under the terms of the insurance policy.
1.2 Issues and key findings
Was the damage covered under the terms of the policy?
Based on the available material, I am satisfied that rainwater inundation caused
some damage to the insured business prior to the arrival of floodwaters at
approximately 2.56am on 31 March 2017. Accordingly, the FSP is required to cover
the loss arising from inundation of the property by rainwater.
The FSP is entitled to decline the remaining loss caused by floodwater that arrived
from 2.56am on 31 March 2017.
1.3 Determination
This determination is partially in favour of the applicant.
The FSP is liable to pay the applicant’s claim for damage to the building, stock and
contents as set out under section 2.1 of this determination in the sum of $93,500.
The FSP is otherwise entitled to decline liability for the applicant’s claim for damage
caused as a result of flood.
2 Reasons for determination
2.1 Is the damage covered under the terms of the policy?
The applicant’s policy was arranged through a broker. The policy is a Business
Insurance Policy that provides cover for loss or damage sustained to the business
property, including buildings, contents, and stock, together with cover for business
Case No: 488241 Determination Page 2 of 6
interruption for a maximum period of 12 months. The policy however specifically
excludes loss or damage caused by flood. ‘Flood’ is defined under the terms of the
policy to be:
the covering of normally dry land by water that has escaped or being released from the
normal confines of:
1) any lake, or any river, creek or other natural watercourse, whether or not altered
or modified; or:
2) any reservoir, canal or dam.
The policy also includes an optional cover for flood as follows:
When ‘Flood’ is shown as insured in the Policy Sch edule, subject to the provisions of
the Policy, We will cover loss of or damage to Property Insured caused by Flood …
The policy schedule for the insured period 31 May 2016 to 31 May 2017 clearly
identifies that the policy did not cover flood. The applicant claims that her instructions
to the broker were to obtain flood cover. Any dispute with respect to this is a dispute
between the applicant and the broker, not the FSP.
Rainwater initially caused damaged prior to the floodwater arriving
The available material indicates that some damage was caused by rainwater before
the floodwater arrived.
There is no dispute that heavy rain fell over the Lismore area from early afternoon on
30 March 2017 until approximately 3.00am on 31 March 2017. Peak rainfall occurred
in the early afternoon of 30 March 2017 and in the early evening of 30 March 2017.
This is supported by the findings of the hydrologist M who was commissioned by the
New South Wales Small Business Commissioner and WM who was engaged by the
FSP.
The applicant obtained a hydrologist report from GC. In relation to the applicant’s
building, GC identified that clear water had entered the premises by a spillage from
the roof. Available photographs confirm this.
GC considered the roof is designed such that the frontage drains back to a central
channel. The channel section then drains to a pipe which is inside the building and
likely connects to the trunk drain in the downstream. An area of substantial damage
was close to the internally located drainpipe. GC considered roof overflows of
stormwater (rainwater) would have closely followed the rainfall and would have
occurred prior to any floodwaters from Leycester Creek entering the premises. GC
confirmed observation from other parties indicate mainstream flooding of the
premises did not occur until approximately 2.30am.
The FSP obtained a site specific hydrology report from WM dated 19 May 2017. That
report confirms that heavy rain occurred all day and into the night on Thursday
30 March 2017. WM noted that CCTV system was damaged at some point during the
evening and appeared to have been damaged by water coming through the ceiling
and down the internal wall. This is consistent with the water entering the property via
the roof during the peak rainfall periods. Despite this, WM considered that the initial
and maximum depth above floor level was caused by floodwater. WM’s r eport
Case No: 488241 Determination Page 3 of 6
concludes that any damage or loss resulting from water leaking through the ceiling or
walls was not caused by floodwater.
The report is inadequate in that it has not addressed the issue of damage sustained
as a result of rainwater entering through the ceiling and walls. A supplementary
report obtained from WM also fails to address this issue.
According to the FSP, its builder JLR confirmed there was rainwater ingress which
occurred as a result of the box gutters of the roof being unable to cope with the
significant and ongoing rainfall.
The assessor CL says the extent of rainwater ingress could not be determined, but
based on the lack of damage to the ceiling and walls , CL considers the extent of the
rainwater ingress to be low to moderate rather than significant or extreme.
Based on the available information, I am satisfied that there was an inundation of the
applicant’s property through rainwater entering via the ceiling and walls of the
property and that as a result of this, damage has been sustained to the stock and
contents of the property as well as some damage to the walls of the property.
Extent of loss from initial inundation by rainwater not settled
JLR provided a quote for the building reinstatement of $13,906.75 (inclusive of GST).
The quote covered numerous items including:
disconnection of electrical services
removal and disposal of F/C wall lining
asbestos testing
supply and installation of F/C wall lining, sand set ready for paint
prepare and paint 12m² of ceiling to match existing doors and colours
prepare and paint 32m² of walls to match existing colours and finishes
test and report on electrical fittings
supply and install CCTV security system
supply and install alarm system.
It is unclear, given the extent of the internal repairs required, why the assessor
considered the extent of rainwater ingress to be low to moderate. Given the rainfall
was continuous with a peak occurring during early afternoon on 30 March 2017, I am
satisfied that the damage due to rainwater is likely to be moderate to significant.
I accept the comments by the assessor that the rainwater would likely have saturated
the floor coverings, and the fixtures and fittings within that area would have drawn
water from the floor coverings by capillary action.
In this regard, I note from the assessor’s first report that the fixtures and fittings , such
as the shelves and display cabinets, were made of laminated particle board. I accept
that this would have sustained extensive swelling and damage as a result of any
rainwater inundation. This would have impacted on the magazine display cabinet,
card display cabinet, lotto counter, and other fixtures not made of solid timber.
CL also identified that some stock in the immediate area of the rainwater ingress
would have been damaged. This was not reflected in the quotation from JLR. The
Case No: 488241 Determination Page 4 of 6
quotation also did not include the replacement of floor coverings that were likely to
have been damaged by the rainwater.
The FSP has offered the applicant $49,000 in settlement of the loss and damage
sustained to the building, contents and stock plus business interruption. The FSP has
assessed the business interruption on a calculation that will take approximately 3.4
weeks to repair the property damaged due to the rainwater inundation at a weekly
earnings rate of $2,710.90.
Whilst the FSP says its builder assessed the time it would have taken to repair the
damage following the rainwater inundation at 3 weeks, it has not set out how it
calculated the remaining $40,000, other than that it relates to some building damage
and some stock and contents loss.
The applicant has disputed the settlement offer and maintains that the losses of stock
and contents were far greater than that assessed by the FSP. The applicant has
supplied an estimate based on a stocktake for stationery, toys, cards, chips,
groceries, cigarettes, confectionery, drinks, gifts and ice creams. The lists are
extensive but do not establish the extent to which the loss was related to the
rainwater inundation as against the flood water inundation. Clearly not all the stock
and contents would be damaged by the rainwater inundation.
The applicant has separately set out a claim for $96,000 for shop equipment damage
and $91,321.27 for stock and contents.
I accept the FSP is liable in addition to the $49,000 offered, to compensate the
applicant for the loss of the cabinets and fixtures not made of solid timber and floor
coverings. I also accept that, given the applicant ’s business as a newsagency, it is
likely that stock and contents would be damaged by the rainwater inundation.
The term of reference require that I do what is fair in all the circumstances. In the
absence of any precise way to assess the extent of any such loss I consider it fair
that the FSP pay the applicant $93,500, being approximately 50% of the amount
claimed by the applicant as per the email of the 14 September 2017. The FSP is
entitled to deduct from this amount the amount of $49,000 if it has already paid the
applicant this amount.
No evidence of stormwater entering the front of the property
The applicant believes that there was stormwater damage that entered through the
front of the property prior to the arrival of floodwaters and that this led to further
damage to the stock and contents.
There is no evidence of stormwater damage entering the front of the property prior to
the arrival of the floodwaters. Whilst I accept that the rainwater had entered the
property, I do not accept that there was stormwater runoff flowing from the road
gutters or drains into the property prior to the inundation of the building by floodwater.
The CCTV footage provided by the applicant’s CCTV identifies the following:
1.50am water flowing in the road gutters but not on the foot path above ground
level
2.56am water completely inundating the road gutters and foot path, and
approaching the crest of the road. It is not raining at this time.
Case No: 488241 Determination Page 5 of 6
2.56am water at the bottom of the screen, indicating water has begun to
inundate the property.
The report from the applicant’s hydrologist GC confirms that most likely the property
was inundated by floodwater at sometime around 2.30am on 31 March 2017.
The site specific report from WM identifies that the water level at L Creek peaked at
about 3.00am on 31 March 2017. The evidence indicates that most likely Leycester
Creek and the Wilson River overtopped their banks around 3.00am on 31 March
2017.
I am satisfied based on the CCTV footage and the hydrology reports provided that
there was no stormwater inundation at the applicant’s p roperty prior to approximately
2.56am on 31 March 2017. I am satisfied that at that time, the property would have
been inundated by a combination of stormwater runoff and floodwater , which is
classed as floodwater.
I am satisfied that the inundation of the applicant’s property and damage to the
applicant’s property after 2.56am on 31 March 2017 was caused by flood, which is
excluded from cover under the terms of the policy.
Peak inundation caused by flood
I am satisfied based on the information provided that the peak inundation of the
applicant’s property to a level of approximately 500mm was due to flood. It is fair in
the circumstances that the FSP is liable under the policy for the inundation caused as
a result of rainwater entering through the ceiling in the roof. Otherwise the FSP is
entitled to decline the remaining loss on the basis it was caused by flood.
3 Supporting information
3.1 FOS approach to this dispute
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
This dispute has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions (which are not binding).
Ombudsmen visited affected communities
In September 2017, Ombudsmen from the Financial Ombudsman Service visited
affected communities in Lismore, Murwillumbah and surrounding areas. They
reviewed the areas and spoke with many of the affected business owners during the
visits.
The visits allowed the Ombudsmen to better understand the topography of the
affected areas and the events leading to the inundation of properties in the areas.
Case No: 488241 Determination Page 6 of 6
The knowledge gained from the visits and discussions with local business owners
has been considered across all disputes in the affected communities.
Rainwater that mixes with flood water is flood
The Courts have established that once rainwater mixes with flood water, it is al l
considered flood water. Where rainwater mixes with flood water and causes damage,
a flood exclusion will usually apply to defeat the claim.
Accordingly, when deciding disputes, consideration has been given to whether there
was any rainwater runoff damage before the flood water arrived at the insured
property.