Home / Financial Firm (Unknown - Insurer) / Determination 488222

Determination 488222

Denial of business property flood damage claim

FirmFinancial Firm (Unknown - Insurer)
Decided2018-02-14
ProductGeneral Insurance · Business / commercial
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

After Tropical Cyclone Debbie flooding, the applicant claimed under a business insurance policy for inundated premises. AFCA decided the FSP was entitled to deny the claim as the loss was caused by flood.

The policy excludes flood losses where flood cover is not scheduled, and the hydrology evidence showed floodwater overflow rather than stormwater runoff caused the inundation.

Issues

Subjects and remedies

natural disastersmall businessno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 488222 Determination Page 1 of 4 Case number: 488222 14 February 2018 1 Overview 1.1 Dispute The applicant held a business insurance policy with the financial services provider (FSP). A claim was lodged under the policy after the business premises were inundated with water on or about 31 March 2017, following heavy rain from Tropical Cyclone Debbie. The FSP says the inundation was caused by flood which is excluded from cover under the terms of the insurance policy. Issues and key findings Was the damage covered under the terms of the policy? Based on the available material, the FSP is entitled to deny the claim as the claimed loss is excluded from cover because:  the policy specifically excludes loss or damage caused by flood  on balance, the water that caused the loss was flood water. Determination This determination is in favour of the FSP. The FSP is entitled to deny the applicant’s claim. Case No: 488222 Determination Page 2 of 4 2 Reasons for determination Is the damage covered under the terms of the policy? Policy excludes losses caused by flood The applicant’s policy covers property against physical loss or damage occ urring during the policy period. This includes coverage for flood damage if it is selected as an option and listed in the policy schedule . Flood cover is not listed in the policy schedule. The policy excludes property losses arising from flooding, if it is not listed as an option under the policy. As such, I am satisfied there was no coverage for flood under the policy. The policy documentation defines flood: “The covering of normally dry land by water that has escaped or been releas ed from the normal confines any of the following: (a) a lake (whether or not it has been altered or modified); (b) a river (whether or not it has been altered or modi fied); (c) a creek (whether or not it has been altered or modified); (d) another natural watercourse (whether or not it has been altered or modified); (e) a reservoir; (f) a canal; (g) a dam.” The exchanged material confirms that the polic y was incepted through a broker and the applicant knew it did not provide flood cover. Whilst there are inconsistencies in the representation of the cover to the applicant (some documents reference “Fire and Defined events” cover and others reference “Property Damage” co ver), it is clear no flood cover existed and the applicant was aware of this. There is no evidence the applicant sought flood cover at any stage. Having reviewed all of the exchanged material, I am satisfied that the applicant was aware that flood coverage was not provided for under the policy. The loss was caused by flood The exchanged material confirms that there was a significant weather event in Australia and the local area in the latter part of March 2017. In addition, the exchanged material confirms that a great deal of rainfall occurred at or about the applicant’s premises in the latter part of March 2017. The available submissions from the applicant indicate the insured premises were first inundated by water after 11.00pm on 30 March 2017. The applicant says this water flowed directly from the north. Case No: 488222 Determination Page 3 of 4 I had the opportunity of reviewing the hydrology report prepared by MH, dated 30 June 2017 and submitted by the Small Business Commissioner. Whilst the report is helpful, it is not specific to the applica nt’s premises. On the other hand, the FSP has provided a report from WR dated 29 May 2017, which was prepared following a general area inspection and telephone interview. WR says that the applicant was at the property during the event. Rain penetrated through the roof of the building in four or five spots but did not cause any apparent damage. The applicant went to bed about 9.30-10.00pm on 30 March 2017 and says there was no water in the building at that time. He got up about 7.30-8.00am the next morning and water was about knee deep. Following enquiries with the applicant and a review of Bureau of Meteorology data together with water level data, WR concluded that the initial and maximum depth of inundation above floor level of the subject property was caused by floodwater overflowing from the Wilsons River and Leycester Creek. Initial inundation of the surrounding areas likely occurred due to floodwater from Leycester Creek overflowing from the north/northwest of the property from around 11.00pm on 30 March 2017. The maximum depth of inundation occurred after Wilsons River overtopped the levee banks. Significantly, WR concluded that stormwater runoff alone would not have inundated the subject property above floor level prior to the arrival of Wilsons River and/or Leycester Creek floodwater. In this regard, I note the peak rainfall intensity of 43mm/h occurred between 1.00pm and 2.00pm on 30 March 2017. Similar levels of rainfall occurred around 6.00pm that evening. These peak periods of rainfall intensity were well before inundation of the property, which the applicant confirms had not occurred by 9.30pm that evening and likely took place after 11.00pm. There was practically no rainfall the next day. I accept that stormwater runoff is generally associated in time with intense rainfall periods. Having reviewed all of the exchanged material, I am satisfied that the report from WR is thorough and logical and its conclusions are compelling. I am satisfied the property was flooded as a result of the overflows from Leycester Creek and the later overtopping of the levee walls for Wilsons River. I am satisfied in the circumstances that the FSP is entitled to rely upon the policy exclusion for flood to deny the applicant’s claim. Case No: 488222 Determination Page 4 of 4 3 Supporting information FOS approach to this dispute There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. This dispute has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions (which are not binding). Ombudsmen visited affected communities In September 2017, Ombudsmen from the Financial Ombudsman Service visited affected communities in Lismore, Murwillumbah and surrounding areas. They reviewed the areas and spoke with many of the affected business owners during the visits. The visits allowed the Ombudsmen to better understand the topography of the affected areas and the events leading to the inundation of properties in the areas. The knowledge gained from the visits and discussions with local business owners has been considered across all disputes in the affected communities. Rainwater that mixes with flood water is flood The Courts have established that once rainwater mixes with flood water, it is all considered flood water. Where rainwater mixes with flood water and causes damage, a flood exclusion will usually apply to defeat the claim. Accordingly, when deciding disputes, consideration has been given to whether there was any rainwater runoff damage occurred before the flood water arrived at the insured property.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.