Basement moisture damage denied and cash settlement for outstanding repairs disputed
Text of the determination
Determination
Case No: 488148 Determination Page 1 of 12
Case number: 488148 3 April 2018
1 Overview
1.1 Dispute
The applicant lodged a claim under his home insurance policy with the financial
services provider (FSP), after his home was damaged by water leaking from a burst
refrigerator hose.
The FSP accepted the applicant’s claim and made arrangements to repair the
property. However, the FSP stopped work after its contractors discovered moisture
damage to the sub-floor of the basement .
The FSP says it is not responsible for repairing the damage to the basement
because this damage was not caused by the refrigerator leak or any other event
insured against under the policy. The FSP has cash settled the applicant for
$25,345.60, including the estimated cost of the outstanding repairs.
The applicant says the damage to the sub -floor was caused by stormwater overflow
and/or leaking pipes (which are covered under the policy). He wants the FSP to pay
for the works required to address the moisture issues affecting the basement
(estimated at over $200,000).
The applicant is also dissatisfied with the manner in which the FSP has handled his
claim. He seeks compensation for various financial and non-financial losses incurred
as a result.
1.2 Issues and key findings
Is the FSP required to increase the cash settlement for building repairs?
The applicant has not established that the additional damage to the sub-floor and
surrounding areas was caused by an insured event. Accordingly, the FSP is not
liable for the cost of repairing this damage.
However, the FSP is required to increase the cash settlement for the repair of the
outstanding damage caused by the leaking refrigerator, to ensure the applicant is
able to complete the necessary repairs.
Is the applicant entitled to any other amounts?
The applicant is not entitled to additional payments for temporary accommodation or
storage costs as the available information does not establish that the FSP’s
settlement offer is inadequate.
Case No: 488148 Determination Page 2 of 12
However, the applicant is entit led to one weeks’ temporary accommodation for his
dog, in accordance with the benefits provided under the policy.
The applicant is entitled to compensation of $500 for non-financial loss suffered as a
result of the FSP’s claims handling. The applicant is not entitled to reimbursement of
legal or professional fees .
1.3 Determination
This determination is partly in favour of the applicant.
The cash settlement is generally fair and reasonable.
However, the FSP is required to pay the applicant:
an additional amount of $13,796.62 for the outstanding building repairs
$500 as compensation for non-financial loss
the cost of one week’s temporary accommodation for his dog (subject to
provision of an appropriate invoice)
Case No: 488148 Determination Page 3 of 12
2 Reasons for determination
2.1 Is the FSP required to increase the cash settlement for building
repairs?
Applicant must show disputed damage was caused by an insured event
The applicant’s home insurance policy is an insured events policy. This means that
not all loss and damage is automatically covered. The policy only provides cover for
damage caused by the insured events listed in the policy, subject to the conditions
and exclusions set out in the policy.
As the applicant is seeking to make a claim under a policy, he is required to show
that, on the balance of probabilities, he has suffered a loss caused by a risk insured
against under the policy.
The FSP’s onus to show that it is entitled to rely on a policy exclusion to deny the
claim only arises once the applicant has established that the damage claimed is
covered by the terms and conditions of the policy.
The insured events for which the policy provides cover include ‘storm, flood,
rainwater and wind’ and ‘water or liquid damage’ (including damage caused by water
escaping from a fixed pipe, fixed gutter or drain).
Cover is provided for damage caused by an ‘incident’ , which is defined in the policy
to mean a single occurrence, or a series of occurrences, arising out of one event.
The policy contains general exclusions for damage caused by earth movement
and/or gradual deterioration.
Additional damage was discovered during claim-related repairs
As outlined above, the FSP accepted liability for water damage caused by a burst
refrigerator hose in the applicant’s kitchen.
The leaking water damaged the kitchen cabinets and floorboards, as well as the
ceiling, walls and parquetry flooring in the basement living area located immediately
underneath.
When the FSP’s builder (BB) removed the basement living room floor as part of the
repair process, he discovered:
rotting damage to the timber joists and bearers of the sub-floor frame
cracking damage to the concrete stumps.
The applicant and the FSP subsequently appointed engineers (RC and IR) to inspect
the property.
RC and IR have confirmed that, in addition to the moisture damage to the sub-floor,
there is also cracking and movement damage to the building , caused by changes in
the moisture content of the moderately reactive foundation soils . The applicant says
this damage worsened significantly over a twelve month period.
Case No: 488148 Determination Page 4 of 12
Parties disagree about cause of moisture issues
The engineers’ reports confirm that the moisture from the surrounding soils has been
seeping into the basement sub-floor area through the retaining walls. However, the
parties disagree about the source of the moisture.
The applicant acknowledges that the moisture issues affecting the basement sub-
floor were unrelated to the leaking refrigerator hose in March 2016.
However, the applicant says the FSP should be liable for rectifying these issues
because they were caused by one or more of the following factors:
water pooling in the kerb at the front of the property due to insufficient drainage
water leaking from cracked underground mains and storm water pipes
a leaking storm water drain located near the boundary fence which was damaged
during works undertaken by his neighbour’s fencing contractor .
The applicant has provided a quotation from his builder (CP) for $212,610.50 (plus
GST) for works including:
the installation of new agriculture pipes and connection to the current drainage
system, so as to divert all water entering the sub-floor into the storm water
system
the removal and reinstatement of concrete pathways, carport and balcony at the
property, to facilitate the drainage works
waterproofing of the brickwork along the east side of the house.
The FSP disputes that the moisture issues were caused by leaking pipes or by
rainwater run-off during a single storm (as is required for cover to be available under
the policy).
The FSP says the damage occurred over an extended period of time as a result of
long-term moisture issues affecting the basement, due to the features of the site and
the surrounding environment.
The FSP will only be liable for the disputed damage if the applicant can show that, on
the balance of probabilities, the proximate cause of the damage is an incident which
is covered under the policy.
It is well established at law that the proximate cause of a loss is not necessarily the
first (or the last) or the sole cause of the loss. It is the effective or dominant or
operative cause.
In any particular case, the proximate cause of the loss is a question of fact to be
determined based on the surrounding circumstances. Where there are several
causes operating, each must be examined for the qualities of predominance and
efficacy in relation to the resultant damage.
Applicant has not shown additional damage was caused by insured event
Having carefully reviewed all of the available information, the panel is not satisfied
that the applicant has established that the moisture issues affecting the basement
were caused by an insured event.
Case No: 488148 Determination Page 5 of 12
As outlined above, the applicant has identified several factors which he says
contributed to the moisture issues affecting the basement. However, the panel is not
satisfied that the information provided establishes a sufficient causal link between
any of these factors and the damage observed.
In relation to the road drainage issue, the applicant says stormwater collects in a low
point on the roadside kerb and channel outside his property. He says this water has
flowed into the soils at the property, seeping into the basement through the retaining
walls.
The applicant has provided photographs and videos showi ng the kerb holding water,
together with a surveyor ’s report (RMK) which confirms that some points of the kerb
and channel will hold water. The applicant has also provided an email from the local
council (BY) confirming the existence of the low point on the roadside kerb.
However, the panel is not satisfied that the volumes of water ponding outside the
property (as shown in the materials provided) are sufficient to cause the damage
observed.
The applicant has provided a water sample report prepared by an environmental
analyst (EF). EF’s findings indicate that the moisture entering the basement is
derived from a natural source (ie rainwater and/or surface run-off), rather than from
pipes servicing the property.
However, EF’s report is not sufficient to show that the water which ponded in the kerb
following regular rainfall events caused the dampness affecting the basement sub-
floor.
After the applicant expressed concerns about the water issues affecting his property,
the local council engaged a water management consultant (EN) to investigate.
Based on his field surveys, geotechnical testing and modelling of surface water flows,
EN concluded that:
the applicant’s property was unlikely to be impacted by the limited water
catchment area at the kerb
the road and the council drainage system were adequate to deal with storm water
and surface flows, even during significant rainfall events.
While the stormwater run-off from the road may have contributed to variations in the
moisture levels of the foundation soils over the years, the panel is not satisfied that
this was the proximate cause of the damage to the basement sub-floor and
surrounding areas.
The applicant also says that water leaking from broken pipes at the property has
caused or contributed to the damage. He has provided a report prepared by this
engineer (RC), along with videos of underground pipes taken by his plumber (DM).
In his report, RC identified a cracked terracotta pipe in the storm water drainage
system at the front of the property. However, based on the limited information in RC’s
report, the panel is not satisfied that the extent of the leak (and the location of the
pipe) is consistent with it having caused the disputed damage.
Case No: 488148 Determination Page 6 of 12
The panel notes that the applicant has referred to various other possible sources of
water affecting the property, including:
a storm water pipe near the boundary fence which the applicant says was
damaged by his neighbour’s contractor
a leaking mains water pipe further down the road, which was repaired by the
water authority in May 2016
possible leaks to storm water pipes under the footpaths outside the property
sub-surface water flows of groundwater from an upstream catchment area
However, the panel is not satisfied that the available information establishes that any
of the potential issues identified above were a proximate cause of the moisture
issues observed at the property.
The FSP’s engineer (IR) concluded that the basement suffered from ongoing
moisture issues over an extended period of time due to the inherent features of the
sub-floor and the surrounding area.
In his report, IR noted that:
the property sloped downwards from the front (north) to the rear (south)
the design of the house meant that the basement had been cut into the site, with
retaining walls on each side adjacent to earth and garden beds
th e basement was located at the lowest point of the building’s footprint , with the
sub-floor well below the level of the surrounding ground
there was inadequate ventilation to the sub -floor area, which contributed to the
build-up of moisture
there were signs of past repairs to the basement (and other areas of the
property), which appeared to have been carried out to address dampness and
movement issues.
The panel considers that, given the features of the property, the basement would
have been susceptible to ongoing dampness issues, due to the build-up of moisture
in the surrounding soils.
It is likely that the build-up of moisture has resulted from a range of factors, including
stormwater run-off, sub-soil groundwater flows and limited provision for sub-soil
drainage. Seasonal variations in the moisture content of the soils would also have
contributed to the cracking and movement damage observed at the property.
Based on the nature and extent of the damage, the panel considers it occurred
progressively over a number of years.
The panel is not satisfied that the applicant has identified any specific incident or
incidents which caused or contributed to the damage to any significant extent.
FSP is not liable for additional moisture damage
For the reasons outlined above, the panel considers the FSP is not liable for the
additional moisture-related damage identified during the course of the repairs.
Accordingly, the FSP’s liability is limited to the cost of repairing the damage caused
by the leaking refrigerator hose in March 2016.
Case No: 488148 Determination Page 7 of 12
The applicant says the FSP advised him at the start of the repair process that it
would repair any further damage identified during the course of the repairs and he
would not be liable for any costs.
However, the FSP is not required to repair additional damage identified during the
repair process, where such damage is unrelated to the event which triggered the
original claim.
FSP should cash settle claim for cost of outstanding repairs
When BB discovered the additional moisture issues in the sub-floor area, the FSP
advised the applicant that it wold not repair this damage, as it was not caused by an
insured event.
The FSP offered the applicant the following two options to settle his claim:
if the applicant completed the works required to address the moisture issues with
the sub-floor, the FSP would arrange for BB to repair the outstanding damage
caused by the burst refrigerator pipe
alternatively, the FSP would cash settle the applicant for the cost of completing
the repairs, based on BB’s quotation.
After the applicant rejected both offers, the FSP elected to cash settle the claim.
The panel considers the FSP’s approach was reasonable, given its contractors were
unable to warrant the claim-related repairs due to the moisture issues affecting the
basement.
Further, it is clear that the relationship between the parties has irretrievably broken
down. The applicant no longer has confidence in the ability of the FSP and its
contractors to carry out their appointed tasks.
It is appropriate in these circumstances that the claim be cash settled. However, the
cash settlement amount should be sufficient to ensure that the applicant is able to
engage his own contractors to complete the outstanding claim-related repairs.
FSP’ s cash settlement amount should be increased to $35,000
The cash settlement amount of $25,345.60 paid by the FSP included an amount of
$21,203.38, which reflected BB’ s estimate for the outstanding repairs.
The applicant has provided an itemised quotation from his builder (CP) for the items
included in BB’s estimate. CP has quoted over $50,000 for these works.
The fact that CP has quoted a significantly higher amount for the repairs does not of
itself establish that BB’s quotation is inadequate. It is not uncommo n for there to be
significant variation between quotations provided by different builders for the same
work.
As outlined above, the FSP was willing to have BB complete the repairs, subject to
the lifetime guarantee provided under the policy. In these circumstances, the panel
considers that BB ’s quotation represents a reasonable basis for determining the cash
settlement amount.
Case No: 488148 Determination Page 8 of 12
Having said that, the panel considers the cash settlement for building repairs should
be increased to a total of $35,000, in order to make appropriate allowance for:
any additional items which are specifically included in CP’s quotation but are not
expressly identified in BB’s quotation (such as site clean -up and rubbish removal)
any variations to the scope of works which may be required (given the FSP would
have been liable for any resulting increase in costs, if the repairs had been
carried out by BB)
the additional risks assumed by the applicant due to the absence of the lifetime
guarantee
the passage of time (including any increase in c osts since BB’s quotation was
provided).
Accordingly, the FSP is required to pay the applicant an additional amount of
$13,796.62 for the outstanding repairs. The FSP is not required to pay interest on the
additional amount.
2.2 Is the applicant entitled to any additional amounts?
Applicant is not entitled to additional temporary accommodation benefits
The applicant’s policy provides for the payment of reasonable temporary
accommodation benefits (for himself, his family and his pets) where his home is
unable to be lived in due to damage caused by an insured event.
The FSP paid temporary accommodation benefits for the applicant and his family
during the early stages of the claim. The FSP also reimbursed the applicant for five
days’ kennel fees for his do g.
However, the FSP ceased paying temporary accommodation benefits from 2 August
2016, after its internal assessor inspected the property and confirmed it remained
habitable. The FSP advised the applicant it had approved the initial benefits in error.
The applicant considers the FSP unreasonably ceased paying temporary
accommodation benefits when its contractors stopped work, leaving his property in a
half-finished state.
Having reviewed the reports provided, the panel is satisfied that the property
remained liveable, despite the removal of the parquetry flooring in the basement
area. Accordingly, the FSP was entitled to cease paying benefits in August 2016.
The applicant also seeks payment of temporary accommodation benefits for a further
period while the repairs to the basement are completed.
As outlined above, the panel has determined that the FSP is not liable for the
additional moisture damage to the basement area. Accordingly, the FSP is not
required to pay temporary accommodation benefits for the time it takes to address
this issue.
The cash settlement paid by the FSP included an amount of $3,000, reflecting the
cost of one weeks’ accommodation while the floorboards at the property were
sanded as part of the outstanding repairs.
Case No: 488148 Determination Page 9 of 12
The amount paid by the FSP for temporary accommodation was based on the cost of
a two bedroom unit and a studio apartment (for the applicant and his three family
members).
The panel is satisfied that the amount paid by the FSP for temporary accommodation
is reasonable. However, the FSP is also required to reimburse the applicant for the
cost of one week’s temporary accommodation for his dog (subject to provision of an
appropriate invoice), in line with the benefit provided under the policy.
Applicant is not entitled to further storage costs
The FSP paid the storage costs for the applicant’s conte nts until 31 July 2017.
The cash settlement amount paid by the FSP included an amount of $1,322.22 for
contents storage for an additional six month period.
Given the FSP is not liable for the additional damage to the basement area, the panel
is satisfied that the amount paid for storage costs is reasonable in the circumstances.
Applicant is not entitled to reimbursement of professional fees
Under the Terms of Reference, FOS may require a financial services provider to
contribute to the professional costs incurred by an applicant in the course of the
dispute.
The applicant seeks reimbursement for fees paid to his contractors for surveying,
geotechnical, water analytical and plumbing investigations.
However, the panel does not consider that the reports provided were of assistance in
resolving the dispute. Accordingly, the applicant is not entitled to reimbursement of
the expenses incurred.
The applicant also seeks reimbursement of legal fees.
The FOS process is designed to be accessible to applicants without the need for
legal advice. Accordingly, the reimbursement of legal fees is only appropriate in
limited circumstances (for example, where a dispute raises complex legal issues).
The panel does not consider that the circumstances of the present dispute were such
as to reasonably require the involvement of a lawyer. Accordingly, the FSP is not
required to reimburse the applicant’s legal fees.
Applicant is entitled to compensation of $500
Under the Terms of Reference, FOS may award compensation (capped at $3,300)
for consequential financial loss suffered by an applicant in connection with their
claim.
FOS may also award non-financial loss (capped at $3,000) where an applicant has
suffered an unusual degree or extent of physical inconvenience, time taken to
resolve the situation or interference with the applicant’s expectation of enjoyment or
peace of mind.
The applicant is dissatisfied with the manner in which the FSP managed his claim.
Case No: 488148 Determination Page 10 of 12
Among other things, the applicant says that the FSP and its contractors:
failed to complete the repairs in the agreed timeframe
left his property in a ‘half - demolished’ state
failed to identify the cause of the additional damage to the basement area
terminated his temporary accommodation arrangements in a humiliating and
embarrassing fashion
attempted to bully and intimidate him into accepting its cash settlement offer
required him to deal with multiple consultants who were not familiar with his claim
failed to promptly and adequately respond to his enquiries
However, having reviewed the claim history, the panel is satisfied that the FSP
generally managed the claim reasonably overall.
Many of the difficulties encountered arose as a result of the additional, unrelated
damage to the basement area discovered during the repair process. While this
complicated the resolution of the claim, it was outside the FSP’s control.
The panel is satisfied that the alternative approaches offered by the FSP to finalise
the claim were reasonable in the circumstances. The additional delays (and the
resulting inconvenience) have arisen largely as a result of the applicant’s decision to
dispute the FSP’s denial of liability for the additional damage.
However, the panel is satisfied that there are aspects of the claim which the FSP
could have handled better. In particular, the FSP’s initial error in advising the
applicant that he was entitled to temporary accommodation benefits has caused him
and his family additional stress and inconvenience.
In the circumstances, the panel considers that the applicant is entitled to an award of
compensation for non-financial loss of $500.
Case No: 488148 Determination Page 11 of 12
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS recommendation. Due to the nature
of the dispute, it has been referred directly to a panel for determination, in line with
the Operational Guidelines to the FOS Terms of Reference. The panel consists of an
Ombudsman and two representatives with consumer and insurance experience.
The panel has decided this case based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
The panel has reviewed and considered a ll of the material provided by the parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, the panel has restricted its commentary to those issues that it
considers directly relevant to the outcome only.
3.2 Key policy terms
Subject Terms
Cover for listed
events
We will cover your buildings or contents for loss o r damage as a result of the
incidents listed on the following pages …
Storm, flood, rainwater or wind
We will cover your buildings or contents for loss or damage as a result of
storm, flood, rainwat er or wind …
Water or liquid damage
We will cover your buildings or contents for loss or damage caused by water or
liquid. We will also cover the cost of finding the where the water or liquid
escaped from, including the cost of repairing any damage that occurs while
looking for the cause.
We will only cover loss or damage as a result of wat er or liquid escaping from:
a fixed pipe or an object attached to a pipe, fixed gutter, fixed tank or a drain
…
We will not cover the cost of repairing the item that caused the escape of water
or liquid escaped from. Or the cost fixing or finding leaks that have not caused
loss or damage to your buildings or contents.
Meaning of
‘incident’
Incident – a sin gle occurrence or a series of occurrences, including an
accident or series of accidents, arising out of one event.
General
exclusions
We will not cover any loss or damage, or liability as a result of, or arising from:
…
settling, shrinkage or any movement of earth
Case No: 488148 Determination Page 12 of 12
Subject Terms
erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear …
Temporary
accommodation
If your buildings or contents suffer loss or damage and you are unable to live in
your home as a result, we will cover the costs of alternative accommoda6tion
for up to 12 months.
The loss or damage must occur was a result of an incident we have agreed to
cover .
If you have buildings insurance we will:
pay an amount that is equal to the weekly rent al value of your buildings
before the incident occurred
pay the reasonable costs of alternative accommodation for your pets …
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.