The applicant's home was damaged in a 2015 storm and the FSP declined the garage slab, hallway ceiling and tennis court. AFCA ordered the FSP to indemnify the garage slab and ceiling with interest, but upheld the tennis court exclusion.

The FSP bore the onus on the earth movement exclusion and the expert evidence did not establish it for the garage slab and ceiling, while the tennis court exclusion applied under the policy terms.

Issues

Subjects and remedies

natural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 487996 Determination Page 1 of 7 Case number: 487996 18 April 2018 1 Overview 1.1 Dispute The financial services provider (FSP) partially accepted liability for storm damage to the applicant‟s home. The FSP denied liability for the garage slab and hallway ceiling as it says these were not caused by the storm. The FSP also denied liability for storm damage to the tennis court as this is specifically excluded under the policy. The applicant disputes th e FSP‟s decisions. 1.2 Issues and key findings Can the FSP deny liability for the garage slab and hallway ceiling? The FSP cannot deny liability for the garage slab and hallway ceiling because the evidence does not show they were caused by normal earth moveme nt. Should the FSP pay for the tennis court? The FSP should not pay for the tennis court because:  the policy clearly says storm damage to a tennis court is not covered  the evidence shows the FSP sent a copy of the policy to the applicant within 14 days after it was incepted by telephone 1.3 Determination This determination is partially in favour of the applicant. The FSP is required to indemnify the applicant for the garage slab and hallway ceiling. In the event any aspect is cash settled, the FSP is to pay interest on those sums. The FSP is not liable to pay for the damage to the tennis court. Case No: 487996 Determination Page 2 of 7 2 Reasons for determination 2.1 Can the FSP deny liability for the garage slab and hallway ceiling? Ceiling damage is an issue in dispute These relevant facts are not in dispute:  the applicant‟s home is about 100 years old and the garage structure is about 40 years old  the damage followed a significant storm on or around 21 April 2015  this event was classed as a catastrophe by the Insurance Council of Australia (ICA) given its magnitude  the FSP accepted and paid for a number of items associated with the claim  the FSP also agreed to pay an amount of $4,999.23 – this was based on a scope of works that included repairing the hallway ceiling The applicant says she accepted the amount of $4,999.23 solely in relation to the hallway ceiling. It was not an acceptance of all the scope of works set out in the FSP‟s submission. Particularly given the actual cost to repair the ceiling was $6,579. The FSP says the offer of $4,999.23 is fair given it was not liable to pay for the ceiling. It is plain the hallway ceiling remains in dispute. FSP has to prove the exclusion applies The applicant is required to show, on the balance of probabilities, she has suffered a loss caused by a risk insured against under the policy. This is known as a prima facie claim. Once the applicant establishes a prima facie claim, the FSP is liable for the loss unless it shows an exclusion applies. The FSP has the onus of proof in establishing the application of the exclusion. The applicant‟s policy includes “Accidental loss or damage”. This is defined as loss or damage “that occurs without intent”. It is clear the damage to the garage slab and hallway would fit within this description. Therefore, the applicant has established a prima facie claim. The FSP says the applicant‟s loss for both the garage and hallway falls within the following policy exclusion: “You are not covered under any section of this policy for damage, loss, cost or legal liability that is ca used by, arises from or involves … erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover landslide or subsidence that is specifically covered under the following insured events …” The FSP is relying upon engineer MPA on both points. The applicant has disputed the FSP‟s position and provided an opinion from engineer IZ regarding the garage slab. Case No: 487996 Determination Page 3 of 7 The engineers‟ opinions and reasoning are summarised in section 3.1. IZ’s evidence is p referred Having carefully reviewed the expert evidence regarding the garage slab, I prefer IZ for the following reasons. First, and of most significance, IZ‟s evidence is consistent with the applicant‟s evidence. MPA says all of the cracks are old. Regarding some of the cracking, this is plausible given they were weathered and had rounded edges. This is consistent with the applicant‟s acknowledgement there was pre -existing cracking. However, regarding the large cracks identified to the western side of the garage, MPA‟s evidence is not persuasive. The photographs of the cracks do not show weathering or rounded edges. MPA does not explain why they were considered old. For instance, MPA‟s second report simply says: “this crack also appeared old as shown in the photographs below, although the tree had impacted the roof above this area”. In contrast, IZ accepts they were new and fresh. Their location is proximate to the tree falling as it was on the western side of th e garage. IZ‟s opinion is consistent with the applicant‟s evidence that the cracks were not apparent prior to the storm. On balance, I accept it is likely these large cracks manifested after the storm. Second, it is difficult to accept differential building movements resulting from long term and on-going variations in the moisture content would have manifested in these new issues:  relatively contemporaneous to the storm event and the tree falling  within the area of where the tree fell The FSP’s submission s do not assist its position The FSP raised a number of submissions as to why MPA‟s evidence should not be preferred. This included the following:  IZ failed to recognize the possibility that the site being built on moderately to highly reactive clay may have caused or otherwise contributed to the loss  IZ failed to report the presence of a crack on the north-eastern edge beam similar to the crack on the north-western edge beam  it can be inferred from IZ‟s report that all of the cracks appeared as a result o f the storm – this is inconsistent with MPA‟s evidence I am not persuaded by these submissions for the following reasons. First, IZ‟s opinion was based on his observations that the cracking was new and fresh and within proximity to the tree falling. His opinion was plausible and logical on these factors and explains why he did not consider the site conditions as causing or contributing to this situation. The fact he did not explicitly state this does not undermine his conclusion. Case No: 487996 Determination Page 4 of 7 Second, I do not accept any failure to report a crack on the north-eastern beam is sufficient to undermine IZ‟s opinion. Particularly given:  the photograph supplied by MPA does not make its location apparent  MPA says the crack “appears old” but provides no reasoning as to how he came to this conclusion given he inspected it three months after the event Third, I do not accept an inference can be drawn that IZ accepts all cracking to the garage is new. IZ specifically referred to a number of cracks in section 2.3 of his report. It is these cracks he accepted were new. There was nothing else in IZ‟s report to indicate he would accept any other unidentified cracking as new. Accordingly, after careful consideration of all the evidence, I do not accept the FSP has shown the cracking damage to the garage slab towards the western end falls within the policy exclusion. MPA’s opinion about the ceiling is not persuasive I note MPA‟s opinion about the ceiling damage is unrefuted. However, I am not persuaded by this opinion for the following reasons. First, there is no dispute that MPA did not observe the ceiling space. Accordingly, the investigations conducted were limited. Second, MPA referred to wind speeds at the end of April. However, MPA did not address the possibility that the ceiling was affected by the strong winds evident on 21 April 2015. Third, MPA referred to the applicant saying there was no moisture ingress in the ceiling lining. Based on the applicant‟s submission to FOS, she was informed by the FSP‟s “make safe” team that there was no noticeable water damage. It is therefore not clear if this observation was the applicant‟s or a third party‟s. It is clear MPA‟s opinion was substantively based on this assumption given they did not inspect the ceiling space. Given the lack of clarity on who made this observation, I am not satisfied this assumption is substantiated. Fourth, the timing was proximate to a significant event. Given all this, I do not accept the FSP has shown this damage falls within the policy exclusion. FSP is liable to indemnify the applicant for the garage slab and ceiling Accordingly, after careful consideration of all the information, I accept the FSP is liable to indemnify the applicant for the garage slab and the ceiling. Further, the FSP is to pay interest on any amount paid to the applicant pursuant to section 57 of the Insurance Contracts Act 1984 (the Act). Interest is payable from 16 September 2015, being the date it denied the claim, until payment is made. Case No: 487996 Determination Page 5 of 7 2.2 Should the FSP pay for the tennis court? Tennis court is not covered under the policy The policy contains the following exclusion under the insured event of storm: “We do not cover … loss or damage to a sporting surface or court.” Whilst the applicant did elect the accidental damage optional cover, it contains the following exclusion: “We do not cover … other than as shown above, loss or damage is not covered under this option if it is excluded elsewhere in this policy (e.g. under an insured event, an additional feature, an additional cover, an optional cover or a general exclusion) .” There is no dispute the applicant‟s tennis court was damaged from the storm. I also accept a tennis court is a “sporting surface or court”. Therefore, the policy terms do not cover the applicant‟s tennis court. Applicant’s argume nt does not assist her The applicant says the FSP cannot rely on this term given it was not specifically brought to her attention when taking out the policy. I do not accept this argument. The FSP is not under an obligation to go through all of the terms and conditions of the policy when it is arranged by telephone. In particular, given the policy is 84 pages long, it would be impractical to do so. Further, it is clear the policy formed part of the insurance contract. This was expressly set out in the Certificate of Insurance which the applicant accepts she received. It would also be apparent that her coverage was subject to the terms and conditions of this document. In addition, the FSP‟s obligation to disclose the terms and conditions are generally satisfied if a copy of the policy is sent within 14 days of it being arranged by phone. These obligations are set out under sections 35 and 69 of the Insurance Contracts Act 1984 (the Act). The FSP has provided evidence to show it sent the policy to the applican t‟s email address within this timeframe. This evidence included:  a detailed statement explaining the process it follows when emailing documents  confirmation that this process was followed in the applicant‟s case with various documents in support  a copy of the email sent to the applicant – this sets out the correct email address and the body of the email saying the policy was specifically included I also note the policy contained a 21 day cooling off period. This provided the applicant with sufficient opportunity to review the terms and conditions and ensure the coverage was suitable to her needs. Therefore, given all this, I am satisfied the FSP is entitled to rely on the policy terms to deny liability for the tennis court. Case No: 487996 Determination Page 6 of 7 3 Supporting information 3.1 Expert reports Record Key points FSP’s expert (MPA ) Report 27 - 08 - 2015 15 - 04 - 2016  Neither the house nor garage was inundated during the storm  No moisture ingress noted near the collapsed ceiling lining  Western area of garage impacted and some roof sheeting dama ged  Cracks in western concrete wall that supported the building super structure  Several cracks on garages concrete floor slab and front paving appear to be old  Ceiling plaster delaminated from timber laths in the hallway area  Several cracks in walls  T he re cords show that 128mm and 307mm of rain fell on 21 and 22 April 2015 respectively .  Foundation soils in the vicinity of the site are likely to include reactive clay horizons, which expand if its moisture content increases and shrink if moisture content reduces  V olumetric heaving and shrinkage movements will lead to vertically upward heaving and downward settlement movements, at the soil surface.  P resence of abnormal soil moisture conditions (i.e. caused by the presence of trees, absence of impervious paving, poor surface water drainage conditions etc.) can exacerbate the seasonal changes in moisture content.  G arage‟s fl oor slab has a slab joint in the middle (along the ridge line) and we noted cracks on the eastern section of the concrete slab.  The obs erved pattern of cracking on the slab and paving is not consistent with a tree impact event  I t is unlikely that any tree impact load on the slab‟s western side would have been transferred to the eastern side via the concrete slab to cause cracking on the e astern section of the slab  Garage‟s floor slab damage has been caused by differential building movements resulting from long term and on - going variations in the moisture content of the reactive clay foundation soils.  T he ceiling plaster must have been in a n unstable condition prior to the recent storm due to long term differential footing movement deterioration.  Most of the cracks appeared old – this indicates that the dwelling had been subjected to long term differential footing movement  No significant win d speed data at end of April 2015 Reins pection  The cracks observed in the concrete slab of the garage were weathered and had rounded edges  D id not observe any sharp edges on these cracks.  O bserved dirt and silt deposition within these cracks.  R emoval of tr ee does not cause the foundation soils heaving just after its removal  It will take several months and even years for the re - equilibration of the foundation soil moisture condition – this is a gradual process, rather than a sudden change. Applicant’s expert  The fallen tree was located on the South West corner of the garage – it has Case No: 487996 Determination Page 7 of 7 ( IZ ) Report 23 - 11 - 2015 fallen towards the North, impacting and causing damage to the Western side of the garage  Cracking through concrete slab  The shear face of the crackin g through the garage floor slab is „clean‟ which indicates that the crack is relatively new.  There is a large differential settlement between the 2 floor slab levels.  The new and large cracks are located on the western side of the garage, which is closest to where the tree fell during the storm.  A large crack is located directly underneath where the tr ee impacted the garage, near the North - West corner.  The shear face of the cracking through the footing edge beam is „clean‟ which indicates that the crack is relatively new  Site is a moderat ely to highly reactive clay site (Class M / H).  C racking has been initiated from the storm event on 20 - 21 April 2015.  It w as necessary to remove the tree from the site, however, this can cause further ground movement and res ultant damage .  Trees located close to a building and within the zone of influence for the footing (e.g. approximat ely within a distanc e of the tree height from the walls) will ex acerbate shrinkage and expansion in reactive clay soils.  When an established tree is removed, or falls during a severe storm, it will significantly alter the ground conditions,  This can lead to cracking of the adjacent building  It is clear that the cracking to the garage floor slab and edge beam is relatively n ew and t hat this has been caused as a direct result of the large tree falling during the storm, and hence being removed.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.