Text of the determination
Determination
Case No: 487957 Determination Page 1 of 6
Case number: 487957 5 July 2018
1 Overview
1.1 Dispute
The applicants held a home insurance policy with the FSP. On 29 December 2016
they lodged a claim for damage caused to a boundary masonry wall and pool
surround at the property. The applicants believe the damage had been caused by
storms earlier in the year.
The FSP has denied the claim and maintains the applicants have not established
when the event occurred and have not established how the damage occurred.
The applicants dispute the FSP‟s decision.
1.2 Issues and key findings
Is the FSP entitled to refuse payment of the claim?
The policy is an insured events policy that provides cover for damage caused by
storm, rain or flood subject to a number of exclusions including erosion or earth
movement.
The panel is satisfied based on the available information that the loss or damage
sustained to the masonry wall and pool surround was due to erosion or earth
movement that has occurred over time. The panel is satisfied the FSP is entitled to
deny the applicants‟ claim as the applicants have not established a claim within the
terms of the policy.
Are the applicants entitled to any other amounts?
The FSP is to contribute $3,000 towards the cost of expert submissions provided by
the applicants.
1.3 Determination
This determination is in favour of the FSP.
The FSP is entitled to rely upon the terms and conditions of the policy to refuse
payment of the applicants‟ claim.
The FSP is to pay the applicants $3,000 towards the cost of their expert reports as
per paragraph 9.4 of the Terms of Reference subject to the applicants providing the
relevant invoices/receipts.
Case No: 487957 Determination Page 2 of 6
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity to address the issues that arise from the information exchanged.
FOS has considered it appropriate to expedite this dispute in accordance with the
Operational Guidelines and to our Terms of Reference due to the nature of the
dispute. FOS has also determined that due to the complexity of the issues, it is
appropriate that this matter be dealt with by a panel.
The panel has decided this dispute based on what fair in all of the circumstances,
having regard to the relevant legal principles, terms of the policy, good industry
practice including codes of practice and prior determinations where applicable.
2.1 Is the FSP entitled to deny the claim?
The applicants must show how the claim comes within the policy terms
The applicants‟ p olicy is an insured events policy that provides cover for loss or
damage arising from certain events set out in the policy documents. The applicants
had not selected the optional accidental loss or damage cover available for the
relevant insurance period.
Cover is provided for damage caused by storm, rain or flood subject to a number of
exclusions including erosion and earth movement. The relevant definitions for storm,
rain, erosion and earth movement are set out under section 3.1 of this determination.
The onus is on the applicants to establish that the damage was caused by storm, rain
or flood.
Circumstances of the loss
In August 2016, the applicants‟ neighbour demolished a boundary fence adjacent the
applicants ‟ property, which revealed the applicants‟ c oncrete pool surround and
masonry wall had suffered extensive movement and cracking. The fence had
previously obscured the damage to the masonry wall and pool surrounds.
The local council issued an emergency order on 17 August 2016 for remedial repairs
to the wall to the west of the applicants‟ swimming pool and the boundary wall to the
south and east boundary of the property.
The applicants did not lodge the claim until 29 December 2016. They believe the
damage arose as a result of a series of heavy rainfa ll events in June 2016.
The applicants say and this is supported by an engineer, HS, that they were not
aware that the storm/rain had washed away the soil as the damage was hidden by
the boundary fence.
The applicants completed the rebuild between November 2016 and May 2017 at a
cost of $86,328. In addition to the damaged areas, there were some undamaged
sections that had to be demolished to allow earth moving equipment access to the
sites. The applicants concede that some of the damage is associated with tree roots.
Case No: 487957 Determination Page 3 of 6
They are not claiming for this damage and believe 50% of the cost of repairs would
be a reasonable figure to resolve the dispute.
Expert reports suggest damage occurred over an extended period
The applicants had a plumber, SP, investigate the wall and pool damage. SP
considered the damage appeared to be caused by heavy rain and flooding, resulting
in water becoming trapped behind the footings in the wall. This attracted strong tree
roots from the neighbouring property which had grown into the mortar joints of the
wall, affecting the wall and supporting foundation.
SP considered this was causing the wall to become unstable and cracked under the
force of the increasingly large woody tree roots.
Photographs provided show numerous tree roots of a mature size. The photos
indicate the tree roots had grown through the wall, most likely over a lengthy period
of time. The panel accepts this did not happen after the rain in June 2016.
HS, an engineer employed by the applicants‟ neighbour identified that t he walls were
in extremely poor condition. He reported extensive cracking and major gaps in the
mortar joints together with shear cracks through the masonry units. He reported
vegetation from the neighbouring property had caused severe damage to parts of the
walls with bricks being lifted off their supporting structures, weakening the wall.
Rotation of the walls was also evident in some sections.
Again, photographs provided supported these comments. The damage appears to be
long term.
In the panel‟s view, it is apparent from the reports provided by SP and HS that the
damage to the wall had occurred over time and not directly as a result of a storm rain
event in June 2016.
Damage most likely caused by erosion/earth movement over time
In order to establish a valid claim under the terms of the policy, the applicants must
establish that the proximate cause, that is the effective or efficient cause of the loss
arose from an insured event.
The panel accepts based on the Bureau of Meteorology data, that there was heavy
rain in June 2016. The applicants‟ driveway provided a natural watercourse that
would have directed water flow through the garage and towards the masonry wall.
This rain may have also caused some erosion to the foundation soils beneath the
pool surround and masonry wall.
The panel does not accept however that this event was the dominant or effective
cause of the loss. In the panel‟s view, the dominant or effective cause of the loss was
most likely the vegetation/tree root growth causing a weakening of the foundation
soils as identified in the reports from SP and HS . In the panel‟s view, this most likely
occurred over time and resulted in erosion and earth movement in the foundation
soils.
Case No: 487957 Determination Page 4 of 6
Policy excludes cover for damage from erosion and earth movement
The insured event „Storm, rain and flood‟ is subject to specific exclusions, as set out
in the policy documents. In particular, there is no cover provided under this insured
event where the proximate cause of loss is either „erosion or earth movement‟.
The policy defines these terms as follows,
Earth movement
Heave, landslide, land-slippage, settling, shrinkage or subsidence.
Erosion
Worn or washed away by water, ice or wind.
In the panel‟s view, the exclusions relating to earth erosion or earth movement apply.
As indicated the panel considers this is likely to have occurred over a lengthy period
of time.
To the extent that the storm/rain in June 2016 has led to the foundation soils being
washed away, this would fall within the exclusion for erosion. To the extent that the
damage has been caused by land slippage, settling, shrinkage or subsidence, this
would be excluded under the exclusion relating to earth movement.
The panel is satisfied that the FSP is entitled to rely upon the terms and conditions of
the policy to refuse payment of the applicants‟ claim.
2.2 Are the applicants entitled to compensation for professional costs
incurred?
Applicants are entitled to compensation pursuant to paragraph 9.4 of the
Terms of Reference (TOR)
Under paragraph 9.4 of the Terms of Reference, FOS may direct an FSP to
contribute to legal or professional costs incurred by the applicants. Unless
exceptional circumstances apply, FOS would not require an FSP to contribute more
than $3,000 towards these costs.
In deciding whether the FSP will make a contribution, it is appropriate to consider
what is fair in all the circumstances. FOS takes into account the complexity of the
dispute and whether the applicants reasonably required the information.
This dispute raised complex issues surrounding the likely cause of loss and whether
the policy would respond. The FSP failed to conduct a detailed investigation of the
applicants‟ claim but instead relied upon the applicants‟ reports to decline the claim.
The reports have been of assistance to and relied on by the panel in reaching its
decision. In the circumstances, it is fair that the FSP contribute up to $3,000 to the
professional costs incurred by the applicant in providing these reports, subject to the
applicants providing relevant invoices/receipts.
Case No: 487957 Determination Page 5 of 6
3 Supporting information
3.1 Policy terms
Storm
Violent weather and high winds, sometimes accompanied by rain, hail or snow including a
cyclone or tornado.
Rain
Water fallen from the sky on to your building or site. This also includes heavy, intense burst
of rainfall, usually during thunderstorms where so much water falls in a very short time that
it can‟t get away quickly enough and collects and flows into your building, but doesn‟t
include flood.
Earth movement
Heave, landslide, land-slippage, settling, shrinkage or subsidence.
Erosion
Worn or washed away by water, ice or wind.
Storm, rain or flood
We won’t cover damage caused by:
water penetrating or entering your building if it‟s not properly maintained and/or existing
dama ge hasn‟t been repaired.
For example, water entering your building through a cracked roof tile you haven‟t replaced.
water penetrating or entering your building because of a design fault, structural default
or defective workmanship
water entering your building through an opening in the wall or roof made for the
purpose of alterations, additions, renovation or repair
For example, if an opening is made in your building as part of renovations we won‟t
continue to insure you against any storm, rain or flood damage unless the builder covers
this opening with a tarpaulin in a workmanlike way at every possible opportunity.
[…]
erosion or earth movement…
3.2 Expert reports
Record Key points
Applicant’s plumber ( SP )
Letter
21 - 03 - 2017
“In our opinion, the movement and damage appears to be
caused by heavy rain and flooding. This has resulted in
water becoming trapped behind the footings and wall.
Attracting strong tree roots from the neighbouring property
in the area. The tree roots had also grown in the mortar
joints of the wall, affecting the wall and supporting
foundations. Thus, causing the wall to become unstable
and crack under the force of increasingly large woody tree
roots.”
“Furt hermore, the tree roots increased the exposed area
within the foundations and wall and have allowed water to
pool in the area. The water has penetrated the foundations
affecting the integrity of the construction. We believe the
recent rain has exacerbated the resulting damage and
caused the foundations to require replacements.”
Case No: 487957 Determination Page 6 of 6
Applicant’s engineer
(HS)
Report
06 - 08 - 2016
The masonry walls formed a courtyard around a swimming
pool and were comprised of concrete blocks supported by
piers.
The western end of the wall was founded on strip footings,
with the lower section acting as a retaining wall and the
upper - section free - standing.
The remainder of the wall was free - standing and founded
on the suspended slab surrounding the pool, supported by
a combination of blockwork piers on pad footings and
masonry wall s on strip footings.
The walls were in extremely poor condition wit h extensive
cracking and major gaps evident, along wit h shear cracks
through mas onry units.
Rotation of the walls evident in some locations.
Recommended the walls be demolished and reconstr ucted
to a suitable standard.
HS
Letter
21 - 09 - 2017
The fence on the adjoining property was removed which
revealed extensive damage to the boundary masonry wall.
The south west corner of the concrete pool surround
settled, and the mas onry wall bet ween the deck and pool
surround settled and cracked.
“I am advised that shortly prior to the demolition of the
boundary fence, a severe storm event had occurred, with
stormwat er flowing down the driveway, overcoming the
capacity of the drainage system, which caused flooding of
the garage to the lower floor of the building, with water als o
discharging under the timber deck beside the pool.
Soil beneath the replacement wall pier holes was found to
be a deep, loose, sandy loam which would have been
prone to erosion dur ing the inundation, due to it being a
loose granular material.
“It is therefore considered that the corner of the concrete
pool surround, and adjacent block wall, which had both
settled and cracked, were most likely undermined by the
erosion of soil caused by the storm event.”
3.3 Other key documents relied upon
Written submissions from the applicants and the FSP.
Photographs provided by the applicants.
Council issued emergency.
Rainfall information provided by the applicants.