Text of the determination
Determination
Case No: 487114 Determination Page 1 of 2
Case number: 487114 18 May 2018
1 Overview
1.1 Dispute
The applicant lodged a claim under the buildings insurance policy held with the
financial services provider (FSP), for damage sustained following a storm event. At
that time, the FSP accepted the claim and repaired the property.
Sixteen months later the applicant discovered water damage to the internal ceiling of
the building. The applicant believes the damage is a re sult of the FSP’s ‘faulty
repairs’, as he says there were no water issues with the roof prior to the storm event.
The FSP assessed the damage and denied liability. It submits it is wind driven rain
that is causing the damage, and not faulty repairs.
The case manager issued a recommendation in favour of the FSP, but the applicant
did not accept that. A copy of the recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct and are adopted in this
determination. Further submissions provided after the recommendation have been
considered.
Is the FSP liable for the new damage?
The FSP is not liable for the new damage which has arisen since the storm event.
That is because the evidence does not establish, on balance, that it was the result of
poor repairs by the FSP.
1.3 Determination
This determination is in favour of the FSP. The FSP is not required to take any
further action.
I agree with the case manager’s reasons for the recommendation and the
recommended outcome.
Case No: 487114 Determination Page 2 of 2
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
recommendation. I am satisfied that the documentation I have relied on has been
provided to both parties.
Director R in this dispute represents the applicant, which is a company. For
simplicity, I will refer to the company applicant and director R as ‘the applicant’ .
I am satisfied that the case manager’s recommendation contains an accurate
summary of the dispute, the issues to be determined, any applicable paragraphs of
the Terms of Reference and any relevant law.
2.2 Is the FSP liable for the new damage?
In suggesting that the new issues with the building are the result of the FSP’s poor
repairs after the storm, the applicant has the responsibility of establishing, on
balance, that is the case.
The experts’ reports are not conclusive as to the cause of the new damage –
although both allow for the possibility that it was from wind-driven rain entering
through a pre-existing ventilation gap. I acknowledge the applicant has said this
damage had not been experienced before the storm event and the FSP’s repairs ;
and it is worth noting that the FSP has acknowledged that as part of the repairs, it did
replace the infill panel that is located internally adjacent to the ventilation duct
opening.
At the same time, though, neither expert’s report identifies any problems/faults with
the roof, or specifically with the previous repairs, to which the damage can
reasonably be attributed.
The applicant’s expert, L, did recommend in their report that further investigation be
undertaken into condensation in the roof, as well as monitoring of the discoloration to
determine the extent to which this is a function of rainfall events. The FSP has said
that it would consider any further expert reports in support of the applicant’s claim.
In the absence of further compelling evidence at this stage, however, I am not
satisfied the available information establishes, on balance, that the new damage is
the result of the FSP’s repairs. That means the FSP is not responsible for the
damage, and is not required to take any further action in relation to this claim.
Recommendation
Case No: 487114 Recommendation Page 1 of 7
Case number: 487114 14 December 2017
3 Overview
3.1 Dispute
Director R in this dispute represents the applicant, which is a company. For brevity, I
will refer to the company applicant and director R as ‘the applicant’ .
The applicant lodged a claim with the financial services provider (FSP) for damages
sustained to its property following a storm event. At that time, the FSP repaired the
property.
16 months later, the applicant discovered water damage to the internal ceiling. The
applicant says the damage is a result of FSP’s ‘faulty repairs’ as he di d not have any
water issues with the roof prior to the storm event.
The FSP assessed the damages and denied liability. In doing so, its engineer says it
is wind driven rain that is causing the damage, and not faulty repairs.
3.2 Issues and key findings
Is the FSP liable for disputed damage?
The FSP is not liable for the disputed damage, because on balance:
expert reports on files did not establish the FSP’s repairs were defective or
faulty
conversely the reports suggest ‘wind driven rain’ caused the damages.
On this basis, the FSP is not liable for the disputed damages.
3.3 Recommendation
This recommendation is in favour of the FSP.
Case No: 487114 Recommendation Page 2 of 7
4 Reasons for recommendation
4.1 Is the FSP liable for disputed damage?
FSP’s liability depends on cause of damage
This dispute is whether the water ingress issue is as a result of FSP’s original
defective repairs, and if so, what rectification is required.
As it is the applicant which is raising this dispute, it is up to the applicant to show, on
the balance of probabilities, there has been a loss as a result of ‘faulty repairs’.
If the applicant meets its onus, the onus falls to the FSP to demonstrate why it is not
liable for the claimed damages.
Expert reports are inconclusive of proximate cause of the damage
Following the applicant identifying a loose panel, the FSP engaged the builder who
carried out the initial repairs (A). Following an assessment and fixing the loose panel,
A says:
wind driven rain had caused the panel to come loose and the water staining
the water is blown threw the bird mesh into the roof space
there is no staining in the area protected by the convex roof on the western
side.
Following disagreement from the applicant, the FSP engaged engineer (K), who
assessed the damages. K says:
if the repair work undertaken was of poor workmanship, there would be
evidence of higher and random levels in the steep ceiling
water is entering via wind driven rain through the ventilation gaps at the top of
the external wall
due to steep, local wind pressure would be significant and water could easily
enter.
Th e applicant disagreed with the FSP’s engineers’ findings. Given this, the applicant
engaged his own engineer (L). In his report, L says there are three possible of water
sources:
1. wind driven rain through the bird mesh
2. condensation is forming on the underside of the sarking and travelling
downslope
3. incorrectly placed or secured roof tiles and associated flashings.
Further L says he cannot rule out the ‘wind driven rain’ however it is highly unlikely
because:
water would need to travel both upwards and horizontally to enter the building
distance from point of entry to staining is significant
Case No: 487114 Recommendation Page 3 of 7
Later in its report, L says there were no obvious signs externally or internally that
suggests loose tiles or flashings were contributing to the water ingress.
No proof initial repairs carried out in 2016 require rectification
K suggested wind driven rain caused the damage the applicant is claiming. Whilst the
applicant’s engineer L considered wind driven rain as a highly unlik ely possibility, L
did not fully rule it out. Later in his report he suggests there are no signs of loose tiles
or flashing.
The applicant speculates, given the FSP carried major repairs to the roof, more than
likely the builder made a mistake/error somewhere.
While I understand the basis of this, significantly, experts engaged by either party
does support the applicant’s speculation. The expert reports on file do not establish:
how the FSPs’ repairs were defective
what repairs/steps are required to rectify the identified defect (if any).
The applicant noted the scope of works requires builder A to s upply and install
suitable flashing to the roof penetrations . Further, the applicant considers the ‘bird
mesh’ a roof penetration which the FSP should have add ressed/sealed.
The FSP sought further clarification from the building consultant who compiled the
original scope of works (C).
In his report C says the pre-existing gap (prior to the storm event) was intended to
provide ventilation to the roof space to co ntrol condensation.
Based on the expert reports, on balance, I do not consider the applicant has met its
onus to demonstrate the FSP’s initial repairs were faulty and the cause of the
disputed damage.
Given this, the FSP is not liable for the claimed damage.
Case No: 487114 Recommendation Page 4 of 7
5 Supporting information
5.1 Key Documents
Record Key points
FSP’s builder’s report ( A )
27 - 04 - 2017
On 19/04/2017 I had a Trade attend site to refix a piece of lining
board that had been reported as coming loose. The loose lining
board was approximately 150mm deep x 1200mm long, below the
rafters on the external wall.
The trade had called me after to inform me that there were water
drops on the timber moulding below the loose panel at the time of
his visit.
Further investigation by the trade showed that at the end of the
rafters, there is bird mesh to prevent vermin entry into the roof
space.
I confirmed that there appeared to be staining on the vertical infill
panels. The staining is on most areas of the roof except the
Western side where the eaves are prot ected by the convex custom
orb roof sheeting.
There is a vent pipe above the area where the panel had come
loose but the staining to the rest of the building would eliminat e
that as the cause.
The eave protecting the water affected area is around 300 - 450mm
and is raked at around 45°. Wh ile on site, I explained to director R
that there is adequate pitch on the roof and that the most likely
cause is that in extremely windy conditions, the rain is blow n
through the bird mesh and into the roof space. Director R did
comment that this had never occurred before.
FSP’s engineer report ( K )
29 - 05 - 2017
The Kindergarten building was originally used as a church, which
now hous es the kindergarten activities of t his commercial
business.
Building additions have been made to both building sides but the
main church steep roof building shape, generally reflects the
former church us e.
The building suffered damage from April 2015 storms, where a
scope of works was prep ared for repairs, which were undertaken
by A. We understand the repairs were completed early 2016.
There is a claim from the insured that water or moisture is entering
roof space and staining the end or lower portions of the steep
ceiling, near the wall li ne, at various small end panel size, and this
entry is a result of poor workmanship.
We have discussed the repairs with the builder, to understand the
works that were undertaken and also are in receipt of a
photograph, showing sarking and battens during ro of tile
placement. The photograph shows the sarking placed down to the
gutter line.
Observing the building externally, at the top of the east and west
building sides, there is a ventilation gap of some 100mm in height,
Case No: 487114 Recommendation Page 5 of 7
which is covered by a wire mesh to pr event birds from entering the
ceiling void. The building detail appears to be part of the original
building construction.
From our observations, if the repair work undertak en was of poor
workmanship, where water was entering the ceiling void via laps or
te ars in the sarking, there would be evidence of higher and random
levels in the steep ceiling, rather than just on odd panels of the end
of ceiling run, on bot h building sides at the wall line.
Our opinion is that the moisture entering the building, is ente ring
via wind driven rain through the ventilation gaps at the top of the
external wall. As the roof pitch is very steep, local wind pressure
would be significant and wind driven rain could easily enter the
ceiling void and stain the small end ceiling panel s.
Applicant’s engineer
report (L)
18 - 08 - 2017
The building has been repurposed from its former use as a church
to its current commercial us e as a child care cent re.
The original load bearing masonry wall church building with tile roof
has been extended to both the east and west recently to hous e the
child care centre. The roof line of the original church building is
largely unchanged and internal ceiling profiles appear to reflect the
original structure. The former church is being used as a child care
sp ace whilst the rec ent extensions house child care support
services.
The tile roof over the former church building was subject to
damage associated with a significant storm event in April 2015. We
understand the extent of damage necessitated the replacement of
the entire tile roof, including battens and sarking as well as ceiling
lining replacement.
Since roof repair there is evidence of moisture ingress resulting in
staining to ceiling linings typically in the vicinity of the ceiling / wall
transition .
The face brickwork of the original church as viewed from ground
level appears in reas onable condition considering the age of the
building. The external walls, despite not being provided with
vertical articulation joints, show no signs of obvious significant
di stress despite founding on reactive clay soils. Closer inspection
of the building exterior may reveal some minor cracking related to
reactive soil movement.
The slope of the former church roof is unknown however it is
relatively steep. Roof rafters continu e over the external skin of
masonry wit h soffit lining fixed to the top of rafter. There is a gap
between the top of external skin masonry and the soffit lining in the
order or 100mm. Wire mesh covers the gap for vermin protection.
The exact eaves overhang is unknown however appears to be in
the order of 400mm. The eaves gutter fixings to rafter ends,
however, project above the soffit lining suggesting battens have
been sized appropriately to convey water to the gutter. Photograph
1 shows these observations .
As indicated earlier in this report discoloration of ceiling linings in
the vicinity of the wall / ceiling junction were noted in several
locations on both the eastern and western walls. At the time of our
Case No: 487114 Recommendation Page 6 of 7
inspection the staining was typically black in c olour and local only
to the wall / ceiling junction. There was no evidence of ceiling lining
fixings failing due to moisture however this is something that
should be continually be monitored. The extent of staining was
more significant on the eastern side .
Whilst it is not possible to confirm the exact source of wat er ingress
there are 3 potential contributing sources warranting further
investigation .
driven moisture during rainfall events is tracking through the gap
between top of masonry and underside of eaves lining. Whilst it is
not possible to rule this out, it is our opinion that this source is an
unlikely contributor for the following reasons:
The eave overhang combined with the steep roof pitch means that
water would need to travel both upwards and h oriz ontally to enter
the building.
The distance from the external skin (point at which water enters the
building) to the location of staining is significant. It is anticipated
that the local eaves pressure driving any potential moisture ingress
would dissi pate once inside the ceiling cavity.
Condensation – The child care rooms are maintained at a constant
temperature during opening hours. Whilst we have not been able
to access the roof space it is feasible that condens ation is forming
on the underside of th e sarking and travelling downslope. The soffit
detail may offer an opportunity for wat er fall off the blanket, thus
resulting in moisture in ceiling / wall linings. Refer to Figure 1 for
sketch detail
Incorrectly placed or secured roof tiles and associated flashings –
from a ground level visual inspection it was not possible to
accurately assess the placement of tiles and flashings. However,
there were no obvious signs externally or internally that suggests
loose tiles or flashings were contributing to the wat er ingress.
FSP’s building
consultant (C)
13 - 10 - 2017
As per our recent telephone conversation I have been instructed to
provide confirmation on the extent of roof flashings required and
intended as part of the CRD Scope of Works dated 10 July 2015.
The section of the Scope in question states the following:
Supply and install suitable flashings to the roof penetrations.
R eplace the damaged lead flashings and dress over the new roof
as required.
The flashings in question relate to any penetration through the roof
tiles (i.e. such as sewer vent pipe penetrations) or any vertical
surface which abuts the roof tiles (i.e. such as parapet walls).
I have been asked to confirm whet her the gap bet ween the
masonry wall and the underside of the roofing, as concealed by the
eave overhang, was intended to be sealed/ flashed by the Scope
of Work.
The pre - existing gap was intended to provide ventilation to the roof
space to control condensation. I can confirm that the sealing of this
gap did not form part of the CRD Scop e of Works and was not the
intention of the Scope.
The gap existed prior to the storm event and no work was intended
Case No: 487114 Recommendation Page 7 of 7
to seal this gap in the masonry wall.