Home / Financial Firm (Unknown - Insurer) / Determination 486926

Determination 486926

Home water inundation claim declined under flood exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2018-08-06
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant claimed for water inundation of her home after a 2017 storm event. AFCA found the water was flood water, which is excluded because she held no flood cover, and that the FSP's $500 ex gratia payment and $1,791 accommodation refund were sufficient.

Rainwater that mixes with flood water is flood under the courts' approach, and the policy excludes flood where the insured holds no flood cover.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 486926 Determination Page 1 of 9 Case number: 486926 6 August 2018 1 Overview 1.1 Dispute The applicant held a home building and contents insurance policy with the financial services provider (FSP). A claim was lodged under the policy, after the property was inundated by water between 30 and 31 March 2017, following heavy rain from ex-tropical cyclone Debbie. The FSP argues the inundation was caused by flood, which is excluded from cover under the policy. The applicant says the damage to her property was caused by storm water. She seeks settlement of her claim in full, as well as compensation for delays in claims handling and losses she says she incurred following the FSP’s loss assessment. 1.2 Issues and key findings Is the damage covered under the terms of the policy? Based on the available material, the FSP is entitled to decline the claim. The claimed damage is excluded from cover because:  the policy specifically excludes loss or damage caused by flood  on balance, the water that caused the loss was flood water. Is the applicant entitled to compensation? The FSP has made an ex gratia payment to the applicant of $500 and has agreed to refund $1,791 for emergency accommodation. In these circumstances, I am satisfied there is no basis for further compensation. 1.3 Determination This determination is in favour of the FSP.  The FSP is entitled to decline the applicant’s claim.  The FSP is not required to pay compensation to the applicant. Case No: 486926 Determination Page 2 of 9 2 Reasons for determination 2.1 Is the damage covered under the terms of the policy? Applicant is not covered for flood The applicant’s policy covers loss or damage caused by insured events, including ‘storm and rainwater’ and escape of liquid. Flood is defined in the policy as: the covering of normally dry land by water that has escaped or been released from the normal confines of: any lake, river, creek or other natural watercourse, whether or not altered or modified; or from any reservoir, canal, or dam. However, loss or damage caused by flood is not covered where an insured does not have flood cover. The policy offers ‘accidental damage’ and ‘flood’ as optional covers. The insurance certificate confirms neither of these two options was taken by the applicant for the relevant period. The applicant has not disputed her level of cover. Limited evidence of stormwater inundation The exchanged material confirms there was a significant weather event across Australia during the latter part of March 2017. A substantial amount of rain fell in the area local to the applicant’s premises during that time. The available submissions from the parties do not identify the time of initial inundation. However, the applicant noticed water had already risen to a certain level within the house by 2.40am on 31 March 2017. The FSP provided a report from hydrologist BW dated 24 May 2017, following a site inspection on 10 May 2017. It also provided a report from its hydrologist WR dated 29 June 2017, following a site inspection on 5 June 2017. At the applicant’s request, BW provided a supplementary report on 31 January 2018 and an email on 15 February 2018. WR provided a supplementary report on 8 February 2018. The property is located at the south eastern end of B Court. It is located on a peninsula, which is surrounded to the northwest, west, south and east by B River. The dwelling at the insured site has a floor level elevation of about 7.5mAHD. The peak rainfall of 68mm/hr occurred in the hour to 1am on 31 March 2017. This was a 10 year average recurrence interval (ARI) event. While such intense rainfall could cause ponding of storm water, I am satisfied the drainage characteristics of the local area and the elevation of the property make this unlikely to have occurred. B Court has three stormwater inlets. BW says they appear to be adequate for the drainage of storm water. While there are indications of previous events of blockage of these inlets, there is no evidence of these events having led to inundation of any properties at B Court in the past. Case No: 486926 Determination Page 3 of 9 Further, even after gathering information from neighbours, BW is not certain whether the inlets were blocked by debris brought by the cyclone during the inundation event. WR notes, despite the intense rainfall, storm water accumulated in B Court could only have ponded up to a height of 7.25mAHD. After this point, water would have flowed east on C Court and toward the south western end of B Court (overflow points). The floor level at the home was inundated up to about 0.1m above floor level (about 7.6mAHD). WR says rainfall on the small local stormwater catchment alone could not have generated sufficient runoff to pond to a depth of an additional 0.35m while at the same time flowing out via the overflow points. Based on the available evidence, I am satisfied, on balance, stormwater runoff could not have ponded to a sufficient height to inundate the property. Loss was caused by flood Having reviewed the available material, including the information from the Bureau of Meteorology, WR concluded the inundation at the insured premises was caused by floodwater from B River coming from the west. Significantly, WR was of the view local stormwater runoff would not have inundated the insured property above floor level, given the rainfall in the local area would not have generated sufficient runoff to inundate the property. Further, BW says it is possible storm water may not have been able to drain effectively due to high water levels in B River. As explained in section 3.1 below, once rain water mixes with flood water, it is all considered flood water. In its first report, BW relied on water level data from F Bridge gauge station to conclude stormwater runoff was the cause of inundation. However, WR identified that a recent flood study prepared by BW in September 2017 states the readings at F Bridge gauge were likely distorted. WR considers the water levels of B River must have been several metres higher. BW agrees WR’s additional information supports the assessment of ‘flood inundation’. I also note the water observed by the applicant was brown and contained silt, which is characteristic of flood waters. Having reviewed the exchanged material, I am satisfied the inundation of the applicant’s property was caused by flood water from B River. On thi s basis, the FSP is entitled to rely upon its policy exclusions for flood to deny the applicant’s claim. 2.1 Is the applicant entitled to compensation? FOS may award compensation in limited circumstances FOS is able to award compensation for non-financial loss (capped at $3,000 per claim of compensation) where there has been:  an unusual degree or extent of physical inconvenience  time taken to resolve the situation Case No: 486926 Determination Page 4 of 9  interference with an applicant’s expectation of enjoyment or peace of mind. However, FOS takes a conservative approach to compensation for non-financial loss. FOS expects an applicant to be moderately robust and bear the normal degree of inconvenience experienced when a problem occurs and take reasonable steps to reduce inconvenience. Applicant seeks compensation for service and losses allegedly incurred The applicant says she was informed by the loss assessor that all the furniture would have to be discarded due to water damage and that the FSP would be replacing all of it. Some skirting boards were al so removed by the FSP’s representative. The applicant disregarded the advice and undertook salvage of the furniture. The FSP’s assessor arranged for approximately 20 industrial fans to assist in drying the house and the applicant was forced to obtain alternative accommodation. The applicant says she was told the accommodation would be paid for by the FSP. The applicant has also raised the length of time the FSP took to deal with the claim. The FSP has already made an ex gratia payment to the applicant of $500 and has agreed to refund $1,791 for emergency accommodation. Applicant has not established entitlement to compensation Having regard to the available information, I consider the FSP handled the claim in a reasonable manner and within reasonable timeframes. Therefore, the applicant is not entitled to any further compensation. Case No: 486926 Determination Page 5 of 9 3 Supporting information 3.1 FOS approach There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. This dispute has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions (which are not binding). The applicant is represented. For the sake of clarity and brevity, both the applicant and her representatives h ave been referred to as ‘the applicant’ in this determination. Rainwater that mixes with flood water is flood The courts have established that once rain water mixes with flood water, it is all considered flood water. Where rainwater mixes with flood water and causes damage, a flood exclusion will usually apply to defeat the claim. Accordingly, when deciding disputes, consideration has been given to whether any rainwater runoff damage occurred before the flood water arrived at the insured property. 3.2 Key points on relevant expert material Record Key points Hydrologist BW Report 24 May 2017  The property consists of a home with a double garage, a yard with pool and a small garden shed. It is at the end of B Court, which is a cul - de - sac.  The site sits on a penins ula. B River is about 100m northwest and southeast at its closest points. In this section, B River is known to be tidal.  The insured first became aware of the inundation at around 2. 40am on 31 March 2017. At that time, they noticed about 10cm of water on the floor in their bedroom and through parts of the home.  The insured say the water peak ed at around 4.00am that morning. They say water appeared to come in from the front.  The insured recall the water was moving slowly, it was brown and contained silt. Si lt also built up on the kerb in front of their property.  The insured say the inundation was due to overland flow down the street resulting from blocked stormwater inlets along B Court.  The insured say the fire brigade washed down the street later that day and the inundation waters appeared to recede relatively quickly.  There are two stormwat er drainage inlets located along B Court, about 50 - 70m north of the site’s boundary.  The site and immediate surrounds are relatively flat. A tree is located above one of the inlets and may contribute leaf and branch matter to it.  There were no obvious signs of water inundation in the river’s line or on structures adjac ent the river. The passage of time has made it difficult to Case No: 486926 Determination Page 6 of 9 ascertain inundation levels along B River and surrounds.  C Repeater rainfall gauge is the closest one (3.7km north of the site). Rainfall recorded at C Repeater station had a peak annual exceedance probability (AEP) of 2% for rainfall durations bet ween 3 and 6 hours.  AEP reduced to 2% - 5% for duration s of 2, 12 and 24 hours. AEP for durations less than 3 hours or longer than 24 hours were below 5%.  The closest water level gauge to the site is F Bridge (850m east from the site). This tidal gauge shows a first peak of the high tide of 2. 4mAHD at around 7 .00pm on 30 March 2017. A second peak level of 4.3mAHD occurred at 6.00am on 31 March 2017.  The site is elevat ed 7 - 7.5mAHD. The property is at a similar level to adjoining properties. B Court is at a lower height than the lots, allowing it to convey stormw at er flows to outlets. Falls along B Court are to the north, away from the property, towards the stormwater inlet.  B Court’s southern end is of slightly lower elevation than the northern end.  The insured’s recollections of the timing of inundation is consi stent with the timing of intense rainfall near the site and peak water levels in B River.  A blockage of street stormwater inlets (due to surface debris or the elevated river levels) may have res ulted in storm water pooling in the depressed roadway of B Cou rt. Storm water would drain through low points at the southern end of B Court.  It is possible storm water could have overflowed through the site and the neighbours’ at the southern end of B Court.  The primary mechanism of inundation is the overflowing of p onding storm water from B Court through the site. The water levels in the nearby tidal B River support this.  The insured’s observations of stormwater inlets along B Court being periodically blocked with leaf litter and the shallow and slow moving nature of the inundation support this as well.  The rainfalls over 30 and 31 March 2017 were likely to have resulted in less than a 5% AEP flood. The North Byron Flood Study indicates a greater than 5% AEP would be required to flood the site.  The high banks of B Riv er in the peninsula are 6 - 7mAHD. Flood wat ers are not considered to have exceeded local bank levels.  The primary mechanism of inundation at the site was storm water ponding in B Court, overflowing and then inundating the site.  It is possible the intense ra infall was not able to drain effectively due to high water levels in B River. Hydrologist WR Report 29 June 2017  The property is a single storey brick residential house located at the south eastern side of B Court. The floor level of the house is about 0.13m above the adjac ent ground level.  The house was inundated to a depth of about 0.1m above floor level.  The ground level at the site is 7.1 - 7.5mAHD. Road levels along B Court range between about 6.7mAHD and 7.1mAHD.  Storm water from B Court in front of the property drains nort h toward the intersection with C Court and is collected in a stormwater pipe system via three stormwater inlets. If this system were not operational, storm water would accumulate in B Court.  Based on available Lidar data, once water levels reach an elevation of about 7.25mAHD, storm water would start to flow east on C Court or west Case No: 486926 Determination Page 7 of 9 to B River via the property at the south western end of B Court. This would limit the potential depth of stormwater inundation in B Court.  A study by BW i n April 2016 shows B Court is not affected by B River flooding for small flood events. However, for larger events, floodwater breaks out of the river channel to the west of the showgrounds and flows east through residential areas, including B Court.  Debris left on the south western end of B Court shows that during the event, B River floodwat er flowed int o B Court from the west.  The insured say fallen leaves from a large gum tree at the end of the street blocked the three stormwat er inlet pipes. They say wat er knocked down the side gate and washed through to the back. They say none of the houses behind theirs was inundated.  The insured say the fire brigade came while it was still dark and cleaned out the inlets to the drains and then water quickly drained awa y. B Court was full of debris which flowed down from the T intersection.  The insured do not believe water came in from B River via C Court. They say storm water flowed west along C Court due to the stormwater drainage being inadequate. Storm water from sur rounding houses also collected in B Court.  F Farm rainfall station is the closest to the property (about 1.1km northeast) and shows rainfall totals to 9.00am of 70mm on 30 March 2017, 362mm on 31 March 2017 and 0mm on 1 April 2017.  Sub - daily rainfall was r ecorded at C [Repeater] rainfall station. It recorded a peak one hour intensity of 68mm/hr in the hour to 1.00am on 31 March.  Between 29 March and 1 April 2017, rainfall intensity for durations of one hour and 48 hours had a 7% AEP (a 14 - 15 year ARI). Rain fall intensities had an AEP between 2% and 4% (bet ween 20 and 50 years ARI).  The closest water level gauge is at B River [F Bridge] station, about 0.8km east - northeast of the property. Water levels recorded peaked at 4.28mGH at 6.00am on 31 March 2017.  Based on the flat topography of C Court and the relatively small inlet capacity of the stormwater pipe system, it is possible drainage would be poor during a signific ant rainfall event.  Given the floor level of the property is elevated well above ground le vel, significant inundation of B Court would be required before the house was inundated above floor level.  The floor level of the house is about 7.5mAHD. It is unlikely local stormwat er runoff alone could have caused sufficient dept h of inundation to affec t the house above floor level, even if all three stormwater inlets in B Court were completely ineffective.  Inundation of the property above floor level was caused by floodwater overflowing from B River via the property at the south western end of B Court. Hydrologist BW Report 31 January 2018  There are three stormwater inlets on B Court which drain via one drain to an outlet to the west of houses on B Court in a small gully line, which connects to B River.  A further separate stormwater system of inlets and pipes exists along C Court. This system drains to a similar downstream location.  There were no apparent signs of inlet blocking at the time of inspection.  Two inlets are close to a large tree. It is conceivable leaf litter and small Case No: 486926 Determination Page 8 of 9 branches/twigs from th is tree could collect in and around the inlets.  The inlet is likely to be large enough to allow leaf litter alone to be washed away. But, if combined with woody debris, this may provide a plat form for leaf litter to accumulate and limit stormwater drainage .  Roots could have penet rated the pipe net work over time, further reducing its capacity and/or providing means for pipe blocking.  The outlets of the pipes were found to not obviously be blocked, although there is some limited vegetative growt h above the ou tlet structures.  It appears pipe inlets and outlets are functional and pipe grades adequat e.  Council doubts any stormwater assets locally have been cleaned recently.  Council says they have previously received calls about the drainage system near B Court being inadequate. Council says water can flow down the southern side of C Court into B Court, as there is no drainage on the southern side of C Court to collect this runoff.  The resident at 2 B Court did not believe stormwater inlets in B Court would stop storm water from draining away due to blockage.  The resident at 3 B Court believes storm water could block with leaves, particularly hedge trimmings. He feels the inundation was initially storm water, followed by riverine inundation.  The resident at 6 B Co urt says stormwater inlets could block with leaves. She has previously seen storm water running down C Court into B Court.  There is some history of stormwat er drainage issues in B Court, pot entially related to flows entering it from C Court.  Stormwater inl ets and outlets at B Court appeared to be in suitable working order at the time of inspection but could block with woody vegetation.  The frequency of blockage of the inlets is unknown. Hydrologist WR Report 8 February 2018  The property is located within a tight bend of B River. The river channel is about 110m to the northwest and 140m to the sout heast.  The results of BW’s April 2016 study show during large flood events, floodwater would overflow from B River to the nort hwest of the property and flow genera lly east across B Court.  Debris marks on the western side of fences indicate that during the event, water flowed to a depth of at least 0.1m in an easterly direction.  Based on the surrounding ground slopes, stormwater runoff in this area would drain predom inantly west towards the nearby B River.  Therefore, B River floodwater must have recently flowed out of B River channel to the northwest of the property then east towards B Court.  Following the event, the Council collated a flood mark dat aset. A flood debris mark was identified along B River, just downstream of B Court at an elevation of 7.582mAHD.  The peak B River flood level just upstream near the property would have been about 7.6mAHD, which is above the river bank level to the west of B Court (typic ally 7.25 - 7.5mAHD based on Lidar survey of ground levels).  These levels confirm B River flowed over its banks into B Court from the northwest. They also confirm the peak flood level inferred from nearby debris marks and WR’s first report: 0.1m above the ho use floor level.  Water levels at B River [F Bridge] gauge peaked at 4.28mAHD at 6.00am on 31 March 2017.  A flood study by BW says, ‘water levels may not be the true nature of the flood’. [F Bridge] gauge is behind a pier. The vena cont racta and Case No: 486926 Determination Page 9 of 9 turbulence effects in the wake of the bridge may distort the water level records at this location.  Therefore, it is likely the peak water level was higher than 4.28mAHD.  F Bridge is located about 2.4km downstream of the insured property. Flood levels would have peake d several metres higher and slightly earlier at the subject property.  The inundation of the property occurred in the early hours of the morning. The exact timing of initial above floor inundation is unknown. However, it occurred before 2.40am.  B Court is e ffectively a self cont ained stormwater basin. The front portions of all B Court properties drain toward the road, then north toward C Court, which is slightly higher than B Court.  Storm water is intercept ed by three stormwater pipe inlets in B Court. The l ayout of these pipe system is unknown, but storm water likely discharges to the nearby B River.  It is unlikely the B Court stormwater drainage system was blocked by local debris. It is more likely the large quantity of debris was conveyed by floodwater ove rflowing from B River.  It is likely the capacity of the pipe stormwater drainage system was significantly reduced by the high water levels of B River.  It is possible B River flood water flowed back through the pipe drainage system and into B Court.  Based o n available Lidar data, if the stormwater pipe system was not operational, storm water would accumulat e in B Court until it ponds up to the level of the overflow point at C Court and flow east.  A second overflow point to the northwest of the property would allow excess storm water to flow west to B River.  These overflow levels are 0. 25m lower than floor levels of the house.  At the intensities recorded at the time of initial inundation (at least 1.5 hours after the peak rainfall intensity), rainfall on the s mall local stormwater catchment alone could not have generated sufficient runoff to pond to a depth of 0.35m while overflowing via the overflow points.  The inundation of the house above floor level was therefore caused by B River flood water, which overflo wed into B Court some time before 2.40am. Hydrologist BW Email 15 February 2018  BW struggled finding debris marks in early May. WR says it found flood debris marks three months after the event. It is not clear this is a reliable indicator of flooding and flood depth, given the duration past.  BW’s later investigation identified issues with the suitability of information provided by F Bridge gauge. WR assert flood levels were likely higher. If this is correct, the site could have been subject to flooding fro m B River.  WR was unable to confirm the western outlet has not been modified and the potential for water to be flowing down C Court into B Court.  WR’s additional information supports the assessment of flood inundation.  One of BW’s main arguments for the or iginal conclusion was the water levels at F Bridge, which have been assessed to have been potentially inaccurat e through a study BW performed later.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.