Determination 486895

Denial of storm water damage claim to home building

FirmFinancial Firm (Unknown - Insurer)
Decided2018-04-05
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant claimed for water damage to his home after a storm in April 2017. The FSP denied the claim as damage occurring over time from a known roof defect and maintenance failure. AFCA agreed with the recommendation in the FSP's favour and rejected the applicant's further submissions, including on premium levels.

The applicant must establish a storm as the proximate cause, and ongoing water entry through a defect the insured was notified of falls within the storm exclusions for defects, maintenance and openings not created by the storm.

Issues

Subjects and remedies

no remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 486895 Determination Page 1 of 4 Case number: 486895 4 April 2018 1 Overview 1.1 Dispute The applicant holds a home and contents policy with the financial services provider (FSP). He lodged a claim with the FSP on 28 April 2017 after a storm on 25 April 2017 had resulted in rainwater entering his home, causing damage to the interior. The FSP denied the claim on the ground the water damage had been caused by a single storm event, but had occurred over a period of time due to defects, lack of maintenance and gradual deterioration. The FSP referred to a previous claim in 2011 where its contractor had noted a defect with the pitch of the roof and the transition flashing not being long enough. The case manager provided the parties with a recommendation on the issues in dispute. The recommendation was in favour of the FSP. A copy of the recommendation is attached to this determination. 1.2 Issues and key findings Were the findings of the recommendation correct? The findings contained in the recommendation were correct and are adopted in this determination. Further submissions provided after the recommendation have been considered. However, these submissions have not warranted a change in the outcome. Was the FSP entitled to deny the claim? The FSP was entitled to deny the claim because the damage to the house did not result from a single storm event. Instead, the damage resulted over a period of time and was due to a defect in relation to the roof pitch angle and transition flashings. 1.3 Determination This determination is in favour of the FSP. I agree with the case manager‟s reasons for the recommendation and the recommended outcome. The FSP is not required to undertake any further action in relation to the claim. Case No: 486895 Determination Page 2 of 4 2 Reasons for determination 2.1 Were the findings in the recommendation correct? I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied the documentation I have relied on has been provided to both parties. I am satisfied the case manager‟s recommendation contains an accurate summary of the dispute, the issues to be determined, any applicable paragraphs of the Terms of Reference and any relevant law. 2.2 Was the FSP entitled to deny the claim? Applicant said damage resulted from a storm The applicant bears the onus of establishing a valid claim (also called a prima facie claim) for which the policy responds. The applicant‟s policy covers loss or damage due to any of the listed insured events. In this instance, the applicant claims a storm he said occurred on 25 April 2017 that resulted in damage to bedrooms 3 and 4. The FSP assessed the damage The FSP arranged a plumbing contractor (CM) to assess the damage. CM attended the property on 1 May 2017 and indicated the applicant first noticed water staining on the ceiling 12 months previously, however it had steadily become worse. CM said there were no storm related openings observed. CM said the pitch was less than required. CM also said the transition flashing where the metal deck roof sheets meet the original tiled roof was too short. CM concluded. “We believe water ingress has occurred due to the incorrect pitch of the roof not adequately dispersing water off the roof top and wind blowing water up under the change of pitch point due to the small overlap of the transition flashing. We recommend an over-sized/extended flashing be installed at the change of pitch point between the two roof faces. … We do not believe the reported damage is due to a single storm event.” FSP referred to previous correspondence with applicant The applicant had previously claimed in February 2011 for storm related damage. The FSP said it had carried out repairs, however the builder (MP) raised issues about the applicant‟s roof. The FSP wrote to the applicant (18 April 2011) advising he needed to rectify the building defect to ensure there was no further damage as a result of that issue. The FSP said: “Until you have had this work carried out no further claims from this source will be considered.” Case No: 486895 Determination Page 3 of 4 The FSP attached a copy of MP‟ s report (dated 12 April 2011), which stated MP had completed repairs on 11 April 2011, however the applicant later advised MP water had re-entered the same areas as before and had damaged the newly repaired areas. MP revisited the property and inspected the damage. MP said there was no sign of storm damage to the roof, such as broken tiles or lifted flashings. MP said the water was entering at the back during heavy rainfalls, where the iron roof tucks under the roofing tiles. MP said that was a maintenance issue and a flashing issue. The applicant should arrange a qualified roofing company to carry out a full inspection. FSP entitled to rely on policy exclusions The information exchanged indicates the effective cause of the damage to the house was not due to a single insured event, such as a storm on 25 April 2017. Instead, the damage most likely arose over a period of time due to defects, faulty workmanship, lack of maintenance and gradual deterioration. The information shows the pitch of the roof was insufficient to remove the rainwater off the roof, away from the back of the iron roof where it joined the original tiled roof. The trim flashing was insufficient in keeping the rainwater out. The FSP notified the applicant of this defec t in 2011 after further rainwater re-entered the house upon MP having completed repair work following the applicant‟s claim. Applicant’s additional submissions do not warrant change in outcome The applicant rejected the recommendation, which was in the FSP ‟s favour and provided additional submissions. The applicant did not believe the FSP had provided sufficient evidence in relation to the 2011 claim. He indicated there were no photographs that support ed the FSP‟s position. The applicant also said he could not see where the damage was located. In essence, the applicant said the FSP had provided no evidence in support of its rejection of the claim. However, I am satisfied the FSP has established the damage had occurred over time, instead of through a single i nsured event. Photographs showed the area where the rainwater had managed to intrude into the interior of the applicant‟s home. MP‟s report in April 2011 referred to the issue with the roof and the flashing. MP suggested this was a maintenance issue. CM provided a more in-depth explanation on why the roof pitch issue and flashings defect resulted in rainwater entering the house. The applicant also raised issues about the level of premium the FSP applied in relation to his policy. He contended the premium would have doubled had he claimed in 2011. It is unclear whether the applicant is referring to the possibility of a second claim in 2011, when he discovered rainwater had re-entered his home (the applicant had made one claim because the FSP sent MP to carry out repairs). Nevertheless, premiums are not only dependent upon an insured‟s claims history. Various other factors also contribute to the level of premium that will apply. Case No: 486895 Determination Page 4 of 4 I am not satisfied the applicant has established a claim within the terms of the policy for storm related damage. I am satisfied the FSP has established the application of the exclusion clauses upon which it relied in denying the claim. The applicant‟s additional submissions do not warrant a change in the outcome. Recommendation Case No: 486895 Recommendation Page 1 of 4 Case number: 486895 18 December 2017 3 Overview 3.1 Dispute The applicant claimed for water damage to his home building after a storm in April 2017. The financial services provider (FSP) declined the claim on the grounds the policy‟s storm cover does not include damage:  occurring over time, or from water entry through openings a storm did not create  from maintenance the applicant knew was required, but did not complete. The applicant asserts the storm caused the damage and denies the FSP notified him of maintenance needs. He seeks it indemnify the roof and resulting (ceilings, walls and mould) damage. 3.2 Issues and key findings Is the FSP entitled to decline the claim? The FSP is entitled to decline the claim because all reports:  conclude water entry was ongoing and not from a single storm  say water entered through a roof area that needed mainte nance. Furthermore, I accept the FSP notified the applicant in 2011 that maintenance relevant area or further claims would not be considered. For these reasons, the applicant‟s claim does not satisfy the policy‟s requirements for an insured (storm) event. The FSP is not required to accept the claim. 3.3 Recommendation This recommendation is in favour of the FSP. No action is required by the FSP. Case No: 486895 Recommendation Page 2 of 4 4 Reasons for recommendation 4.1 Is the FSP entitled to decline the claim? Onus on applicant to establish valid claim The applicant claims for building damage caused by a storm in April 2017. It is an accepted principle of insurance law the applicant bears the onus of establishing he suffered a loss covered by the policy. This is called a valid, or prima facie, claim. The applicants‟ policy covers damage caused by specific insured events, including storm. These are listed in the policy‟s product disclosure statement (PDS). Each insured event is subject to the various conditions and exclusions in the PDS. Parties disagree April 2017 storm caused the damage The applicant seeks the FSP accept the claim on the basis that a storm caused visible damage extending across the roof. In support of the claim, he says:  only small leaks were present before this  during normal rain and wi nds there was no water/roof damage  as the FSP competed exterior make-safe repairs, they should include interiors. The FSP disagrees the April 2017 storm caused the claimed damage. It instead refers to assessor and plumber reports which say:  the applicant confirmed the roof leaked for years before the storm  water has entered over time from a point in the roof where the „metal deck roof meets the original tiled roof‟. The FSP also relies on a 2011 letter notifying the applicant it would no longer consider claims from the roof until a defect was rectified. This was located: at the back where a flat roof extension has been added [where] the iron roof tucks under the roofing tiles. Proximate cause of damage must be determined Conditions in the PDS limit the causes of damage the policy will cover under a storm event (Section 3). Given this, the proximate cause must be identified to determine if the applicant established a valid claim. What is the proximate cause of the loss is a question of fact depending upon the circumstances of each case. It is well established at law that a proximate cause of damage is not necessarily the first or the last or the sole cause of the loss. It is the effective or dominant or operative cause of the loss. If there are several causes operating contemporaneously, then each must be examined for the qualities of predominance and efficiency as the active, efficient cause that sets a relevant train of events in motion. Courts have said that if one cause would have resulted the harm in any case and the other would not have done so in the absence of the first, then the first is the proximate cause. Case No: 486895 Recommendation Page 3 of 4 On balance, proximate cause of damage was water ingress over time I have closely reviewed all material provided, including plumbing reports, assessor reports, and parties‟ submissions. I consider the proximate cause of damage was ongoing water entry, rather than a single storm. This is because all reports:  conclude ongoing water entry was the proximate cause of damage  confirmed ongoing water entry occurred during normal, heavy and storm rains. While I have considered the applicant‟s submissions, ultimately I must give more weight to expert reports. In any case, the reports show the applicant advised assessors that water entry was occurring for between one and five years prior to the storm. FSP notified applicant maintenance was needed The applicant asserts FSP has lied to him and that its reasoning regarding 2011 maintenance notifications is illogical. Relevantly, the applicant disputes that:  he received the 2011 defect notification  it requests any maintenance  for the FSP to be aware of the defect as outlined is implausible  the FSP should be able to rely on the letter without supporting photographs. Based on the parties‟ material, I disagree wi th these interpretations. I consider the letter requests the applicant rectify water entry occurring between the metal and tiled roofs. The letter was addressed to the insured property. Additionally, the FSP‟s claim record shows the applicant calling to qu ery the letter‟s contents. In my view the sequence of events is plausible. This is because the material provided shows:  the applicant‟s 2011 storm damage claim was accepted and repaired  the FSP investigated water entry after storm-related repairs were completed  PM gave his opinion on the cause of further water entry (12 April 2011)  the FSP issued the defect letter (18 April 2011). Applicant’s claim does not meet policy conditions for storm For these reasons, the applicant has not established a valid c laim for a storm event. This is because:  all reports conclude the water entered between the iron and tiled roof  all reports‟ view this cause as defect requiring maintenance  I accept the FSP notified the applicant of this need for maintenance. Furthermore, the applicant himself agrees this entry point was not created by the storm. As outlined in Section 3, these circumstances do not satisfy the conditions for „storm‟ under the policy‟s insured events. Accordingly, the FSP is entitled to decline the claim. Case No: 486895 Recommendation Page 4 of 4 5 Supporting information 5.1 Policy 6. Storm and rainwater: We will not cover - a defect that [the applicant] knew about or should reasonably have known about and did not fix - an opening that was not created by the storm. Storm is not persistent rain by itself. 5.2 Reports Record Comments FSP’s expert Property manager (MP) Inspection report letter 12 - 04 - 2011  we had completed repair works on 08 - 04 - 2011 … it is our opinion that there is no [further] storm damage to the roof but at the back where a flat roof extension has been added [where] the iron roof tucks under the roofing tiles  it is our opinion that wat er is getting in under this area during normal heavy rain notwithstanding the major storm it appears this is happening on most heavy rains and is a maintenance issue and flashing problem  we would suggest the [applicant] has a full inspection carried out by a qualified roofing company as this seems to be ongoing FSP’s expert Building assessor (BC) Assessment report 16 - 05 - 2017  [there is] water damage to bed[room] 3, however, the [applicant] said has been occurring for around 5 years … the [applicant] was aware of the water stains as he first noticed them approx[imately] 5 years previous[ly] to the claim being lodged  25th April large storm hit and the water stain/damage has got worse as storm was happening FSP’s expert Leak det ection and plumbing services (CM) 05 - 2017  water staining was first noticed 12 months ago and this has become steadily wors e  cement tile roof area and a metal deck roof over the rear extended area of the house … inspection of the reported damage revealed the water stains ring from the rear bedroom to the kitchen area along the line where the extended area of house starts  we believe water ingress has occurred due to the incorrect pitch of the roof not adequately dispersing water off the roof top and wind blowing water up under the chang e of pitch point due to the small overlap of the transition flashing … we do not believe the reported damage is due to a single storm event

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.