Home / Financial Firm (Unknown - Insurer) / Determination 486522

Determination 486522

Storm damage claim to house and shed declined on excluded causes (defects, faulty workmanship, deterioration, subsidence)

FirmFinancial Firm (Unknown - Insurer)
Decided2018-01-18
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A homeowner claimed storm damage to a house and shed, which the insurer declined as caused by excluded defects, faulty workmanship, deterioration and subsidence. AFCA upheld the denial of the house and shed sheeting but ordered the insurer to reassess other storm-related items if the applicant pursues them.

The insurer must prove an exclusion applies, and the proximate cause is the dominant or effective cause, here inadequate footings and rain entering through an opening not created by the storm.

Issues

Subjects and remedies

home or building damagenatural disasterreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 486522 Determination Page 1 of 12 Case number: 486522 18 January 2018 1 Overview 1.1 Dispute The applicant lodged a claim on 14 March 2017 with the financial services provider (FSP) under his home building insurance policy after a storm the day before. The FSP assessed the damage and declined the claim as it says the storm did not cause the damage. Rather, it say defects and faulty workmanship caused the damage, which the policy specifically excludes. The applicant disagrees and seeks the FSP to accept the claim and repair the damage. The case analyst provided the parties with a recommendation on the issues in dispute. The recommendation was in favour of the FSP. The FSP accepted the recommendation but it was not accepted by the applicant. In the circumstances, the dispute has been referred to me for determination. 1.2 Issues and key findings Can the FSP deny the applicant’s claim ? The available information establishes the FSP is entitled to deny the claimed damage to the house and the sheeting damage to the shed because the proximate cause of the loss was a number of excluded causes. The available information establishes the damage to the house was caused by rain which entered the house through an opening not created by the storm. Damage was also caused by defects and faulty workmanship and lack of maintenance and deterioration in the footings. As these causes of damage are excluded from cover, the FSP is entitled to deny the claim to the house and the sheeting damage to the shed. Was there further damage caused by the storm which the FSP should assess and accept? The available information does not establish whether the policy responds to the other issues raised by the applicant. The FSP is willing to arrange an inspection of some of the other issues. This is a reasonable response in the circumstances. Should the applicant wish to pursue these other issues, the parties are to work together to assess and resolve the other issues raised by the applicant. Case No: 486522 Determination Page 2 of 12 1.3 Determination This determination is substantially in favour of the FSP. The FSP is not required to indemnify the applicant in relation to the claimed damage to the house or the sheeting damage to the shed. If the applicant wishes to pursue any or some of the other issues raised and referred to in section 2.2 of the determination, he is to notify the FSP of his intentions as soon as possible. Upon notification, the FSP is to arrange for its assessors to re-attend, inspect and assess the cause of damage and policy response regarding these other issues. If an inspection occurs, the FSP is to advise the applicant of the policy response within 14 days of the inspection. Case No: 486522 Determination Page 3 of 12 2 Reasons for decision I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied the documentation I have relied on has been provided to both parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. Submissions and new material were provided after recommendation After the recommendation was rejected, the applicant made further submissions. The submissions are summarised in supporting section 3 of this determination together with the FSP’s expert reports. Where relevant, this material is referred to in the determination. 2.1 Can the FSP deny the applicant’s claim ? Policy responds to an insured event not accidental damage The applicant must establish on the balance of probabilities he has suffered a loss caused by an event to which the policy responds. This is k nown as a prima facie claim. The applicant’s policy with the FSP provides cover for accidental damage. The damage to the applicant’s home and contents was caused accidentally and so the applicant has established a prima facie claim. Once so established, the onus shifts to the FSP to prove on the balance of probabilities an exclusion applies if it seeks to deny or limit its liability for the loss. In this regard, the FSP’s policy is clear and unambiguous. It says if the cause of the damage falls under an insured event in the policy, the damage will be assessed under that insured event. Policy responds to storm damage The applicant’s policy also covers him for storm damage. The information provided establishes a significant amount of rain fell in a short pe riod of time. The relevant weather observations and photographs provided show the streets were flooded because of the heavy rain and water entered the applicant’s home. On the information provided, I am satisfied the applicant has established a prima facie claim. Case No: 486522 Determination Page 4 of 12 FSP must establish policy exclusions relied on apply The onus shifts to the FSP to prove on the balance of probabilities exclusions apply if it seeks to deny the claim. In the context of this claim, the FSP must establish the damage was caused b y:  rain which entered an ordinarily fully enclosed part of the home through an opening not created by the storm  defects, structural or design faults, faulty workmanship or faulty design  wear and tear and lack of maintenance  subsidence or landslide FSP relies on three expert reports The FSP obtained reports from R and D who assessed the damage and from RE, a structural and geotechnical engineer. Relying on those reports, the FSP says it is entitled to deny the claim. It submits the reports confirm the damage and water entry to the home was due to the material deterioration and decay of the stumps. It says the reports confirm where water has entered via the kitchen door the home was built level with the ground. While acknowledging the amount of rainfall at the time of the insured event, it says this was not the cause of the water entry to the home. It says the water entered the home because it was built level to the ground. Because of this, the FSP submits it is entitled to deny the claim as the storm did not create an opening in the home which allowed water to enter. It also submits the observations of the engineer demonstrate the damage occurred gradually over time and not from the one off insured event. The FSP’s claim file notes on 14 March 2017 describe the incident: Rain entered Kitchen and bathroom from underground. Water damage throughout, shed and items damaged during storm. Dents on roof from hail. The FSP appointed R to assess the claim. R noted and photographed the resulting damage and noted the affected areas of the kitchen, bathroom and bedroom. R’s technician advised: …the cause of the ingress could possibly be from the stumps of the property sinking D attended and photographed the property on 15 March 2017. D also noted damage to the shed. D reported the main area affected was the rear of the house, kitchen and bathroom. He said the rear of the house may not meet building standards noting, for example, the rear section was built on the ground and the height of the door meant water entered the home through the door as it is level with the outside ground. D’s photographs show the backdoor is level or close to level with the ground where the water entered. D recommended the FSP appoint an engineer to advise on the cause of the damage. The FSP appointed a structural and geotechnical engineer (RE) who inspected and photographed the property on 16 May 2017. I have carefully considered his report and findings together with the photographs taken in support of the findings. A Case No: 486522 Determination Page 5 of 12 summary of the FSP’s engineer’s evaluations and conclusions are set out in supporting section 3 of this determination. The report says damage occurred because water entered the rear section of the building because it was constructed at ground level and there was no appropriate clearance above ground. Further damage occurred in the form of localised subsidence because the footings supporting the building at these locations were inadequate. The engineer concedes the floodwaters may have promoted movement but says: “(the movements) were inevitable due to the lack of maintenance and the inappropriate nature of previous repairs….. If the footings had been adequate or even partia lly adequate, subsidence would not have occurred causing damage .” Applicant’s submissions including material after the recommendation The applicant does not dispute he arranged for the house to be re-levelled about four years before the storm event. He says he had a quote for $12,000 to raise the house or $2,200 to level it. He chose to re-level the house and was not told of any problems when he had the work done. He has no recourse to the tradesmen who did the work as it was not done by someone local. He has no identifying receipt because he paid cash. The applicant submits the severe storm caused the damage because of its severity and ensuing inundation of his property. In support of this contention, he provides material from the Bureau of Meteorology and a number of photographs showing the damage and a significant amount of water in the streets. He says he has lived in the area since 2006 and his house has have never been flooded before. The applicant also says, as he is not an engineer or builder, he did not know the house was badly built or the work undertaken to relevel the house four years ago was not well done. After the recommendation, the applicant made further submissions with the help of LS who runs a small engineering supply business and who was a past employee of a government department dealing with conservation. Adopting observations made by LS, the applicant criticises the FSP’s expert who said water came up from under the kitchen floor. He says the only water which entered the house was water running in from above the floor. LS supports the applicant’s contentions about the severity of the storm event and the inundation caused to the applicant’s property. He says the combination of rain and hail showed levels of 92mm in his rain gauge. L S analyses both the recommendation and the FSP’s reports and criticises some conclusions and states the essence of the engineer’s reports is that the damage to the applicant’s home was a direct result of the storm event. Proximate causes of the loss are causes excluded from cover I have carefully read all the material and considered the photographs provided. Case No: 486522 Determination Page 6 of 12 It is not in contention there was significant rainfall on the day in question. The engineer agrees the significant rainfall “may have promoted movement” but his clear and unambiguous conclusion is the inadequate footings were the principal cause of the building movement and damage which occurred in the storm event. LS challenges the opinion of the FSP’s engineer and he says the levelling work was not substandard. However, having considered the submissions made by LS and the report of the FSP’s engineer together with the photographs he took to support his report, I p refer the opinion of a qualified structural engineer. Having considered his opinion and the photographs he took in support of his opinion, I am satisfied on the balance of probabilities the relevelling work was inadequate and the footings generally are inadequate. While LS challenges the opinions of the FSP’s experts on the basis they did not inspect under the house, I am satisfied the inspections they made and the photographs provided establish the contentions upon which the opinions are based. Although the house may not have been constructed too close to the ground when it was built, the photographs provided show the backdoor is level or close to level with the ground where the water entered. The FSP’s principal reason for denial of the claim is not ma de because of faulty workmanship to the house itself but the faulty workmanship undertaken when the relevelling work was done. LS also says rain could not have entered the house from underground. I accept this contention. However the FSP is not relying on this contention. The statement in R’s report is a general description which was probably provided from the FSP’s claim file notes made after the applicant’s report of the incident. Rather, in trying to understand how the damage was caused, R and the FSP focused on the potential defect in the footings. The FSP must establish an excluded event was the proximate cause of the loss. Case law establishes t he proximate cause of the loss is the dominant or effective or operative cause of the loss whether or not t hat be the last in time or the sole cause. While the FSP’s engineer concedes the water from the storm may have promoted movement, his conclusion is clear - the subsidence damage to the house would not have occurred had the drainage and footings been adequa te. On the information provided, I am satisfied the FSP is entitled to deny the claim for claimed damage because the proximate cause of the loss was a number of excluded events. I am satisfied the damage was caused by rain which entered the building through an opening not created by the storm. Damage was also caused by defects and faulty workmanship and lack of maintenance and deterioration in the footings. As these causes of damage are excluded from cover, the FSP is entitled to deny the claim for damage to the house. Case No: 486522 Determination Page 7 of 12 FSP entitled to deny the claim relating to sheets of iron off the shed The applicant also claims damage to his back shed. He reported to D some sheets of iron came off the shed in the wind. D inspected the shed and agreed there was damage to the shed wall caused by strong winds. A photograph was provided by D showing the blown off sheets. However, D also said the shed was not constructed properly as there was no middle rail to support the wall sheeting. Had there been a middle rail in place with the sheets fixed, D said the sheets would not have come loose. The applicant has provided no persuasive rebuttal material either before or after the recommendation about the sheets of iron which came off the shed in the storm. On the information provided, I am satisfied this damage was caused by a structural defect or lack of maintenance. These causes of damage are excluded from cover. In these circumstances, I am satisfied the FSP is entitled to deny the damage to the back shed when sheets of iron came off in the wind. 2.2 Was there further damage caused by the storm which the FSP should assess and accept? FSP required to undertake further assessment of other issues raised After the recommendation, LS said the applicant did not want to pursue other claims such as damage to his back shed, the shade cloth over his chillies and damage to a wire fence. He said the applicant raised these other issues in support of his contention about the severity of the storm. Whatever the reason for raising these other iss ues, the applicant is entitled to have the FSP investigate and assess these other issues. Even though this determination does not find in the applicant’s favour in relation to his main concern regarding the subsidence damage to the house, this does not mea n these other issues should not be investigated and assessed by the FSP. Aside from the main concern about the water and subsidence damage to the house, when the applicant made the claim, the FSP’s file notes show the applicant reported a shed and items were damaged during the storm and there was hail damage on the roof. Aside from the sheeting damage to the shed (which is excluded), it is not clear whether the hail damage is to the roof of the shed or the roof of the house. The FSP’s file notes also sh ow a number of telephone calls took place during the claims process in which the applicant indicated issues with a petrol generator, an air compressor, DVDs, a set-top box, TV and DVD player. The applicant said the air conditioning unit was surging. He said the shed sheets blew off and rain entered the shed and contents in the shed, including hotplates on a stove in the shed, were damaged. In one call, he said the hot water service was leaking from a valve which he asserted was damaged in the storm. Some of these issues have been raised in correspondence with FOS as well. Case No: 486522 Determination Page 8 of 12 The FSP’s file notes show the applicant was invited to provide certain information in substantiation of these other issues. From the information provided, it is not known whether the information was provided by the applicant to the FSP. The report from R shows an inventory was collated about affected contents. A photograph was attached with the annotation “DVDs only submerged in water.” D commented about the damage to the shed sheeting caused by strong winds which issue has been addressed earlier in this determination. The FSP’s engineer was not engaged to address these other issues. In its Notice of Response, the FSP said it would need to reappoint D to inspect the hail damage and the shade cloth. It further commented the applicant would need to provide proof the shade cloth was professionally installed within the last 10 years as required by its policy. As foreshadowed by the FSP, the FSP may be entitled to rely on certain policy exclusions in relation to these other issues. Nonetheless, I consider it is fair in all the circumstances that if the applicant wishes to pursue any or some of these other issues, that he notify the FSP of his intentions as soon as possible. Upon notification, the FSP is to arrange for R or D to re-attend and inspect and assess the cause of damage and policy response regarding these other issues. If an inspection occurs, the FSP is to advise the applicant of the policy response within 14 days of the inspection. Should the applicant be dissatisfied with the FSP’s claims decision about these other issues, he is entitled to pursue these other issues through the FSP’s internal dispute resolution process. The parties are encouraged to resolve these other issues. If they are unable to, these other issues can be brought back to FOS for further consideration after the FSP’s internal dispute resolution process is exha usted. Case No: 486522 Determination Page 9 of 12 3 Supporting information 3.1 FOS Approach It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy extracts The relevant policy extracts are referred to in the FSP’s Notice of Response dated 15 September 2017 which have been exchanged with the applicant. Storm  A violent wind including a tornado or named cyclone; or  Rain, hail or snow of unusual volume, force of duration. It is not persistent bad weather or heavy or persistent rain by itself. Storm What is covered Your building and/or contents are covered for loss or damage caused by storm . What is not covered Your building and/or contents are not covered under this Insured Event for:  loss of or damage to - any exterior blind, shade cloth or awning unless professionally installed in the last 10 years; …  loss or damage caused by wind, rain, hail or snow which entered an ordinarily fully enclosed part of your building through an opening not created by the storm . This includes but is not limited to: - an open window or door; General Exclusions Under this policy there is no cover provided for any loss, damage or liability caused directly or indirectly by or in any way connected with: 1. defects, structural or design faults, faulty workmanship or faulty design; 4. wear and tear and lack of maintenance, including rust, corrosion and deterioration … 8. subsidence or landslide …. 3.3 Expert reports Report Key findings Case No: 486522 Determination Page 10 of 12 FSP’s assessor (R ) Report undated  The cause of the ingress could possibly be from the stumps of the property sinking. FSP ’s builder (D ) Report 11 - 04 - 2017  D amage to the shed was caused by strong winds during the storm .  S hed has not be constructed correctly as there is no middle rail to support the wall sheeting if there had of been a middle rail in plac e with the sheets fixed in three points top, bottom and middle it would have been very unlikely that the sheets would have come loose [sic] .  Water has entered th e rear of the property and on inspection there has been some foundation movement over some time and the downpour which occurred may have and most likely created more.  Water has overflowed from the gutters and water was running directly under the house aro und the piers.  M ain area affected was the rear of the house, kitchen and bathroom . These areas have sunk may have been over time.  N o visual damage apart from gaps at the rear of kicker in the kitchen and around bathtub and a wall/ floor separation in the main bed room which may have been there before the storm.  R ear of the residenc e would struggle to meet building standards. For example rear section being built on the ground , and the rear door is only 1900mm high. This door where the water has entered the property is level with the outside ground. FSP’s engineer (RCE) Report 22 - 05 - 2017  Home originally support ed on a series of isolated timber stumps.  Applicant told him about four years ago the house was “relevelled” in various locations; after the storm, water ponded to a depth of about 50mm against the rear section of the house and wat er entered the kitchen area (which is virtually at ground level) ; storm water ran under the house and when the rain stopped, the wat er drained after about two hours; after the storm, subsidence was noted at various location due to foundation movements.  Engineering evaluations included the following: the building is constructed too close to the ground to support proper ventilation and free drainage for the floor; the kitchen has insufficient subfloor clearance with the floorboards being almost on the ground; the floor relevelling (replacing the original stumps with masonry blocks and timber chocks) was substandard and did not address the issues of subsidence and building movem ent which would have been present then; if the house had been properly re - stumped it is very unlikely the subsidence would have occurred as a result of the short flooding event; the site drainage conditions direct free water into the space beneath the floo ring system which promotes deterioration and building movement.  Building is effectively seated on the ground surface wit h no reliable foundation system/appropriate site drainage provisions.  B uilding movements are primarily related to the long term effects of material deterioration which has caused the stumps to either dec ay to the point that they were no longer capable of carrying the required loadings and due to previous poor and inappropriate construction practices adopt ed by the "Re - Stumping Cont ractor' engaged by the Owner approximately four (4) years ago .  Although soil moisture related ground movements due to Case No: 486522 Determination Page 11 of 12 shrink/swell effects may have contributed to the movement, such issues would generally be expected to occur over the long term. The almost comple te lack of adequate footings (foundations) beneath this building is considered to be the principle cause of the building movement and damage which occurred in March 2017. Summary of s ubmissions made on behalf of the applicant by LS after the recommendatio n  LS supports the applicant’s contentions about the severity of the storm event and the inundation caused to the applicant’s house.  R ain and hail showed levels of 92mm in LS’s rain gauge.  Levellers made no structural changes to the house so allegation s of faulty workmanship are incorrect because no structural modification, repairs or additions were made to the house.  Hous e was not constructed too close to the ground when built.  Kitchen floor is 50mm above the concrete pathway and normally rain runs off the path and flows on the ground or under the gaps between the house through to the front of the house.  Floorboards are clear of the ground and not previously damaged by water.  Levelling work not substandard for reasons stated.  Leveller did not adv ise the applicant of any problems with existing stumps.  Stumps sinking is a natural course of events with stumped houses.  Many houses in the township are close to the ground and were not inundated.  LS has been involved in re - stumping and re - levelling hous es in the area and what was done to applicant’s house was normal general practice - there has never been an incident of this kind in the town before.  W ater entered due to the depth of flood water plus a buildup of water coming from railway embankment and t ownship .  The level of flood water caused the water entry.  Rain cannot enter the kitchen and bathroom from underground.  FSP’s reports are only assumptions because none of the experts actually went under the house. 3.4 Other relevant material considered and relied on  Parties’ submissions, emails , invoices, reports, photographs and all attachments to all submissions both before and after the recommendation  Correspondence between the parties 3.5 Case law and proximate cause Case law establishes:  The proximate cause of the loss is the dominant or effective or operative cause of the loss whether or not that be the last in time or the sole cause.  If there are several causes operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would Case No: 486522 Determination Page 12 of 12 have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause.  A common sense approach is taken to determine proximate cause.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.