1.1 Complaint
The complainant holds a business insurance policy with the financial firm (insurer)
which provides cover for its caravan park and holiday accommodation business.
In June 2016, the complainant lodged a claim under the policy for storm damage to a
building used for backpacker and low budget accommodation. The complainant
advised the damage had been caused by Cyclone Marcia in February 2015.
In April 2017, the complainant lodged a second claim for further damage to the
property, including internal water damage and sunken pavers adjacent to an external
cool room. The complainant advised this damage had been caused by Cyclone
Debbie in March 2017.
The insurer denied both claims on the basis that the damage to the property had not
been caused by the cyclones, but by factors which are excluded from cover under the
policy (such as lack of maintenance, structural defects and soil movement).
The complainant disputes the insurer’s decision and seeks cover for all of the damage
to the property.
1.2 Issues and key findings
Is the insurer liable for the damage claimed due to Cyclone Marcia?
The available information does not establish any damage to the roof caused by the
cyclone. The proximate cause of the internal water damage is faulty design and lack
of maintenance. Accordingly, the insurer is not liable for the damage.
Is the insurer liable for the damage claimed due to Cyclone Debbie?
The insurer is not liable for the additional water damage which occurred in March
2017, as this damage was caused by factors which are excluded from cover under
the policy. The damage to the brick pavers caused by subsidence of the soil was not
caused by the cyclone, but occurred over an extended period of time.
Determination | Case number: 486145 Page 2 of 11
1.3 Determination
This determination is in favour of the financial firm (insurer).
The insurer is not liable for the damage to the property and is not required to take any
further action.
Determination | Case number: 486145 Page 3 of 11
2 Reasons for determination
2.1 Is the insurer liable for the damage claimed due to Cyclone Marcia?
Policy provides cover for storm damage subject to exclusions
The complainant is required to show that, on the balance of probabilities, it has
suffered a loss caused by a risk insured against under the policy. This is known as a
valid (or prima facie) claim.
If the complainant is able to establish a prima facie claim, then the onus shifts to the
insurer to show that, on the balance of probabilities, it is entitled to rely on an
exclusion under the policy to deny the claim.
The complainant’s policy provides cover for the insured events listed in the policy
(including damage caused by wind and water), subject to the conditions and
exclusions set out in the policy.
However, the insured event of wind and water excludes cover for damage caused by
water entering the building:
due to inadequate maintenance, or
because of either a structural defect, faulty design or faulty workmanship when the
building was constructed.
The policy also excludes cover for damage caused by soil movement (including
erosion and subsidence) unless the damage is directly caused by, and occurs within
72 hours of, a storm or other insured event.
The policyholder is required to maintain the business premises in sound condition and
take all reasonable precautions to avoid or minimise loss. If the policyholder does not
comply with these conditions, the insurer may refuse to pay part or all of their claim.
Complainant has established a prima facie claim for water damage
The complainant says the property was damaged by Cyclone Marcia in February
2015. Specifically, the complainant says water entered the property:
through the roof cavity, due to the gutters being unable to cope with the excessive
rainfall experienced during the storm, and
through the skylights mounted on the roof, which were damaged during the storm.
In its submissions, the complainant has also sought cover for the cost of replacing the
roof in its entirety (at an estimated cost of over $90,000).
The complainant did not lodge a claim until June 2016, approximately sixteen months
after the damage allegedly occurred. The reason for this delay is unclear.
Determination | Case number: 486145 Page 4 of 11
After the claim was lodged, the insurer appointed an assessor (CL) to inspect the
damage to the property. CL attended in August 2016 and confirmed the property had
suffered internal water damage due to rainwater entry. CL observed water staining to
the ceilings and noted that the electrical fittings had also been affected by water.
On this basis, the panel is satisfied that the complainant has established a prima facie
claim for water damage under the policy. However, the panel notes that the
co mplainant’s delay in lodging the claim makes it difficult to determine exactly when
this damage occurred.
Insurer is required to show damage was caused by excluded factors
As the complainant has established a prima facie claim, the insurer bears the onus o f
showing that, on the balance of probabilities, it is entitled to deny the claim based on
a policy exclusion or condition.
The insurer says there is no evidence of any damage to the roof caused by the
cyclone in February 2015. The insurer says the roof was defective and in poor
condition at the time of the cyclone, which allowed water to enter the property.
Accordingly, the insurer says it is not liable for the internal water damage to the
property because water entered the property due to faulty design or workmanship and
a lack of maintenance.
In order to be entitled to deny liability for the damage, the insurer must show that the
proximate cause of the damage was one of the excluded factors referred to above.
It is well established at law that the proximate cause is not necessarily the first or the
last or the sole cause of the damage. It is the dominant or effective or operative
cause.
In any particular case, the proximate cause of the loss is a question of fact to be
determined based on the surrounding circumstances. Where there are several causes
operating, each must be examined for the qualities of predominance and efficacy in
relation to the resultant damage.
Contractors have identified ongoing issues with roof
The roofer (RR) engaged by the insurer to inspect the property in August 2016
reported that there was no evidence of storm damage to the roof. However, RR
advised that the roof was in poor condition with rust throughout.
Based on further discussions with RR, the insurer’s loss adjuster (CL) conc luded that
internal water entry to the property had been caused by the lack of maintenance to
the roof. RR advised that the roof was original and had not been properly maintained.
Determination | Case number: 486145 Page 5 of 11
The photographs included in RR’s report confirm there was extensive rust evi dent to
the corrugated metal sheeting in August 2016. There is no sign of any damage to the
roof sheets or the roof mounted skylights caused by the storm.
A subsequent report provided by the complainant’s builder (AP) in May 2017 advised
that the property was susceptible to water entry because the roof had insufficient fall.
AP advised that the design of the roof allowed water to pond on it during heavy rains
and run backwards up the roof to the inside of the building. AP recommended that the
roof be replaced. A second builder (KC) engaged by the complainant in May 2017
also identified a lack of sufficient fall to the roof.
The building consultant (SB) engaged by the insurer to undertake a detailed
assessment of the property in September 2017 confirmed that the pitch of the roof
was non- compliant with the manufacturer’s specifications. SB advised that the lack of
pitch caused water to pond on the roof sheets and track over the side laps and into
the roof cavity.
While the contractors did not inspect the roof until after the second cyclone in March
2017, the design issues they identified would have existed at the time of the first
cyclone in February 2015.
There is also evidence of multiple, ongoing attempts to patch the roof through the
extensive application of waterproof sealant in various areas . However, the insurer’s
building consultant (SB) described these repairs as ‘poor’.
In particular, the complainant’s plumber (BP) applied sealant to a number of areas
following Cyclone Marcia (including skylights, vents, flashings and roof sheets) in an
attempt to address previous leaks.
Damage was caused by faulty design and lack of maintenance
Based on the available information, the panel considers the insurer is not liable for the
damage to the roof or the internal water damage to the property which was the
subject of the claim lodged in June 2016.
The photographs provided do not show any evidence of damage to the roof which is
consistent with having been caused by Cyclone Marcia.
The complainant has provided a submission from its previous representative (JM), an
architecture student and qualified industrial designer. JM stated that the roof of the
property has suffered structural damage due to cyclonic winds and rain, as well as
dents caused by heavy rain.
However, the panel is not satisfied that JM has provided sufficient evidence to
substantiate the damage to the roof as identified in her report. In particular, the
Determination | Case number: 486145 Page 6 of 11
various photographs taken following Cyclone Marcia do not show any damage to the
roof which is consistent with having been caused by the cyclone.
Having, carefully reviewed the available information, the panel is satisfied that the
proximate cause of the internal water entry to the property observed in August 2016
was faulty design and a lack of maintenance.
The panel considers that the nature and location of water staining to the interior of the
property is consistent with this damage having been caused by the insufficient pitch of
the roof, together with rainwater entering through the poorly maintained flashings,
vents and skylights.
For the reasons outlined above, the insurer is not liable for the damage claimed due
to Cyclone Marcia.
2.2 Is the insurer liable for the damage claimed due to Cyclone Debbie?
Complainant says cyclone caused further damage
In April 2017, the complainant lodged a claim for damage to the property caused by
Cyclone Debbie on 23 March 2017.
The complainant advised that, during the cyclone a stormwater pipe at the property
became blocked, causing subsidence to a section of the external paving and cracking
to a nearby brick wall.
The complainant also advised that the property had sustained additional water
damage. In addition to the areas of pre-existing damage referred to above (which had
not been repaired) there was further water damage to other areas of the property,
including the south side facing bedrooms.
After the second claim was lodged, the insurer appointed its building consultant (SB)
to carry out a thorough inspection of the property and advise on the cause of t he
damage to each area. SB prepared a detailed reported dated 5 September 2017,
which includes a number of close up, colour photographs of the affected areas.
Insurer is not liable for damage to pavers and surrounding area
The complainant says the damage to the paving occurred during the cyclone when:
heavy rain caused the creek at the boundary of the property to overflow, blocking
the stormwater drain
the blockage resulted in stormwater washing away the soil surrounding the pipe,
causing the pavers near the outdoor cool room to subside.
The complainant says that, after the pavers subsided, a crack developed in the
external brick wall on the south side of the building, near the affected area.
Determination | Case number: 486145 Page 7 of 11
The complainant has provided a report from its plumber (BP) which confirms he
replaced a section of earthenware piping at the rear of the property, after identifying a
blockage in the pipe. The complainant has also provided photographs of these works.
In his report, BP advised that the manner in which the drainage s ystem had been
constructed meant that there was a gap at the junction between the earthenware pipe
and PVC pipe (which had a slightly smaller diameter). Accordingly, the blockage in
the pipe caused water to enter the surrounding area, causing the soils to subside.
The insurer’s building consultant ( SB) confirmed that there was extensive erosion of
the soil under the pavers in the vicinity of the blocked stormwater pipe, extending
almost two metres from the pipe. The erosion had caused the pavers to subside.
SB agreed with BP that water had leaked from the stormwater pipe, saturating the
black sandy soil around the pipe and causing it to subside. However, SB advised that
both the subsidence and the blockage had not been caused by the cyclone, but had
developed over an extended period of time.
SB advised that the gap between the pipes would have allowed the sandy material to
gradually enter the pipe, where it would have slowly solidified over time, causing the
blockage.
Having carefully reviewed the reports and photographs provided, the panel is satisfied
that the subsidence of the pavers was caused in the manner described by SB. The
panel considers SB’s report provides a logical explanation of how the damage
occurred which is consistent with the observed facts.
The nature and extent of the erosion to the area surrounding the pipe is consistent
with the damage having occurred over an extended period of time, rather than directly
as a result of the cyclone.
The panel notes that, while BP’s report describes the n ature of the damage and the
repairs required, he does not confirm that the damage was caused by the cyclone in
March 2017.
As outlined above, the policy excludes cover for erosion or subsidence caused by
water, unless the damage was caused by, and occurred within 72 hours of, a storm.
Accordingly, the insurer is not liable for the damage to the pavers.
The location and timing of the cracking to the southern wall is consistent with this
damage having been caused by the subsidence of the founding soils around the
stormwater pipe. Accordingly, this damage is also excluded from cover under the
policy.
Determination | Case number: 486145 Page 8 of 11
Insurer is not liable for damage caused by further water entry
As outlined above, some of the areas which were the subject of the complainant’s
second claim had previously been damaged by water.
These areas include the ceilings around the skylights in the central hallway and the
tenants’ kitchen, where leaking water had caused an electrical conduit to catch on
fire.
Based on a comparison of the damage to these areas (as shown in photographs
taken before and after Cyclone Debbie), the panel is not satisfied that any material
additional damage occurred as a result of the cyclone.
Based on the information provided, the panel is satisfied that the bulk of the additional
water entry to other areas of the building was caused by the following factors:
the insufficient pitch of the roof at the northern and southern ends of the building,
which caused water to track over the side of the roof sheets, staining the ceilings of
the south facing rooms and the patio at the northern end of the building
the blockage of the stormwater pipe (which contributed to the gutters overflowing
and water entry into the south facing rooms. As outlined above, this blockage was
due to the build-up of sandy soils in the pipe over an extended period of time, and
the generally poor condition of the metal roof sheets, gutters and downpipes
(including the poorly applied sealant and extensive corrosion), which allowed water
to enter during periods of heavy rainfall and storm activity.
In reaching its view, the panel has placed significant weight on the comprehensive
report prepared by the insurer’s building consultant (SB), which clearly sets out each
area of damage to the property and provides a detailed explanation of how the
damage occurred.
The complainant has provided copies of reports obtained from various consultants
during the course of the claims.
However, these reports are expressed in general terms which attribute all of the
damage to the property (including the condition of the roof) to the cyclones. The
complainant’s consultant s do not provide any detailed explanation of the mechanism
by which the damage occurred.
The panel acknowledges that SB considered that some of the damage to property (in
particular, the tenants’ kitchen and the commercial kitchen) may have been caused by
the cyclone in 2017.
SB advised that wind-blown rain may have entered through the flashings around the
kitchen exhausts, which he considered to be in a ‘sound condition’, following the
application of sealant by BP in October 2016.
Determination | Case number: 486145 Page 9 of 11
However, based on the photographs provided, the panel considers that the cost of
repairing this aspect of the damage would be unlikely to exceed the policy excess.
For the reasons outlined above, the insurer is not liable for for the damage claimed
due to Cyclone Debbie.
Determination | Case number: 486145 Page 10 of 11
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
3.2 Our approach to this complaint
This complaint has not been the subject of a recommendation. Due to the nature of
the complaint, it has been referred directly to a panel for determination, in line with the
Operational Guidelines to the FOS Terms of Reference. The panel consists of an
Ombudsman and two representatives with consumer and insurance experience.
The panel has decided this complaint based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
The panel has reviewed and considered all of the material provided by the parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination the panel has restricted its commentary to those issues that it
considers directly relevant to the outcome only.
The policyholder is the corporate trustee of a discretionary trust, which has been
represented by one of its directors during the complaint process. For the purposes of
this determination, the policyholder and its director are collectively referred to as ‘the
complainant’.
Determination | Case number: 486145 Page 11 of 11
3.3 Claim for loss of income
In its initial submissions, the complainant sought cover for loss of income under the
business interruption provisions of the policy. The complainant advised that, as a
result of the damage to the property, it was unable to be used for its intended
purpose.
The amount of the complainant’s claim for loss of income ($571,000) exceeds the
monetary jurisdiction under the FOS Terms of Reference, as applicable at the time
the complaint was lodged. Accordingly, the panel is unable to consider this aspect of
the complaint.
3.4 Key policy terms
Subject Terms
Scope of cover –
wind and water
We will cover you for loss or damage caused directly by the following Insured
events:
Wind and water ….
The excess applicable to claims for damage:
caused by a named cyclone is $5,000 or the amount shown on the Insuranc e
Certificate, whichever is the greater …
Our exclusions
You are not covered for … loss or damage caused: …
by soil movement including erosion, subsidenc e, landslide, mudslide or
settling unless it is directly caus ed by and occurs within 72 hours of an Insured
Event; …
by water entering the building due to inadequate maint enance, or through an
opening made for any building maintenance or repair work, or because of
either a structural defect, faulty design or faulty workmanship when the
building was constructed …
General conditions General conditions that apply to every section of the policy …
You are required to:
take all reasonable precautions to avoid or minimise loss, damage or liability
maintain all business premises, fittings, appliances and equipment in sound
condition …
If you do not comply with your obligations we may refuse to pay part or all of
your claim.