Retaining wall collapse claim declined as gradual loss

FirmFinancial Firm (Unknown - Insurer)
Decided2018-05-29
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Applicants' sandstone retaining wall collapsed after rain and the FSP denied the claim. AFCA preferred the FSP engineer's evidence of gradual earth pressure over the applicants' unproven theory of a leaking sewer main.

The applicants did not establish that a sewer leak existed before the collapse, so the gradual loss or damage exclusion applied.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 486019 Determination Page 1 of 11 Case number: 486019 29 May 2018 1 Overview 1.1 Dispute The applicants lodged a claim with their financial service provider (FSP) for a collapsed retaining wall following rain on 4 October 2010. The FSP assessed the damages and subsequently denied the claim. In doing so, the FSP says the cause of the damage was the gradual increase of earth pressure. On 13 March 2013, the applicants located a collapsed sewer main. The applicants attributed the collapsed retaining wall to this leaking sewer pipe. The FSP assessed the damage and further denied the claim. In doing so, the FSP says at the time of the wall collapsing there was no proof of the distressed sewer pipe. The applicants disagree and seek cover for the reinstatement of the retaining wall. 1.1 Issues and key findings Is the FSP entitled to deny the claim? The FSP is entitled to deny the claim because:  the FSP‟s engineer‟s (RF) opinion about the cause of damage is persuasive  RF says the damage is due to increased earth pressure over a period of time  this falls within the policy exclusion for gradual loss or damage of any kind. 1.2 Determination This determination is in favour of the FSP. The FSP is entitled to deny liability for the applicants‟ claim. Case No: 486019 Determination Page 2 of 11 2 Reasons for determination Is the FSP entitled to deny the claim? Applicants establish a valid claim The applicants carry the initial onus to establish any loss or damage arising from an event is covered by the terms and conditions of the policy. This is known as a valid ( prima facie ) claim. Once a valid claim is established, the FSP bears the onus to show the loss falls within a policy exclusion or is otherwise entitled to deny the claim. The standard of proof is the balance of probabilities. The applican ts‟ policy covers the building for accidental loss or damage, subject to various conditions and exclusions. The policy defines the words „accident‟ and „damage‟ to mean: Word Policy definition Accident Something that was not intended, planned or expected and which did not occur through a malicious act Damage Actual physical damage to your building, contents or pers onal valuables Given the scope of cover provided under the policy, the Panel is satisfied the applicants have established a valid claim for accidental damage to the retaining wall. Accordingly, it falls to the FSP to demonstrate on the balance of probabilities:  the cause of the disputed damage was a factor the policy excludes  it is otherwise entitled to deny the claim. Retaining wall has partially collapsed On 5 October 2010, the applicants contacted the FSP to lodge a claim for the collapse of their retaining wall. At claim lodgement, the applicants say the damage resulted from a rain event. The FSP assessed the claim, but subsequently declined it. On or around March 2013, whilst excavating parts of the retaining wall, the applicants discovered a collapsed sewer main. The applicants attributed the damages sustained to the retaining wall as a result of this leaking pipe. Both parties have engaged a number of experts to review the area and provide an opinion as the likely cause of damage. Their reports are summarised in section 3. Evidence does not show the sewer leak existed in October 2010 The applicants‟ position is solely based on an as sumption that the sewer leak discovered in March 2013 existed in October 2010. Case No: 486019 Determination Page 3 of 11 HC (hydrologist) explained a theory about how this leak could have caused the damage. EB (engineer) supported this possibility. The FSP‟s engineers, RF and CC, disagree. The Panel is not persuaded the evidence shows a leak occurred in October 2010 for the following reasons. First, there is no physical or contemporaneous evidence to show the retaining wall was affected by a sewer leak. RF, who attended the site the day after the claim was reported, did not observe any evidence of a sewer leak. Given the wall collapsed and the soil retained would have been evident, it is unclear how RF, or anyone else attending the scene, could have missed this, had there been a leak. Second, an odour would have been readily apparent. Whilst EB says no odour would have been noticed given the leak would have been predominantly water, this is difficult to accept. RF and CC, as well as consultant RZ, accept this should have been readily discernible. Further, this sewer main services nine properties. In addition, and of significance, the only evidence to support that this leak existed is the applicants saying they noticed an odour before the wall collapsed. If this is the case, then it should have been readily discernible when the area was inspected after the collapse. It was not. Third, there is no contemporaneous evidence of the applicants noticing an odour prior to the discovery of the collapsed sewer main. Whilst the applicants say they engaged a plumber to attend the property and investigate the source, no evidence of this was provided beyond the plumber who attended in March 2013. Fourth, the sequence of events that led to the discovery of the leak is unclear. HC says a plumber attended the site to investigate a blockage. CC says the plumber was called after workmen excavating the site discovered the collapsed sewer. CC also says RZ called this plumber who said he attended the site two weeks earlier to cap the services and did not notice any issue. No evidence was provided by this plumber directly. It is therefore unclear if the leak was discovered after excavations works were conducted or what extent, if any, the plumber‟s evidence is consistent with HC or CC. Further, and of significance, it is unclear if the excavation works damaged the sewer and what physical evidence (if any) supports the possibility the sewer was affected prior to the excavation works. RF’s evidence is preferred As the Panel is not satisfied the evidence shows the leak occurred in October 2010, then HC‟s or EB‟s opinions about the cause of damage is unpersuasive. This leaves the opinions of RF and CC. RF concluded that the cause was likely the increased earth pressure load over a period of time. CC, to a degree, agreed with this by saying the wall was not capable of withstanding the load. Their evidence is consistent with the identification of three anchors installed to the wall. Case No: 486019 Determination Page 4 of 11 EB says these anchors do not support their evidence. EB based this on the fact an engineer had provided a pre-purchase inspection report in September 2008 and observed no signs of distress. EB also said these anchors would have only assisted the stones in the wall immediately around the base plates. EB does not explain what other purpose these anchors se rved though. The Panel considers that it is reasonable to presume they were installed to anchor issues at those particular points in the wall. This is consistent with CC and EB who explain how these anchors would have assisted. No other purpose for their installation has been provided. If that is the case, then their installation supports RF and CC‟s conclusion that the wall was experiencing distress from the increased earth pressure. The Panel does not accept the pre-purchase inspection refutes this. This is because a copy of the report is not available and it is not clear how closely the wall was reviewed and considered by the engineer. FSP is entitled to deny the claim Accordingly, after careful consideration of all the evidence, the panel prefers RF‟s opinion as to the likely cause of collapse. RF attended the scene contemporaneous to the event. His evidence is supported to an extent by CC. It is relatively consistent with the evidence of the anchors. EB‟s contrary opinion is not persuasive as it is reliant on an assumption that is unsubstantiated. Therefore, the Panel is satisfied the evidence shows the loss falls within the policy exclusion for “gradual loss or damage of any kind”. Given this, the FSP is entitled to deny liability for the retaining wall. Case No: 486019 Determination Page 5 of 11 3 Supporting information 3.1 FOS approach to this dispute We prioritised this dispute in line with the Operational Guidelines of our Terms of Reference because of the nature of this dispute. It has progressed directly to a determination by a panel, consisting of an Ombudsman, and advocates with extensive experience in consumer complaints, and insurance industry practice. We shared all information in this determination with the parties, and the parties had the opportunity to respond. We also reviewed all material supplied in response to make our determination. While the parties raised many issues, we have only commented on those directly relevant. We decided this dispute on its merits, considering the relevant law, good industry practice, codes of practice, and previous FOS decisions where relevant. 3.2 Expert reports Record Key points FSP’s engineer (RF) Report 11 - 10 - 2010  The writer carried out a site visit to the above noted residential property on Wednesday 6 October 2010 in the presence of the insured.  The purpose of the visit was to inspect and comment on the likely cause(s) of collapse to a section of retaining wall along the western boundary.  The section of wall which collapsed is approximately 2.9 m high by 4 m long.  The height of the subject retain ing wall is approximately 2.9m above the sandstone shelf, which is exposed and appears to be sound.  The primary framing of the subject retaining wall consists of random sandstone blocks with varying dimensions bedded to form a structural thickness of about 600mm.  The structure is deemed a „gravity retaining wall‟ system with the back fill material being of sand consistency.  Above this height there exists a masonry balustrade and on top of the same there exists a metal balustrade.  The retaining wall contain anchors to provide additional support. These anchors are post original construction and we believe they were installed to provide additional support.  Typically, anchors are installed when walls exhibit signs of distress.  The majority of the terrace above the retaining wall is paved with the exception of a small garden bed located in the south west corner.  On site we tested the storm water line by using a hose at the rear roof gutters. Water discharged out at the front Case No: 486019 Determination Page 6 of 11 street gutter, immediately in front of the council boundary line.  The 90 mm PVC storm wat er pipe was viewed within the collapsed section of the wall. This pipe appeared to be functioning well and this was confirmed by the plumber‟s investigation.  It is our opinion that the likely cause of coll apse can be attributed to the increased earth pressure load behind the subject wall over a period of time.  Additional hydrostatic pressure from upstream seepage may have also contributed to the failure.  Sand mat erial is a good drainage layer and weep holes at the bottom of the subject wall may have been inadequate to discharge the volume of water causing a built up of pressure behind the wall.  The fact that the anchors were installed suggests that there was some degree of distress to the wall prior to the c ollapse.  At the remaining section of the wall, near the mid anchor, the wall exhibits some degree of bulging. FSP’s building consultant (CC) Report 14 - 03 - 2013  No reference was made in RF‟s report to a large Frangipani tree which was located in the south west corner garden bed, immediately behind the south end of the collapsed length of the west boundary ret aining wall.  The insureds advised their workmen preparing to install a garage in place of the rear courtyard and boundary retaining wall had discovered a collapsed sewer main under the middle of the previously existing courtyard.  The insureds are now of the opinion that the collapsed sewer pipe may have been the cause of the collapse of the boundary retaining wall.  It would appear that the collapsed mech anism was forward rotation of the wall and not outward slippage of the base off the supporting bedrock.  The wall is a mass gravity wall (i.e. relying on the self - weight to resist overturning and forward displacement)  Clearly the three tie - back anchors were installed to try to counteract the shortcomings of the original wall and/or were introduced to bolster the wall when the courtyard level was raised.  The collapsed sewer pipe was about 2 to 2.5 meters distant from the back of the collaps ed stone wall on th e west side boundary.  RF report shows a considerable penetration into the west side of the site at the rear courtyard location, almost sufficient to have sighted the in ground sewer main.  The escaping sewage would have been more obvious two days after the wall collapsed.  We do not believe the damaged sewer main was associated with the collapse of the boundary retaining wall, Case No: 486019 Determination Page 7 of 11 for the following reas ons:  If escaping sewage water was causing hydrostatic pressure on the back of the retaining wall prior to collap se, sewer would have been seeping out under the base of the wall on top of bed rock base.  Escaping sewage water would have drained straight down through the free draining sand and only changed direction when contacting the base bedrock.  Sewage water emanat ing from the base of the stone wall onto the public footpath would have been recognized as a health hazard in very quick time, if only from the smell.  To survive undiscovered servicing nine dwellings upstream, for a further 2 years and 5 months is an unrea sonable assumption. App’s hydrologist (HC) Report 10 - 06 - 2013  The almost total disappearance of the missing section of pipe indicates the following possibilities:  The high pressure jet obliterated the damaged pipe. The only time a jet will cause damage to an earthenware pipe is if the pipe itself was already significantly compromised by external factors such as surrounding ground movement.  There has been significant soil movement in this area of the property to the extent the pipe has been completely washed away.  Although there is evidence of seepage running off the bedrock in Russell Street closest to the North West corner of the building, this by no means confirms that the seepage is confined to this corner of the property.  It is likely for a damaged sewer age pipe to function for a number of years even if damaged.  The damaged sewer pipe could have caused the retaining wall collapse given the following: - An initial small crack opened up in the pipework most likely caused by ground movement. - A small percentage of waste started leaking - The amount of water escaping increas ed - The combination of seepage and inc reasing amounts of sewage raised the pressure and weight of soil behind retaining wall. - Residents would not have known of this issue as there was no evidence App’s building consultant (EB) Report 01 - 05 - 2015  I do not concur with RF‟s opinion on the anchors but say that the anchors were inspected in September 2008 by the owners engineer with no report of any movement and failure of thes e anchors.  If as asserted the anchors were installed as the walls were exhibiting signs of distress then the signs of distress would have been observed and not ed and reported to owners.  It is my understanding that no report of any distress on the Case No: 486019 Determination Page 8 of 11 3 wall anchors has been reported a t the property since the purchase by the owners in late 2008/early 2009.  Furthermore there was no distress on the wall observed by me on 12 March 2015 in the location of the single anchor still in position at the time of my inspection.  It is my experience and observation that the anchors installed to the sandstone gravity wall would have only assisted the stones in the wall immediately around and at the base  The sewer line was not tested by RF.  It is my understanding the 3 anc hors would have been installed many years prior when the wall was increased in height and the courtyard level raised as suggested.  The opinions and comments from RF do not take into consideration the broken and failed sewer line in direct proximity of the section of the failed sandston e wall.  The frangipani trees have non - invasive root systems that can be safely grown near pipes and cables and in narrow planter beds.  Furthermore the tree is still standing. I am also of the opinion that the height of the tree (yet to be determined) would not have caused the collapse of the sandstone wall. The sandstone wall would have collapsed at halfway down the height of the wall.  If there was an issue with the height of this non - evasive plant it would have only dislodged the top section of the wall.  I do not agree it was forward rotation of the wall but say it was the outward slippage of the base of the wall. From the photos provided to me the wall collaps ed at the base of the wall outwards to the maximum width of 4 met ers and approximately 2 to 2.5 me t res at the top that I say is due to the abnormal and excess water behind the wall coming from the collaps ed sewer line.  The wall was inspected by the owners engineer prior to purchase with no issues reported.  The reason in my opinion for the collapse of the wall at that section is directly in line with the broken sewer that allowed abnormal and excessive water to collect behind the wall causing the collapse. The sewer line was discovered to be broken in March 2013 when a plumber attended the site to inves tigate a blockage in the common sewer line.  The common sewer line is towards the rear or eastern side of the property that was not uneart hed when the wall collapsed in October 2010.  I further question if the storm water lines were tested and found no leaks that the sewer line should have been tested as well.  It is my opinion that the common sewer main is located more to the rear of the property or eastern side than in the middle. This is the reas on why it was not discovered until Case No: 486019 Determination Page 9 of 11 March 2013.  The location of the common sewer line is irrelevant considering it was only discovered in March 2013 that there was a 1 metre section of the VCP missing of the sewer line after the plumber investigated the sewer blockage.  I have been instructed that there was a slight se wer smell before and after the collapse of the sandstone wall and then discovered in March 2013 that the line had failed.  It is my summation that the sewer line servicing the nine houses has partially failed allowing water to escape, building up abnormally behind the sandstone wall causing the wall to eventually fail.  I do not agree that sewage would have drained from the property. The water escaping the sewage line would have filtered through the sand backfill medium that was at the top of the property and only a smell would have remained. I have been advis ed such a smell existed.  In any event the partially damaged sewer line was towards the rear of the property and still buried and or visible after the collapse.  The broken sewer line in my opinion was the sole reason for the collapse of the sandstone wall. FSP’s building consultant (CC) Supplement ary Report 15 - 08 - 2015  We could speculate that the large excavator moving and working on the small site could have caused the disturbing ground movement referred to above.  There is a fundamental contradiction in the version of events surrounding the discovery of the broken sewer pipe.  The arguments presented to explain why leaking sewage might go undetected do not take into account that the bedrock appears to be gr ading down from south to north (towards the front of the house) and from east to west (across the site towards Russell Street).  Furthermore, the sewer leakage if it existed before the arrival of the large excavator, was only a matter of 3 met ers from the R ussell street face of the collapsed retaining wall.  Just how is it possible to dispose of leakage sewage and the accompanying odour in 10 feet, through sand, without some appearance/stink on the Russell Street façade?  The leak then continued for a further 2 years and 5 months completely undetected, with no visible loss of transportable sand and with no interruption to the waste services.  There was no reason for the sewer line to break in the first place. The development of a crack in the sewer line is entir ely man - created imagination.  There was no leakage until the builder start ed at the site and the sewer was accidently broken. The builder calls the plumber.  The HC report is a totally speculative version of how a waste pipe could spontaneously develop a cra ck and how the ensuing leak age of sewage could build up over the Case No: 486019 Determination Page 10 of 11 years and then be linked directly to the collapse of the stone retaining wall.  The problem is the gross speculation in the report then transfers into EB‟s report where it is accepted as a fac t.  The EB conclusion is that water escaping from the sewer built up behind the stone retaining wall until it caused the wall to collapse out into the foot path. Let us examine the chances.  The 100 year old sand stone block wall would have had to be a water retaining structure.  The wall was not designed to retain water. The wall, as built, could not hold or retain water.  There was no internal liner to provide waterproofness.  The irregular joints could not have been sufficiently caulked to prevent escape of sewage.  There was no sealant around the wall piercing anchor bolts or plates.  There was no rusting of the bolts or plates.  The water escaping between the base of the rough sandstone blocks and the rough surfac e of the bedrock bench had no odour .  The subjec t sewer was only 3 meters away and serviced not one hous e, but nine.  This was the main sewer line, yet the wat er running down the bedrock onto the footpat h showed no flow lines, or slumping of saturated sand.  The sand backfill deposited on the footpath was odourless and free of sewage, or it would not have stayed there for long.  The EB report depends on the leakage created in the HC report, so it is no surprise that EB agrees entirely with HC. FSP’s engineer RF Supplement ary report 19 - 08 - 2015  We note the w all collapsed following a rain storm.  The rear yard is paved and is directed to the garden bed in the south west corner.  As such, concentrated water flows would have been directed to this area and immediately behind the failed section of wall.  As noted the subject wall was reinforced with anchors suggesting previous distress to same.  However these would have only provided localized support to the stones immediat ely in front of the anchor plates, because the tensile capacity of the wall would have been limit ed.  The frangipani tree would have caused additional load, both from its mass and root growth over a period of time.  The depth of penetration int o the subject rear yard was reasonable to allow inspection of same. At the time of our inspection we observed n o evidence that would suggest that there was distress to a sewer line.  No Sewage odour was noted by the writer given the subject Case No: 486019 Determination Page 11 of 11 line services nine properties, odour would have been evident around the collapsed rear yard pavers.  If rain water can find its way out at the top of the rock shelf, then so would the sewage water.  As we understand no odour was report ed for a period greater than 2 years post loss date.  It is our understanding that high pressure jets do not generally destroy clay pipes. What can occ ur if there is a significant break in the pipe is that the soil around the pipe would be washed away by the jet water.  If the clay pipe was defective and leaking to the extent that it was obliterated by high pressure jets, then sewage odour from a pipe ser vicing 9 properties would have been very obvious.  Not only would sewage odour be obvious, we would have expected some migration of the sandy soil below the rear pavers and further collapse of same. App’s building consultant (AP) Supplement ary Report 28 - 01 - 2017  I note the sewer line was not tested by the cont ractor but only the storm water lines at the property.  It appears CC does not accept the owners‟ independent engineer inspected the property that included the sandstone wall and found no defects to that wall.  It appears that CC has determined that the sandstone wall was not capable of retaining the site fill but has not taken into consideration that the wall as built was ret aining the fill for at least 20 to 30 years prior to the collapse.  It is obvious that the effect of water from the constant leaking sewer line over time has caused additional hydrostatic pressure behind the wall.  What conditions changed to affect the pressure behind the sandstone wall for it to collapse? The only plausible answer is th e constant leaking sewer overtime.  The owner advised that on occasions there was a faint smell of sewer prior to the collapse of the wall and after. The sewer line became blocked 2 years after the wall collapse.  It is very likely that the sewer line has be en leaking water at a constant rate for some time prior to the collapse of the wall providing the additional hydrostatic pressure stated in RF‟s report. This being the case the constant leaking sewer line has caused the failure of the sandstone wall.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.