Retaining wall collapse claim declined as gradual loss
Summary
Applicants' sandstone retaining wall collapsed after rain and the FSP denied the claim. AFCA preferred the FSP engineer's evidence of gradual earth pressure over the applicants' unproven theory of a leaking sewer main.
The applicants did not establish that a sewer leak existed before the collapse, so the gradual loss or damage exclusion applied.
Issues
- Claim denial primary · not upheld“The Panel prefers RF's opinion that the collapse was due to increased earth pressure over time, within the exclusion for gradual loss or damage.”
Subjects and remedies
home or building damageno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 486019 Determination Page 1 of 11
Case number: 486019 29 May 2018
1 Overview
1.1 Dispute
The applicants lodged a claim with their financial service provider (FSP) for a
collapsed retaining wall following rain on 4 October 2010.
The FSP assessed the damages and subsequently denied the claim. In doing so, the
FSP says the cause of the damage was the gradual increase of earth pressure.
On 13 March 2013, the applicants located a collapsed sewer main. The applicants
attributed the collapsed retaining wall to this leaking sewer pipe.
The FSP assessed the damage and further denied the claim. In doing so, the FSP
says at the time of the wall collapsing there was no proof of the distressed sewer
pipe.
The applicants disagree and seek cover for the reinstatement of the retaining wall.
1.1 Issues and key findings
Is the FSP entitled to deny the claim?
The FSP is entitled to deny the claim because:
the FSP‟s engineer‟s (RF) opinion about the cause of damage is persuasive
RF says the damage is due to increased earth pressure over a period of time
this falls within the policy exclusion for gradual loss or damage of any kind.
1.2 Determination
This determination is in favour of the FSP.
The FSP is entitled to deny liability for the applicants‟ claim.
Case No: 486019 Determination Page 2 of 11
2 Reasons for determination
Is the FSP entitled to deny the claim?
Applicants establish a valid claim
The applicants carry the initial onus to establish any loss or damage arising from an
event is covered by the terms and conditions of the policy. This is known as a valid
( prima facie ) claim.
Once a valid claim is established, the FSP bears the onus to show the loss falls
within a policy exclusion or is otherwise entitled to deny the claim.
The standard of proof is the balance of probabilities.
The applican ts‟ policy covers the building for accidental loss or damage, subject to
various conditions and exclusions. The policy defines the words „accident‟ and
„damage‟ to mean:
Word Policy definition
Accident Something that was not intended, planned or expected and which did not occur through
a malicious act
Damage Actual physical damage to your building, contents or pers onal valuables
Given the scope of cover provided under the policy, the Panel is satisfied the
applicants have established a valid claim for accidental damage to the retaining wall.
Accordingly, it falls to the FSP to demonstrate on the balance of probabilities:
the cause of the disputed damage was a factor the policy excludes
it is otherwise entitled to deny the claim.
Retaining wall has partially collapsed
On 5 October 2010, the applicants contacted the FSP to lodge a claim for the
collapse of their retaining wall. At claim lodgement, the applicants say the damage
resulted from a rain event. The FSP assessed the claim, but subsequently declined
it.
On or around March 2013, whilst excavating parts of the retaining wall, the applicants
discovered a collapsed sewer main. The applicants attributed the damages sustained
to the retaining wall as a result of this leaking pipe.
Both parties have engaged a number of experts to review the area and provide an
opinion as the likely cause of damage. Their reports are summarised in section 3.
Evidence does not show the sewer leak existed in October 2010
The applicants‟ position is solely based on an as sumption that the sewer leak
discovered in March 2013 existed in October 2010.
Case No: 486019 Determination Page 3 of 11
HC (hydrologist) explained a theory about how this leak could have caused the
damage. EB (engineer) supported this possibility. The FSP‟s engineers, RF and CC,
disagree.
The Panel is not persuaded the evidence shows a leak occurred in October 2010 for
the following reasons.
First, there is no physical or contemporaneous evidence to show the retaining wall
was affected by a sewer leak. RF, who attended the site the day after the claim was
reported, did not observe any evidence of a sewer leak. Given the wall collapsed and
the soil retained would have been evident, it is unclear how RF, or anyone else
attending the scene, could have missed this, had there been a leak.
Second, an odour would have been readily apparent. Whilst EB says no odour would
have been noticed given the leak would have been predominantly water, this is
difficult to accept. RF and CC, as well as consultant RZ, accept this should have
been readily discernible. Further, this sewer main services nine properties.
In addition, and of significance, the only evidence to support that this leak existed is
the applicants saying they noticed an odour before the wall collapsed. If this is the
case, then it should have been readily discernible when the area was inspected after
the collapse. It was not.
Third, there is no contemporaneous evidence of the applicants noticing an odour
prior to the discovery of the collapsed sewer main. Whilst the applicants say they
engaged a plumber to attend the property and investigate the source, no evidence of
this was provided beyond the plumber who attended in March 2013.
Fourth, the sequence of events that led to the discovery of the leak is unclear. HC
says a plumber attended the site to investigate a blockage. CC says the plumber was
called after workmen excavating the site discovered the collapsed sewer. CC also
says RZ called this plumber who said he attended the site two weeks earlier to cap
the services and did not notice any issue.
No evidence was provided by this plumber directly. It is therefore unclear if the leak
was discovered after excavations works were conducted or what extent, if any, the
plumber‟s evidence is consistent with HC or CC. Further, and of significance, it is
unclear if the excavation works damaged the sewer and what physical evidence (if
any) supports the possibility the sewer was affected prior to the excavation works.
RF’s evidence is preferred
As the Panel is not satisfied the evidence shows the leak occurred in October 2010,
then HC‟s or EB‟s opinions about the cause of damage is unpersuasive.
This leaves the opinions of RF and CC. RF concluded that the cause was likely the
increased earth pressure load over a period of time. CC, to a degree, agreed with
this by saying the wall was not capable of withstanding the load.
Their evidence is consistent with the identification of three anchors installed to the
wall.
Case No: 486019 Determination Page 4 of 11
EB says these anchors do not support their evidence. EB based this on the fact an
engineer had provided a pre-purchase inspection report in September 2008 and
observed no signs of distress. EB also said these anchors would have only assisted
the stones in the wall immediately around the base plates.
EB does not explain what other purpose these anchors se rved though.
The Panel considers that it is reasonable to presume they were installed to anchor
issues at those particular points in the wall. This is consistent with CC and EB who
explain how these anchors would have assisted. No other purpose for their
installation has been provided.
If that is the case, then their installation supports RF and CC‟s conclusion that the
wall was experiencing distress from the increased earth pressure. The Panel does
not accept the pre-purchase inspection refutes this. This is because a copy of the
report is not available and it is not clear how closely the wall was reviewed and
considered by the engineer.
FSP is entitled to deny the claim
Accordingly, after careful consideration of all the evidence, the panel prefers RF‟s
opinion as to the likely cause of collapse. RF attended the scene contemporaneous
to the event. His evidence is supported to an extent by CC. It is relatively consistent
with the evidence of the anchors. EB‟s contrary opinion is not persuasive as it is
reliant on an assumption that is unsubstantiated.
Therefore, the Panel is satisfied the evidence shows the loss falls within the policy
exclusion for “gradual loss or damage of any kind”. Given this, the FSP is entitled to
deny liability for the retaining wall.
Case No: 486019 Determination Page 5 of 11
3 Supporting information
3.1 FOS approach to this dispute
We prioritised this dispute in line with the Operational Guidelines of our Terms of
Reference because of the nature of this dispute. It has progressed directly to a
determination by a panel, consisting of an Ombudsman, and advocates with
extensive experience in consumer complaints, and insurance industry practice.
We shared all information in this determination with the parties, and the parties had
the opportunity to respond. We also reviewed all material supplied in response to
make our determination. While the parties raised many issues, we have only
commented on those directly relevant.
We decided this dispute on its merits, considering the relevant law, good industry
practice, codes of practice, and previous FOS decisions where relevant.
3.2 Expert reports
Record Key points
FSP’s engineer (RF)
Report
11 - 10 - 2010
The writer carried out a site visit to the above noted
residential property on Wednesday 6 October 2010 in the
presence of the insured.
The purpose of the visit was to inspect and comment on
the likely cause(s) of collapse to a section of retaining wall
along the western boundary.
The section of wall which collapsed is approximately 2.9 m
high by 4 m long.
The height of the subject retain ing wall is approximately
2.9m above the sandstone shelf, which is exposed and
appears to be sound.
The primary framing of the subject retaining wall consists of
random sandstone blocks with varying dimensions bedded
to form a structural thickness of about 600mm.
The structure is deemed a „gravity retaining wall‟ system
with the back fill material being of sand consistency.
Above this height there exists a masonry balustrade and on
top of the same there exists a metal balustrade.
The retaining wall contain anchors to provide additional
support. These anchors are post original construction and
we believe they were installed to provide additional
support.
Typically, anchors are installed when walls exhibit signs of
distress.
The majority of the terrace above the retaining wall is
paved with the exception of a small garden bed located in
the south west corner.
On site we tested the storm water line by using a hose at
the rear roof gutters. Water discharged out at the front
Case No: 486019 Determination Page 6 of 11
street gutter, immediately in front of the council boundary
line.
The 90 mm PVC storm wat er pipe was viewed within the
collapsed section of the wall. This pipe appeared to be
functioning well and this was confirmed by the plumber‟s
investigation.
It is our opinion that the likely cause of coll apse can be
attributed to the increased earth pressure load behind the
subject wall over a period of time.
Additional hydrostatic pressure from upstream seepage
may have also contributed to the failure.
Sand mat erial is a good drainage layer and weep holes at
the bottom of the subject wall may have been inadequate
to discharge the volume of water causing a built up of
pressure behind the wall.
The fact that the anchors were installed suggests that there
was some degree of distress to the wall prior to the
c ollapse.
At the remaining section of the wall, near the mid anchor,
the wall exhibits some degree of bulging.
FSP’s building
consultant (CC)
Report
14 - 03 - 2013
No reference was made in RF‟s report to a large Frangipani
tree which was located in the south west corner garden
bed, immediately behind the south end of the collapsed
length of the west boundary ret aining wall.
The insureds advised their workmen preparing to install a
garage in place of the rear courtyard and boundary
retaining wall had discovered a collapsed sewer main
under the middle of the previously existing courtyard.
The insureds are now of the opinion that the collapsed
sewer pipe may have been the cause of the collapse of the
boundary retaining wall.
It would appear that the collapsed mech anism was forward
rotation of the wall and not outward slippage of the base off
the supporting bedrock.
The wall is a mass gravity wall (i.e. relying on the self -
weight to resist overturning and forward displacement)
Clearly the three tie - back anchors were installed to try to
counteract the shortcomings of the original wall and/or
were introduced to bolster the wall when the courtyard level
was raised.
The collapsed sewer pipe was about 2 to 2.5 meters distant
from the back of the collaps ed stone wall on th e west side
boundary.
RF report shows a considerable penetration into the west
side of the site at the rear courtyard location, almost
sufficient to have sighted the in ground sewer main.
The escaping sewage would have been more obvious two
days after the wall collapsed.
We do not believe the damaged sewer main was
associated with the collapse of the boundary retaining wall,
Case No: 486019 Determination Page 7 of 11
for the following reas ons:
If escaping sewage water was causing hydrostatic
pressure on the back of the retaining wall prior to
collap se, sewer would have been seeping out under
the base of the wall on top of bed rock base.
Escaping sewage water would have drained straight
down through the free draining sand and only changed
direction when contacting the base bedrock.
Sewage water emanat ing from the base of the stone
wall onto the public footpath would have been
recognized as a health hazard in very quick time, if
only from the smell.
To survive undiscovered servicing nine dwellings
upstream, for a further 2 years and 5 months is an
unrea sonable assumption.
App’s hydrologist (HC)
Report
10 - 06 - 2013
The almost total disappearance of the missing section of
pipe indicates the following possibilities:
The high pressure jet obliterated the damaged pipe.
The only time a jet will cause damage to an
earthenware pipe is if the pipe itself was already
significantly compromised by external factors such as
surrounding ground movement.
There has been significant soil movement in this area
of the property to the extent the pipe has been
completely washed away.
Although there is evidence of seepage running off the
bedrock in Russell Street closest to the North West corner
of the building, this by no means confirms that the seepage
is confined to this corner of the property.
It is likely for a damaged sewer age pipe to function for a
number of years even if damaged.
The damaged sewer pipe could have caused the retaining
wall collapse given the following:
- An initial small crack opened up in the pipework most
likely caused by ground movement.
- A small percentage of waste started leaking
- The amount of water escaping increas ed
- The combination of seepage and inc reasing amounts
of sewage raised the pressure and weight of soil
behind retaining wall.
- Residents would not have known of this issue as there
was no evidence
App’s building
consultant (EB)
Report
01 - 05 - 2015
I do not concur with RF‟s opinion on the anchors but say
that the anchors were inspected in September 2008 by the
owners engineer with no report of any movement and
failure of thes e anchors.
If as asserted the anchors were installed as the walls were
exhibiting signs of distress then the signs of distress would
have been observed and not ed and reported to owners.
It is my understanding that no report of any distress on the
Case No: 486019 Determination Page 8 of 11
3 wall anchors has been reported a t the property since the
purchase by the owners in late 2008/early 2009.
Furthermore there was no distress on the wall observed by
me on 12 March 2015 in the location of the single anchor
still in position at the time of my inspection.
It is my experience and observation that the anchors
installed to the sandstone gravity wall would have only
assisted the stones in the wall immediately around and at
the base
The sewer line was not tested by RF.
It is my understanding the 3 anc hors would have been
installed many years prior when the wall was increased in
height and the courtyard level raised as suggested.
The opinions and comments from RF do not take into
consideration the broken and failed sewer line in direct
proximity of the section of the failed sandston e wall.
The frangipani trees have non - invasive root systems that
can be safely grown near pipes and cables and in narrow
planter beds.
Furthermore the tree is still standing. I am also of the
opinion that the height of the tree (yet to be determined)
would not have caused the collapse of the sandstone wall.
The sandstone wall would have collapsed at halfway down
the height of the wall.
If there was an issue with the height of this non - evasive
plant it would have only dislodged the top section of the
wall.
I do not agree it was forward rotation of the wall but say it
was the outward slippage of the base of the wall. From the
photos provided to me the wall collaps ed at the base of the
wall outwards to the maximum width of 4 met ers and
approximately 2 to 2.5 me t res at the top that I say is due to
the abnormal and excess water behind the wall coming
from the collaps ed sewer line.
The wall was inspected by the owners engineer prior to
purchase with no issues reported.
The reason in my opinion for the collapse of the wall at that
section is directly in line with the broken sewer that allowed
abnormal and excessive water to collect behind the wall
causing the collapse. The sewer line was discovered to be
broken in March 2013 when a plumber attended the site to
inves tigate a blockage in the common sewer line.
The common sewer line is towards the rear or eastern side
of the property that was not uneart hed when the wall
collapsed in October 2010.
I further question if the storm water lines were tested and
found no leaks that the sewer line should have been tested
as well.
It is my opinion that the common sewer main is located
more to the rear of the property or eastern side than in the
middle. This is the reas on why it was not discovered until
Case No: 486019 Determination Page 9 of 11
March 2013.
The location of the common sewer line is irrelevant
considering it was only discovered in March 2013 that there
was a 1 metre section of the VCP missing of the sewer line
after the plumber investigated the sewer blockage.
I have been instructed that there was a slight se wer smell
before and after the collapse of the sandstone wall and
then discovered in March 2013 that the line had failed.
It is my summation that the sewer line servicing the nine
houses has partially failed allowing water to escape,
building up abnormally behind the sandstone wall causing
the wall to eventually fail.
I do not agree that sewage would have drained from the
property. The water escaping the sewage line would have
filtered through the sand backfill medium that was at the
top of the property and only a smell would have remained. I
have been advis ed such a smell existed.
In any event the partially damaged sewer line was towards
the rear of the property and still buried and or visible after
the collapse.
The broken sewer line in my opinion was the sole reason
for the collapse of the sandstone wall.
FSP’s building
consultant (CC)
Supplement ary Report
15 - 08 - 2015
We could speculate that the large excavator moving and
working on the small site could have caused the disturbing
ground movement referred to above.
There is a fundamental contradiction in the version of
events surrounding the discovery of the broken sewer pipe.
The arguments presented to explain why leaking sewage
might go undetected do not take into account that the
bedrock appears to be gr ading down from south to north
(towards the front of the house) and from east to west
(across the site towards Russell Street).
Furthermore, the sewer leakage if it existed before the
arrival of the large excavator, was only a matter of 3 met ers
from the R ussell street face of the collapsed retaining wall.
Just how is it possible to dispose of leakage sewage and
the accompanying odour in 10 feet, through sand, without
some appearance/stink on the Russell Street façade?
The leak then continued for a further 2 years and 5 months
completely undetected, with no visible loss of transportable
sand and with no interruption to the waste services.
There was no reason for the sewer line to break in the first
place. The development of a crack in the sewer line is
entir ely man - created imagination.
There was no leakage until the builder start ed at the site
and the sewer was accidently broken. The builder calls the
plumber.
The HC report is a totally speculative version of how a
waste pipe could spontaneously develop a cra ck and how
the ensuing leak age of sewage could build up over the
Case No: 486019 Determination Page 10 of 11
years and then be linked directly to the collapse of the
stone retaining wall.
The problem is the gross speculation in the report then
transfers into EB‟s report where it is accepted as a fac t.
The EB conclusion is that water escaping from the sewer
built up behind the stone retaining wall until it caused the
wall to collapse out into the foot path. Let us examine the
chances.
The 100 year old sand stone block wall would have had to
be a water retaining structure.
The wall was not designed to retain water. The wall, as
built, could not hold or retain water.
There was no internal liner to provide waterproofness.
The irregular joints could not have been sufficiently caulked
to prevent escape of sewage.
There was no sealant around the wall piercing anchor bolts
or plates.
There was no rusting of the bolts or plates.
The water escaping between the base of the rough
sandstone blocks and the rough surfac e of the bedrock
bench had no odour .
The subjec t sewer was only 3 meters away and serviced
not one hous e, but nine.
This was the main sewer line, yet the wat er running down
the bedrock onto the footpat h showed no flow lines, or
slumping of saturated sand.
The sand backfill deposited on the footpath was odourless
and free of sewage, or it would not have stayed there for
long.
The EB report depends on the leakage created in the HC
report, so it is no surprise that EB agrees entirely with HC.
FSP’s engineer RF
Supplement ary report
19 - 08 - 2015
We note the w all collapsed following a rain storm.
The rear yard is paved and is directed to the garden bed in
the south west corner.
As such, concentrated water flows would have been
directed to this area and immediately behind the failed
section of wall.
As noted the subject wall was reinforced with anchors
suggesting previous distress to same.
However these would have only provided localized support
to the stones immediat ely in front of the anchor plates,
because the tensile capacity of the wall would have been
limit ed.
The frangipani tree would have caused additional load,
both from its mass and root growth over a period of time.
The depth of penetration int o the subject rear yard was
reasonable to allow inspection of same. At the time of our
inspection we observed n o evidence that would suggest
that there was distress to a sewer line.
No Sewage odour was noted by the writer given the subject
Case No: 486019 Determination Page 11 of 11
line services nine properties, odour would have been
evident around the collapsed rear yard pavers.
If rain water can find its way out at the top of the rock shelf,
then so would the sewage water.
As we understand no odour was report ed for a period
greater than 2 years post loss date.
It is our understanding that high pressure jets do not
generally destroy clay pipes. What can occ ur if there is a
significant break in the pipe is that the soil around the pipe
would be washed away by the jet water.
If the clay pipe was defective and leaking to the extent that
it was obliterated by high pressure jets, then sewage odour
from a pipe ser vicing 9 properties would have been very
obvious.
Not only would sewage odour be obvious, we would have
expected some migration of the sandy soil below the rear
pavers and further collapse of same.
App’s building
consultant (AP)
Supplement ary Report
28 - 01 - 2017
I note the sewer line was not tested by the cont ractor but
only the storm water lines at the property.
It appears CC does not accept the owners‟ independent
engineer inspected the property that included the
sandstone wall and found no defects to that wall.
It appears that CC has determined that the sandstone wall
was not capable of retaining the site fill but has not taken
into consideration that the wall as built was ret aining the fill
for at least 20 to 30 years prior to the collapse.
It is obvious that the effect of water from the constant
leaking sewer line over time has caused additional
hydrostatic pressure behind the wall.
What conditions changed to affect the pressure behind the
sandstone wall for it to collapse? The only plausible answer
is th e constant leaking sewer overtime.
The owner advised that on occasions there was a faint
smell of sewer prior to the collapse of the wall and after.
The sewer line became blocked 2 years after the wall
collapse.
It is very likely that the sewer line has be en leaking water at
a constant rate for some time prior to the collapse of the
wall providing the additional hydrostatic pressure stated in
RF‟s report. This being the case the constant leaking sewer
line has caused the failure of the sandstone wall.