Determination 485504
Claim declined for support post movement after storm landslide
Summary
After a storm caused a landslide, the FSP denied the claim for a support post that the applicant said had moved. AFCA preferred the applicant's engineering evidence and ordered the claim accepted, with expert report costs and interest if cash settled.
The applicant established a prima facie claim for accidental damage caused by the storm and the FSP's expert evidence was not persuasive.
Issues
- Claim denial primary · upheld“The FSP should accept the claim under the terms of the policy and either conduct necessary repairs or cash settle.”
- Inadequate claim investigation secondary · upheld“I prefer the applicant's expert evidence over the FSP engineer's assessment.”
Subjects and remedies
home or building damagenatural disasterpay claimpay compensationpay interestrepair or rectify
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 485504 Determination Page 1 of 7
Case number: 485504 21 December 2017
1 Overview
1.1 Dispute
A storm event caused a landslide around the corner of the applicant’s home. She
lodged a claim for this landslide and what she says is movement to the support post
as a result.
Both the applicant and the financial services provider (FSP) have appointed
engineers to determine if there is any pole movement as a result of the storm. The
engineers disagree on this.
The FSP have declined the claim on the basis of its engineer’s report. The applicant
seeks coverage on the basis of both of her engineers’ findings.
1.2 Issues and key findings
Can the FSP deny the claim?
The FSP cannot deny the claim. The applicant has established the damage to the
support post was caused by a landslide from the claimed storm event.
1.3 Determination
This determination is in favour of the applicant.
The FSP is required to indemnify the applicant for this claim in accordance with
section 2.1 of this Determination.
The FSP is also to reimburse the applicant’s costs for obtaining the engineers’
reports.
Case No: 485504 Determination Page 2 of 7
2 Reasons for determination
2.1 Can the FSP deny the claim?
Applicant is covered for accidental loss or damage caused by an accident
Current principles say an insured bears the onus of establishing that, on the balance
of probabilities, they have suffered a loss caused by a risk insured under the policy.
This is known as a prima facie claim.
If the insured is able to establish a prima facie claim, the onus then shifts to the
insurer to show that, on the balance of probabilities, the loss falls within an exclusion
clause under the policy or that it is otherwise entitled to deny liability.
The applicant’s policy contains an optional benefit for “Accidental Damage”. This
responds in the following circumstances:
“we will cover … accidental loss or damage to your home caused by an accident which
occurs at the insured address”
Accident is defined by the policy to mean “a single occurrence or series of
occurrences arising from one event which you did not intend or expect to happen”.
Therefore, the applicant has can establish a prima facie claim if the evidence shows
the property suffered accidental loss or damage caused by an “accident”.
Parties agree that a storm caused a landslide
On 31 March 2017 the applicant’s property was affected by a significant storm. The
applicant reported that the storm caused landslide at her property and the failure of
her retaining wall.
The occurrence of the storm and the landslide are not in dispute. Both parties agree
that the landslide and the failure of the retaining wall were caused by the storm. The
applicant accepts that the replacement of the lost earth and the failure of the
retaining wall are not covered under the policy.
The applicant says the landslide also caused a support post at the corner of her
home to move, causing damage.
The FSP disputes this. The FSP says the support post has not moved and has
always been out of place.
Applicant’s experts’ evidence is preferred
Both parties have provided numerous expert opinions.
The FSP is relying upon engineer J. The applicant is relying upon engineers R and P
as well as builder JW.
The relevant evidence has been summarised in section 3.1 of this Determination.
Having carefully reviewed all the avail able evidence, I prefer the applicant’s expert
evidence for the following reasons.
Case No: 485504 Determination Page 3 of 7
First, and of most significance, the evidence does not support J’s assumption the
support post was always out of place. The applicant has provided the following
persuasive evidence disputing this:
evidence from the Council saying it would not have passed the inspection for
the support pole if it was not plumb
evidence from builder JW who was working on the property prior to the event
and was familiar with its layout – after the storm, JW said it was immediately
apparent the support post had moved
the relevant support post is substantively out of plumb compared to the others –
it is unlikely this would have been installed in such a manner and passed by
Council
This evidence re futes J’s assumption that the post was installed in a manner that was
not plumb. J has not provided any other explanation for how it became out of plumb.
This factor alone undermines J’s opinion.
Second, whilst J has highlight concerns about R’s measuremen ts, J has not
explained the methodology he followed. In contrast, R explained that he used a laser
distance measuring device three times to ensure accuracy. P and JW agreed R’s
methodology is acceptable.
Given this, R’s measurements should be preferred as the process has been
explained and is supported by two other experts. R’s measurements show that the
posts have continued to move subsequent to the event. This contradicts J’s evidence
that there has been no movement.
Third, R’s measurements shows the supp ort post has at least moved approximately
10mm downwards and approximately 50mm to the north east. J noted that 10mm
vertical movement is within expected tolerance. However, JW and R noted that the
50mm movement is clearly outside of tolerance. Further, the direction is consistent
with the landslide. This supports their conclusion that the post moved following the
landslide.
Fourth, JW said J’s testing about the depth of the footing could not be conclusive as
it would not be able to distinguish other solid matters, such as brick or a rock. J has
not commented on this possible margin for error. Given this, I do not accept J has
established that the footing extended more than a metre below the exposed section
of the footing.
Fifth, R has noted that due to the post to verandah floor being connected by a single
bolt, the rotation of it would not cause any visible damage to the floor structure. This
explains the lack of evidence of damage to the floor structure and supports R’s
conclusion.
FSP to indemnify the applicant for her claim
Given all this, I am satisfied the applicant has shown a prima facie claim regarding
the support post and any resultant damage.
Therefore, the FSP should accept the claim under the terms of the policy and either
conduct necessary repairs or cash settle the applicant for the repair works on a
current repair quote.
Case No: 485504 Determination Page 4 of 7
If the FSP cash settles the claim, it should pay interest on any amount paid pursuant
to section 57 of the Insurance Contracts Act 1984 (the Act). Interest is payable from
11 May 2017, being the date the FSP denied the claim, until payment is made.
Further, the FSP should reimburse the costs incurred by the applicant in obtaining
R’s and P’s reports. These were reasonably incurred given the technical nature of the
issue in dispute and the fact they substantively assisted the applicant’s position.
Case No: 485504 Determination Page 5 of 7
3 Supporting information
3.1 Expert Reports
Record Key points
FSP’s expert ( J )
Report 1
27 April 2017
During the heavy rainfall event of late March 2017, the
ground at the rear LH comer of the dwelling experienc ed a
major land slip which has caused the ground at that comer to
drop and move downhill away from the dwelling.
The land sl ip has tak en the section of timber retain ing wall
with it down the slope of the embankment 1500 mm out wards
and 600mm downwards. The ground around the timber pole
has subsided and left part of the concrete footing exposed.
Tests with a ground probe indicate the concrete footing
extends more than 1 m below the exposed section of footing.
Levels taken on the subfloor indicat e no vertical movement
has occurred to the pole·. The 200mm diameter timber pole is
out of plumb approximat ely 30mm in two directions at the
bottom.
Given the subfloor levelness, the tightn ess of the subfloor
members and no other visible signs of movement, it is evident
the pole has not moved as a result of the land slip rather the
pole was originally installed slightly out of plumb.
Applicant’s expert ( R )
Report
22 May 2017
The post at the NE comer of the veranda was found to be
significantly out of plumb. T he verticality of all the other posts
supporting the structure were found to be within 1 0mm.
I t is our c onclusion that this post and it s foundation have
m ov e d along with the slipped soil.
The movement of the base of the post can be summarised as
follows: West to East 48mm South to North 45mm total
movement 66mm to the NE ( the direction of the landslip).
The veranda floor level was seen to be 10mm lower at the SE
Corner
Th e internal floor level from the NE corner of the kitchen was
found to be 18mm lower
The author is largely in agreement with the findings of the J
report, however, our measurements indicated a larger
amou nt of out of plumb of the base of the comer post, tha n
30 mm in the J report. i.e. 66mm and noting the accuracy of
the other posts. Disagree that the post in question was
erected out - of - plumb. As the post to veranda floor bearer
connection is by a single bolt, i.e. pin jointed, the rotation of
the post did not cause any visible damage to the floor
structure.
The significant movement of the base of the post is
considered to be a structural failure, as well as an obvious
visual deformity to the overall presentation of the home.
Case No: 485504 Determination Page 6 of 7
FSP ’s expert ( J )
Report 2
17 July 2017
The first observation was that three of the five acrow props
installed immediately after the event were very loose and not
bearing any weight. These acrow props surrounded the inside
of the subject pole. The loose props indicate the pole itself is
bearing on firm ground and not moving while the fill ground
beneath the acrow prop sole plates has settled.
The second observation is the levels of the subfloor have
remained consistent in the nearly three months since the first
level readings were taken. A comparison sketch plan is
shown below.
Slight gapping is apparent around the rafters and cornices in
the kitchen area and also at the veranda post to veranda
beam and rafter connection immediately above the subject
pole. All buildings can and do move and this gapping and
movement is normal for a building of this age and
construction type.
The gaps around the veranda post are the result of timber
shrink age and they have previously been filled with gap filler
and painted indicating their long term presence. C onsidered
negligible.
The available evidence from this inspection indicates that the
timber pole at the rear LH corner of the dwelling has not
moved in the three months since our first inspection. As
stated in our April report, it is confirmed there is no evidence
to suggest the pole has moved as a result of the rain event in
late March 2017.
Applicant’s expert ( R )
Report
15 July 2017
In order to asce rtain the movement of the post P1, a number
of measurements were taken, using a laser distance
measuring devic e.
The measuring device, a Leica DISTO DXT has a g uaranteed
accuracy of + or - 1mm. Each measurement was repeated at
least 3 times to minimise any errors.
The movement of the base of the post can be summarised as
follows:
West to East 30mm South to North 50mm, total movement
58mm to the NE (the direction of the landslip). The total
movement measured on 13t h May was 66mm.
The verandah floor level at Post P1 was seen to be 17mm
lower (compared to 10mm lower on the 13th May) and Post
P2 10mm lower (compared to 5mm lower on the 13th May).at
the SE corner and when compared to the floor level at the
second post back. The internal floor level from the NE co rner
of the kitchen, compared to the floor level diagonally back to
the second row of posts was found to be 18mm lower .
The author disagrees that the post in question (P1) was
erected out - of - plumb. As the post to veranda floor bearer
connection is by a sin gle bolt, i.e. pin jointed, the rotation of
the post did not cause any visible damage to the floor
structure.
However, there has been a noticeable increase in the vertical
Case No: 485504 Determination Page 7 of 7
settlement of the two veranda posts P1 & P2, and this is likely
to continue, unless remedial measures are taken.
The significant movement of the base of the post P1, as well
as the bowing and stress fractures, is considered to be a
structural failure, as well as an obvious vis ual deformity to the
overall presentation of the home.
Applica nt’s expert ( P )
Report
3 September 2017
1. It is unlikely that the corner post would have been
constructed out of plumb as suggested in the J ’s report of 27
April
2. R’s l evels clearly show both vertical and horizontal
movement in the P1 post at its base and the deck level at the
top of the post, consistent with movement down the hill.
D etails of the movement are shown on drawing S2 from
report of 15 July.
3. A visual assessment shows the P1 post base has moved
slightly down the hill in the direction of th e slope.
4. “On the balance of probabilities” the storm event and the
ensuing drainage failure and subsequent retaining wall failure
have contributed to the movement of the post P1. It is not
possible to determine the amount of movement in post P1
prior to the storm event of March 2017.
5. There is no evidence that there has been any substantial
movement in P2 or P3 as stated in the conclusion of R ’S
report of 15 July. Post P2 has only moved by 5mm which is
within the range of what would be expected for this type of
building and measuring system adopted.
In relation to the extent of damage to the buildings finishes, I
agree wit h J ’S assessment that th ere has been negligible
damage to the house as a cons equence of the movement of
post P1.
In summary, there is clear evidenc e that post P1 has moved
and should be re - positioned to prevent a future structural
failure of the buildings support system.
FSP ’s e xpert ( J )
Report
8 September 2017
In taking the measurements a laser beam is shot across to
the adjac ent post and it is imperative that this laser beam is
absolutely horizontal. R took three measurements in each
location and took the average reading to acc ount for any
measurement being out of horizont al . H owever, it is not a
completely accurate method of measurement.