Home / Financial Firm (Unknown - Insurer) / Determination 485504

Determination 485504

Claim declined for support post movement after storm landslide

FirmFinancial Firm (Unknown - Insurer)
Decided2017-12-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

After a storm caused a landslide, the FSP denied the claim for a support post that the applicant said had moved. AFCA preferred the applicant's engineering evidence and ordered the claim accepted, with expert report costs and interest if cash settled.

The applicant established a prima facie claim for accidental damage caused by the storm and the FSP's expert evidence was not persuasive.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay interestrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 485504 Determination Page 1 of 7 Case number: 485504 21 December 2017 1 Overview 1.1 Dispute A storm event caused a landslide around the corner of the applicant’s home. She lodged a claim for this landslide and what she says is movement to the support post as a result. Both the applicant and the financial services provider (FSP) have appointed engineers to determine if there is any pole movement as a result of the storm. The engineers disagree on this. The FSP have declined the claim on the basis of its engineer’s report. The applicant seeks coverage on the basis of both of her engineers’ findings. 1.2 Issues and key findings Can the FSP deny the claim? The FSP cannot deny the claim. The applicant has established the damage to the support post was caused by a landslide from the claimed storm event. 1.3 Determination This determination is in favour of the applicant. The FSP is required to indemnify the applicant for this claim in accordance with section 2.1 of this Determination. The FSP is also to reimburse the applicant’s costs for obtaining the engineers’ reports. Case No: 485504 Determination Page 2 of 7 2 Reasons for determination 2.1 Can the FSP deny the claim? Applicant is covered for accidental loss or damage caused by an accident Current principles say an insured bears the onus of establishing that, on the balance of probabilities, they have suffered a loss caused by a risk insured under the policy. This is known as a prima facie claim. If the insured is able to establish a prima facie claim, the onus then shifts to the insurer to show that, on the balance of probabilities, the loss falls within an exclusion clause under the policy or that it is otherwise entitled to deny liability. The applicant’s policy contains an optional benefit for “Accidental Damage”. This responds in the following circumstances: “we will cover … accidental loss or damage to your home caused by an accident which occurs at the insured address” Accident is defined by the policy to mean “a single occurrence or series of occurrences arising from one event which you did not intend or expect to happen”. Therefore, the applicant has can establish a prima facie claim if the evidence shows the property suffered accidental loss or damage caused by an “accident”. Parties agree that a storm caused a landslide On 31 March 2017 the applicant’s property was affected by a significant storm. The applicant reported that the storm caused landslide at her property and the failure of her retaining wall. The occurrence of the storm and the landslide are not in dispute. Both parties agree that the landslide and the failure of the retaining wall were caused by the storm. The applicant accepts that the replacement of the lost earth and the failure of the retaining wall are not covered under the policy. The applicant says the landslide also caused a support post at the corner of her home to move, causing damage. The FSP disputes this. The FSP says the support post has not moved and has always been out of place. Applicant’s experts’ evidence is preferred Both parties have provided numerous expert opinions. The FSP is relying upon engineer J. The applicant is relying upon engineers R and P as well as builder JW. The relevant evidence has been summarised in section 3.1 of this Determination. Having carefully reviewed all the avail able evidence, I prefer the applicant’s expert evidence for the following reasons. Case No: 485504 Determination Page 3 of 7 First, and of most significance, the evidence does not support J’s assumption the support post was always out of place. The applicant has provided the following persuasive evidence disputing this:  evidence from the Council saying it would not have passed the inspection for the support pole if it was not plumb  evidence from builder JW who was working on the property prior to the event and was familiar with its layout – after the storm, JW said it was immediately apparent the support post had moved  the relevant support post is substantively out of plumb compared to the others – it is unlikely this would have been installed in such a manner and passed by Council This evidence re futes J’s assumption that the post was installed in a manner that was not plumb. J has not provided any other explanation for how it became out of plumb. This factor alone undermines J’s opinion. Second, whilst J has highlight concerns about R’s measuremen ts, J has not explained the methodology he followed. In contrast, R explained that he used a laser distance measuring device three times to ensure accuracy. P and JW agreed R’s methodology is acceptable. Given this, R’s measurements should be preferred as the process has been explained and is supported by two other experts. R’s measurements show that the posts have continued to move subsequent to the event. This contradicts J’s evidence that there has been no movement. Third, R’s measurements shows the supp ort post has at least moved approximately 10mm downwards and approximately 50mm to the north east. J noted that 10mm vertical movement is within expected tolerance. However, JW and R noted that the 50mm movement is clearly outside of tolerance. Further, the direction is consistent with the landslide. This supports their conclusion that the post moved following the landslide. Fourth, JW said J’s testing about the depth of the footing could not be conclusive as it would not be able to distinguish other solid matters, such as brick or a rock. J has not commented on this possible margin for error. Given this, I do not accept J has established that the footing extended more than a metre below the exposed section of the footing. Fifth, R has noted that due to the post to verandah floor being connected by a single bolt, the rotation of it would not cause any visible damage to the floor structure. This explains the lack of evidence of damage to the floor structure and supports R’s conclusion. FSP to indemnify the applicant for her claim Given all this, I am satisfied the applicant has shown a prima facie claim regarding the support post and any resultant damage. Therefore, the FSP should accept the claim under the terms of the policy and either conduct necessary repairs or cash settle the applicant for the repair works on a current repair quote. Case No: 485504 Determination Page 4 of 7 If the FSP cash settles the claim, it should pay interest on any amount paid pursuant to section 57 of the Insurance Contracts Act 1984 (the Act). Interest is payable from 11 May 2017, being the date the FSP denied the claim, until payment is made. Further, the FSP should reimburse the costs incurred by the applicant in obtaining R’s and P’s reports. These were reasonably incurred given the technical nature of the issue in dispute and the fact they substantively assisted the applicant’s position. Case No: 485504 Determination Page 5 of 7 3 Supporting information 3.1 Expert Reports Record Key points FSP’s expert ( J ) Report 1 27 April 2017  During the heavy rainfall event of late March 2017, the ground at the rear LH comer of the dwelling experienc ed a major land slip which has caused the ground at that comer to drop and move downhill away from the dwelling.  The land sl ip has tak en the section of timber retain ing wall with it down the slope of the embankment 1500 mm out wards and 600mm downwards. The ground around the timber pole has subsided and left part of the concrete footing exposed. Tests with a ground probe indicate the concrete footing extends more than 1 m below the exposed section of footing.  Levels taken on the subfloor indicat e no vertical movement has occurred to the pole·. The 200mm diameter timber pole is out of plumb approximat ely 30mm in two directions at the bottom.  Given the subfloor levelness, the tightn ess of the subfloor members and no other visible signs of movement, it is evident the pole has not moved as a result of the land slip rather the pole was originally installed slightly out of plumb. Applicant’s expert ( R ) Report 22 May 2017  The post at the NE comer of the veranda was found to be significantly out of plumb. T he verticality of all the other posts supporting the structure were found to be within 1 0mm.  I t is our c onclusion that this post and it s foundation have m ov e d along with the slipped soil.  The movement of the base of the post can be summarised as follows: West to East 48mm South to North 45mm total movement 66mm to the NE ( the direction of the landslip).  The veranda floor level was seen to be 10mm lower at the SE Corner  Th e internal floor level from the NE corner of the kitchen was found to be 18mm lower  The author is largely in agreement with the findings of the J report, however, our measurements indicated a larger amou nt of out of plumb of the base of the comer post, tha n 30 mm in the J report. i.e. 66mm and noting the accuracy of the other posts. Disagree that the post in question was erected out - of - plumb. As the post to veranda floor bearer connection is by a single bolt, i.e. pin jointed, the rotation of the post did not cause any visible damage to the floor structure.  The significant movement of the base of the post is considered to be a structural failure, as well as an obvious visual deformity to the overall presentation of the home. Case No: 485504 Determination Page 6 of 7 FSP ’s expert ( J ) Report 2 17 July 2017  The first observation was that three of the five acrow props installed immediately after the event were very loose and not bearing any weight. These acrow props surrounded the inside of the subject pole. The loose props indicate the pole itself is bearing on firm ground and not moving while the fill ground beneath the acrow prop sole plates has settled.  The second observation is the levels of the subfloor have remained consistent in the nearly three months since the first level readings were taken. A comparison sketch plan is shown below.  Slight gapping is apparent around the rafters and cornices in the kitchen area and also at the veranda post to veranda beam and rafter connection immediately above the subject pole. All buildings can and do move and this gapping and movement is normal for a building of this age and construction type.  The gaps around the veranda post are the result of timber shrink age and they have previously been filled with gap filler and painted indicating their long term presence. C onsidered negligible.  The available evidence from this inspection indicates that the timber pole at the rear LH corner of the dwelling has not moved in the three months since our first inspection. As stated in our April report, it is confirmed there is no evidence to suggest the pole has moved as a result of the rain event in late March 2017. Applicant’s expert ( R ) Report 15 July 2017  In order to asce rtain the movement of the post P1, a number of measurements were taken, using a laser distance measuring devic e.  The measuring device, a Leica DISTO DXT has a g uaranteed accuracy of + or - 1mm. Each measurement was repeated at least 3 times to minimise any errors.  The movement of the base of the post can be summarised as follows:  West to East 30mm South to North 50mm, total movement 58mm to the NE (the direction of the landslip). The total movement measured on 13t h May was 66mm.  The verandah floor level at Post P1 was seen to be 17mm lower (compared to 10mm lower on the 13th May) and Post P2 10mm lower (compared to 5mm lower on the 13th May).at the SE corner and when compared to the floor level at the second post back. The internal floor level from the NE co rner of the kitchen, compared to the floor level diagonally back to the second row of posts was found to be 18mm lower .  The author disagrees that the post in question (P1) was erected out - of - plumb. As the post to veranda floor bearer connection is by a sin gle bolt, i.e. pin jointed, the rotation of the post did not cause any visible damage to the floor structure.  However, there has been a noticeable increase in the vertical Case No: 485504 Determination Page 7 of 7 settlement of the two veranda posts P1 & P2, and this is likely to continue, unless remedial measures are taken.  The significant movement of the base of the post P1, as well as the bowing and stress fractures, is considered to be a structural failure, as well as an obvious vis ual deformity to the overall presentation of the home. Applica nt’s expert ( P ) Report 3 September 2017  1. It is unlikely that the corner post would have been constructed out of plumb as suggested in the J ’s report of 27 April  2. R’s l evels clearly show both vertical and horizontal movement in the P1 post at its base and the deck level at the top of the post, consistent with movement down the hill. D etails of the movement are shown on drawing S2 from report of 15 July.  3. A visual assessment shows the P1 post base has moved slightly down the hill in the direction of th e slope.  4. “On the balance of probabilities” the storm event and the ensuing drainage failure and subsequent retaining wall failure have contributed to the movement of the post P1. It is not possible to determine the amount of movement in post P1 prior to the storm event of March 2017.  5. There is no evidence that there has been any substantial movement in P2 or P3 as stated in the conclusion of R ’S report of 15 July. Post P2 has only moved by 5mm which is within the range of what would be expected for this type of building and measuring system adopted.  In relation to the extent of damage to the buildings finishes, I agree wit h J ’S assessment that th ere has been negligible damage to the house as a cons equence of the movement of post P1.  In summary, there is clear evidenc e that post P1 has moved and should be re - positioned to prevent a future structural failure of the buildings support system. FSP ’s e xpert ( J ) Report 8 September 2017  In taking the measurements a laser beam is shot across to the adjac ent post and it is imperative that this laser beam is absolutely horizontal. R took three measurements in each location and took the average reading to acc ount for any measurement being out of horizont al . H owever, it is not a completely accurate method of measurement.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.