Determination 485186

Tree-impact storm repairs alleged defective and further roof, eave and tile damage claimed; delays in repairs

FirmFinancial Firm (Unknown - Insurer)
Decided2018-03-26
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,000
Amount claimed—
SourceAFCA PDF

Summary

The applicant alleged that FSP-authorised tree-damage repairs to his roof, eaves and shower tiles were defective and sought rectification. AFCA found the repairs were not shown to be defective and the other damage was not caused by the event, but ordered $1,000 for non-financial loss due to delays.

The applicant did not establish that the repairs were defective or that the claimed damage was caused by the tree or repairs, while unacceptable delay in commencing repairs and responding to complaints warranted compensation under the Terms of Reference.

Issues

Subjects and remedies

pay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 485186 Determination Page 1 of 7 Case number: 485186 22 February 2018 1 Overview 1.1 Dispute The applicant held a home building policy with the financial services provider (FSP). The applicant says there were a number of issues with repair work authorised by the FSP, which in turn have resulted in issues with the roof, eaves and tiles in the shower. He complains about the damage caused by the repairs or the fallen tree. The FSP se nt a builder to inspect the repairs and the damage. Based on the builder’s opinion, the FSP denied the claim saying the repairs did not require rectification and the claimed damage was not caused by any insured event. The case manager provided the parties with a recommendation on the issues in dispute. The recommendation was in favour of the FSP. The FSP accepted the recommendation but it was not accepted by the applicant. In the circumstances, the dispute has been referred to me for determination. 1.2 Issues and key findings Is the FSP liable for the applicant’s damage and claim for rectification? The FSP is not liable for the applicant’s claim for damage or rectification as the available material does not establish on the balance of probabilities the repair works were defective or the repairs or the fallen tree caused the claimed damage. Is the applicant entitled to compensation? The available information establishes there has been an unusual amount of physical inconvenience, time taken to resolve a situation and interference with the a pplicant’s expectation of enjoyment or peace of mind because of delays in commencing repairs and responding to the applicant’s complaints. 1.3 Determination This determination is in favour of the FSP. The FSP is not required to take any further action in relation to the claim or the dispute. Should the applicant accept this determination, then within seven days of acceptance, the FSP is to pay to the applicant $1,000 compensation. Case No: 485186 Determination Page 2 of 7 2 Reasons for decision I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied that the docume ntation I have relied on has been provided to both parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. Applicant provided a plumber’s report after the re commendation After the recommendation was rejected, the applicant made further submissions and provided a report from a plumber. Where relevant, this is referred to in the determination. 2.1 Is the FSP liable for the applicant’s damage and claim for rectification? Applicant must show repairs were defective or the fallen tree caused damage The applicant must establish on the balance of probabilities that he has suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. The FSP’s policy provides cover for impact damage caused by trees or branches. It is not in dispute some parts of the applicant’s home were damaged by tree impact. The FSP’s policy says if it agrees to cover a claim it will pay the cost to repair the part of the home which was damaged. The FSP can elect for its repairers to repair the damage or pay the reasonable cost to repair the damage. The FSP agreed to repair the damage. The dispute relates to the repairs. The applicant says the roof has not been properly repaired. The applicant claims the roof sags because the FSP did not replace the battens as specified in the scope of works. He also claims damage to the tiles in the ensuite shower and damaged eaves. The applicant says the eaves lining started falling down around the house between the time of the tree impact and the start of repairs. He says he made these repairs. He complains about the FSP’s delays. He says if something was defective outside the scope of works, he should have been told so he could make repairs. He does not accept the claimed damage was outside the scope of works or was a pre-existing issue. The FSP says the roof is properly repaired. It also says the claimed damage to the tiles and the eaves were not damaged by the repairs or the impact of the tree. The FSP’s policy provides if the FSP elects to repair damage, then in addition, the FSP provides a lifetime guarantee. This means it guarantees the workmanship of Case No: 485186 Determination Page 3 of 7 repairs which it authorised for the lifetime of the home. It also means it will fix any defect caused by poor workmanship. The policy provides the FSP will decide on what needs to be done to fix any defect. The guarantee does not apply to wear and tear that is consistent with normal gradual deterioration of the home. The applicant must establish on the balance of probabilities there are now defects caused by the FSP’s poor workmanship. Once so established, the onus shifts to the FSP to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. Repairs to roof were not defective The FSP was not required to repair the whole roof. The FSP was only required to repair the parts of the roof and home damaged by the fallen tree. The damage was identified by the assessor and builder who examined the damage with the applicant. A scope of works was prepared. The applicant agreed to the scope of works and the repairs were carried out in accordance with the agreed scope. I have considered the available material including photographs. I do not accept the roof is sagging because of the FSP’s repairs. I accept the scope of works, provided the FSP’s builder was to remove and replace damaged beams above the ensuite and master bedroom and this was not done. However, the available material establishes the beams were not replaced because it would have affected the cedar lining walls in the ensuite below. After consultation with an engineer, the existing beams were laminated on both sides. The builder surveyor approved this work. The available material establishes the works have been certified as compliant by the relevant authorities. After the recommendation, the applicant provided a report from a plumber. While the plumber says the sheets bow, the report does not establish where the sheets bow. In order to establish the work done by FSP was defective, the applicant must establish the roof was sagging in the area of repairs over the ensuite and master bedroom. The available material does not establish this. On the information provided, I am not satisfied the applicant has established the repair work to the roof was defective. Tiles were not damaged by the tree or by the repairs I accept the tiles are damaged and repair work was done above the ensuite. The damage was assessed with th e applicant by the FSP’s assessor within weeks of the impact damage. No impact damage was noted inside the house. The builder described the internal damage as minimal. The photographs show no other damage in the bathroom. The cedar timber above the tiles is not damaged at all. Photographs provided show the grouting is failing but the house is around 30 years old. The FSP’s builder says the old grout had been missing for a long time. The applicant provided no material to rebut the opinion of the FSP’s builde r. Case No: 485186 Determination Page 4 of 7 In the circumstances, I am not satisfied the available material establishes the claimed damage to the tiles in the bathroom was caused by the impact damage of the tree or by the repairs undertaken by the FSP. Eaves not damaged by the tree and do not require rectification repairs The applicant also says eaves are coming lose. However, he does not specify which eaves. The agreed scope of works shows the FSP was to remove and replace damaged eave sheets to the veranda (approx. 3 sqm). The construction manager from FSP’s builder inspected the repairs on 5 June 2017. He reported to the FSP that there is some rotted fascia but says it is at the other end of the house to the repairs. He says this is not related to the claim. The FSP is only obliged to repair the damage caused by the insured event or rectify repairs undertaken pursuant to an agreed scope of works. The FSP is not obliged to advise an insured of any other maintenance work which is required. The repair work is certified as compliant. In the circumstances, I am not satisfied the available material establishes the claimed damage to the eaves was caused by the impact damage of the tree or requires rectification. 2.2 Is the applicant entitled to compensation? Compensation paid in some circumstances FOS’s Terms of Reference allow the payment of compensation (capped at $3,000) for non-financial loss. FOS may decide an FSP should compensate an applicant for such loss only where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the applicant’s expectation of enjoyment or peace of mind. The applicant complains about delays and the stress caused by the claim. I accept issues arose in relation to the i nitial assessment of the claim. However, the repairs only commenced about a year after the insured event and this is an unacceptable delay. Further, when the applicant complained about the repairs in 2017, it took several months for the FSP’s builder to respond to the applicant’s concerns. FOS takes a conservative approach to compensation for non-financial loss. In the circumstances of this dispute, I consider there was an unusual amount of time taken to resolve the situation both initially and in 2017. I accept the FSP’s conduct has interfered with the applicant’s expectation of enjoyment or peace of mind. I am satisfied it is fair in all the circumstances the FSP pay to the applicant $1,000 compensation. Case No: 485186 Determination Page 5 of 7 3 Supporting information 3.1 FOS Approach It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Expert reports and other material Expert Key points Applicant’ s plumber’s report 20 - 09 - 17  RS inspected the roof repair and photographs .  Batons of the roof have not been rectified before the roof was reinstalled/repaired.  When walking on the roof the sheets bow down by about 30mm to meet the baton. The screws would only just be biting the bat on.  Th is results in non - waterproof and non - compliant work .  If the screws are tightened to make a tight seal, the colorbond sheets sag about 30mm. FSP’s builder’s report 06 - 03 - 14  Inspected damage with applicant 28 February 2014.  Tree fell on the home causing a hole through the roof and damage to the front right hand section of the home.  Noted external damage to about 10 roof sheets, 3 rafters and 2sqm eave lining to the veranda.  Internal damage is minimal with no damage to plaster. Noted fan in bedroom 4 making humming sound, fan to ens uite dislodged and will require reinstatement.  Noted more damage may be found once roof sheeting removed . Scope of Works executed 03 - 06 - 14  See below under 3.3. Variation request 28 - 08 - 14  Variation in quotation $23,387.36. Included:  21. Exhaust fan in ensuite checked and confirmed to be replaced.  21. Arrange engineer to attend site to provide structural plans for the replacement of the beams. Truss Replacement Plans  Approved 18.12.14.  Existing damaged roof trusses above the ensuite hatched area up to be removed and replaced by new timber trusses. Email from structural engineer to FSP’s builder 04 - 02 - 15  Proposed alternative method of repair to roof truss. Case No: 485186 Determination Page 6 of 7 FSP’s builder email 20 - 02 - 15  Roof rectified today.  Battens have been fixed done correctly and are compliant.  We have re - screwed every batten on the roof and they meet the current building standard.  If unevenness to the roof incurs in the future please contact us. Compliance Certificate VBA 25 - 02 - 15  Plumbing work completed 23 Feb 2015.  Installation details: remove existing storm damage ro ofing and replace with new colo rbond corry and sisaltion and matc h existing flashings, guttering, downpipes, move drainage vent and replace damaged roof sprinkler system. Certificate of final inspection 20 - 04 - 15  Roof truss replacement approved . FSP ’s builder (GT) email to FSP 8 - 06 - 2017  Met the applicant on 5 June 2017 with plumber and builder as applicant says all roof battens should be replaced.  I have ex plained to the insured it is not a renovation it is a rectification. The area of damaged was repaired as whic h I showed the photos of the work that had been done and framing inspection that was carried out by the council with the engineering plan see attached.  Tiles in ensuite have come lose. Wall tiles is missing a lot of its grout between the tiles and in the corner which is letting water in behind the tiles which are now coming loos e. Phot attached.  Another issue is there is some rotted fascia at the other end of the house which the ins ured believe that this should have been replaced as a small section of eave sheet is starting to b ecome dislodge. Which is not related to the claim. See photo attached.  Another issue the insured believed that a top plate in the ensuite had not been replaced. We inspected this in the roof and the top plate has a very small split where the nail had come out through the side photo attached (sic). FSP ’s builder (GT) email to FSP 26 - 07 - 2017  The reason for the change in the scope was that if the beams had to be totally replaced it would have affected the cedar lining walls in the ensuite. The external build er brought this up with our Building Consultant that the engineer had not taken this into a count the cedar wall lining and the size of the new beams. The building Consultant contacted anot her engineer who gave another alternative to laminate on both sides of existing which the Building Surveyor had approved.  The repair were done on the R/H side of the roof looking from the back photo attached. The insured was claiming when I went to site on the 5th June 2017 that the roof was uneven. The uneven part of th e roof is not where the work were carried out. The repair works that had been carried out the laminate beams are a lot stronger than the existing ones.  We do not believe that the tree had damaged the shower as none of the cedar lining boards were dislodged and the tiles in the shower were still intact. I have spoken to the builder and engineer and they recall that there was no damage to this area only old grout that had been missing for a long time. When I viewed this on the 5t h June 2017 I found the same t hing. Case No: 485186 Determination Page 7 of 7  The insured may of have had a straight roof when the house was 1st built which was done out of OBHW as we know OBHW does shrink a lot over time that is why the roof is uneven not by the impact.  Yes the top plate has a very small split in the top edge of the plate where the rafter was skewed nail the rafter to the top plate unfort unately this can happen for time to time. I have spoken to the engineer about this and they have stated this is not a structural problem. 3.3 Original scope of works executed 3 June 2014 The original scope of works executed 3/6/2014 included the following: 2. Check exhaust fan to ensuite and confirm correct operation and reinstate cover. If damage is found a variation will be required, 3. RHF of home. Remove and replace damaged eave sheets to front verandah to best match existing approx. 3sqm (variation may be required if any additional sheets are damage from fascia replacement). 10. 22.5m x 6.8m Carpenter Remove and replace damaged beams to front RHS of home (above ensuite and master bedroom) approx. 6.8m (Note: Variation will be required if additional damage is found once roofing sheets are lifted) Approx 4 beams @6.8m. 11. 22.5m x 6.8m Plumbing Remove and replace 10 roofing sheets and flashing to RHS above ensuite Approx 6.8m x 7.5m (Includes replacement battens to roofing sheets) . 12. 22.5m x 6.8m Electrical Remove and replace 3 damaged solar panels to best match existing (Variation will be required if solar system inverter does not function correctly) . 13. 22.5m x 6.8m Plumbing Remove and replace gutter to front RHF of home from ensuite to entry area Approx. 25LM (Includes reinstatement of existing gutter guard) . 14. RHS front of home 22.5m x 6.8m Carpenter Remove and replace fascia to best match existing approx. 9LM. 15. RHS front of home 22.5m x 6.8m Painting Seal and paint fascia, eave lining and guttering to the RHS Front of the home approx. 25LM of guttering and fascia eave lining 45sqm. 3.4 Relevant policy sections The relevant policy extracts are referred to in the recommendation and the FSP’s Notice of Response dated 5 July 2017. Both the policy document and the Notice have been exchanged with the applicant. 3.5 Other relevant material considered and relied on  Parties’ submissions, emails, photographs, reports, scopes of work and all attachments to all submissions both before and after recommendation.  Correspondence between the parties.