Home / Financial Firm (Unknown - Insurer) / Determination 485166

Determination 485166

Storm damage roof repair scope and cash settlement amount disputed

FirmFinancial Firm (Unknown - Insurer)
Decided2018-01-23
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$7,454
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

After a hail storm, the applicant disputed the insurer's assessment of roof damage, which it had cash-settled at about $1,730. AFCA found about one-third of the roof was damaged, including sarking and resulting bathroom damage, and ordered a cash payment of $7,453.80 plus the bathroom repair cost.

On the balance of probabilities, the hail damage to roughly one-third of the roof, with the sarking and bathroom water damage caused by the storm, must be covered under the policy less the $1,000 excess.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 485166 Determination Page 1 of 4 Case number: 485166 10 January 2018 1 Overview 1.1 Dispute The applicant held a home and contents insurance policy (Policy) issued by the financial services provider (FSP). The Policy started on 16 September 2016 and provided cover for loss or damage as a result of insured events. The Policy did not include accidental damage cover. On 18 February 2017 the applicant lodged a claim for storm damage. The FSP accepted the claim. This dispute is about the scope of work required to repair the damage caused by the storm. 1.2 Issues and key findings Has the FSP assessed the damage correctly? The FSP has underestimated the damage caused by the hail storm . Based on the information provided by both parties I am satisfied that approximately one-third of the roof was damaged by hail. The FSP is also liable for the repair of the sarking and the resulting damage to the bathroom. The applicant is not entitled to compensation for non-financial loss. 1.3 Determination This determination is partially in favour of the applicant. Within 14 days of the applicant’s acceptance of this determination the FSP must:  pay the applicant $7,453.80 which is one -third of the cost of a full roof replacement less the applicable excess of $1000, and  obtain a quotation for the cost of repairing the resulting damage in the bathroom and pay this amount to the applicant. In all of the circumstances I am not satisfied that the FSP is responsible for unreasonably delaying the settlement of this claim and therefore no interest is payable on these amounts. Case No: 485166 Determination Page 2 of 4 2 Reasons for determination 2.1 Has the FSP assessed the damage correctly? The home sustained damage caused by a storm There is no dispute that the home sustained damage during a storm. The roof was damaged by large hailstones. The hail impacted the concrete roof tiles cracking and breaking some of the tiles. This allowed water to ingress the home. This dispute is about the extent of damage caused by the storm. The FSP says that the hail:  broke or cracked up to 100 tiles  damaged the ridges which require repointing, and  allowed water to enter the home and cause damage the bathroom. The FSP has agreed to repair these items and provide a lifetime guarantee on the work. Alternatively it says the reasonable cost of these repairs (less the excess of $1000) is $1,729.71. It has offered to cash settle the applicant for this amount. The applicant says that the home built in 2016 and was less than 6 months old when the hail storm occurred. He says the roof was basically new and was in good condition. He says the damage is more extensive than the FSP has allowed for. He says the entire roof requires replacement. The reports on the extent of the damage caused by hail varies The FSP and the applicant have provided reports. The following table summarises all of the reports and quotations provided: Date /Provided by Report details 22 February 2017 FSP Emergency Make safe Report (NR) Inspect roof for any damage caused by storms Hail damage to approx. 60 roof tiles 3 March 2017 FSP Assessment Report (BBS) Hail damage to approx. 60 roof tiles (This report describes design type as single storey when in fact the home is double storey so unsure if assessor attended property) 24 March 2017 FSP Expert Assessment – Roof Repo rt (TR) Identifies 3 issues that are a direct result of the hail storm:  Water ingress into front lower roof section under area where there are approximat ely 10 broken tiles and 4lm of ridge capping that requires repointing  Approximately 60 broken tiles on upper roof area and repointing of ridge capping  Approximately 25 broken tiles on the lower roof area and Case No: 485166 Determination Page 3 of 4 repointing of ridge capping 26 May 2017 FSP (BBS) Scope of Works including replacing 95 tiles recapping and resulting damage to bathroom ceiling due to water ingress 6 July 2017 FSP Damage report (AJG) Water damage to bathroom confirmed as storm relat ed 7 July 2017 FSP Roof Report (DRT) On inspection of the roof we found a concrete tile roof with multiple broken tiles, app rox. 50 - 60, due to hail imp act 3 August 2017 Applicant Roof Report (AMR) Upon inspection of top and lower roof, damage from February hail storm was apparent and extensive. Over 100 tiles are broken and many more with hairline fractures 1 September 2017 Applicant Maintenance Inspection Report (TBB) It is recommended to have a roofer replace the damaged, cracked and misaligned tiles and the sarking underneath as it is also damaged and contributing to the ongoing wat er leaks which appears to be affecting bet ween a third to half of the tiles to roof areas Many tiles on the roof are broken, others appear to have hair line fractures and others are misaligned. It is recommended that the tiles with hairline fractures be treated as damaged as there is no way of identifying the level o f damage to this tiles without possibly causing more damage by removing them 4 September 2017 Applicant Roof repair quotation (MH) Based on the report supplied and upon my own inspection…Due to the excessive damage we would only complete a full Re Roof Re pair The reports consistently identify approximately 100 broken tiles The reports provided by both the applicant and the FSP consistently identify approximately 100 broken tiles. In particular the roof report done closest in time to the storm finds three issues, which include approximately 95 broken tiles in total. The applicant’s roof report of 3 August 2017 says over 100 til es are broken. Based on the information provided I am satisfied that at least 100 tiles require replacing because they are broken or cracked. The hail storm also caused some roof tiles to develop hairline fractures In addition to clearly broken tiles, the applicant’s experts also report many more tiles having hairline fractures. The applicant says these tiles should also be replaced. He has provided a quotation for a full roof repair. On the balance of probabilities I also accept that the tiles with hairline fractures were also damaged by hail and should be replaced. Case No: 485166 Determination Page 4 of 4 Neither party has provided an accurate inventory of the total amount of hail damaged tiles. In this case, given the time that has elapsed since the storm, it is fair in all the circumstances that the FSP cash settle the applicant so that the applicant can have the roof repaired as he believes is required. The FSP must make a contribution to this cost that covers the extent of its liability under the Policy. Based on all of the information provided by both parties I estimate that approximately one-third of the roof was damaged, including ridge capping and broken and cracked tiles. The applicant has provided a quotation for a full roof repair in the amount of $25,316.11. Using this recent quotation as a guide, the FSP’s contribution is $8,453.70 (or one-third). The FSP is responsible for the repair of the sarking The applicant did some make safe works himself to prevent further water damage to the bathroom. In doing so the sarking was damaged. The FSP has rejected this part of the applicant’s claim. The applicant’s quote allows for the repair of the sarking. I am satisfied that the FSP should contribute to the repair of the sarking a nd the quote should not be adjusted to allow for a deduction of this cost because:  the water was entering the home because of the hail damage,  water continued to enter the home after the make safe works were done because not all of the broken tiles were sealed, and  the applicant attempted to mitigate the loss by preventing further damage and diverting the water out of the roof space and into the bath in the bathroom instead. The FSP is responsible for the resulting damage in the bathroom The FSP has agreed to repair or pay for the cost of the resulting damage in the bathroom. No separate costing has been provided for this damage. The FSP must cash settle the applicant for the reasonable cost of these repairs or undertake the work. The applicant is not entitled to compensation for delay FOS has a limited jurisdiction for awarding compensation for non-financial loss for stress and inconvenience. I am not satisfied that the FSP unreasonably delayed the progress of the claim for the reasons set out in the Preliminary View.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.