Home / Financial Firm (Unknown - Insurer) / Determination 484958

Determination 484958

Replacement of corroded copper pipework denied; compensation sought for claim handling

FirmFinancial Firm (Unknown - Insurer)
Decided2018-03-23
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's copper pipes leaked and the FSP cash settled the resultant water damage for $4,290 but refused to replace the pipes. AFCA found corrosion excluded, but the leak-location costs were conditionally payable up to $1,500, and it refused compensation for the delay.

The policy excludes corrosion and the cost of repairing the item that leaked, so the pipe replacement is not covered, but the limited exploratory cost cover applies once expenses are proven.

Issues

Subjects and remedies

pay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 484958 Determination Page 1 of 7 Case number: 484958 16 March 2018 1 Overview 1.1 Dispute In August 2016, the applicant lodged a claim with the financial services provider (FSP) after a pipe leaked and caused damage at the insured address. Other leaks were also discovered shortly thereafter. The FSP accepted the resulting damage from the leaks and exploratory costs but denied the replacement of the copper pipework throughout the home on the basis this is excluded under the policy. The applicant disputes the FSP’s decision and also seeks compensation for non - financial loss due to the poor handling of the claim. The case manager provided the parties with a recommendation on the issues in dispute. The recommendation was in favour of the FSP. The FSP accepted the recommendation but it was not accepted by the applicant. In the circumstances, the dispute has been referred to me for determination. 1.2 Issues and key findings Is the FSP’s position reasonable and ac cording to policy terms? The FSP position is reasonable and according to policy terms as the available material establishes on the balance of probabilities the pipes leaked due to long -term corrosion which occurred due to the poor quality of water. As corrosion is excluded from cover the FSP is entitled to deny the claim. Further, as the FSP’s policy does not cover the cost of repairing or replacing the item from which the liquid escaped, the FSP is not obliged to pay for the cost of repairing or replacing the copper pipes. The FSP is entitled to settle the claim for the resultant damage by paying the amount it would cost the FSP to repair the damage. The material provided establishes on the balance of probabilities the amount paid by the FSP in June 2017 to repair damage resulting from the leaking pipes was reasonable. Where the leak is not covered under an insured event, the FSP’s policy provides limited cover for exploratory costs for location of leaks up to $1,500. If the applicant can satisfy the FSP further amounts (in addition to the amounts paid already) have been expended for exploratory costs for location of the leaks, the applicant is entitled to be indemnified by the FSP up to $1,500. Case No: 484958 Determination Page 2 of 7 Is the applicant entitled to compensation? Taking into account all matters relating to the claim and the dispute, compensation is not warranted. 1.3 Determination This determination is in favour of the FSP. If the applicant can satisfy the FSP further amounts (in addition to the amounts paid already) have been expended for exploratory costs for location of the leaks, the applicant is entitled to be indemnified by the FSP up to $1,500. Otherwise, the FSP is not required to take any further action in relation to the claim or the dispute. Case No: 484958 Determination Page 3 of 7 2 Reasons for decision I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. No new information provided after the recommendation After the recommendation was rejected, the applicant made further submissions in which she essentially reiterated her position. No new material was provided by either party. 2.1 Is the FSP’s position reasonable and according to policy terms? The applicant has established a prima facie claim The applicant must establish on the balance of probabilities that she has suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. The FSP’s policy includes cover for accidental damage. The FSP’s policy defines accidental damage to mean loss or damage that occurs without intent. The material provided establishes leaks at the home caused damage. I am satisfied the damage occurred without intent. I am satisfied a prima facie claim has been established. The FSP is not liable to cover the cost of repairing the pipes Once so established, the onus shifts to the FSP to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the damage. The cover for accidental damage has a number of exclusions. Specifically, accidental damage is not covered if it is excluded elsewhere in the policy under an insured event or under a general exclusion. The FSP’s policy covers the home and contents when damaged by the escape of liquid. Relevantly, the FSP does not cover the cost of repairing or replacing the item from which the liquid escaped nor does the policy cover loss or damage caused by corrosion. The material provided establishes a number of experts inspected and photographed the damage and reported on the cause of damage. Notably, an engineer inspected and photographed the damage on 8 March 2017. The engineer carried out an Case No: 484958 Determination Page 4 of 7 inspection and invasive testing of the pipes, which showed they were corroding from the inside out resulting in leaks. The engineer concluded: …. the failure of the copper water pipes relates back to long -term corrosion which has occurred due to poor quality water. The corrosion process has been triggered and ongoing since the day the pipes were installed. The applicant says prior to the time of the claim, she had no issues or problems with leaking pipes. She says she did not know the pipes required replacement. The available materia l supports this contention. However, the applicant’s knowledge of the state of the pipes is not relevant to the particular policy response to the subject claim. The applicant does now have knowledge of the state of the pipes and this may be relevant to policy response to future claims. The applicant also says the house was compliant with building codes and past local council laws when built in September 1998. This is also not in contention but does not alter the policy response. The applicant challenged the adequacy of the FSP’s tests and the engineer’s findings to which the engineer responded. The applicant has provided no expert evidence to challenge the engineer’s findings. Damage was caused by corrosion which is excluded under the policy Having cons idered the available material I am satisfied the engineer’s findings and tests are adequate. I am further satisfied on the balance of probabilities the damage was caused by corrosion which is excluded under the policy. I am also satisfied the policy terms are clear and unambiguous. The FSP is not liable to pay for the cost of repairing or replacing the item from which the liquid escaped. The water escaped from the copper pipes because they were corroded. The applicant indicated she would be prepared to meet 50% of the cost of replacing the pipes. However, in view of the FSP’s clear policy terms, I am satisfied the FSP is not liable to make any payment for the cost of repairing or replacing the copper pipes. For the sake of clarity, if the cost of repairs or replacement of the copper pipes includes holes which will be made in the walls of the home to repair or replace the copper pipes, or if there is other damage necessitated by the repairs or replacement of the copper pipes, these costs and damage are not covered. This is because these costs are inherent to the cost of repairing or replacing the copper pipes. Available material establishes cash settlement reasonable The available material shows in or about June 2017, the FSP cash settled the cost of repairing the resultant damage caused by the leaking pipes in the sum of $4,290. The FSP’s policy entitles it to choose how to settle the claim. It can decide to repair the damage to the home or pay an insured what it would cost the FSP to repair the damage to the home. Case No: 484958 Determination Page 5 of 7 In circumstances where the pipes require repairs, I am satisfied the decision to cash settle the claim was reasonable. Further, the FSP’s file notes indicate the applicant did not want the FSP’s builder to complete repairs as she had local trad espeople ready to do the work. The applicant says she has had four leaks in the copper pipes. The material provided indicates the leaks were in the ground floor laundry and toilet and kitchen. Quotes were obtained for the cost of repairs. The first quote is from B Homes dated 18 August 2016 in the sum of $5,893.80. The second quote is from NC builders dated 28 November 2016 in the sum of $4,290. In correspondence with FOS, the applicant indicated concerns that the amount paid by the FSP in the sum of $4,290 covers the cost of repairs. However, the applicant has provided no rebuttal material about the reasonable cost of repairing the damage caused by the leaking pipes. Two quotations were obtained in relation to the cost of repairs. The FSP is entitled to settle the claim by paying the amount it would cost it to repair the damage. The quotation relied on from the FSP’s builder NC appears comprehensive. It includes 12% builder’s margin, supervision fees and insurance. Therefore on the material provided, I am satisfied on the balance of probabilities the amount already paid by the FSP in June 2017 to repair damage resulting from the leaking pipes is reasonable. Subject to satisfactory proof, FSP liable for exploratory costs up to $1,500 The FSP’s policy provides it will pay for exploratory costs, it will pay the reasonable costs of locating the source of the escaped liquid and repair and restore the damage to the home caused by explorative work but only if the escape of liquid is covered under this insured event. As set out above, the FSP has establish the policy exclusion of corrosion applies to the claim. The FSP’s policy provides some limited cover for exploratory costs for location of leaks up to $1,500. The material provided establishes the FSP has paid to the applicant $701.25 for exploratory costs. The available material does not establish anything further was incurred for exploratory costs. However, if the applicant can satisfy the FSP further amounts have been expended for exploratory cost for location of the leaks, she is entitled to be indemnified by the FSP up to $1,500. 2.2 Is the applicant entitled to compensation? Compensation paid only in some circumstances FOS’s Terms of Reference allow the payment of compensation (capped at $3,000) for non-financial loss. FOS may decide an FSP should compensate an applicant for such loss only where there has been an unusual amount of physical inconvenience, Case No: 484958 Determination Page 6 of 7 time taken to resolve a situation, or interference with the applicant’s ex pectation of enjoyment or peace of mind. The applicant contends the claim was not resolved due to the FSP’s inadequacy and inefficiency. She says she did not receive any formal letters in relation to the claim, only emails and a very brief explanation about claims progress. The FSP acknowledges concerns with the amount of time taken to process the claim and has apologised to the applicant. Further, the FSP accepted only one policy excess in the sum of $2,000. The material provided establishes a claim was made in August 2016. The FSP promptly arranged for the claim to be assessed. In November 2016, the builder NC was engaged to inspect and report on the claim. In March 2017, an engineer was engaged to provide a report about the cause of damage. The FSP arranged an expert review in March 2017. The claim was first denied by email dated 28 March 2017. The final claims decision was made on 25 May 2017. While the assessor attended in August 2016, NC builders were not engaged until November 2016. While the quote fr om B Homes was obtained by the FSP’s assessor in August 2016, no contemporaneous action appears to have been taken by the assessor or the FSP. Payment for the resultant damage was not made until June 2017. However, once the FSP became involved in late 2016, I am satisfied adequate explanations and information about the claims progress and policy response was provided. I have carefully considered the FSP’s claim file notes and listened to the telephone recordings provided by the applicant. I am satisfied there appears to have been a lapse in communication on the part of the FSP’s assessor. The FSP acknowledges this in a telephone conversation with the applicant. As a result, it arranged for an engineer to be engaged to establish the cause of damage. Once it w as agreed it was important to establish the cause of the leak, an engineer’s report was obtained and provided in a reasonably timely manner. FOS takes a conservative approach to compensation for non-financial loss. FOS expects an applicant to be moderately robust and bear the normal degree of inconvenience experienced when a problem occurs and take reasonable steps to reduce inconvenience. In the circumstances of this dispute, I consider there has been an unusual amount of time taken to resolve the situat ion because of the apparent lapse of the FSP’s assessor which would have interfered with the applicant’s expectation of enjoyment or peace of mind. However, once the FSP became involved again, the claims handling and the policy response was reasonable. Further, I note the FSP has apologised for its conduct. I also note the FSP applied only one policy excess to the claim given the circumstances surrounding the claim and delays in responding. Case No: 484958 Determination Page 7 of 7 Taking into account all matters relating to the claim and the dispute, I am not satisfied compensation is warranted. The FSP is not required to pay the applicant compensation. 3 Supporting information 3.1 FOS Approach It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy extracts The relevant policy extracts are referred to in the parties’ submissions and in the FSP’s Notice of Response dated 31 July 2017. Both the policy document and the Notice have been exchanged with the applicant. 3.3 Other relevant material considered and relied on  Parties’ submissions, emails , reports, invoices, photographs and call recordings  FSP’s claim file notes  Correspondence between the parties