Home / Financial Firm (Unknown - Insurer) / Determination 484958
Determination 484958
Replacement of corroded copper pipework denied; compensation sought for claim handling
Summary
The applicant's copper pipes leaked and the FSP cash settled the resultant water damage for $4,290 but refused to replace the pipes. AFCA found corrosion excluded, but the leak-location costs were conditionally payable up to $1,500, and it refused compensation for the delay.
The policy excludes corrosion and the cost of repairing the item that leaked, so the pipe replacement is not covered, but the limited exploratory cost cover applies once expenses are proven.
Issues
- Claim denial primary · not upheld
“I am further satisfied on the balance of probabilities the damage was caused by corrosion which is excluded under the policy.”
- Delay secondary · upheld
“I consider there has been an unusual amount of time taken to resolve the situation because of the apparent lapse of the FSP's assessor.”
Subjects and remedies
pay claim
Text of the determination
Determination
Case No: 484958 Determination Page 1 of 7
Case number: 484958 16 March 2018
1 Overview
1.1 Dispute
In August 2016, the applicant lodged a claim with the financial services provider
(FSP) after a pipe leaked and caused damage at the insured address. Other leaks
were also discovered shortly thereafter.
The FSP accepted the resulting damage from the leaks and exploratory costs but
denied the replacement of the copper pipework throughout the home on the basis
this is excluded under the policy.
The applicant disputes the FSP’s decision and also seeks compensation for non -
financial loss due to the poor handling of the claim.
The case manager provided the parties with a recommendation on the issues in
dispute. The recommendation was in favour of the FSP.
The FSP accepted the recommendation but it was not accepted by the applicant. In
the circumstances, the dispute has been referred to me for determination.
1.2 Issues and key findings
Is the FSP’s position reasonable and ac cording to policy terms?
The FSP position is reasonable and according to policy terms as the available
material establishes on the balance of probabilities the pipes leaked due to long -term
corrosion which occurred due to the poor quality of water. As corrosion is excluded
from cover the FSP is entitled to deny the claim. Further, as the FSP’s policy does
not cover the cost of repairing or replacing the item from which the liquid escaped,
the FSP is not obliged to pay for the cost of repairing or replacing the copper pipes.
The FSP is entitled to settle the claim for the resultant damage by paying the amount
it would cost the FSP to repair the damage. The material provided establishes on the
balance of probabilities the amount paid by the FSP in June 2017 to repair damage
resulting from the leaking pipes was reasonable.
Where the leak is not covered under an insured event, the FSP’s policy provides
limited cover for exploratory costs for location of leaks up to $1,500. If the applicant
can satisfy the FSP further amounts (in addition to the amounts paid already) have
been expended for exploratory costs for location of the leaks, the applicant is entitled
to be indemnified by the FSP up to $1,500.
Case No: 484958 Determination Page 2 of 7
Is the applicant entitled to compensation?
Taking into account all matters relating to the claim and the dispute, compensation is
not warranted.
1.3 Determination
This determination is in favour of the FSP.
If the applicant can satisfy the FSP further amounts (in addition to the amounts paid
already) have been expended for exploratory costs for location of the leaks, the
applicant is entitled to be indemnified by the FSP up to $1,500.
Otherwise, the FSP is not required to take any further action in relation to the claim or
the dispute.
Case No: 484958 Determination Page 3 of 7
2 Reasons for decision
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
recommendation. I am satisfied that the documentation I have relied on has been
provided to both parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
No new information provided after the recommendation
After the recommendation was rejected, the applicant made further submissions in
which she essentially reiterated her position. No new material was provided by either
party.
2.1 Is the FSP’s position reasonable and according to policy terms?
The applicant has established a prima facie claim
The applicant must establish on the balance of probabilities that she has suffered a
loss caused by an event to which the policy responds. This is known as a prima facie
claim.
The FSP’s policy includes cover for accidental damage. The FSP’s policy defines
accidental damage to mean loss or damage that occurs without intent. The material
provided establishes leaks at the home caused damage. I am satisfied the damage
occurred without intent. I am satisfied a prima facie claim has been established.
The FSP is not liable to cover the cost of repairing the pipes
Once so established, the onus shifts to the FSP to prove on the balance of
probabilities that an exclusion applies if it seeks to deny or limit its liability for the
damage.
The cover for accidental damage has a number of exclusions. Specifically, accidental
damage is not covered if it is excluded elsewhere in the policy under an insured
event or under a general exclusion.
The FSP’s policy covers the home and contents when damaged by the escape of
liquid. Relevantly, the FSP does not cover the cost of repairing or replacing the item
from which the liquid escaped nor does the policy cover loss or damage caused by
corrosion.
The material provided establishes a number of experts inspected and photographed
the damage and reported on the cause of damage. Notably, an engineer inspected
and photographed the damage on 8 March 2017. The engineer carried out an
Case No: 484958 Determination Page 4 of 7
inspection and invasive testing of the pipes, which showed they were corroding from
the inside out resulting in leaks. The engineer concluded:
…. the failure of the copper water pipes relates back to long -term corrosion which has
occurred due to poor quality water. The corrosion process has been triggered and
ongoing since the day the pipes were installed.
The applicant says prior to the time of the claim, she had no issues or problems with
leaking pipes. She says she did not know the pipes required replacement. The
available materia l supports this contention. However, the applicant’s knowledge of
the state of the pipes is not relevant to the particular policy response to the subject
claim.
The applicant does now have knowledge of the state of the pipes and this may be
relevant to policy response to future claims.
The applicant also says the house was compliant with building codes and past local
council laws when built in September 1998. This is also not in contention but does
not alter the policy response.
The applicant challenged the adequacy of the FSP’s tests and the engineer’s findings
to which the engineer responded.
The applicant has provided no expert evidence to challenge the engineer’s findings.
Damage was caused by corrosion which is excluded under the policy
Having cons idered the available material I am satisfied the engineer’s findings and
tests are adequate. I am further satisfied on the balance of probabilities the damage
was caused by corrosion which is excluded under the policy.
I am also satisfied the policy terms are clear and unambiguous. The FSP is not liable
to pay for the cost of repairing or replacing the item from which the liquid escaped.
The water escaped from the copper pipes because they were corroded. The
applicant indicated she would be prepared to meet 50% of the cost of replacing the
pipes. However, in view of the FSP’s clear policy terms, I am satisfied the FSP is not
liable to make any payment for the cost of repairing or replacing the copper pipes.
For the sake of clarity, if the cost of repairs or replacement of the copper pipes
includes holes which will be made in the walls of the home to repair or replace the
copper pipes, or if there is other damage necessitated by the repairs or replacement
of the copper pipes, these costs and damage are not covered. This is because these
costs are inherent to the cost of repairing or replacing the copper pipes.
Available material establishes cash settlement reasonable
The available material shows in or about June 2017, the FSP cash settled the cost of
repairing the resultant damage caused by the leaking pipes in the sum of $4,290.
The FSP’s policy entitles it to choose how to settle the claim. It can decide to repair
the damage to the home or pay an insured what it would cost the FSP to repair the
damage to the home.
Case No: 484958 Determination Page 5 of 7
In circumstances where the pipes require repairs, I am satisfied the decision to cash
settle the claim was reasonable. Further, the FSP’s file notes indicate the applicant
did not want the FSP’s builder to complete repairs as she had local trad espeople
ready to do the work.
The applicant says she has had four leaks in the copper pipes. The material provided
indicates the leaks were in the ground floor laundry and toilet and kitchen.
Quotes were obtained for the cost of repairs. The first quote is from B Homes dated
18 August 2016 in the sum of $5,893.80. The second quote is from NC builders
dated 28 November 2016 in the sum of $4,290.
In correspondence with FOS, the applicant indicated concerns that the amount paid
by the FSP in the sum of $4,290 covers the cost of repairs.
However, the applicant has provided no rebuttal material about the reasonable cost
of repairing the damage caused by the leaking pipes.
Two quotations were obtained in relation to the cost of repairs. The FSP is entitled to
settle the claim by paying the amount it would cost it to repair the damage. The
quotation relied on from the FSP’s builder NC appears comprehensive. It includes
12% builder’s margin, supervision fees and insurance.
Therefore on the material provided, I am satisfied on the balance of probabilities the
amount already paid by the FSP in June 2017 to repair damage resulting from the
leaking pipes is reasonable.
Subject to satisfactory proof, FSP liable for exploratory costs up to $1,500
The FSP’s policy provides it will pay for exploratory costs, it will pay the reasonable
costs of locating the source of the escaped liquid and repair and restore the damage
to the home caused by explorative work but only if the escape of liquid is covered
under this insured event.
As set out above, the FSP has establish the policy exclusion of corrosion applies to
the claim.
The FSP’s policy provides some limited cover for exploratory costs for location of
leaks up to $1,500. The material provided establishes the FSP has paid to the
applicant $701.25 for exploratory costs.
The available material does not establish anything further was incurred for
exploratory costs. However, if the applicant can satisfy the FSP further amounts have
been expended for exploratory cost for location of the leaks, she is entitled to be
indemnified by the FSP up to $1,500.
2.2 Is the applicant entitled to compensation?
Compensation paid only in some circumstances
FOS’s Terms of Reference allow the payment of compensation (capped at $3,000)
for non-financial loss. FOS may decide an FSP should compensate an applicant for
such loss only where there has been an unusual amount of physical inconvenience,
Case No: 484958 Determination Page 6 of 7
time taken to resolve a situation, or interference with the applicant’s ex pectation of
enjoyment or peace of mind.
The applicant contends the claim was not resolved due to the FSP’s inadequacy and
inefficiency. She says she did not receive any formal letters in relation to the claim,
only emails and a very brief explanation about claims progress.
The FSP acknowledges concerns with the amount of time taken to process the claim
and has apologised to the applicant. Further, the FSP accepted only one policy
excess in the sum of $2,000.
The material provided establishes a claim was made in August 2016. The FSP
promptly arranged for the claim to be assessed. In November 2016, the builder NC
was engaged to inspect and report on the claim. In March 2017, an engineer was
engaged to provide a report about the cause of damage. The FSP arranged an
expert review in March 2017. The claim was first denied by email dated 28 March
2017. The final claims decision was made on 25 May 2017.
While the assessor attended in August 2016, NC builders were not engaged until
November 2016.
While the quote fr om B Homes was obtained by the FSP’s assessor in August 2016,
no contemporaneous action appears to have been taken by the assessor or the FSP.
Payment for the resultant damage was not made until June 2017.
However, once the FSP became involved in late 2016, I am satisfied adequate
explanations and information about the claims progress and policy response was
provided. I have carefully considered the FSP’s claim file notes and listened to the
telephone recordings provided by the applicant. I am satisfied there appears to have
been a lapse in communication on the part of the FSP’s assessor. The FSP
acknowledges this in a telephone conversation with the applicant. As a result, it
arranged for an engineer to be engaged to establish the cause of damage.
Once it w as agreed it was important to establish the cause of the leak, an engineer’s
report was obtained and provided in a reasonably timely manner.
FOS takes a conservative approach to compensation for non-financial loss. FOS
expects an applicant to be moderately robust and bear the normal degree of
inconvenience experienced when a problem occurs and take reasonable steps to
reduce inconvenience.
In the circumstances of this dispute, I consider there has been an unusual amount of
time taken to resolve the situat ion because of the apparent lapse of the FSP’s
assessor which would have interfered with the applicant’s expectation of enjoyment
or peace of mind. However, once the FSP became involved again, the claims
handling and the policy response was reasonable.
Further, I note the FSP has apologised for its conduct. I also note the FSP applied
only one policy excess to the claim given the circumstances surrounding the claim
and delays in responding.
Case No: 484958 Determination Page 7 of 7
Taking into account all matters relating to the claim and the dispute, I am not satisfied
compensation is warranted. The FSP is not required to pay the applicant
compensation.
3 Supporting information
3.1 FOS Approach
It is an accepted principle of general insurance law that an insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy extracts
The relevant policy extracts are referred to in the parties’ submissions and in the
FSP’s Notice of Response dated 31 July 2017. Both the policy document and the
Notice have been exchanged with the applicant.
3.3 Other relevant material considered and relied on
Parties’ submissions, emails , reports, invoices, photographs and call recordings
FSP’s claim file notes
Correspondence between the parties
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.