Text of the determination
Determination
Case No: 484843 Determination Page 1 of 4
Case number: 484843
29 March 2018
1 Overview
1.1 Dispute
The applicants lodged a claim under their home insurance policy with the financial
services provider (FSP) after their ceiling collapsed.
The FSP declined the claim. The FSP says the damage was not a result of an
insured event and so it is entitled to decline the loss.
The applicants do not agree with the outcome. They also want the FSP to make a
decision on another claim they had made for their heating and air conditioning
system, which has been ongoing for some time.
The case analyst provided the parties with a recommendation on the issues in
dispute. The recommendation was substantially in favour of the FSP. A copy of the
recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct and are adopted in this
determination. No further submissions were provided after the recommendation.
Is the FSP entitled to decline the claim for the collapsed ceiling?
The available information establishes that the damage has occurred gradually over a
period of time, rather than as a result of an insured event. Since an insured event has
not been established as being the cause, the FSP is not liable for the damage from
the collapsed ceiling.
Should the FSP accept liability for the heating/air conditioning unit?
The FSP has said it requires another inspection of the unit in order to make a final
decision as to liability. Because it appears that has not been possible, and if a
decision has not already been made, the FSP is to make a decision as to its liability
(and advise the applicants of that decision) within 10 business days from the date of
this determination. That decision should be based on the evidence that is currently
available to the FSP.
Case No: 484843 Determination Page 2 of 4
1.3 Determination
This determination is substantially in favour of the FSP. The FSP is not liable for the
collapsed ceiling. It must make a decision and advise the applicants on its liability for
the heating/cooling unit within 10 days from the date of this determination.
Case No: 484843 Determination Page 3 of 4
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
recommendation. I am satisfied that the documentation I have relied on has been
provided to both parties.
I am satisfied that the case analyst’s recommendation contains an accurate summary
of the dispute, the issues to be determined, any applicable paragraphs of the Terms
of Reference and any relevant law.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
No new information was provided after the recommendation.
2.2 Is the FSP entitled to decline the claim for the collapsed ceiling?
Applicant must establish damage caused by an insured event
The applicant’s policy provides cover for loss or damage caused by an insured event
listed in the policy or product disclosure statement (PDS). This means not all loss
and damage will be automatically covered by the policy. Rather, only loss or damage
caused by one of the specified insured events will be covered. One of the specified
insured events is storm, which includes rain and violent wind.
The cover is subject to the general exclusions which are detailed within the PDS.
It is accepted insurance law the applicant carries the initial onus to establish he has
suffered loss and damage which is covered by the terms and conditions of the policy.
The FSP then must establish the application of an exclusion upon which it seeks to
rely to decline the claim.
Circumstances of the loss
The applicants’ policy provides cover for loss or damage caused by the insured
events listed in the policy (including storm), subject to the conditions and exclusions
set out in the policy.
The applicants say the ceiling collapsed on the 21 March 2017, but they believe it
was a storm event in November 2016 which initiated the start of the collapse. It is on
this basis the applicants contend a storm event caused the damage.
‘AJ’ attended the property for the FSP, and confirmed with the applicants there was
no evidence of rain water to the plaster in the ceiling. AJ concluded the timber ceiling
battens collapsed due to structural failure.
Case No: 484843 Determination Page 4 of 4
The applicants’ have provided a report from ‘BH’. This report also confir ms the weight
of the plaster was a contributing factor to the collapse. BH says a possible cause
could be excessive moisture on the ceiling, contributing to the weight and ultimately
the collapse. However, AJ is specific that it confirmed with the applicants there was
no evidence of water to the plaster; and BH does not state that there was in fact
evidence of water in this case.
The FSP has also confirmed there was no strong winds on the day the ceiling
collapsed that could have caused the collapse.
The FSP is entitled to decline the claim for the collapsed ceiling
While I accept the policy provides cover for storm, the available material does not
establish the proximate cause of the claimed damage was a storm or any other
insured event. Even if the eventual collapse of the ceiling was from the progressive
effect of wind over time on the inadequate construction, that does not mean that wind
or storm was the operative or effective cause of the damage.
I am satisfied the evidence establishes, on the balance of probabilities, that the
cause of the damage was a gradual process of deterioration due to structural issues
including insufficient nails used in the attaching of the ceiling to the battens.
As the applicants have been unable to establish the loss was a result of an insured
event, I am satisfied the FSP is entitled to decline the claim.
2.3 Should the FSP accept liability for the heating/air conditioning unit?
The case analyst, in his recommendation, suggested further arrangements be made
for the FSP to inspect the heating and cooling system again. However, I understand
that the applicants are not happy to allow a re-inspection, and as the
recommendation was rejected by the applicants, I am can only assume this has not
taken place since then.
That means the FSP can only reasonably make a decision about its liability for the
claim for the heating/cooling system based on the evidence already available to it. If
it has not already done so, the FSP is required to make that decision, and advise the
applicants of it, within 10 business days of the date of this determination.
If the FSP decides to decline the claim for the heating/cooling system, and the
applicants are unhappy with that, they are of course entitled to seek a review of the
matter through this service, if it cannot be resolved first through the FSP’s internal
dispute resolution process.
Recommendation
Case No: 484843 Recommendation Page 1 of 5
Case number: 484843 13 November 2017
3 Overview
3.1 Dispute
In March 2017, the applicants lodged a claim with the financial services provider
(FSP) after their ceiling collapsed. The applicants say the cause of the damage was
a storm.
The FSP assessed the damage and denied the claim. In doing so, the FSP says the
cause of the damage was factors the policy excludes.
The applicants disagree and seek acceptance of the claim. The applicants are also
unhappy the FSP has yet to finalise a claim lodged in November 2016 for an air
conditioner unit.
3.2 Issues and key findings
Is FSP entitled to deny repairs to ceiling?
Based on the available information, the applicants have not established any insured
event caused this damage.
Instead, the information supports the proximate cause of the damage was insufficient
fastening of the plaster to the ceiling battens was likely the proximate cause of the
mould damage.
Accordingly, the FSP is entitled to deny repairs to the ceiling.
Is the FSP required to repair the air-conditioner unit?
Currently the parties have provided conflicting information regarding whether the
identified issues to the unit relate to the storm event.
To resolve the dispute, the material warrants an independent repairer to inspect the
unit and report on its condition. The mechanism for this resolution is set out in 2.2 of
the recommendation.
3.3 Recommendation
This recommendation is substantially in favour of the FSP.
FSP is not required to repair the ceiling damages.
Should both parties accept the recommendation, the dispute regarding the air-
condition unit is to be resolved within the timeframes and as per the resolution
mechanism set out in the body of the recommendation.
Case No: 484843 Recommendation Page 2 of 5
4 Reasons for recommendation
4.1 Is FSP entitled to deny repairs to ceiling?
Applicants have the burden of establishing an insured event
The applicants carry the initial onus to establish any loss or damage arising from an
event is covered by the terms and conditions of the policy.
The a pplicants’ policy is a defined events policy. This means the policy only responds
where one or more of the listed events causes damage to the applicants’ property ,
subject to any exclusions.
The applicants ’ claim relates to damage to their ceiling, which they consider occurred
from a storm. In lodging the claim, the applicants told the FSP they heard a large
bang and found the family room ceiling had collapsed. The applicants also told the
FSP they had not found any rain entry over the affected area.
The FS P’s policy provides cover for loss or damage caused by storm including:
violent wind, cyclone or tornado
rain, thunderstorm, hail or snow
landslide or subsidence that happens immediately as a result of a storm.
Proximate cause of the damage must be established
In order to determine whether the applicant’s claim falls within an insured event, it is
necessary to determine the proximate cause of the loss. What is the proximate cause
of the loss is the question of fact depending upon the circumstances of each case.
It is well established that a proximate cause is not necessarily the first or last or the
sole cause of the loss. It is the effective or dominant or operative cause of the loss. If
there are several causes operating contemporaneously, then each must be
examined for the qualities of predominance and efficiency as the active efficient
cause that sets a relevant train of events in motion.
Courts have said that if one cause would have resulted in the harm in any case and
the other would not have done so in the absence of the first, then the first is the
proximate cause.
Available information does not support a storm caused the damage
Both parties provided information in support of their positions. However, on the
balance of the information, I am not satisfied the applicants have established a storm
caused the ceiling to collapse of the damage.
The FSP provided information to show the cause of the ceiling damage was not the
storm:
The FSP’s builder ( AJG), reported that the ceiling plaster and support battens
delaminated over time
damage is consistent with structural failure and not an insurable event
plaster and ceiling battens have collapsed due to insufficient fastening
Case No: 484843 Recommendation Page 3 of 5
roof tiles are in average condition with no leaks sighted.
The applicants also engaged a builder (BH) to report on the damage. BH says there
are three possible causes of the damage, two of which relate to excessive weight on
the plaster board. BH attributes the third possible cause to be:
excessive moisture caused by rain water, intern contributing to ceiling insulation absorbing and
maintain water, this would have had a direct effect on extra weight and downward pressure on both
battens and the plaster board (sic)
Upon review of the available information:
there is no indication of water staining to the underside of the ceiling
plasterboard
the ceiling battens do not appear wet, and did not fall under an alleged
‘excessive moisture’, nor is there any indication of water staining on the family
room floor
BH has not provided any information to establish how the water got into the roof
cavity.
Additionally, Bureau of Meteorology (BOM) weather reports suggest there was no
excessive rain or wind on the date of loss, or in the preceding days.
Given the above, I do not consider the applica nts have established a storm caused
the damage.
I note after the FSP denied the claim, the applicants suggested a storm in November
2016 may have been the cause of the damage. The applicants suggested it took
time for the ceiling to collapse. If this was the case, I would expect to see evidence
of water staining to the plasterboards and/or water damage to the battens.
Given the available material does not show this, the applicants have not persuaded
me that a November 2016 storm was the cause of the damage.
FSP entitled to deny the claim
Even if accept the applicant established a valid claim (for which I do not), the
available information indicates factors the policy excludes was the proximate cause.
Both experts refer to ‘excessive weight’ and insuffic ient supporting of the ceiling
structure as the cause of its collapse.
Therefore on balance of available information, insufficient fastenings to the ceiling
plaster boards is the proximate cause of the damage. Given this the FSP would be
entitled to rely upon the general exclusions of faulty design and workmanship to deny
the claim.
4.2 Is the FSP required to repair the air conditioner unit?
FSP should have the opportunity to reinspect the air conditioner unit
The applicants appointed their experts MTD and YP to inspect the air conditioner
unit. Both experts state the cause of the damage to the unit and its electrical
components was a storm event in November 2016.
Case No: 484843 Recommendation Page 4 of 5
The FSP says its initial inspection did not properly assess the damage due to lack of
refrigerant and disconnected power supply. Accordingly it says it is still considering
the claim and seeks a reinspection of the unit to make a final decision.
The applicants are currently disallowing a reinspection, because they ha ve no
confidence in the FSP’s initial assessment. While I appreciate the applicants’
concerns, ultimately I accept the applicants ought to give the FSP an opportunity to
reinspect the air conditioner unit.
FSP is to arrange independent reinspection of the unit
To help bring this matter to a close, should both parties accept this recommendation,
the following must occur in order to effect the resolution of this part of the dispute:
The FSP is to identify two independent experts who are suitably qualified to
undertake a comprehensive examination of the applicant’s air-condition unit and
then provide a written report
The FSP is to email the applicants with details of the proposed experts within 14
days of this recommendation being accepted by both parties. This email should
also contain details of the expert’s investigation
Upon receipt of these details, the applicants are to advise the FSP within seven
days by return email of their preferred expert
If the applicants wish the independent expert to review and provide comment on
other matters, the applicant is to outline this in the return email
Upon receipt of the applicants’ advice as to their preferred expert (and any other
matters the applicants wish the expert to comment on), the parties should work
together on a mutually agreeable time for the expert’s inspection
Once the inspection occurs, the expert is to ensure his/her written report is
made available to both parties within a further seven days
Both parties are to agree the expert’s opinions will be final and not subject to
appeal
If it is the expert’s opinion the unit and/or its components have been storm
damaged, the FSP is to carry out the required works, in line with the policy’s
terms and conditions. This work should be completed within 28 days of the
expert’s report being received, unless the expert provides a written view in the
report that a longer timeframe should be afforded to the FSP.
Case No: 484843 Recommendation Page 5 of 5
5 Supporting information
5.1 Expert reports
Record Key points
FSP’s expert (A JG )
Report
29 - 03 - 2017
Damage to entire cornice and ceiling in the family room
Requires replacement along with ceiling battens and ceiling
installation
Electrical cabling servicing lighting is disturbed
Ceiling dislodging due to timber ceiling battens only fastened using
one 75x3 mm smooth shank framing nail
Due to ceiling containing excessive weight it is required that ceiling
battens are fastened using two typical framing nails into each truss
Roof trusses have moved over time with wind pressure and has
caused the one nail holding t he ceiling batten/truss connection to
detach
Scratched hardwood flooring surface from collapsed ceiling
Plaster and ceiling battens have collapsed due to insufficient
fastening during construction
Over time the ceiling plaster and support battens has delam inated
from the roof truss bottom cords
Is consistent with structural failure and not an insurable event
Insured was not aware of these issues
Applicant’s expert ( BH )
Report
25 - 04 - 2017
Approximately 70 square metres of ceiling plaster collapsed
Ceiling in sulation is removed
14 down light and associated cabling have failed
Heating and cooling ducts need attention
All cornices have failed
Possible causes of damages include
Excessive weight on ceiling plasterboard
Failing of ceiling batten to support the downward force applied as a
result overweight plasterboard
Excessive moisture caused by rain storm, in turn contributing to
ceiling insulation abs orbing and maintaining water
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.