Determination 484843

Claim declined for collapsed ceiling; air conditioner liability not yet decided

FirmFinancial Firm (Unknown - Insurer)
Decided2018-03-29
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants claimed for a collapsed ceiling and an air conditioner unit that the FSP had not decided. AFCA found the ceiling damage was not caused by an insured event and ordered the FSP to decide its liability for the air conditioner within 10 days.

The applicants bear the onus of proving a listed insured event was the proximate cause, and the evidence showed gradual structural failure.

Issues

Subjects and remedies

home or building damagereassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 484843 Determination Page 1 of 4 Case number: 484843 29 March 2018 1 Overview 1.1 Dispute The applicants lodged a claim under their home insurance policy with the financial services provider (FSP) after their ceiling collapsed. The FSP declined the claim. The FSP says the damage was not a result of an insured event and so it is entitled to decline the loss. The applicants do not agree with the outcome. They also want the FSP to make a decision on another claim they had made for their heating and air conditioning system, which has been ongoing for some time. The case analyst provided the parties with a recommendation on the issues in dispute. The recommendation was substantially in favour of the FSP. A copy of the recommendation is attached to this determination. 1.2 Issues and key findings Were the findings of the recommendation correct? The findings contained in the recommendation were correct and are adopted in this determination. No further submissions were provided after the recommendation. Is the FSP entitled to decline the claim for the collapsed ceiling? The available information establishes that the damage has occurred gradually over a period of time, rather than as a result of an insured event. Since an insured event has not been established as being the cause, the FSP is not liable for the damage from the collapsed ceiling. Should the FSP accept liability for the heating/air conditioning unit? The FSP has said it requires another inspection of the unit in order to make a final decision as to liability. Because it appears that has not been possible, and if a decision has not already been made, the FSP is to make a decision as to its liability (and advise the applicants of that decision) within 10 business days from the date of this determination. That decision should be based on the evidence that is currently available to the FSP. Case No: 484843 Determination Page 2 of 4 1.3 Determination This determination is substantially in favour of the FSP. The FSP is not liable for the collapsed ceiling. It must make a decision and advise the applicants on its liability for the heating/cooling unit within 10 days from the date of this determination. Case No: 484843 Determination Page 3 of 4 2 Reasons for determination 2.1 Were the findings in the recommendation correct? I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. I am satisfied that the case analyst’s recommendation contains an accurate summary of the dispute, the issues to be determined, any applicable paragraphs of the Terms of Reference and any relevant law. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. No new information was provided after the recommendation. 2.2 Is the FSP entitled to decline the claim for the collapsed ceiling? Applicant must establish damage caused by an insured event The applicant’s policy provides cover for loss or damage caused by an insured event listed in the policy or product disclosure statement (PDS). This means not all loss and damage will be automatically covered by the policy. Rather, only loss or damage caused by one of the specified insured events will be covered. One of the specified insured events is storm, which includes rain and violent wind. The cover is subject to the general exclusions which are detailed within the PDS. It is accepted insurance law the applicant carries the initial onus to establish he has suffered loss and damage which is covered by the terms and conditions of the policy. The FSP then must establish the application of an exclusion upon which it seeks to rely to decline the claim. Circumstances of the loss The applicants’ policy provides cover for loss or damage caused by the insured events listed in the policy (including storm), subject to the conditions and exclusions set out in the policy. The applicants say the ceiling collapsed on the 21 March 2017, but they believe it was a storm event in November 2016 which initiated the start of the collapse. It is on this basis the applicants contend a storm event caused the damage. ‘AJ’ attended the property for the FSP, and confirmed with the applicants there was no evidence of rain water to the plaster in the ceiling. AJ concluded the timber ceiling battens collapsed due to structural failure. Case No: 484843 Determination Page 4 of 4 The applicants’ have provided a report from ‘BH’. This report also confir ms the weight of the plaster was a contributing factor to the collapse. BH says a possible cause could be excessive moisture on the ceiling, contributing to the weight and ultimately the collapse. However, AJ is specific that it confirmed with the applicants there was no evidence of water to the plaster; and BH does not state that there was in fact evidence of water in this case. The FSP has also confirmed there was no strong winds on the day the ceiling collapsed that could have caused the collapse. The FSP is entitled to decline the claim for the collapsed ceiling While I accept the policy provides cover for storm, the available material does not establish the proximate cause of the claimed damage was a storm or any other insured event. Even if the eventual collapse of the ceiling was from the progressive effect of wind over time on the inadequate construction, that does not mean that wind or storm was the operative or effective cause of the damage. I am satisfied the evidence establishes, on the balance of probabilities, that the cause of the damage was a gradual process of deterioration due to structural issues including insufficient nails used in the attaching of the ceiling to the battens. As the applicants have been unable to establish the loss was a result of an insured event, I am satisfied the FSP is entitled to decline the claim. 2.3 Should the FSP accept liability for the heating/air conditioning unit? The case analyst, in his recommendation, suggested further arrangements be made for the FSP to inspect the heating and cooling system again. However, I understand that the applicants are not happy to allow a re-inspection, and as the recommendation was rejected by the applicants, I am can only assume this has not taken place since then. That means the FSP can only reasonably make a decision about its liability for the claim for the heating/cooling system based on the evidence already available to it. If it has not already done so, the FSP is required to make that decision, and advise the applicants of it, within 10 business days of the date of this determination. If the FSP decides to decline the claim for the heating/cooling system, and the applicants are unhappy with that, they are of course entitled to seek a review of the matter through this service, if it cannot be resolved first through the FSP’s internal dispute resolution process. Recommendation Case No: 484843 Recommendation Page 1 of 5 Case number: 484843 13 November 2017 3 Overview 3.1 Dispute In March 2017, the applicants lodged a claim with the financial services provider (FSP) after their ceiling collapsed. The applicants say the cause of the damage was a storm. The FSP assessed the damage and denied the claim. In doing so, the FSP says the cause of the damage was factors the policy excludes. The applicants disagree and seek acceptance of the claim. The applicants are also unhappy the FSP has yet to finalise a claim lodged in November 2016 for an air conditioner unit. 3.2 Issues and key findings Is FSP entitled to deny repairs to ceiling? Based on the available information, the applicants have not established any insured event caused this damage. Instead, the information supports the proximate cause of the damage was insufficient fastening of the plaster to the ceiling battens was likely the proximate cause of the mould damage. Accordingly, the FSP is entitled to deny repairs to the ceiling. Is the FSP required to repair the air-conditioner unit? Currently the parties have provided conflicting information regarding whether the identified issues to the unit relate to the storm event. To resolve the dispute, the material warrants an independent repairer to inspect the unit and report on its condition. The mechanism for this resolution is set out in 2.2 of the recommendation. 3.3 Recommendation This recommendation is substantially in favour of the FSP. FSP is not required to repair the ceiling damages. Should both parties accept the recommendation, the dispute regarding the air- condition unit is to be resolved within the timeframes and as per the resolution mechanism set out in the body of the recommendation. Case No: 484843 Recommendation Page 2 of 5 4 Reasons for recommendation 4.1 Is FSP entitled to deny repairs to ceiling? Applicants have the burden of establishing an insured event The applicants carry the initial onus to establish any loss or damage arising from an event is covered by the terms and conditions of the policy. The a pplicants’ policy is a defined events policy. This means the policy only responds where one or more of the listed events causes damage to the applicants’ property , subject to any exclusions. The applicants ’ claim relates to damage to their ceiling, which they consider occurred from a storm. In lodging the claim, the applicants told the FSP they heard a large bang and found the family room ceiling had collapsed. The applicants also told the FSP they had not found any rain entry over the affected area. The FS P’s policy provides cover for loss or damage caused by storm including:  violent wind, cyclone or tornado  rain, thunderstorm, hail or snow  landslide or subsidence that happens immediately as a result of a storm. Proximate cause of the damage must be established In order to determine whether the applicant’s claim falls within an insured event, it is necessary to determine the proximate cause of the loss. What is the proximate cause of the loss is the question of fact depending upon the circumstances of each case. It is well established that a proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective or dominant or operative cause of the loss. If there are several causes operating contemporaneously, then each must be examined for the qualities of predominance and efficiency as the active efficient cause that sets a relevant train of events in motion. Courts have said that if one cause would have resulted in the harm in any case and the other would not have done so in the absence of the first, then the first is the proximate cause. Available information does not support a storm caused the damage Both parties provided information in support of their positions. However, on the balance of the information, I am not satisfied the applicants have established a storm caused the ceiling to collapse of the damage. The FSP provided information to show the cause of the ceiling damage was not the storm:  The FSP’s builder ( AJG), reported that the ceiling plaster and support battens delaminated over time  damage is consistent with structural failure and not an insurable event  plaster and ceiling battens have collapsed due to insufficient fastening Case No: 484843 Recommendation Page 3 of 5  roof tiles are in average condition with no leaks sighted. The applicants also engaged a builder (BH) to report on the damage. BH says there are three possible causes of the damage, two of which relate to excessive weight on the plaster board. BH attributes the third possible cause to be: excessive moisture caused by rain water, intern contributing to ceiling insulation absorbing and maintain water, this would have had a direct effect on extra weight and downward pressure on both battens and the plaster board (sic) Upon review of the available information:  there is no indication of water staining to the underside of the ceiling plasterboard  the ceiling battens do not appear wet, and did not fall under an alleged ‘excessive moisture’, nor is there any indication of water staining on the family room floor  BH has not provided any information to establish how the water got into the roof cavity. Additionally, Bureau of Meteorology (BOM) weather reports suggest there was no excessive rain or wind on the date of loss, or in the preceding days. Given the above, I do not consider the applica nts have established a storm caused the damage. I note after the FSP denied the claim, the applicants suggested a storm in November 2016 may have been the cause of the damage. The applicants suggested it took time for the ceiling to collapse. If this was the case, I would expect to see evidence of water staining to the plasterboards and/or water damage to the battens. Given the available material does not show this, the applicants have not persuaded me that a November 2016 storm was the cause of the damage. FSP entitled to deny the claim Even if accept the applicant established a valid claim (for which I do not), the available information indicates factors the policy excludes was the proximate cause. Both experts refer to ‘excessive weight’ and insuffic ient supporting of the ceiling structure as the cause of its collapse. Therefore on balance of available information, insufficient fastenings to the ceiling plaster boards is the proximate cause of the damage. Given this the FSP would be entitled to rely upon the general exclusions of faulty design and workmanship to deny the claim. 4.2 Is the FSP required to repair the air conditioner unit? FSP should have the opportunity to reinspect the air conditioner unit The applicants appointed their experts MTD and YP to inspect the air conditioner unit. Both experts state the cause of the damage to the unit and its electrical components was a storm event in November 2016. Case No: 484843 Recommendation Page 4 of 5 The FSP says its initial inspection did not properly assess the damage due to lack of refrigerant and disconnected power supply. Accordingly it says it is still considering the claim and seeks a reinspection of the unit to make a final decision. The applicants are currently disallowing a reinspection, because they ha ve no confidence in the FSP’s initial assessment. While I appreciate the applicants’ concerns, ultimately I accept the applicants ought to give the FSP an opportunity to reinspect the air conditioner unit. FSP is to arrange independent reinspection of the unit To help bring this matter to a close, should both parties accept this recommendation, the following must occur in order to effect the resolution of this part of the dispute:  The FSP is to identify two independent experts who are suitably qualified to undertake a comprehensive examination of the applicant’s air-condition unit and then provide a written report  The FSP is to email the applicants with details of the proposed experts within 14 days of this recommendation being accepted by both parties. This email should also contain details of the expert’s investigation  Upon receipt of these details, the applicants are to advise the FSP within seven days by return email of their preferred expert  If the applicants wish the independent expert to review and provide comment on other matters, the applicant is to outline this in the return email  Upon receipt of the applicants’ advice as to their preferred expert (and any other matters the applicants wish the expert to comment on), the parties should work together on a mutually agreeable time for the expert’s inspection  Once the inspection occurs, the expert is to ensure his/her written report is made available to both parties within a further seven days  Both parties are to agree the expert’s opinions will be final and not subject to appeal  If it is the expert’s opinion the unit and/or its components have been storm damaged, the FSP is to carry out the required works, in line with the policy’s terms and conditions. This work should be completed within 28 days of the expert’s report being received, unless the expert provides a written view in the report that a longer timeframe should be afforded to the FSP. Case No: 484843 Recommendation Page 5 of 5 5 Supporting information 5.1 Expert reports Record Key points FSP’s expert (A JG ) Report 29 - 03 - 2017  Damage to entire cornice and ceiling in the family room  Requires replacement along with ceiling battens and ceiling installation  Electrical cabling servicing lighting is disturbed  Ceiling dislodging due to timber ceiling battens only fastened using one 75x3 mm smooth shank framing nail  Due to ceiling containing excessive weight it is required that ceiling battens are fastened using two typical framing nails into each truss  Roof trusses have moved over time with wind pressure and has caused the one nail holding t he ceiling batten/truss connection to detach  Scratched hardwood flooring surface from collapsed ceiling  Plaster and ceiling battens have collapsed due to insufficient fastening during construction  Over time the ceiling plaster and support battens has delam inated from the roof truss bottom cords  Is consistent with structural failure and not an insurable event  Insured was not aware of these issues Applicant’s expert ( BH ) Report 25 - 04 - 2017  Approximately 70 square metres of ceiling plaster collapsed  Ceiling in sulation is removed  14 down light and associated cabling have failed  Heating and cooling ducts need attention  All cornices have failed  Possible causes of damages include  Excessive weight on ceiling plasterboard  Failing of ceiling batten to support the downward force applied as a result overweight plasterboard  Excessive moisture caused by rain storm, in turn contributing to ceiling insulation abs orbing and maintaining water