Text of the determination
Determination
Case No: 484537 Determination Page 1 of 5
Case number: 484537 9 July 2018
1 Overview
1.1 Dispute
This matter involves a claim by the applicant under his home building insurance
policy, held with the financial services provider (FSP) in respect of damage to the
insured property.
The FSP has denied the applicant‟s claim on the basis of exceptions to coverage
within the policy.
1.2 Issues and key findings
Is the FSP entitled to deny the applicant’s claim?
The FSP is not en titled to deny the applicant‟s claim.
1.3 Determination
This determination is in favour of the applicant.
The exchanged material does not include sufficient information to determine the
extent of the applicant‟s claim.
As such, the FSP is required to undertake the appropriate investigation and prepare
a scope of works and quotation and to meet the applicant‟s claim under the terms
and conditions of the policy.
Case No: 484537 Determination Page 2 of 5
2 Reasons for determination
This dispute has been the subject of a recommendation issued by the service on 25
October 2017.
It was the case analyst‟s recommendation that the FSP was entitled to deny the
applicant‟s claim on the basis of exceptions to coverage within the policy .
The applicant has disputed the recommendation. A copy of the recommendation is
attached to the determination.
Subsequent to the recommendation, the applicant has provided further information,
including the report from a consulting registered engineer and building practitioner
(RB) together with further material.
The applicant‟s further submissions, information and material have been exchanged
with the FSP.
It is of significance that the FSP has not responded to the applicant‟s further
submissions, information or material.
This is particularly significant because the report from RB specifically challenges the
conclusions of the FSP‟s consulting engineer , (HC).
There is no information to indicate whether or not the FSP has sought a response
from HC in relation to the specific issues raised by RB.
I have carefully considered all of the material provided both before and after the
recommendation in the preparation of this determination.
This determination follows consideration of all of the information exchanged and is
based on what is fair in the circumstances, having regard to the relevant legal
principles, terms of the policy, good industry practice and where applicable, prior
determinations.
2.1 Is the FSP entitled to deny the applicant’s claim?
Coverage of the policy
The applicant says that the policy wording relied upon by the FSP is defective and
should not be considered.
The applicant has provided copies of the policy documentation, which he says should
be relied upon. In particular, the applicant says that the statement that there is no
provision to cover damage caused by an insurable event like „water and/or other
liquids and/or substances discharged and/or overflowing and/or leaking from any
apparatus and/or appliance and/or pipes‟, is incorrect.
The coverage provided by the applicant‟s home building insurance policy is detailed
within the Product Disclosure Statement (PDS) and Schedule of Insurance.
Having reviewed the policy documentation and the exchanged material, I am
satisfied that the policy provides coverage in the event of accidental loss or damage,
which include s a number of specified events, including „water and/or other liquids
Case No: 484537 Determination Page 3 of 5
and/or substances discharged and/or overflowing a nd/or leaking from any apparatus
and/or appliance and/or pipes‟.
However, the coverage provided by the policy is qualified by specific reference to
coverage for erosion, subsidence, landslide or earth movement.
Erosion, subsidence, landslide or earth movement is insured against but only if it is
directly as a result of:
water and/or other liquid leaking from any apparatus and/or appliance and/or
pipes and (emphasis added)
it occurs no more than seventy-two (72) hours after the insured event.
Circumstances of the loss
The exchanged material confirms that in or about April 2016, the applicant noted
damage at the property and engaged a plumber who located and repaired a broken
pipe.
The applicant says that it was the leak of water from this pipe that has caused the
damage at the property.
The FSP engaged a consulting engineer (HC) who provided several reports and
concluded that the damage at the property should be apportioned between multiple
causes:
seasonal changes in the moisture content of the foundation material - 20%
tree root drying - 20%
footings not deep enough to account for the trees - 20%
leaking drain and inadequately connected drain - 40%.
HC provided a brief email in response to a specific question from the FSP:
„Further to your email, we advised that in our opinion the cracking and movement would not
have occurred within 72 hours of the leak occurring as the 72 hours is insufficient time to
contribute/ result in extreme changes in the moisture content of the foundation materials.‟
On the basis of the report from HC, the FSP denied the applicant‟s claim.
The recommendation prepared by the case analyst was made on the basis that the
only expert opinion relevant to the damage itself was from HC and as a
consequence, the FSP was entitled to deny the applicant‟ s claim.
As stated, subsequent to the recommendation, the applicant has provided a report
from a consulting registered engineer and building practitioner RB, which significantly
challenges the conclusions of HC.
As also noted, there is no evidence that the FSP has sought a response from HC and
the FSP has not responded to the further submissions or the material provided by the
applicant, subsequent to the recommendation.
I have carefully reviewed the report from RB, dated 8 November 2017 and I am
satisfied that it is thorough and logical and its conclusions are supported by analysis
and helpful photographs, technical references to appropriate standards and other
supporting material.
Case No: 484537 Determination Page 4 of 5
As the report has been exchanged, I do not propose to go through each aspect of the
report save for saying that on the basis of the report, from RB, I am satisfied that the
conclusions of HC in relation to seasonal changes, tree roots drying and the depth of
footings, has been significantly challenged by RB.
As stated, I am satisfied that the challenge is thorough and logical and in the
absence of a response from either the FSP or HC, I prefer to accept the conclusions
of RB in relation to these matters.
The result is that I accept the conclusions of RB to the effect that 100% of the
damage was due to the leaking drain (pipe).
That is, the applicant has established that the proximate cause of the loss and
damage at the property was the covered event of water and/or other liquids and/or
substances discharged and/or overflowing and/or leaking from any apparatus and/or
appliance and/or pipes.
Seventy-two hours
As stated above, for coverage under the policy, the subsidence, landslide or earth
movement resulting from water and/or other liquid leaking from any apparatus and/or
appliance and/or pipes, must occur no more than seventy-two (72) hours after the
insured event, the leak.
As also stated above, HC says the cracking and movement would not have occurred
within 72 hours of the leak occurring as the 72 hours is insufficient time to contribute /
result in extreme changes in the moisture content of the foundation material.
On the other hand, RB has said HC has not provided a substantiation of this position
or a definition of when the seventy-two hour period starts and whether there is only
one such period or many.
RB says that the leak only occurred when rain fell on the balcony and ran to the
broken section of the pipe and that it did this without the knowledge of the applicant
until the pipe was fixed.
Further, RB says that the date and time when the pipe was first broken is not known
and cannot be established, although I note that RB is of the view it is likely the
damage to the pipe occurred when the applicant was removing part of the garden.
RB says that the rejection of the claim based on the seventy-two hour notion may be
unsustainable because the seventy-two hour period has not and cannot be
established.
Again, it must be noted that the FSP has not responded to the report from RB or the
submissions of the applicant, subsequent to the recommendation.
In my view, noting that it cannot be certain as to when the pipe was leaking, it is not
possible for the FSP to establish that the subsidence and earth movement at the
property occurred more than seventy-two hours after the pipe was leaking.
The report from RB makes specific reference to the fact that the applicant informed
RB that a short time before he noticed the damage at the property, he had removed
some Wild Iris plants from the garden.
Case No: 484537 Determination Page 5 of 5
RB says that Wild Iris is difficult to remove and the applicant had to use gardening
tools including a crowbar, spade and gardening fork.
RB provided information including photographs, to support the position that it is likely
that the damage to the pipe occurred when the applicant was removing the Wild Iris
plants from the garden.
Noting that the applicant informed RB that a short time before he noticed the damage
at the property, he had removed some plants from the garden and given the
evidence from RB, this likely caused the damage to the pipe, it may well be that the
erosion, subsidence, landslide or earth movement occurred within seventy-two hours
of the leak commencing.
This position is supported by the commentary from RB to the effect that the design of
the housing development and thus specifically the applicant‟s home , was such that
even though the soil was classed as Highly Reactive, it could be expected that the
moisture content at the home would not change to any appreciable degree.
Significantly, RB notes that paradoxically, however, the moisture content at the home
will react if a local flooding event occurs in any particular location, which may result in
local building damage.
I am satisfied that the report from RB supports the position that there was a local
flooding event, that is the broken pipe and given the nature of the development and
the classification of the soil, as detailed by RB (that is, Highly Reactive), then this led
to the damage noticed by the applicant and detailed by RB within his report.
The result is that having reviewed all of the exchanged material and in particular the
material provided subsequent to the recommendation and not responded to by the
FSP, I am not satisfied that the FSP has established that the subsidence or earth
movement occurred more than seventy-two hours after the water leaking.
I prefer the view that the subsidence and earth movement occurred within a short
period and in particular, within seventy-two hours of the leak occurring at the
property.
I also accept that the subsidence and earth movement, caused by the leak from the
pipe, resulted in the damage at the property.
The result is that the FSP is not entitled to deny the applicant‟s claim.
The exchanged material does not include sufficient information to detail the extent of
the applicant‟s claim and the FSP is to carry out appropriate investigation to prepare
a scope of works and quotation and to meet the applic ant‟s claim under the terms
and conditions of the policy.
Recommendation
Case No: 484537 Recommendation Page 1 of 8
Case number: 484537 25 October 2017
3 Overview
3.1 Dispute
The applicant holds a home building insurance policy with the financial services
provider (FSP). The applicant lodged a claim for cracking sustained to his property.
The applicant states the cracking was caused by a leaking pipe. The applicant
provided a p lumber‟s report (P) to the FSP which concluded there was a leaking
pipe.
The FSP appointed loss adjusters (CL) to assess the damage. CL appointed
engineer HCC to determine the cause of the cracking. HCC had previously assessed
the property for a prior claim. HCC concluded there were several concurrent causes
for the cracking.
The FSP declined the claim on the basis of several concurrent causes. The applicant
disputes the FSP‟s decision and is seeking acceptance of the claim. The applicant is
further seeking compensation for delays.
3.2 Issues and key findings
Is the FSP is entitled to decline the claim?
The available information establishes the cracking was caused by subsidence of the
foundations and the drying effects of the tree roots from trees located on the nature
strip of the property. Further, the FSP established the damage did not occur within 72
of the broken drain. Therefore, the FSP is entitled to rely on the exclusion to decline
the claim.
The applicant‟s reports do not provide assistance to the a pplicant. The reports are
recommendations. The available information shows, these recommendations were
not followed.
Is the applicant is entitled to compensation for delays?
The applicant is not entitled to compensation as the information provided establi shed
there were no unreasonable delays in accessing the claim.
3.3 Recommendation
This recommendation is in favour of the FSP.
The FSP is entitled to decline the claim.
Case No: 484537 Recommendation Page 2 of 8
4 Reasons for recommendation
4.1 Is the FSP entitled to decline the claim?
Policy provides cover for accidental damage subject to exclusions
The applicant is required to show that, on the balance of probabilities, he has
suffered a loss caused by a risk insured against under the policy. This is known as a
prima facie claim.
If the applicant is able to establish a prima facie claim, then the onus shifts to the
FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion
under the policy or is otherwise entitled to deny the claim.
The applicant‟s policy provides cover for accidental loss or damage to his property,
subject to the conditions and exclusions set out in the policy. The courts have defined
“accidental” in this context to mean “unintended and unexpected”.
However, the policy clearly states that there are some forms of accidental damage
which will only be covered in specific circumstances (and will not otherwise be
covered).
This includes damage caused by landslide or subsidence, which will only be covered
where the damage occurs within 72 hours after a direct result of certain specified
events (including the escape of liquid from a fixed pipe).
The policy also contains general exclusions for damage caused by:
landslide or subsidence (except in the circumstances described above)
settling, shrinkage or any movement of earth; and/or
roots from trees, plants, shrubs or grass.
Damage caused in this manner is not covered under any circumstances.
It is necessary to determine the proximate cause of the damage
In order to determine whether the FSP is liable for the cracking damage, it is
necessary to identify the proximate cause of the damage.
The proximate cause is the dominant, efficient or operative cause of the damage.
However, it is not required to be the sole cause or the last in time.
There may also be circumstances where it is reasonable to conclude that there were
two causes which were equal or concurrent in their efficiency in bringing about the
damage. If one of those causes was an insured event, and the other an excluded
event, then the excluded event would prevail.
The leaking drain is not the proximate cause of the damage
The applicant maintains the damage was caused by the leaking drain. The applicant
relies on repairs completed by his plumber, who repaired the broken drain.
The FSP relies on the reports provided by HCC. HCC concluded the damage
occurred due to a multiple causes:
Case No: 484537 Recommendation Page 3 of 8
seasonal changes in the moisture content of the foundation
tree root drying
footings not founded deep enough to account for the trees
leaking drain and inadequately connected drains.
HCC noted the seasonal changes in the extreme conditions can result in differential
settlement of the footings and cracking and movement of the structure above. HCC
also noted changes in the moisture content of the foundation‟s materials are
exacerbated by drying roots from the local gum trees. This results in the roots of the
local gum trees drawing water from the soil, accentuating the seasonal changes and
resulting in differential settlement.
HCC states the broken drain contributed to the cracking and movement. HCC stated
there was inadequate connecting drains, which resulted in water draining to and
concentrating adjacent to the footings along the front of the building. HCC concluded
this could have contributed to extreme changes in the moisture content of the
foundations of the building.
On the basis of the information, I accept there were concurrent causes for the
damage, being leaking drain, changes in the moisture content of the foundation and
tree root drying. I accept the causes contributed to the subsidence in the property
which led to the cracking.
If not for the changes in the moisture content of the foundation and tree roots drying
at the soil, I do not consider the damage would have occurred. On this basis, I am
satisfied the leaking drain is not the proximate cause of the damage.
FSP entitled to rely on exclusions for accidental damage for claim decline
The FSP considered the concurrent causes, and concluded the policy does not
respond. The policy does provide coverage for subsidence from a pipe bursting.
However, the subsidence needs to occur within 72 hours of the pipe bursting.
The available information shows, 72 hours would be insufficient to result in the
extreme changes in the moisture content of the foundation material required or
subsidence to occur.
Further, the policy does not cover damage resulting from settling, shrinkage or any
movement of the earth unless it relates to subsidence from a pipe bursting within 72
hours of the pipe bursting.
The applicant has not established an insured event under the accidental damage
cover of the policy. The FSP established, on balance, the damage did not occur
within 72 hours of the pipe bursting.
The applicant states the 72 hour time period is irrelevant as the drain was below
ground level. The FSP responded to this statement by saying the applicant is
referring to section 46 of the Insurance Contracts Act 1984 (the Act). Section 46
refers to pre-existing defect or imperfection. The FSP submits as the claim does not
apply to defect or imperfection, section 46 will not assist the applicant.
The FSP further states the applicant has not provided any evidence to suggest the
pipe was defective or imperfect. The applicant‟s plumbe r report states there was
Case No: 484537 Recommendation Page 4 of 8
adequate drainage in the property. Therefore, I am satisfied the claim does not relate
to a defect or imperfection.
In review of the information, I am of the view the FSP is entitled to rely on the
exclusion regarding the 72 hour time period. I am satisfied the FSP is entitled to
decline the claim for the damage.
Applicant’s engineer’s reports do not assist the applicant
The applicant submits the issues with foundations and footings were taken into
consideration prior to the construction. The applicant relies on geotechnical engineer
ASJ‟s report and structural engineer VHC‟s report.
In review of ASJ‟s report, I note the report provides an analysis of the foundation
material and construction advice of the property. The report further confirms the
foundations are highly reactive.
Further, in review of VHC‟s report, I note the report contains recommendations. The
report note s nearby trees may affect the footing system. The FSP‟s engineer, HCC,
noted the close proximity of trees to the property.
ASJ‟s report emphasises the need for adequate articulation joints. The FSP‟s
engineer HCC assessed the property for a previous claim and noted the articulation
joints exceeded the specifications set out in ASJ‟s report.
While I appreciate the applicant providing ASJ‟s report in support of his position
regarding the foundations and footings, I am of the view it does not support his
po sition. ASJ‟s report provides construction recommendations for the property. As
HCC reported, the recommendations were not followed. VHC‟s report also provided
recommendations, which were not followed. Therefore, the reports provided do not
assist to the applicant.
4.2 Is the applicant entitled to compensation for delays?
FOS takes a conservation approach to compensation
FOS may award compensation for non-financial loss in circumstances where the
claims handling by the FSP has led to an unusual degree or exte nt of physical
inconvenience, time taken to resolve the situation or interference with the applicant‟s
expectation of enjoyment or peace of mind.
However, FOS adopts a conservative approach to the award of compensation for
non-financial loss. FOS expects applicants to be moderately robust and bear the
usual stress and inconvenience associated with an insurance claim.
No compensation is warranted in the circumstances
The applicant claims there were delays in handling the claim. The General Insurance
Code of Practice provides timeframes in which a FSP must access and process the
claim. It also provides guidelines of when contact should be made with the applicant.
Case No: 484537 Recommendation Page 5 of 8
In review of the information provided, I do not agree with the applicant regarding
delays in handling the claim. The FSP is entitled to assess the claim to ensure
appropriate advice is provided to the applicant. In this instance, the FSP did keep the
applicant informed about his claim. Further, the FSP responded to the applicant‟s
complaint in a reasonably timely manner.
Therefore, on this basis, I am satisfied no compensation is warranted in the
circumstances.
Case No: 484537 Recommendation Page 6 of 8
5 Supporting information
5.1 Policy wording
Accidental damage cover
What is covered.
Your building and/or your contents as set out in your Policy Schedule are covered if they are
destroyed, lost or damaged. They are covered only if you own them, or are liable for them.
We will cover your buildings and your cont ents for accidental loss or accidental damage. There is
some loss or damage we will only cover under specific conditions. This is accidental loss or accidental
damage caus ed by:
Landslide or subsidence. Cover only applies when the landslide or subsidence occurs within 72
hours after a direct result of one of the following:
Storm, flood, tsunami, rainwater, hail, snow or wind
Explosion
Earthquake
Liquid that escape from a fixed pipe or somet hing attached to a pipe, fixed gutter, fixed tank
apparatus or a drain.
What we will not pay for
We will not cover your buildings and your contents for any accidental loss or accidental damage
caused by:
Landslide or subsidence, except as described in this Policy.
Settling, shrinkage or any movement of earth.
5.2 Reports
Record Key points
APP ’s expe rt (A SJ )
Report
21 - 06 - 2000
Particular care should be taken to provide adequat e articulation
again given the reactivity of the clays and potential for moisture
content change.
Articulation Spacings should not exceed 6.0 metres unless
structural design of the structure is able to accommodate increased
spacings.
Articulation joints should be provided at the transition points where
more than one footing type is being used. Equally full height
articulation should be provided at the junction bet ween an existing
structure and an extension.
We cannot over emphasise the need for adequate jointing and this
should be provided without exception, or the recommendations of
this report are n ot valid.
APP ’s expert ( VHC )
Report
Use flexible plumbing joints to allow for the design movements.
Any nearby trees may adversely affect the performance of the
Case No: 484537 Recommendation Page 7 of 8
04 - 0 8 - 200 6 footing system (removal of trees or the use of vertical root barriers
may be requi red).
FSP’s expert (HCC )
Report
17 - 10 - 2012
The external inspection of the north - west corner of the theatre
room also showed that the spacing of the articulation joints
exceeds the maximum 6m recommended, and in this instance, the
spacing is approximately 8m.
The excessive spacing of the articulation joints in this area may
have contributed to the problem as a greater stress could have
occurred in the brickwork than would have occurred if the
articulation joints were within the maximum 6m required,
The ex cessive spacing of the articulation joints is a construction
fault.
FSP’s expert (HCC)
Report
25 - 01 - 201 3
Cracking and movement resulted from a combination of the recent
earthquake and the excessive spacing of the articulation joints.
Recent cracking and movement resulted from a combination of
normal building movement.
APP ’s expert ( P )
Report
02 - 06 - 2016
The pipe was fractured due to structural movement and leaking
The offset from the pipe at the base of the column to the main
drain was fractured due to structural movement and leaking.
FSP’s expert (HCC )
Report
13 - 07 - 201 6
Cracking and damage to the property caused by differential
settlement of the foundations.
Ext remes in the seasonal changes in the moisture content of the
foundation material with previous drought conditions, followed by a
sustained period of normal rainfall and more recently return to dry
conditions.
These extremes can res ult in differential sett lement of the footings
and cracking and movement of the structure above.
Tree root drying by roots originating from the pre - existing Council
gum trees growing in the nature strip has accentuated the
seasonable changes in the moisture content of the founda tion
material, resulting in differential settlement of the footings and
cracking to the structure.
FSP’s expert (HCC )
Report
03 - 11 - 201 6
Cracking and movement would not have occurred within 72 hours
of the leak occurring.
72 hours is insufficient time t o contribute/result in extreme changes
in the moisture content of the foundation material.
5.3 Other matters considered but not relevant to the outcome
Insufficient information to establish the FSP misled the applicant
The applicant submits the claim should be accepted as CL advised him the policy
would respond to the damage. The FSP submits if CL had advised him of this, it
would only be preliminary advice. The FSP further submits the applicant had not
relied on this advice to his detriment.
Case No: 484537 Recommendation Page 8 of 8
The first CL report refers to the damage as being consistent with escape of liquid.
However, CL reported a causation report would be required to confirm this. While this
can be interpreted as to the policy responding, it does not mean the claim is
accepted. The FSP further submits CL is not employee of the FSP, therefore CL is
not in a position to provide advice on claim acceptance.
The applicant further submits a claims specialist from the FSP advised him the claim
should not be denied and the claim would be reopened. The applicant relies on an
email from the claims specialist.
I reviewed the email carefully. While it does say the claim should not have been
denied in its entirety, it does not say the claim should be accepted. The email states
the claim will passed on to a team for further review.
In consideration of the above, there is insufficient information to establish if the FSP
misled the applicant. The available information shows the FSP was reviewing the
claim decline and the further inquiries were being made. Even if I accept the
applicant was misled by the advice provided by CL and the claims specialist, this
does not mean the claim should paid. Therefore, I will not consider this point any
further.
FSP’s error on final de cision letter does not make the findings redundant
The applicant raised concerns regarding the incorrect address on the final decision
letter. The applicant had concerns as to whether the FSP reviewed the correct file.
The FSP acknowledged the error, howe ver maintains the content of the letter relates
to the applicant‟s claim. In review of the letter, I am satisfied it was error in the
incorrect address, however the contents refer to the applicant‟s claim. Therefore, the
findings are not redundant.
FSP en titled to rely on its own engineer’s report in declining the claim
The applicant submits the FSP is required to provide a scientific or specialist report
confirming that landslide or subsidence is a factor.
The FSP submits it is entitled to rely on HCC‟s report. The FSP further submits HCC
report is a specialist report. Further, HCC is the only report which was prepared in
relation to the current damage. The applicant has not provided his own engineer‟s
report to refute the findings of HCC.
Therefore, I a m satisfied the FSP is entitled to rely on HCC‟s report in declining the
claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.