Claim declined for cracking attributed to subsidence and the 72-hour limit

FirmFinancial Firm (Unknown - Insurer)
Decided2018-07-16
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant claimed for cracking to his home caused by a leaking drain, which the FSP declined as subsidence outside the 72-hour window. AFCA found the FSP not entitled to deny and ordered it to investigate, scope and meet the claim under the policy.

On the preferred expert evidence the leaking pipe was the proximate cause, and the subsidence likely occurred within 72 hours of the leak, which the FSP had not disproved.

Issues

Subjects and remedies

home or building damagepay claimreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 484537 Determination Page 1 of 5 Case number: 484537 9 July 2018 1 Overview 1.1 Dispute This matter involves a claim by the applicant under his home building insurance policy, held with the financial services provider (FSP) in respect of damage to the insured property. The FSP has denied the applicant‟s claim on the basis of exceptions to coverage within the policy. 1.2 Issues and key findings Is the FSP entitled to deny the applicant’s claim? The FSP is not en titled to deny the applicant‟s claim. 1.3 Determination This determination is in favour of the applicant. The exchanged material does not include sufficient information to determine the extent of the applicant‟s claim. As such, the FSP is required to undertake the appropriate investigation and prepare a scope of works and quotation and to meet the applicant‟s claim under the terms and conditions of the policy. Case No: 484537 Determination Page 2 of 5 2 Reasons for determination This dispute has been the subject of a recommendation issued by the service on 25 October 2017. It was the case analyst‟s recommendation that the FSP was entitled to deny the applicant‟s claim on the basis of exceptions to coverage within the policy . The applicant has disputed the recommendation. A copy of the recommendation is attached to the determination. Subsequent to the recommendation, the applicant has provided further information, including the report from a consulting registered engineer and building practitioner (RB) together with further material. The applicant‟s further submissions, information and material have been exchanged with the FSP. It is of significance that the FSP has not responded to the applicant‟s further submissions, information or material. This is particularly significant because the report from RB specifically challenges the conclusions of the FSP‟s consulting engineer , (HC). There is no information to indicate whether or not the FSP has sought a response from HC in relation to the specific issues raised by RB. I have carefully considered all of the material provided both before and after the recommendation in the preparation of this determination. This determination follows consideration of all of the information exchanged and is based on what is fair in the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice and where applicable, prior determinations. 2.1 Is the FSP entitled to deny the applicant’s claim? Coverage of the policy The applicant says that the policy wording relied upon by the FSP is defective and should not be considered. The applicant has provided copies of the policy documentation, which he says should be relied upon. In particular, the applicant says that the statement that there is no provision to cover damage caused by an insurable event like „water and/or other liquids and/or substances discharged and/or overflowing and/or leaking from any apparatus and/or appliance and/or pipes‟, is incorrect. The coverage provided by the applicant‟s home building insurance policy is detailed within the Product Disclosure Statement (PDS) and Schedule of Insurance. Having reviewed the policy documentation and the exchanged material, I am satisfied that the policy provides coverage in the event of accidental loss or damage, which include s a number of specified events, including „water and/or other liquids Case No: 484537 Determination Page 3 of 5 and/or substances discharged and/or overflowing a nd/or leaking from any apparatus and/or appliance and/or pipes‟. However, the coverage provided by the policy is qualified by specific reference to coverage for erosion, subsidence, landslide or earth movement. Erosion, subsidence, landslide or earth movement is insured against but only if it is directly as a result of:  water and/or other liquid leaking from any apparatus and/or appliance and/or pipes and (emphasis added)  it occurs no more than seventy-two (72) hours after the insured event. Circumstances of the loss The exchanged material confirms that in or about April 2016, the applicant noted damage at the property and engaged a plumber who located and repaired a broken pipe. The applicant says that it was the leak of water from this pipe that has caused the damage at the property. The FSP engaged a consulting engineer (HC) who provided several reports and concluded that the damage at the property should be apportioned between multiple causes:  seasonal changes in the moisture content of the foundation material - 20%  tree root drying - 20%  footings not deep enough to account for the trees - 20%  leaking drain and inadequately connected drain - 40%. HC provided a brief email in response to a specific question from the FSP: „Further to your email, we advised that in our opinion the cracking and movement would not have occurred within 72 hours of the leak occurring as the 72 hours is insufficient time to contribute/ result in extreme changes in the moisture content of the foundation materials.‟ On the basis of the report from HC, the FSP denied the applicant‟s claim. The recommendation prepared by the case analyst was made on the basis that the only expert opinion relevant to the damage itself was from HC and as a consequence, the FSP was entitled to deny the applicant‟ s claim. As stated, subsequent to the recommendation, the applicant has provided a report from a consulting registered engineer and building practitioner RB, which significantly challenges the conclusions of HC. As also noted, there is no evidence that the FSP has sought a response from HC and the FSP has not responded to the further submissions or the material provided by the applicant, subsequent to the recommendation. I have carefully reviewed the report from RB, dated 8 November 2017 and I am satisfied that it is thorough and logical and its conclusions are supported by analysis and helpful photographs, technical references to appropriate standards and other supporting material. Case No: 484537 Determination Page 4 of 5 As the report has been exchanged, I do not propose to go through each aspect of the report save for saying that on the basis of the report, from RB, I am satisfied that the conclusions of HC in relation to seasonal changes, tree roots drying and the depth of footings, has been significantly challenged by RB. As stated, I am satisfied that the challenge is thorough and logical and in the absence of a response from either the FSP or HC, I prefer to accept the conclusions of RB in relation to these matters. The result is that I accept the conclusions of RB to the effect that 100% of the damage was due to the leaking drain (pipe). That is, the applicant has established that the proximate cause of the loss and damage at the property was the covered event of water and/or other liquids and/or substances discharged and/or overflowing and/or leaking from any apparatus and/or appliance and/or pipes. Seventy-two hours As stated above, for coverage under the policy, the subsidence, landslide or earth movement resulting from water and/or other liquid leaking from any apparatus and/or appliance and/or pipes, must occur no more than seventy-two (72) hours after the insured event, the leak. As also stated above, HC says the cracking and movement would not have occurred within 72 hours of the leak occurring as the 72 hours is insufficient time to contribute / result in extreme changes in the moisture content of the foundation material. On the other hand, RB has said HC has not provided a substantiation of this position or a definition of when the seventy-two hour period starts and whether there is only one such period or many. RB says that the leak only occurred when rain fell on the balcony and ran to the broken section of the pipe and that it did this without the knowledge of the applicant until the pipe was fixed. Further, RB says that the date and time when the pipe was first broken is not known and cannot be established, although I note that RB is of the view it is likely the damage to the pipe occurred when the applicant was removing part of the garden. RB says that the rejection of the claim based on the seventy-two hour notion may be unsustainable because the seventy-two hour period has not and cannot be established. Again, it must be noted that the FSP has not responded to the report from RB or the submissions of the applicant, subsequent to the recommendation. In my view, noting that it cannot be certain as to when the pipe was leaking, it is not possible for the FSP to establish that the subsidence and earth movement at the property occurred more than seventy-two hours after the pipe was leaking. The report from RB makes specific reference to the fact that the applicant informed RB that a short time before he noticed the damage at the property, he had removed some Wild Iris plants from the garden. Case No: 484537 Determination Page 5 of 5 RB says that Wild Iris is difficult to remove and the applicant had to use gardening tools including a crowbar, spade and gardening fork. RB provided information including photographs, to support the position that it is likely that the damage to the pipe occurred when the applicant was removing the Wild Iris plants from the garden. Noting that the applicant informed RB that a short time before he noticed the damage at the property, he had removed some plants from the garden and given the evidence from RB, this likely caused the damage to the pipe, it may well be that the erosion, subsidence, landslide or earth movement occurred within seventy-two hours of the leak commencing. This position is supported by the commentary from RB to the effect that the design of the housing development and thus specifically the applicant‟s home , was such that even though the soil was classed as Highly Reactive, it could be expected that the moisture content at the home would not change to any appreciable degree. Significantly, RB notes that paradoxically, however, the moisture content at the home will react if a local flooding event occurs in any particular location, which may result in local building damage. I am satisfied that the report from RB supports the position that there was a local flooding event, that is the broken pipe and given the nature of the development and the classification of the soil, as detailed by RB (that is, Highly Reactive), then this led to the damage noticed by the applicant and detailed by RB within his report. The result is that having reviewed all of the exchanged material and in particular the material provided subsequent to the recommendation and not responded to by the FSP, I am not satisfied that the FSP has established that the subsidence or earth movement occurred more than seventy-two hours after the water leaking. I prefer the view that the subsidence and earth movement occurred within a short period and in particular, within seventy-two hours of the leak occurring at the property. I also accept that the subsidence and earth movement, caused by the leak from the pipe, resulted in the damage at the property. The result is that the FSP is not entitled to deny the applicant‟s claim. The exchanged material does not include sufficient information to detail the extent of the applicant‟s claim and the FSP is to carry out appropriate investigation to prepare a scope of works and quotation and to meet the applic ant‟s claim under the terms and conditions of the policy. Recommendation Case No: 484537 Recommendation Page 1 of 8 Case number: 484537 25 October 2017 3 Overview 3.1 Dispute The applicant holds a home building insurance policy with the financial services provider (FSP). The applicant lodged a claim for cracking sustained to his property. The applicant states the cracking was caused by a leaking pipe. The applicant provided a p lumber‟s report (P) to the FSP which concluded there was a leaking pipe. The FSP appointed loss adjusters (CL) to assess the damage. CL appointed engineer HCC to determine the cause of the cracking. HCC had previously assessed the property for a prior claim. HCC concluded there were several concurrent causes for the cracking. The FSP declined the claim on the basis of several concurrent causes. The applicant disputes the FSP‟s decision and is seeking acceptance of the claim. The applicant is further seeking compensation for delays. 3.2 Issues and key findings Is the FSP is entitled to decline the claim? The available information establishes the cracking was caused by subsidence of the foundations and the drying effects of the tree roots from trees located on the nature strip of the property. Further, the FSP established the damage did not occur within 72 of the broken drain. Therefore, the FSP is entitled to rely on the exclusion to decline the claim. The applicant‟s reports do not provide assistance to the a pplicant. The reports are recommendations. The available information shows, these recommendations were not followed. Is the applicant is entitled to compensation for delays? The applicant is not entitled to compensation as the information provided establi shed there were no unreasonable delays in accessing the claim. 3.3 Recommendation This recommendation is in favour of the FSP. The FSP is entitled to decline the claim. Case No: 484537 Recommendation Page 2 of 8 4 Reasons for recommendation 4.1 Is the FSP entitled to decline the claim? Policy provides cover for accidental damage subject to exclusions The applicant is required to show that, on the balance of probabilities, he has suffered a loss caused by a risk insured against under the policy. This is known as a prima facie claim. If the applicant is able to establish a prima facie claim, then the onus shifts to the FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to deny the claim. The applicant‟s policy provides cover for accidental loss or damage to his property, subject to the conditions and exclusions set out in the policy. The courts have defined “accidental” in this context to mean “unintended and unexpected”. However, the policy clearly states that there are some forms of accidental damage which will only be covered in specific circumstances (and will not otherwise be covered). This includes damage caused by landslide or subsidence, which will only be covered where the damage occurs within 72 hours after a direct result of certain specified events (including the escape of liquid from a fixed pipe). The policy also contains general exclusions for damage caused by:  landslide or subsidence (except in the circumstances described above)  settling, shrinkage or any movement of earth; and/or  roots from trees, plants, shrubs or grass. Damage caused in this manner is not covered under any circumstances. It is necessary to determine the proximate cause of the damage In order to determine whether the FSP is liable for the cracking damage, it is necessary to identify the proximate cause of the damage. The proximate cause is the dominant, efficient or operative cause of the damage. However, it is not required to be the sole cause or the last in time. There may also be circumstances where it is reasonable to conclude that there were two causes which were equal or concurrent in their efficiency in bringing about the damage. If one of those causes was an insured event, and the other an excluded event, then the excluded event would prevail. The leaking drain is not the proximate cause of the damage The applicant maintains the damage was caused by the leaking drain. The applicant relies on repairs completed by his plumber, who repaired the broken drain. The FSP relies on the reports provided by HCC. HCC concluded the damage occurred due to a multiple causes: Case No: 484537 Recommendation Page 3 of 8  seasonal changes in the moisture content of the foundation  tree root drying  footings not founded deep enough to account for the trees  leaking drain and inadequately connected drains. HCC noted the seasonal changes in the extreme conditions can result in differential settlement of the footings and cracking and movement of the structure above. HCC also noted changes in the moisture content of the foundation‟s materials are exacerbated by drying roots from the local gum trees. This results in the roots of the local gum trees drawing water from the soil, accentuating the seasonal changes and resulting in differential settlement. HCC states the broken drain contributed to the cracking and movement. HCC stated there was inadequate connecting drains, which resulted in water draining to and concentrating adjacent to the footings along the front of the building. HCC concluded this could have contributed to extreme changes in the moisture content of the foundations of the building. On the basis of the information, I accept there were concurrent causes for the damage, being leaking drain, changes in the moisture content of the foundation and tree root drying. I accept the causes contributed to the subsidence in the property which led to the cracking. If not for the changes in the moisture content of the foundation and tree roots drying at the soil, I do not consider the damage would have occurred. On this basis, I am satisfied the leaking drain is not the proximate cause of the damage. FSP entitled to rely on exclusions for accidental damage for claim decline The FSP considered the concurrent causes, and concluded the policy does not respond. The policy does provide coverage for subsidence from a pipe bursting. However, the subsidence needs to occur within 72 hours of the pipe bursting. The available information shows, 72 hours would be insufficient to result in the extreme changes in the moisture content of the foundation material required or subsidence to occur. Further, the policy does not cover damage resulting from settling, shrinkage or any movement of the earth unless it relates to subsidence from a pipe bursting within 72 hours of the pipe bursting. The applicant has not established an insured event under the accidental damage cover of the policy. The FSP established, on balance, the damage did not occur within 72 hours of the pipe bursting. The applicant states the 72 hour time period is irrelevant as the drain was below ground level. The FSP responded to this statement by saying the applicant is referring to section 46 of the Insurance Contracts Act 1984 (the Act). Section 46 refers to pre-existing defect or imperfection. The FSP submits as the claim does not apply to defect or imperfection, section 46 will not assist the applicant. The FSP further states the applicant has not provided any evidence to suggest the pipe was defective or imperfect. The applicant‟s plumbe r report states there was Case No: 484537 Recommendation Page 4 of 8 adequate drainage in the property. Therefore, I am satisfied the claim does not relate to a defect or imperfection. In review of the information, I am of the view the FSP is entitled to rely on the exclusion regarding the 72 hour time period. I am satisfied the FSP is entitled to decline the claim for the damage. Applicant’s engineer’s reports do not assist the applicant The applicant submits the issues with foundations and footings were taken into consideration prior to the construction. The applicant relies on geotechnical engineer ASJ‟s report and structural engineer VHC‟s report. In review of ASJ‟s report, I note the report provides an analysis of the foundation material and construction advice of the property. The report further confirms the foundations are highly reactive. Further, in review of VHC‟s report, I note the report contains recommendations. The report note s nearby trees may affect the footing system. The FSP‟s engineer, HCC, noted the close proximity of trees to the property. ASJ‟s report emphasises the need for adequate articulation joints. The FSP‟s engineer HCC assessed the property for a previous claim and noted the articulation joints exceeded the specifications set out in ASJ‟s report. While I appreciate the applicant providing ASJ‟s report in support of his position regarding the foundations and footings, I am of the view it does not support his po sition. ASJ‟s report provides construction recommendations for the property. As HCC reported, the recommendations were not followed. VHC‟s report also provided recommendations, which were not followed. Therefore, the reports provided do not assist to the applicant. 4.2 Is the applicant entitled to compensation for delays? FOS takes a conservation approach to compensation FOS may award compensation for non-financial loss in circumstances where the claims handling by the FSP has led to an unusual degree or exte nt of physical inconvenience, time taken to resolve the situation or interference with the applicant‟s expectation of enjoyment or peace of mind. However, FOS adopts a conservative approach to the award of compensation for non-financial loss. FOS expects applicants to be moderately robust and bear the usual stress and inconvenience associated with an insurance claim. No compensation is warranted in the circumstances The applicant claims there were delays in handling the claim. The General Insurance Code of Practice provides timeframes in which a FSP must access and process the claim. It also provides guidelines of when contact should be made with the applicant. Case No: 484537 Recommendation Page 5 of 8 In review of the information provided, I do not agree with the applicant regarding delays in handling the claim. The FSP is entitled to assess the claim to ensure appropriate advice is provided to the applicant. In this instance, the FSP did keep the applicant informed about his claim. Further, the FSP responded to the applicant‟s complaint in a reasonably timely manner. Therefore, on this basis, I am satisfied no compensation is warranted in the circumstances. Case No: 484537 Recommendation Page 6 of 8 5 Supporting information 5.1 Policy wording Accidental damage cover What is covered. Your building and/or your contents as set out in your Policy Schedule are covered if they are destroyed, lost or damaged. They are covered only if you own them, or are liable for them. We will cover your buildings and your cont ents for accidental loss or accidental damage. There is some loss or damage we will only cover under specific conditions. This is accidental loss or accidental damage caus ed by:  Landslide or subsidence. Cover only applies when the landslide or subsidence occurs within 72 hours after a direct result of one of the following:  Storm, flood, tsunami, rainwater, hail, snow or wind  Explosion  Earthquake  Liquid that escape from a fixed pipe or somet hing attached to a pipe, fixed gutter, fixed tank apparatus or a drain. What we will not pay for We will not cover your buildings and your contents for any accidental loss or accidental damage caused by:  Landslide or subsidence, except as described in this Policy.  Settling, shrinkage or any movement of earth. 5.2 Reports Record Key points APP ’s expe rt (A SJ ) Report 21 - 06 - 2000  Particular care should be taken to provide adequat e articulation again given the reactivity of the clays and potential for moisture content change.  Articulation Spacings should not exceed 6.0 metres unless structural design of the structure is able to accommodate increased spacings.  Articulation joints should be provided at the transition points where more than one footing type is being used. Equally full height articulation should be provided at the junction bet ween an existing structure and an extension.  We cannot over emphasise the need for adequate jointing and this should be provided without exception, or the recommendations of this report are n ot valid. APP ’s expert ( VHC ) Report  Use flexible plumbing joints to allow for the design movements.  Any nearby trees may adversely affect the performance of the Case No: 484537 Recommendation Page 7 of 8 04 - 0 8 - 200 6 footing system (removal of trees or the use of vertical root barriers may be requi red). FSP’s expert (HCC ) Report 17 - 10 - 2012  The external inspection of the north - west corner of the theatre room also showed that the spacing of the articulation joints exceeds the maximum 6m recommended, and in this instance, the spacing is approximately 8m.  The excessive spacing of the articulation joints in this area may have contributed to the problem as a greater stress could have occurred in the brickwork than would have occurred if the articulation joints were within the maximum 6m required,  The ex cessive spacing of the articulation joints is a construction fault. FSP’s expert (HCC) Report 25 - 01 - 201 3  Cracking and movement resulted from a combination of the recent earthquake and the excessive spacing of the articulation joints.  Recent cracking and movement resulted from a combination of normal building movement. APP ’s expert ( P ) Report 02 - 06 - 2016  The pipe was fractured due to structural movement and leaking  The offset from the pipe at the base of the column to the main drain was fractured due to structural movement and leaking. FSP’s expert (HCC ) Report 13 - 07 - 201 6  Cracking and damage to the property caused by differential settlement of the foundations.  Ext remes in the seasonal changes in the moisture content of the foundation material with previous drought conditions, followed by a sustained period of normal rainfall and more recently return to dry conditions.  These extremes can res ult in differential sett lement of the footings and cracking and movement of the structure above.  Tree root drying by roots originating from the pre - existing Council gum trees growing in the nature strip has accentuated the seasonable changes in the moisture content of the founda tion material, resulting in differential settlement of the footings and cracking to the structure. FSP’s expert (HCC ) Report 03 - 11 - 201 6  Cracking and movement would not have occurred within 72 hours of the leak occurring.  72 hours is insufficient time t o contribute/result in extreme changes in the moisture content of the foundation material. 5.3 Other matters considered but not relevant to the outcome Insufficient information to establish the FSP misled the applicant The applicant submits the claim should be accepted as CL advised him the policy would respond to the damage. The FSP submits if CL had advised him of this, it would only be preliminary advice. The FSP further submits the applicant had not relied on this advice to his detriment. Case No: 484537 Recommendation Page 8 of 8 The first CL report refers to the damage as being consistent with escape of liquid. However, CL reported a causation report would be required to confirm this. While this can be interpreted as to the policy responding, it does not mean the claim is accepted. The FSP further submits CL is not employee of the FSP, therefore CL is not in a position to provide advice on claim acceptance. The applicant further submits a claims specialist from the FSP advised him the claim should not be denied and the claim would be reopened. The applicant relies on an email from the claims specialist. I reviewed the email carefully. While it does say the claim should not have been denied in its entirety, it does not say the claim should be accepted. The email states the claim will passed on to a team for further review. In consideration of the above, there is insufficient information to establish if the FSP misled the applicant. The available information shows the FSP was reviewing the claim decline and the further inquiries were being made. Even if I accept the applicant was misled by the advice provided by CL and the claims specialist, this does not mean the claim should paid. Therefore, I will not consider this point any further. FSP’s error on final de cision letter does not make the findings redundant The applicant raised concerns regarding the incorrect address on the final decision letter. The applicant had concerns as to whether the FSP reviewed the correct file. The FSP acknowledged the error, howe ver maintains the content of the letter relates to the applicant‟s claim. In review of the letter, I am satisfied it was error in the incorrect address, however the contents refer to the applicant‟s claim. Therefore, the findings are not redundant. FSP en titled to rely on its own engineer’s report in declining the claim The applicant submits the FSP is required to provide a scientific or specialist report confirming that landslide or subsidence is a factor. The FSP submits it is entitled to rely on HCC‟s report. The FSP further submits HCC report is a specialist report. Further, HCC is the only report which was prepared in relation to the current damage. The applicant has not provided his own engineer‟s report to refute the findings of HCC. Therefore, I a m satisfied the FSP is entitled to rely on HCC‟s report in declining the claim.