Home / Financial Firm (Unknown - Insurer) / Determination 483816
Determination 483816
Faulty balcony repairs, bathroom floor damage and loss of rent
Summary
The applicant's investment property balcony tiles were repaired faulty in 2013, and she claimed bathroom floor damage and loss of rent. AFCA found the bathroom floor damage was not caused by the balcony leak but ordered the insurer to pay lost rent from the claim lodgement date until re-tenanting or six weeks after rectification; no dollar figure was stated.
Loss of rent is payable under the policy where faulty workmanship makes the property untenantable, and the bathroom damage was not shown to be causally linked to the balcony leak.
Subjects and remedies
home or building damagepay claim
Text of the determination
Determination
Case No: 483816 Determination Page 1 of 4
Case number: 483816 14 August 2018
1 Overview
1.1 Dispute
The financial services provider (FSP) accepted the balcony tiles that it replaced in
2013 required rectification due to faulty workmanship. However the applicant also
says:
there was bathroom floor damage caused by the balcony leak
she suffered loss of rent due to the faulty workmanship.
The FSP has not accepted these additional claims because:
the bathroom floor damage was due to causes excluded under the policy
the damage from the balcony leak did not deem the property unlivable.
A case analyst provided the parties with a recommendation on the issues in dispute.
The recommendation was partially in favour of the applicant. A copy of the
recommendation is attached to this determination.
1.2 Issues and key findings
Were the repairs from 2013 faulty?
The repairs from 2013 require rectification. As these repairs, and the resultant
damage, is being addressed by the Queensland Building and Construction
Commission (QBCC), this issue is resolved.
Did the balcony leak cause the damage to the bathroom floor?
There is no evidence to show the balcony leak caused damage to the bathroom floor.
Should the FSP pay loss of rent?
The applicant suffered lost rent due to the FSP‟s failure to properly repair the balcony
in 2013. The FSP should therefore pay for loss of rent in line with section 2.3.
1.3 Determination
This determination is partially in favour of the applicant.
The FSP is liable to pay for loss of rent in line with section 2.3.
The FSP is not liable for the bathroom floor or any resultant damage this caused.
Case No: 483816 Determination Page 2 of 4
2 Reasons for determination
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
recommendation. I am satisfied that the documentation I have relied on has been
provided to both parties.
I am satisfied that t he case analyst‟s recommendation contains an accurate summary
of the dispute, the issues to be determined, any applicable paragraphs of the Terms
of Reference and any relevant law.
2.1 Were the repairs from 2013 faulty?
This issue is resolved
It is no longer in dispute that the repairs to the balcony were faulty. This is now
required to be addressed by the FSP‟s contractors through QBCC. This appears to
include any resultant damages.
Therefore, I agree with the case analyst‟s recommendation that this issue sho uld be
resolved by QBCC‟s involvement.
2.2 Did the balcony leak cause the damage to the bathroom floor ?
No evidence to show the bathroom was affected by the balcony
The expert evidence does not support the applicant‟s assertion that the bathroom
floor was affected by the balcony. Instead, they agree they are unrelated.
This includes QBCC who investigated this issue.
The applicant has made a number of arguments to support her position. They include
the following:
the bathroom has not had a problem previously
any issues should have been identified by the FSP back in 2013.
I do not accept these arguments for the following reasons:
the expert evidence clearly say the two are unrelated
the FSP‟s obligation was to repair the claim related damage back in 2013, not to
identify any other possible issue with the property unrelated to the claim .
Therefore, I agree with the case analyst‟s finding that the evidence does not show
the balcony leak affected the bathroom or the FSP is liable for this.
Case No: 483816 Determination Page 3 of 4
2.3 Should the FSP pay loss of rent?
Applicant suffered loss of rent due to the faulty workmanship
For reasons to follow, I do not accept the lost rent should be subject to contribution.
The issue of whether loss of rent should be payable is not based on the policy in
2013. Instead, it is based on whether the applicant has suffered a loss of rent caused
by the FPS‟s failure to properly repair the balcony in 2013 in line with its policy
obligations.
I agree with the case analyst‟s reasons that the nature of the damage meant the
property could not be rented. This was further exacerbated by the events that
transpired:
the applicant initially lodged a claim for this damage with her insurer at the time
– they referred her to the FSP given the workmanship issues
the FSP investigated the claim after the applicant notified it of the damage – this
required numerous contractors to attend the property
around late June or early July, the FSP was open to the possibility that it was
liable for faulty workmanship – it then sought to cash settle the claim
the dispute was conciliated by FOS on 18 September 2017 and was not able to
be resolved
the applicant subsequently involved QBCC who have directed the builders to
rectify the workmanship and resultant damage – this was appropriate given the
applicant retained the warranty of the repairs conducted .
Bathroom leak did not make a material difference
I acknowledge the situation was complicated by the applicant‟s claim that the
bathroom leak was connected to the balcony. The evidence did not support her
position on this.
However, I do not accept this made any material difference to the outcome. There is
nothing to indicate the issue with the faulty workmanship and resultant damage
would have been addressed sooner if the bathroom issue was not in play, particularly
when you consider the events that transpired.
Instead, the available evidence shows the dominant, efficient or operative cause of
the applicant‟s inability to rent the premises was due to the defective workmanship
and the events that followed this.
Therefore, I accept the applicant suffered loss of rent due to the FSP‟s failure to
properly repair the balcony in line with its policy obligations.
Accordingly, the FSP is to pay for the applicant‟s lost rent from the date the claim
was lodged with it (14 February 2017) until the earliest of the following dates:
the property is re-tenanted
six weeks after the balcony and resultant repairs are rectified.
Case No: 483816 Determination Page 4 of 4
I have nominated six weeks as this is the general timeframe it should take to relet the
property.
I do not agree lost rent should be payable from the time the leak occurred
The applicant says she should be paid for lost rent from the date the leak occurred. I
do not agree.
The property had been untenanted prior to the damage. Therefore, if the damage
had not occurred, it is likely the property would have remained untenanted for a
period of time subsequent to this until a new tenant was found.
Therefore, any lost rent for this period of time cannot be said to have been caused by
the poor workmanship.
As such, I consider it is fair that lost rent be payable from when the claim was
recorded as lodged with the FSP (14 February 2017). This is because it is likely that
if the damage had not occurred, the property could have been tenanted around this
time.
Recommendation
Case No: 483816 Recommendation Page 1 of 7
Case number: 483816 12 January 2018
3 Overview
3.1 Dispute
The applicant lodged a claim with the financial services provider (FSP) for storm
damage to the balcony of her investment property in 2013. The FSP accepted the
claim and repaired the balcony tiles and balustrade. Following a storm event in
February 2017, the applicant contacted the FSP requesting it reassess the 2013
repairs. The FSP accepted the balcony tiles required rectification due to faulty
workmanship. However the applicant also claimed:
bathroom floor damage saying it was caused by the balcony leak
loss of rent.
The FSP declined to accept the applicant‟s additional claims because:
the bathroom floor damage was due to causes excluded under the policy
the damage from the balcony leak did not deem the property unlivable.
The applicant disputes this and asks the FSP pay loss of rent from the date she
contacted the FSP in 2017 and for acceptance of the bathroom floor damage.
3.2 Issues and key findings
Were the repairs from 2013 faulty?
Yes, the repairs from 2013 required rectification. While the FSP accepted this, the
applicant contacted Queensland Building and Construction Commission (QBCC) who
instructed the FSP‟s repairer to rectify the balcony repairs.
Did the balcony leak cause the bathroom floor damage?
There is no evidence to show the balcony leak caused the damage to the bathroom
floor. The bathroom floor damage is more consistent with defective waterproofing
during previous repairs.
Should the FSP pay loss of rent?
The FSP should contribute 50% to the applicant‟s lost rent as the property was not
tenantable with the faulty workmanship from the 2013 repairs and the applicant was
responsible for the bathroom floor damage.
Case No: 483816 Recommendation Page 2 of 7
3.3 Recommendation
This recommendation is in favour of the FSP.
However, the FSP is to pay 50% of the applicant‟s lost rent.
Case No: 483816 Recommendation Page 3 of 7
4 Reasons for recommendation
4.1 Were the repairs from 2013 faulty?
Water ingress was due to faulty waterproofing membrane
The FSP‟s expert Q reinspected the repairs carried out in 2013. Spray and flood and
testing to the balcony tiles showed water leaking through the bulkhead of the kitchen.
FSP‟s expert SG determined defective waterproofing at the junction of the external
wall/balcony floor.
The FSP accepts liability for the faulty workmanship and had chosen to cash settle
the applicant.
The applicant sought the assistance of QBCC who agreed with the FSP‟s experts.
However, also determined the original repairs did not include a drip edge which
caused the cladding to deteriorate behind the facia tiles.
As QBCC directed Q to rectify the waterproof membrane and any associated
damages, I consider this aspect of the applicant‟s dispute resolved.
The FSP is entitled to retract its original offer to cash settle the applicant as the
applicant had not accepted this in any event.
4.2 Did the balcony leak cause the damage to the bathroom floor?
No link between bathroom floor damage and balcony leak
There is no evidence presented which links the bathroom floor damage to the
balcony leak.
The FSP‟s expert SG says the ceiling damage due to leak from “S” trap of bathroom.
SG observed the following:
bathroom floor tiles were loose
tiles detached from sand cement bedding
hairline cracking through the tiles
missing grout
no sealant around floor waste drain
previous repairs carried out to shower floor (mismatched tiles).
SG reports the shower cubicle was flooded for 26 hours and did not leak on to the
kitchen ceiling. SG cut an exploratory hole in the kitchen ceiling in the place of the
water stain and saw water stains on the outside face of the S trap. SG splashed
water by hand across the cracked bathroom floor tiles around the floor waste drain
and saw water leaking down the outside of the S trap through the kitchen ceiling
space and drip on to the kitchen floor tiles. Importantly, SG observed significant
amount of water fall on to kitchen floor tiles almost immediately after it flashed water
on to bathroom floor.
The applicant says the bathroom floor tiles are damaged due to the balcony leak
because:
Case No: 483816 Recommendation Page 4 of 7
the shower was flood tested for 26 hours and was not leaking
the top of the balcony skirting tile is above the bathroom floor level
previous repairs to the shower is not the cause of the water leak.
While I acknowledge the applicant‟s view, there is no expert evidence which supports
her position the balcony leak caused the bathroom floor damage. SG concludes that
the waterproof membrane to the bathroom floor is defective allowing water to
penetrate through the cracked tiles on to the kitchen ceiling. SG also confirms the
kitchen ceiling cavity inspection at multiple points did not show water ingress from the
balcony to the ceiling stains in the centre of the kitchen.
The applicant provided a leak detection report from AL who noted the kitchen ceiling
being directly below cracked bathroom floor tiles and the bathroom floor waste. The
report shows failure of the spray testing to the shower wall tiles and splash test of
bathroom floor. AL reported:
splash testing of the bathroom floor tiles failed as water could be seen entering through the cracked
tiles around the waste as well as through gaps in the grouting and was found to be immediately
dripping through to the kitchen below.
The applicant‟s expert A initially reported the leak to the ceiling was likely from water
tracking across ceiling from balcony leak. However in a later report confirmed:
damage to the kitchen ceiling downstairs is consistent with a leak from the
upstairs bathroom which is directly over the kitchen
the shower screen pressure test failed
leak from shower is not significant enough to cause damage to kitchen
previous repair to tiles would have interfered with waterproofing
leak is related to a waterproofing issue associated with previous bathroom tile
repairs.
Based on the evidence above, I am satisfied the balcony leak did not cause or
contribute to the bathroom floor damage. Therefore, the FSP is not liable to repair the
bathroom floor.
The applicant provided evidence from her real estate agency saying that she takes
care of her property. While this may be true, the evidence regarding the bathroom
floor is not a reflection on the applicant as a property owner.
4.3 Should the FSP pay loss of rent
Policy provides cover for loss of rent subject to exclusions
The policy provides cover for loss of rent in the event a claim for loss or damage is
accepted by the FSP and the FSP agrees the damage is so extensive that a tenant
cannot live in the property.
The applicant says the property was vacant as of 6 January 2017 upon expiry of the
tenancy agreement on 26 December 2016. The information shows the applicant
contacted the FSP on 14 February 2017 to discuss the faulty workmanship to the
balcony.
Case No: 483816 Recommendation Page 5 of 7
The applicant says on numerous occasions the FSP advised her she was covered for
loss of rent and to not rent the property. Having listened to all the available call
recordings, I am unable to find any evidence of this. There is also no evidence to
confirm the applicant‟s comments the FSP told her not to lease the property.
The FSP denied the applicant‟s claim for loss of rent because it did not agree the
damage from the faulty workmanship rendered the property unlivable. I note the
policy does not define „unlivable‟.
While it may be reasonable for a homeowner who occupies their home to endure
certain outstanding repairs, the subject property is an investment property. Therefore,
the livability of the property is ambiguous as this would be reliant on whether the
property could be tenanted.
The applicant provided letters from her real estate agency saying the applicant
wanted to urgently rent the property, however the real estate agent‟s view was the
property could not be rented given:
the exploratory holes
further rain events causing the bulkhead to leak
no end date for repair completion.
On this basis, I do not agree the property could have been tenanted (or lived in by a
tenant) because:
water leaked through kitchen bulkhead on to kitchen bench when it rained.
the deterioration of the balcony soffit cladding and timber trim from poor repairs
from 2013
exploratory holes cut in the kitchen bulkhead
potential ongoing leaking (as per SG‟s report)
numerous assessments taking place, including flood testing of balcony.
Given this, I am not satisfied the FSP can wholly deny paying loss of rent.
I accept the damage to the bathroom was also a contributory factor to the property
not being rented and as discussed above, this does not form part of the FSP‟s
liability.
As such, I consider the FSP to contribute 50% to the applicant‟s lost rent from the
date she contacted the FSP to notify of the faulty workmanship until the property is
re-tenanted or when balcony repairs are completely rectified, whichever occurs
earlier.
This is because both the applicant and the FSP were responsible for the damage that
prevented the property from being tenanted.
Case No: 483816 Recommendation Page 6 of 7
5 Supporting information
5.1 Expert reports
Record Key points
FSP’s expert (SG )
Report
30 May 2017
Inspection of the bat hroom directly above the kitchen
stain…general condition of floor tiles were poor
Upon traversing the floor tiles in the main area of bathroom…may
tiles were loose under foot and emitted cracking noises, indicating
tiles had detached from sand cement bedding,.
Observed Hairline cracking through the tiles and significant amount
of grout missing between the tiles
Around floor waste drain, flexible sealant applied to cracked tiles
now detaching
Was able to lift cracked tiles from bedding
Completed inspection by applying duct tape to the shower floor
waste and flooding the shower 25mm
[the next day] I observed shower had not leaked on to kitchen
ceiling.
Shower cubicle is not leaking and has not caused or contributed to
the existing kitchen stains.
I cut a new hole in the area of the kitchen ceiling that has sustained
gold sized water related det erioration
I observed PVC “S” trap of the bathroom drain system. Extending
down the outside face of the “S” trap I observed water stains
Returning to the bat hroom above I splashed water by hand across
the previously noted cracked floor tiles that surround the floor
waste to the main area of the bathroom.
Returning to the kitchen beneath I observed water extending down
the outside face of the “S” trap, through the kitchen ceiling cavity
and dripping on to floor tiles.
Quite a significant amount of water fell onto the kitchen floor tiles
almost immediat ely after it was splashed onto the bathroom floor.
I note that a thorough inspection of the kitchen ceiling cavity at
multiple locations sho wed no evidence of water ingress from the
rear balcony across to the ceiling stains in the centre of the kitchen
I consider the water from the main bathroom area floor has
penetrated the kitchen ceiling cavity beneath, via cracked floor tiles
around the fl oor waste and led to the water stained kitchen ceiling.
I consider the waterproof membrane to the main bathroom floor
area/floor waste junction has been breached and is therefore
defective.
Applicant’s expert (AL)
Report
07 August 2017
Splash testing of the bat hroom shower wall tiles failed, as water
could be seen entering through gaps in the grouting.
Splash testing of the bat hroom floor tiles failed as water could be
seen ent ering through the cracked tiles around the waste as well
as through gaps in the grouting and was found to be immediately
dripping through to the kitchen below.
All test results suggest that the wat er damage to the kitchen ceiling
Case No: 483816 Recommendation Page 7 of 7
directly below the bathroom floor waste is caused by water
entering through the crack ed tiles around the bathroom floor waste
as well as through gaps in the bathroom floor grouting.
While splash testing of the shower wall tiles failed it is not thought
to be the cause of the water damage to the ceiling directly under
the bathroom floor wa ste.
Applicant’s expert (A )
Report
08 February 2017
Our inspection completed has found that damage to the kitchen
ceiling downstairs is consistent with a leak from the upstairs
bathroom which is directly over the kitchen.
The amount of water that could po ssible from the leak through the
shower door/screen that failed a spray test is not significant
enough to create the damage to the ceiling below.
The repair completed to the tiles in the bat hroom/shower would not
have allowed the waterproofing membrane to be repaired to meet
current building codes therefore suggesting the cause of the leak
to below is related to a waterproofing issue and requires further
investigation.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.