The applicant claimed for retaining wall and house damage after a neighbour removed a bamboo screen fence. AFCA found no insured event caused the damage, which was mainly gradual rotation of the wall, an excluded cause.
The applicant did not establish a defined insured event as the proximate cause, and gradual deterioration is expressly excluded, so the claim denial is upheld.
Issues
- Claim denial primary · not upheld“The FSP is entitled to deny the claim because the applicant did not establish an insured event caused the damage”
Subjects and remedies
home or building damageno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 483540 Determination Page 1 of 4
Case number: 483540 23 January 2018
1 Overview
1.1 Dispute
The applicant lodged a claim with the financial service provider (FSP) for damages
sustained to his home after his neighbour removed their asbestos fence.
The FSP assessed the damage and subsequently denied the claim. In doing so, the
FSP says the policy does not cover the cause of the damage.
The applicant disagrees and seeks compensation for his loss. A Recommendation
has been made in this matter and I agree with the findings and outcome in the
Recommendation for the reasons set out below.
1.2 Issues and key findings
Was the FSP entitled to deny the claim?
The FSP is entitled to deny the claim because the applicant did not establish an
insured event caused the damage. On balance:
the neighbour’s action is not a defined event under the policy
the proximate cau se of the resultant damage to the applicant’s house is the
gradual rotation of the wall
the policy does not provide cover for gradual rotation of the retaining wall and
the neighbour’s removal of the fence.
1.3 Determination
This Determination is in favour of the FSP.
Case No: 483540 Determination Page 2 of 4
2 Reasons for Determination
2.1 Can the FSP deny the applicant’s claim?
Applicant required to establish damage arose from an insured event
It is an accepted principle of insurance law the applicant bears the onus of
establishing, on the balance of probabilities, he suffered a loss caused by a risk
covered under the policy. This is called a valid or prima facie claim.
If the applicant is able to establish a valid claim, the onus shifts to the FSP to show,
on the balance of probabilities, the loss falls within a policy exclusion or it is
otherwise able to deny liability.
Policy provides cover for defined events
The applicant’s claim related to damage to a retaining wall and resultant damage to
his house. He considers the damage occurred as a result of his neighbour’s removal
of a boundary fence (bamboo screening).
The applicant’s policy only provides cover in the event of:
Accidental breakage
Burglary or break-in
Burning out of an electric motor
Deliberate or intentional act
Earthquake or tsunami
Fire or explosion
Impact damage
Landslide or subsidence
Lightning or thunderbolt
Riots or civil commotion
Storm, flood, rainwater or wind
Theft or attempted theft
Vandalism or a malicious act
Water or liquid damage.
This means in order for cover under the polic y, the applicant needs to demonstrate
one of the abovementioned events damaged the retaining wall and any resultant
damage to the house.
No proof of a defined event
On 29 March 2017 the applicant contacted the FSP to lodge a claim for damage
sustained to a retaining wall on his property, as a result of “the neighbour removing a
fence (bamboo screen)” two days earlier.
The FSP’s builder (M) attended and confirmed the retaining wall has deviated
outwards and was close to failure.
Case No: 483540 Determination Page 3 of 4
Subsequently the FSP denied the claim on the basis the “neighbour’s action” was not
a defined event. The FSP also contended the claim was excluded. It argued:
“Exclusions to your cover –
We will not cover any loss or damage as a result of, or caused by:
- Defect in an item, structural defects, or faulty workmanship or design
- Erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear.
After analysing the engineers report they have noted the following:
- Lack of drainage behind at the rear of the wall on the adjacent property.
- This has therefore applied hydrostatic pressure under wet conditions and has
contributed to the wall failing
- Design faults
- 1800 mm high colour bond fence adds load to the combined wall and acts like a
sail
- Large verandah at 55 [Name] St also adds loads to the wall and is overloading
the wall
- The engineer confirms the wall has been rotating and failing for many years
- Retaining wall not designed to support all the loadings
- Super Six fence has been supporting the failed combined wall and when
removed the wall further failed
- Super Six fence is designed for wind loadings only.
The photos supplied show quite significantly the wall is failing as advised by
(neighbour’s engineer MC), they also advised this has been failing over a period of
time, Goog le Maps in 2015 show the problem existed then.”
The applicant disagreed and provided the neighbour’s engineer’s report (MC). The
engineer says:
“ In my opinion the proximate cause of all the super six fence damage at this boundary
are as a direct result of poor, or no, design being carried out on the 3-part combined
retaining wall to ensure it was constructed to Australian Standards... This Google street
image from January 2015 shows that rotation of the walls was occurring then and in my
opinion well before the issues were uncovered by the removal of the bamboo
screening and the super six fence on the insured's property. ”
The applicant also engaged his own engineer (MID). The engineer says:
“Given the condition of the landscaping above the retaining wall, t here is evidence to
suggest sudden failure has occurred which is consistent with being a result of the
asbestos fence removal, this combined with a loss of integrity of the retaining wall over
the years has resulted in sudden collapse.”
Both engineers agree that the proximate cause of the damage is the rotation of the
walls and loss of integrity of the retaining wall over a number of years which resulted
in its collapse following the neighbour’s action in removing the bamboo screening.
The applicant did not establish a valid claim
Having reviewed the available information, I conclude a defined event under the
policy cover was not the cause of the damage. For this reason, the applicant has not
met his onus of establishing a valid claim.
Case No: 483540 Determination Page 4 of 4
Even if the neighbour’ s action was a defined event under the policy, the FSP would
still be entitled to deny the claim. This is because the evidence indicates the cause of
the damage was gradual deterioration, which is expressly excluded from cover .
Given the above, the FSP is entitled to deny the claim in full.