Home / Financial Firm (Unknown - Insurer) / Determination 483329
Determination 483329
Claim declined for subsidence damage caused by tree roots
Summary
A homeowner claimed for building and sewer pipe damage, which the insurer declined as caused by tree root subsidence. AFCA accepted the exclusion applied but found an avoidable several-week delay in the claim decision and ordered $100 non-financial loss compensation.
Under the policy the proximate cause of the loss is the effective dominant cause, and here long-term drying of foundation soil by tree roots was excluded from cover.
Issues
- Claim denial primary · not upheld
“The available evidence shows, on balance, that the proximate cause of the damage was ground movement from tree roots drying the foundation soils, which is excluded from cover.”
- Delay secondary · upheld
“The applicant's claim was delayed several weeks as a result of the FSP's actions. I accept this caused him avoidable inconvenience.”
Subjects and remedies
home or building damagepay non financial loss
Text of the determination
Determination
Case No: 483329 Determination Page 1 of 7
Case number: 483329 6 March 2018
1 Overview
1.1 Dispute
In January 2017, the applicant made a claim under his home insurance policy held
with the financial services provider (FSP). This was after he had noticed cracks to the
walls and foundations of his property, and the plumbing began backing up. The
applicant says his plumber confirmed the sewerage pipe had cracked and the house
had moved, which had caused damage to the building.
The FSP declined the claim because it says the damage was caused by long term
subsidence as a result of trees immediately adjacent to the property. The applicant
disagreed. He says it was the leak in the sewerage pipe that caused the subsidence.
The case manager issued a recommendation in favour of the FSP, but the applicant
did not accept that.
1.2 Issues and key findings
Was the FSP entitled to decline the claim?
The available evidence shows, on balance, that the proximate cause of the damage
was ground movement from tree roots drying the foundation soils. This is excluded
from cover under the policy. That means the FSP is entitled to decline the claim.
Should the FSP compensate the applicant?
T he FSP responded to the applicant’s concerns in a time ly manner overall. However,
there was a delay of several weeks in it finalising the claim decision, after its building
consultant did not provide an opinion on the damage specifically being claimed . The
FSP should compensate the applicant $100 for the inconvenience arising from this
avoidable delay.
1.3 Determination
This determination is substantially in favour of the FSP.
The FSP is not required to accept liability for the damage to the applicant’s property,
however it is required to pay the applicant $100 compensation for non-financial loss.
Case No: 483329 Determination Page 2 of 7
2 Reasons for determination
I have decided this case on the basis of what I consider fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions.
I have taken into account all the material submitted by the parties, both before and
after the recommendation. I am satisfied that the documentation I have relied on has
been provided to both parties. For the purposes of this determination, I will deal with
only those points considered relevant.
2.1 Was the FSP entitled to decline the claim?
The applicant has established a prima facie claim
The applicant carries the initial onus to establish a loss which is covered by the terms
and conditions of the policy. This is called a prima facie claim. Once the applicant
has shown he has a prima facie claim, in order to decline a claim, the FSP must
show, on the balance of probabilities, a policy exclusion applies or the proximate
cause of the damage was not an insured event.
The applicant’s policy provides cover for accidental damage to the property. It is
accepted by both parties the damage was not de liberate or expected. So I am
satisfied the applicant has established a prima facie claim. Therefore, the FSP bears
the onus to show the damage is excluded from cover or it is otherwise entitled to
deny the claim.
The FSP says tree roots caused the damage
All general insurance policies provide cover subject to certain conditions or
exclusions. While the applicant’s policy cover s accidental damage, that cover is
subject to a number of general exclusions. One of these exclusions says the FSP will
not cover:
Loss, damage, injury or death arising from…tree roots
The policy also excludes loss or damage arising from subsidence or landslide unless
it happens immediately as a result of an earthquake, explosion, a storm or a flood.
In declining the claim, the FSP said the damage to the applicant’s property was
caused by tree roots drying the surrounding soil, causing subsidence. In support of
its view, the FSP has provided an engineer’s (AK’s) report which concludes that the
roots of trees immediately adjacent to the property have reduced the moisture
content of the foundation soils. The report says this caused subsidence over time,
which has resulted in the movement of the property and the breaking of the
sewerage pipe.
The applicant says the leaking pipe caused the damage
The applicant disagrees with the FSP’s conclusion about the cause of the damage.
The applicant says the water escaping from the broken pipe caused the foundations
of the building to move, resulting in the claimed damage.
Case No: 483329 Determination Page 3 of 7
The applicant says he has obtained opinions from various people in support of his
view, including his gardener who has 40 years’ experience , as well as two builders
whom he contacted to obtain a quote for the works. The applicant says these
opinions support his view that it was the escaping of liquid which caused the
damage.
FSP’s liability depends on the proximate cause of the damage
In order to determine whether or not the applicant’s claim is excluded by the policy, it
is necessary to determine the proximate cause o f the loss. The proximate cause of
the loss is a question of fact depending upon the circumstances of each case.
It is well established law that a proximate cause is not necessarily the first, last or the
sole cause of the loss. It is the effective, dominant or operative cause of the loss. If
there are several causes operating contemporaneously, then each must be
examined for the qualities of predominance and efficiency, as the active cause that
sets a relevant train of events in motion.
Courts have said that if one cause would have resulted in the harm in any case and
the other would not have done so in the absence of the first, then the first is the
proximate cause.
Different opinions on the cause of the damage
Both parties have provided credible and logical explanations about how the damage
was caused. FOS’s role is to review the available information provided by the parties
and decide which of the proposed causes is more likely to have caused the claimed
damage.
In this case, FOS has been provided with two written opinions about the cause of the
damage. The first is from the applicant’s plumber in his invoice for the works
conducted. The invoice says:
Pipework broken due to movement of surrounding area
The second written opinion which has been provided is from the FSP’s contracted
engineer, AK. AK ’s report concludes:
It is our opinion that the footing slab and paving slab in the area of the Bathroom has been
exposed to long term decrease in moisture content with subsequent shrinkage of
foundation soil. This long term movement has created stress on the sewer pipe attached to
the south elevation of the residence, resulting in the break in the pipe.
It is more likely than not the damage was caused by the tree roots
Understandably, given the costs involved, the applicant has not obtained a further
report in support of his view. However, both written opinions provided to FOS concur
that the movement of the building occurred before the damage to the pipework. In the
circumstances, I am satisfied the available information supports the conclusion that
the long term drying of the foundation soils because of adjacent trees caused
movement of the building. This movement caused the damage to the pipe and the
resulting leak.
Case No: 483329 Determination Page 4 of 7
It is possible the escape of water from the broken pipe accelerated the movement,
and therefore the damage. However, as the pipework would not have been damaged
in the absence of the drying/movement of the soil, I consider the proximate cause of
the damage was the tree roots adjacent to the building. As a result, the applicant’s
claim is excluded under the policy and the FSP is not obliged to pay for the damage.
2.2 Should the FSP compensate the applicant ?
The applicant says the FSP delayed assessing the claim
In addition to his opinion that the FSP incorrectly declined the claim, the applicant
also complained about the FSP’s handling of the matter. The applicant said, although
the damage occurred in January 2017, it took the FSP until June to respond in writing
confirming its denial of the claim. The applicant says the FSP told him there would be
delays in assessing his claim as there were a large amount of other claims as a
result of a natural disaster which it was prioritising. The applicant says the FSP only
took action when he made a complaint to FOS.
The FSP has provided a copy of its claim notes regarding the applicant’s dispute.
Having reviewed the information available, it is clear the FSP did respond to the
applicant’s concerns in a timely manner. Howev er, there were delays as a result of
the FSP’s building consultant initially reporting on unclaimed damage. Given that the
time between the engineer being requested (following the building consultant’s
attendance) and the report being provided was 21 days, it is likely a claim decision
would have been reached on 13 March 2017 rather than 27 March 2017.
The FSP should compensate the applicant for the delay
In addition to compensation for financial loss, FOS may also award compensation for
non-financial loss, which covers such issues as the stress or inconvenience
experienced as a result of an error by an FSP. FOS takes a conservative approach to
claims for non-financial loss.
In the circumstances of this dispute , the applicant’s claim was delayed several weeks
as a result of the FSP’s actions. I accept this caused him avoidable inconvenience at
an already stressful time. As a result, it is fair in the circumstances that the FSP pay
the applicant $100 compensation.
Case No: 483329 Determination Page 5 of 7
3 Supporting information
3.1 Timeline of events
Date Action
20 February 2017 Applicant’s wife calls to make claim.
24 February 2017 Building consultant attends the applicant’s property to report on
the damage. Report focuses on termite damage which is not
part of the claimed damage. No opinion provided about the
cause of the movement of the building or the damage to the
pipe.
6 March 2017 Applicant’s wife calls FSP for update. FSP informs applicant’s
wife that there is extensive termite damage and there is no
cover. FSP says it will send a copy of the report and a letter.
FSP’s dispute resolution process is also explained to the
appli cant’s wife.
6 March 2017 Later the same day, the applicant called the FSP to discuss the
claim. The applic ant says there is significant movement of the
property. It is confirmed that the previous report only provides
opinion on the termite damage and no t the movement of the
property. It is explained during this phone call that if the
movement is due to subsidence, the claim would not be
covered. A request for a further engineer’s report is made.
13 March 2017 Engineer attends the applicant’s property t o report on the
movement in the building.
27 March 2017 Engineer’s report completed confirming damage is due to tree
roots drying foundation soils.
28 March 2017 Email from applicant to FSP requesting update on claim.
30 March 2017 FSP calls applicant confirming FSP has received engineer’s
report and a copy will be provided to applicant. FSP confirmed it
will contact applicant to discuss after he has had a chance to
review the report.
3 April 2017 FSP calls applicant to discuss the claim. Applicant indicates that
he does not accept the engineer’s opinion. FSP invites the
applicant to provide a report of his own. Applicant reiterates that
he does not accept the FSP’s decision on the claim.
4 April 2017 Applicant calls FSP again to reiterate that he does not accept
engineer’s opinion of the damage and asks FSP to reconsider.
FSP confirms team manager will be writing to him to confirm
decision.
Case No: 483329 Determination Page 6 of 7
4 April 2017 Claim decision letter sent to applicant co nfirming denial of claim
as a result of the engineer’s report. Further discussion with
applicant about the claim decision. Applicant says the engineer
did not want to be there and the engineer’s conclusion is only a
theory.
3.2 Relevant policy provisions
Accidental damage
Covered under Buildings Insurance
damage to your home that is caused unintentionally – for example, you’re in the roof
space and accidentally put your foot through the ceiling.
Exclusions from all cover
What we don’t cover
Loss, damage, injury or death arising from …
Subsidence or landslide unless it happens immediately as a result of:
o An earthquake or explosion
o A storm or flood
…
Tree roots…
3.3 Extracts from the FSP’s report
Section Extract
1.2 The presenc e of the trees located near the south wall will have
great influenc e on the soil conditions, in particular changes to
the moisture content. Tree of this size will cause large
fluctuations in the moisture content of the founding soil of the
residence from the moisture absorption from the root system.
Subsequent shrinkage of the founding soil and subsidence in
the footing system has occurred as a result of this drying out
process.
1.3 It is our opinion that the footing slab and paving slab in the area
of the Bat hroom has been exposed to a long term dec reas e in
moisture content with subsequent shrinkage of the foundation
soil. This long term movement has created stress on the sewer
pipe attached to the sout h elevation of the residence, resulting
in the break in the pipe.
1.9 The damage is n ot from a one - off event. The damage to the
sewer pipe is the result from long term differential movement
between the foundation soils underneath the primary footing
slab and external pathway slab causing the sewer pipe to
fracture at a location near the fo oting slab. In our opinion there
Case No: 483329 Determination Page 7 of 7
was no ot her resultant damage to the residence after the sewer
pipe has fractured.
6.2 The CSIRO Homeowners Guide Sheet No 10 - 91 (CSIRO)
recommends that trees should not be planted within the
distance of their mat ure heigh t from the residence depending on
the site classification. For a tree on an ‘M’ class site (our
estimate), the tree should not be locat ed within a distance equal
to the tree height from the footing. Based on the height and
proximity of the trees located ne ar the sout h wall, the tree
locations do not follow CSIRO’s recommendations i.e. the tree
20 metres in height is located within 9 meters of the residenc e.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.