Text of the determination
Determination
Case No: 482056 Determination Page 1 of 8
Case number: 482056 3 July 2018
1 Overview
1.1 Dispute
The applicant lodged a claim under her home building insurance policy with the
financial services provider (FSP) for damage to her property, following a leak from a
water main.
The FSP accepted the claim and agreed to cover the cost of repairing some of the
damage (including, in particular, the garage floor slab). However, it declined to repair
other parts of the property, saying this damage was caused by differential ground
movement which pre-existed the leaking water main.
The applicant disagrees and says water entered most of the perimeter of her home,
and the disputed damage is attributable to the water leak. She also seeks
compensation for out of pocket expenses and non-financial loss.
The case analyst issued a recommendation that the FSP was partially liable for the
disputed damage. Neither party accepted that.
1.2 Issues and key findings
Is the FSP liable for the disputed damage to the property?
The available information establishes, on balance, that the proximate cause of
damage was the leak from the water main. However, the evidence also shows that
other factors are likely to have contributed . So, it is fair in the circumstances that the
FSP pay the full cost of repairing all damage it has already accepted, but that its
liability for the remaining disputed damage (including a further garage wall crack), be
limited to 30% of the repair costs, as set out in section 2.1 below. Additionally, given
the applicant’s expert assisted in the resolution of this dispute, the FSP is liable for
the expert’s costs, up to a maximum amount of $3,000.
While the claim process has been difficult and stressful for the applicant,
compensation for non-financial loss is not warranted in the circumstances.
1.3 Determination
This determination is partially in favour of the applicant. In addition to the full cost of
repairing/replacing the garage slab and other damage already accepted, the FSP is
required to contribute 30% of the costs of repairing the disputed damage (including a
further garage wall crack). It must also reimburse the applicant the costs of her
engineer ’s reports and advice (up to a maximum of $3,000).
Case No: 482056 Determination Page 2 of 8
2 Reasons for determination
I have decided this case based on what I consider fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions.
I have taken account of all the material submitted by the parties, both before and
after the recommendation. I am satisfied that the documentation I have relied on has
been provided to both parties. For the purposes of this determination, I will deal with
only those points considered relevant.
2.1 Is the FSP liable for the disputed damage to the property?
Applicant has established a valid claim
The applicant’s policy is a defined events policy. This means the policy only responds
where damage is caused by one or more of the listed events, subject to any
conditions and exclusions. ‘Liquid escaping suddenly and unexpectedly’ from a water
main, drain or fixed pipe is one of the events covered under the policy.
There is no dispute the applicant has suffered loss from a leaking storm water pipe,
which caused movement and cracking. The FSP has accepted there is a valid claim.
In seeking to decline the claim, the FSP then has the responsibility of showing an
exclusion applies, or that it is otherwise entitled to do so.
Property has been subject to movement and cracking damage
The applicant lodged the claim on 23 June 2012. She told the FSP she had found
water seeping into her property and she suspected foundation damage.
The cracking and movement damage which is the subject of the claim occurred to
both external and internal parts of the property. The applicant specifically identified:
several areas of cracking in the mortar joints in the external walls
cracks to concrete floor and walls in garage
internal cracking to walls, ceilings and cornices in several rooms
damage to plasterwork in the internal area.
The experts appointed by the parties agree the property is built on clay soil, which is
reactive to changes in moisture. It is also agreed there is movement and cracking
damage to the property from the leaking water main. However, the experts do not
agree about the extent of the damage arising from the leak, and that arising from
other causes.
The applicant is reported as having said that pre-existing cracking identified by the
FSP’s ass essor (TH) in July 2012 was from re-stumping which had taken place in the
preceding five years. TH noted that it could take time for water to travel and for the
building to show any signs of further damage from the leak itself.
The FSP’s engineer (FMG) first attended in March 2013 and conducted a ‘superficial
examination of only the visible and accessible parts of the structure’. FMG
discovered several areas of cracking, particularly to external brick mortar walls and
internal plaster ceiling and cornices. In later reports, FMG also identified structural
and building issues.
Case No: 482056 Determination Page 3 of 8
In accepting part of the claim in the first instance, the FSP pointed out that FMG had
identified some pre-existing damage. It offered a cash settlement of $5,248.44 (less
the applicable excess), on the basis that repairs could not be warranted because of
the on-going movement at the property.
However, the FSP later accepted that FMG had recommended the property be left to
settle for 12 to 18 months, to allow any further resulting damage to become evident,
after which a detailed scope of works should be prepared to include all identified
damage attributable to the water leak (with a revised quote and cash settlement, as
necessary).
Further inspections were then conducted by FMG (in 2014, 2016 and 2017), and an
amended scope of works prepared.
Experts differ as to cause/causes of damage
FMG reported inadequate site drainage, drying of the soil due to the proximity of
trees, and structural issues as contributing to the differential foundation movement
responsible for the disputed damage. As well, however, FMG observed several areas
of internal plasterwork which had loose plaster fragments still present, which would
suggest that had occurred in the recent past.
The applicant ’s engineer (FES) inspected the property on 19 August 2015, and
concluded the water leak from the main, and seepage from the disused gas pipe,
was the likely cause of damage, while also acknowledging the reactive clay soil and
proximity of trees. FES specifically found:
the soil was saturated due to water main burst
moisture content of 35.5% was noted to front side of the property (near the
disused gas pipe)
the floor level survey showed the higher levels were close to the water ingress
path and to the part of the property damaged by the burst water main
landscape was in good condition to drain run off water from building footings .
FES also noted its floor level survey was similar to FMG ’s , and so suggested long-
term movement was unlikely, as the soil condition was in balance after the two and
half year period between their respective inspections.
After its re-inspection of the property in May 2017, FMG identifi ed that ‘the majority of
the damage to the internal finishes is centred on the bathroom and toilet area, where
the support for the structure is inadequate, and not the southeast corner of the
lounge’ (which is closer to the water leak).
FMG also explained that it had changed its initial opinion about the perceived heave
in the southeast corner of the lounge, because the difference in floor levels between
that area and the north wall of the toilet had not reduced since the leak was repaired.
That meant, FMG said, that there had been settlement, rather than heave in the
southeast corner.
However, FMG noted too that the pattern of movement/settlement towards the
bathroom/toilet area had itself ‘remained relatively unchanged’. That would seem to
indicate that the settlement in that part of the property was less likely to be on-going
and long-term.
Case No: 482056 Determination Page 4 of 8
It is also worth noting that there had been other moisture issues identified and
investigated in 2016 and 2017 in the vicinity of the garage area and elsewhere (some
of which, I understand, were addressed by the local water authority). I consider it
reasonable to accept this is likely to have influenced the state of the soil, and meant
that a re-settling after any original heave may not have occurred, or may not have
been as marked.
FMG also acknowledged the ALD leak detection report of November, 2016. That
report noted failed tests of inspections of the sewer line, storm water line and waste
pipes.
Proximate cause of the damage was, on balance, the seeping water main
To determine whether the disputed damage was the result of an insured event, it is
necessary to identify the proximate cause of the loss. This is a question of fact
depending upon the circumstances of each case.
It is well established law that a proximate cause is not necessarily the first or last or
the sole cause of the loss: it is the effective or dominant or operative cause of the
loss. If there are several causes operating contemporaneously, then each must be
examined for the qualities of predominance and efficiency.
There may also be circumstances in which it is proper to conclude that there are two
causes which are equal or at least nearly equal in their efficiency in bringing about a
harm.
The FSP relies on the following general exclusions to deny the claim:
You are not covered under any section of the policy for damage, loss, cost or liability
caused by or arising from or involving:
…
soil movement or settlement,
subsidence or landslide unless caused by the insured event of earthquake,
…
the actions of trees, plants or their roots.
FMG ’s conclusion is that the cause of the disputed damage is from factors such as
poor drainage, presence of trees, previous packing to foundation stumping, and
structural issues. The leak detection report from November 2016 (and previous
builder’s report from 2014) did identify issues with cracking and tree roots in
sewer/stormwater pipes.
FES, on the other hand, considered the damage was attributable to abnormal
moisture condition caused by water ingress from the water main and water seepage
from the disused gas pipe. FMG has also, in its most recent report, expressed
concern about possible defects and ongoing water issues from the nearby local water
authority site.
The evidence of previous foundation packing also suggests there was some previous
ground movement (and the applicant agreed during TH’s initial inspection, that there
was pre-existing cracking damage); and FMG specifically notes issues with the
support of part of the floor frame, and bracing of concrete floor stumps. However, the
extent of these likely contributory factors has not been clearly established.
While acknowledging some pre-existing damage and the likely influence of certain
excluded factors, I am satisfied, on balance, the leaking pipe is responsible for
Case No: 482056 Determination Page 5 of 8
ground movement and was the effective cause of the loss, including the disputed
damage.
The FSP is fully liable for the already accepted damage. However, I consider it is fair
in the circumstances that the FSP ’s liability for the disputed damage be limited to
30%, to take account of the possible contribution of those other factors .
Appropriate to cash settle claim
After the initial assessment and engineer’s report in 2013, the FSP proposed a cash
settlement, given that they expected further c racking to occur in the future ‘due to the
age of the home and type of soil’.
Since I consider the FSP is only partially liable for some of the damage, and given
also the possible future impact of other factors, then a cash settlement remains the
appropriate way of dealing with the claim.
In calculating an appropriate and fair cash settlement amount, it is necessary to
consider all reasonable factors. That includes the nature of the repairs required and
whether the cash settlement will adequately ensure the applicant is able to properly
complete all relevant repairs and cover all reasonable contingencies.
FMG provided a scope of works (SOW2) with its report o f 18 October 2016. That
identified the accepted damage, but did not include a further crack in the south
internal garage brick wall which, I understand, was pointed out by the applicant when
the FSP’s builder attended in March 2017. Given the evidence of o ther accepted
cracking damage in the garage walls (and the long time-frames over which such
damage might appear following a leak), I consider it reasonable to accept that this
further crack is likely to be related to the claimed event. Repair of that crack should
therefore be included in the new quote.
The FSP is to arrange for a new quote to be prepared to cover SOW2 (for which it is
fully liable); as well as for the disputed damage as set out in section 1.4 of FMG’s
October 2016 report (but including the further garage wall crack), for which it is 30%
liable.
The FSP’s cash settlement should be based on the new quote, which should also
include an allowance for contingencies, and must represent the price actually
available to the applicant to have the work completed as a retail customer (and not
‘trade prices’).
FSP is to pay the applicant the cost of FES’s report s
Paragraph 9.4 of the FOS Terms of Reference provides that we may determine an
FSP should contribute to legal or other professional costs incurred by an applicant in
the course of a dispute. We will take into account the complexity of the dispute, and
whether the applicant’s expert advice/report was reasonably needed, and the costs
justifiable.
Unless exceptional circumstances apply, FOS will not require an FSP to contribute
more than $3,000 to these costs.
In this case, I accept that the costs of the applicant’s expert reports and advice were
necessarily incurred to assist in establishing her case. That means I am satisfied that
Case No: 482056 Determination Page 6 of 8
the FSP should reimburse the applicant for those costs, up to the total maximum of
$3,000. She has provided evidence of payment in the form of invoices and an email
receipt.
To be clear, the costs incurred are $1,500 for the forensic investigation and report,
$600 for moisture test, $350 for soil report, and $1,100 for meetings and
consultation/document review/advice.
2.2 Is the applicant entitled to non-financial loss compensation?
FOS may award non-financial loss compensation
FOS will only award compensation for non-financial loss where there has been an
unusual amount of physical inconvenience, time taken to resolve the situation or
i nterference with the applicants’ expectati on of enjoyment or peace of mind.
I accept that the applicant has experienced understandable upset and inconvenience
in the course of her claim and this dispute. However, it is important to note that the
nature of the water problem meant that the matter could not be effectively finalised
without allowing time for any related damage to appear.
I am not persuaded that the overall delay and the associated concern for the
applicant can reasonably be attributed to anything the FSP has done or failed to do.
So while I acknowledge this will have been a difficult time for the applicant, I do not
consider compensation is warranted in the circumstances.
Case No: 482056 Determination Page 7 of 8
3 Supporting information
3.1 Expert reports
Record Key points
FSP’s expert (FMG)
Report s
27 - 03 - 2013
18 - 10 - 2016
31 - 05 - 2017
Water leaking from a broken public water main located along the
southern site boundary entered the subject site via a disused gas
pipe
The water flowed under the subject structure, causing an increase
in the CLAY foundation soil moisture content contributing to the
differential footing observed in the floor level s survey results ,
resulting in the following damage items:
The vertical crack on eastern wall originating at the Garage door
top southern corner
The deteriorated operation of the Garage door as reported by the
Insured
The detachment of the (previously) cracked concrete threshold
along the bas e of the Garage door
The vertical movement of the (previously) cracked section of the
Garage concrete floor
The distress to the internal plasterwor k located at the northwest
corner of the Front Entry along with some cornice gaps
The binding Bathroom, WC and Laundry doors
The distress to the internal plasterwork located in the Hallway
along with some cornice gaps
The distress to the internal plasterwork located in Bedroom along
with some cornice gaps
The distress to the internal plasterwork located in the Meals area
with some cornice gaps
Damages observed
Several cracks in the mort ar joints in the external walls
Disused gas pipe where water en tered was located at the bas e of
the southern wall
Garage
Conc rete threshold along roller door base has detached from the
floor and extensively cracked
Cracks to concrete floor \ timber wedge packing to steel beams
supporting kitchen floor
Stepped diagonal c rack with movement through mort ar joints
Packing material between top of stumps and timber bearers in the
subfloor
Front
Hairline crack on southern wall
Several buckles, loose fragments and cracks in southern wall
Continuous gaps at cornice/wall, and cornice/ceiling
Bedroom 2
Several vertical/diagonal buckles and horizontal cracks on eastern
wall originating from Hallway door top southern corner [27]
Case No: 482056 Determination Page 8 of 8
Discontinuous gaps at cornice/wall, cornice/ceiling and cornice
mitre joints around f ull perimeter, som e with loose plaster
fragments still present
Pair of vertical cracks located on western wall
Hairline vertical crack located on western wall
Vertical corner crack located at northeast corner
Report three
the sewer lines are expected to be not contributing to this observed
moisture
FMG did not observe any moisture in the subfloor in 2013
leak detection in 2014 confirmed that the storm, sewer and supply
lines were free from defect
the moisture in the subfloor is expected to be originating from the
site dr ainage and/or the storm lines given the reasonably high
amount of rainfall in Victoria in the latter half of 2016
leak detection testing and the interval between subsequent tests
indicates that the reported defects in the hydraulic services have
occurred since 2014, are not related to the Event and have not
contribut ed to the damage which was observed prior to when the
services were deemed to be free of defect in 2014
Inadequate support of the floor frame of the meals area, laundry,
toilet and bathroom
Ina dequate concrete stumps supporting the floor frames in meals,
laundry and toilet area
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.