Home / Financial Firm (Unknown - Insurer) / Determination 481861

Determination 481861

Hail damage roof settlement amount and scope disputed

FirmFinancial Firm (Unknown - Insurer)
Decided2018-04-26
ProductGeneral Insurance · Strata
OutcomeFor the complainant in part
Amount awarded$62,000
Non-financial loss—
Amount claimed$89,799
SourceAFCA PDF

Summary

The body corporate claimed hail damage to five units' roofs and disputed the FSP's repair offer. AFCA found the FSP's scope understated the damage and ordered cash settlement of $62,000 or repairs by an alternative contractor.

Settlement is based on the reasonable and necessary cost of repairing the damaged portions under the policy, and minor hail indentations are covered accidental damage.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 481861 Determination Page 1 of 5 Case number: 481861 27 March 2018 1 Overview 1.1 Dispute The insured body corporate holds a residential strata insurance policy with the financial services provider (FSP) which provides cover for five semi-detached two storey units. In 2016, the body corporate lodged a claim for damage to the roofs at the property caused by a hail storm in November 2014. The FSP accepted the claim and obtained a scope of works and quotations for the necessary repairs. The FSP offered to settle the claim by arranging for its contractor (SC) to carry out the repairs or cash settling the body corporate based on SC’s quotation ($38,346). However, the applicant is dissatisfied with the FSP’s settlement offer. She sa ys that:  the scope of works approved by the FSP does not include all of the damage to the roofs caused by the hail storm  the amount quoted by SC is insufficient to carry out the necessary repairs. The applicant says the FSP should be required to cash settle the claim for $89,799, based on the cost of a complete roof replacement as quoted by her builder (AB). 1.2 Issues and key findings Is the FSP required to increase its settlement offer? The FSP is liable for repairing the damage in accordance with the scope of works prepared by its building consultant (MB), expanded to include:  the replacement of roofing which has sustained minor hail indentations (as identified in MB’s report)  the repair of the internal water damage to Unit 2. 1.3 Determination This determination is partly in favour of the applicant. The FSP is required to, at the election of the insured body corporate:  cash settle the claim for $62,000, or  arrange for its contractor (AM or an equivalently qualified builder) to complete the repairs, on the basis set out in section 2.1 below. Case No: 481861 Determination Page 2 of 5 2 Reasons for determination 2.1 Is the FSP required to increase its settlement offer? Policy sets out how claims will be settled The strata insurance policy provides that the FSP will settle claims for damage to the building by paying the reasonable and necessary cost of repairing the damaged portions to their condition when new. However, the policy states that the FSP will not pay any costs for repairing or replacing undamaged property. In the present case, the FSP has offered to settle the claim by either:  arranging for its contractor (SC) to undertake the repairs based on a scope of works prepared by its building consultant (MB) or  cash settling the body corporate for the amount of SC’s quotation ($38,346). Applicant’s builder says full roof replacement is required During the course of this dispute, the parties have obtained reports from various contractors who were appointed to assess the nature and extent of the hail damage to the roofs at the property. The views expressed in these reports differ. When the body corporate lodged the claim, it provided a report from its builder (AB). In his report, AB advised that there was hail damage to all exposed metal surfaces, including the roof sheeting and associated components (vents, caps, barges etc). AB noted that the damage was worse to the south facing surfaces (due to the direction of the storm). However, he considered there was damage to all roof sheets and therefore recommended that the roofs of all five units be replaced in their entirety. AB provided a quotation for $89,799 for the roof repl acement. AB’s quotation also included the repair of internal water damage to the ceiling in the lounge room of Unit 2. The applicant subsequently obtained a quotation from another builder (MR), who quoted $108,880 for the replacement of all of the roofs (excluding the awnings). FSP’s c ontractors have provided varying scopes of work and quotations Following lodgement of the claim, the FSP appointed its own roofer (SC) to report on the damage to the property. SC reported that only the south west facing areas of the roofs needed to be replaced. SC quoted these repairs at $38,346. SC’s quotation included the repair of internal water damage to the lounge and bedroom ceilings and a downstairs cupboard in Unit 2. Case No: 481861 Determination Page 3 of 5 After the applicant disputed SC’s findings, the FSP appointed a building consultant (MB) to carry out a further inspection and prepare a scope of works for the repair of the property. MB prepared a comprehensive report which included a detailed analysis of the damage to each of the roofs, together with a scope of works setting out the repairs required to each of the units. In summary, MB concluded that approximately 80% of the roofs (and related areas) were damaged and required replacement. However, MB also identified some areas which he considered were undamaged and therefore did not need to be replaced. Following receipt of MB’s final report, the FSP obtained an updated quotation from SC for the repairs set out in MB’s scope of works. SC reiterated his original quotation of $38,346. He advised that this quotation already included an allowance for some of the additional works identified by MB. The FSP also obtained a quotation from another builder (AB) for $54,671.10, based on MB’s scope of works. FSP is required to replace roofs in all areas with hail indentations Having carefully reviewed the various reports provided, I consider that MB’s scope of works most accurately identifies the repairs required to address the hail damage to the roofs. As outlined above, MB’s report includes a detailed analysis of th e damage to the roofs of each of the units. MB separately analysed the damage to each section of each roof. MB’s report also includes numerous close -up, colour photographs showing areas of the roofs where he identified hail damage, as well as those portions which he considered to be undamaged. In his report, MB referred to a technical bulletin issued by the manufacturer of the roof sheeting (BS). In this bulletin, BS advises that indentations from hail stones will generally not affect the life of a roof, other than in two specific scenarios. MB relied on the BS bulletin for the purpose of determining whether hail-damaged sections of the roofs needed to be replaced – that is, he considered replacement was only required where the hail dents to the roofs satisfied either of the criteria in the technical bulletin. On this basis, MB concluded that areas of the roofs which had suffered only minor hail indentations did not need to be replaced. The strata policy provides cover for accidental damage, being any physical loss or destruction which is unintended and unexpected. Given the broad scope of cover under the policy, I am not satisfied that it was necessarily appropriate for the FSP to exclude cover for areas of the roofs which had suffered only minor (rather than major) hail indentations. Case No: 481861 Determination Page 4 of 5 Accordingly, MB’s scope of works potentially underestimates the extent of the repairs for which the FSP is liable. Having said that, based on MB’s report, I am satisfied that there are parts of the roofs (and associated components) at some of the units which did not sustain any hail indentations due to their location. While the applicant’s builder (AB) has advised that a complete roof replacement is required, this is not consistent with the condition of the various sections of the roofs as shown in the photographs included in MB’s report. Settlement should be based on AM’s quotation subject to adjustments As outlined above, the FSP has obtained quotations from two builders (SC and AM) for the repairs set out in MB’s scope of works . The first builder (SC) prepared its original quotation (for $38,346) on the basis that only the south west facing sections of the roofs needed to be replaced. SC did not increase its original quotation after being provided with the revised scope of works prepared by MB. SC maintained its original quotation, despite MB’s scope of works providing for the replacement of a considerably greater portion of the roof. In these circumstances, I am not satisfied that SC’s quotation reflects the fair and reasonable cost of undertaking the necessary repairs. The FSP’s second builder (AM) provided a quotation for $54,671.10, based on MB’s scope of works (as compared to the cost of a full roof replacement, which it quoted at $59,532). AM has confirmed it is willing to undertake the repairs. The fact that the applicant’s contractors (AB and MR) have quoted significantly higher amounts for the repairs does not of itself establish that AM’s quotation is insufficient. Given AM’s quotation was based on MB’s scope of works, I consider it reflects the reasonable and necessary cost of repairing the hail damage to the roofs at the property, subject to the following comments:  for the reasons outlined above, AM’s quotation should be increased to allow for the additional cost of replacing roofing which has sustained minor hail indentations (as identified in MB’s report)  AM’s quotation does not appear to include any allowance for the repair of the internal water damage to Unit 2, for which the FSP has accepted liability  AM’s q uotation is over twelve months old and therefore the cost of undertaking the repairs is likely to have increased. In the circumstances, I consider that the FSP should be required to cash settle the claim for the amount of $62,000. In determining this amount, I have taken into account the passage of time. Accordingly, the FSP is not required to pay interest. Alternatively, the FSP has offered to arrange for its contractors to carry out the necessary repairs. Accordingly, the insured body corporate may elect to have the claim settled on the basis that AM (or an equivalent contractor) will complete the repairs (as outlined above). Case No: 481861 Determination Page 5 of 5 3 Supporting information 3.1 FOS approach to this dispute FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS Preliminary View and has proceeded directly to Determination. This dispute has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues which are considered directly relevant to the outcome only. During the course of this dispute, the insured body corporate has been represented by the applicant and her building consultant (JC). For the purpose of this determination, submissions made by JC have been taken as if they had been made by the applicant herself. 3.2 Relevant policy wording Subject Policy wording Scope of cover We will cover Your Insured Property for any Damage occurring during the Period of Insurance not excluded by this Section … Damage means any Accidental physical loss or destruction … Settlement of claims REINSTATEMENT AND REPLACEMENT When Damage not excluded by this Section occurs to Your Building(s), We will pay the reasonable and necessary cost of rebuilding Your Building(s) or repairing the Damaged portions to the same condition as when they were new. We decide which one We will do .. . CASH SETTLEMENT … If you choose not to repair or replace Your Insure d Property, We will at Our option:  Cash settle your claim based on the cost to repair or replace Your Insured Property, or  Pay Your claim based on Indemnity Value … UNDAMAGED PROPERTY We will not pay any costs for replacing, repairing, altering or modifyin g any undamaged Insured Property or undamaged sections of Your Insured Property.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.