Home / Financial Firm (Unknown - Insurer) / Determination 481861
Determination 481861
Hail damage roof settlement amount and scope disputed
Summary
The body corporate claimed hail damage to five units' roofs and disputed the FSP's repair offer. AFCA found the FSP's scope understated the damage and ordered cash settlement of $62,000 or repairs by an alternative contractor.
Settlement is based on the reasonable and necessary cost of repairing the damaged portions under the policy, and minor hail indentations are covered accidental damage.
Issues
- Claim amount dispute primary · upheld“The FSP is required to cash settle the claim for $62,000, or arrange repairs; SC's quotation does not reflect the fair and reasonable cost.”
- Claim denial secondary · upheld“Not satisfied it was appropriate for the FSP to exclude cover for roof areas with only minor hail indentations.”
Subjects and remedies
home or building damagenatural disasterpay claimrepair or rectify
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 481861 Determination Page 1 of 5
Case number: 481861 27 March 2018
1 Overview
1.1 Dispute
The insured body corporate holds a residential strata insurance policy with the
financial services provider (FSP) which provides cover for five semi-detached two
storey units.
In 2016, the body corporate lodged a claim for damage to the roofs at the property
caused by a hail storm in November 2014. The FSP accepted the claim and obtained
a scope of works and quotations for the necessary repairs.
The FSP offered to settle the claim by arranging for its contractor (SC) to carry out
the repairs or cash settling the body corporate based on SC’s quotation ($38,346).
However, the applicant is dissatisfied with the FSP’s settlement offer. She sa ys that:
the scope of works approved by the FSP does not include all of the damage to
the roofs caused by the hail storm
the amount quoted by SC is insufficient to carry out the necessary repairs.
The applicant says the FSP should be required to cash settle the claim for $89,799,
based on the cost of a complete roof replacement as quoted by her builder (AB).
1.2 Issues and key findings
Is the FSP required to increase its settlement offer?
The FSP is liable for repairing the damage in accordance with the scope of works
prepared by its building consultant (MB), expanded to include:
the replacement of roofing which has sustained minor hail indentations (as
identified in MB’s report)
the repair of the internal water damage to Unit 2.
1.3 Determination
This determination is partly in favour of the applicant.
The FSP is required to, at the election of the insured body corporate:
cash settle the claim for $62,000, or
arrange for its contractor (AM or an equivalently qualified builder) to complete
the repairs, on the basis set out in section 2.1 below.
Case No: 481861 Determination Page 2 of 5
2 Reasons for determination
2.1 Is the FSP required to increase its settlement offer?
Policy sets out how claims will be settled
The strata insurance policy provides that the FSP will settle claims for damage to the
building by paying the reasonable and necessary cost of repairing the damaged
portions to their condition when new.
However, the policy states that the FSP will not pay any costs for repairing or
replacing undamaged property.
In the present case, the FSP has offered to settle the claim by either:
arranging for its contractor (SC) to undertake the repairs based on a scope of
works prepared by its building consultant (MB) or
cash settling the body corporate for the amount of SC’s quotation ($38,346).
Applicant’s builder says full roof replacement is required
During the course of this dispute, the parties have obtained reports from various
contractors who were appointed to assess the nature and extent of the hail damage
to the roofs at the property. The views expressed in these reports differ.
When the body corporate lodged the claim, it provided a report from its builder (AB).
In his report, AB advised that there was hail damage to all exposed metal surfaces,
including the roof sheeting and associated components (vents, caps, barges etc).
AB noted that the damage was worse to the south facing surfaces (due to the
direction of the storm). However, he considered there was damage to all roof sheets
and therefore recommended that the roofs of all five units be replaced in their
entirety.
AB provided a quotation for $89,799 for the roof repl acement. AB’s quotation also
included the repair of internal water damage to the ceiling in the lounge room of
Unit 2.
The applicant subsequently obtained a quotation from another builder (MR), who
quoted $108,880 for the replacement of all of the roofs (excluding the awnings).
FSP’s c ontractors have provided varying scopes of work and quotations
Following lodgement of the claim, the FSP appointed its own roofer (SC) to report on
the damage to the property. SC reported that only the south west facing areas of the
roofs needed to be replaced.
SC quoted these repairs at $38,346. SC’s quotation included the repair of internal
water damage to the lounge and bedroom ceilings and a downstairs cupboard in
Unit 2.
Case No: 481861 Determination Page 3 of 5
After the applicant disputed SC’s findings, the FSP appointed a building consultant
(MB) to carry out a further inspection and prepare a scope of works for the repair of
the property.
MB prepared a comprehensive report which included a detailed analysis of the
damage to each of the roofs, together with a scope of works setting out the repairs
required to each of the units.
In summary, MB concluded that approximately 80% of the roofs (and related areas)
were damaged and required replacement. However, MB also identified some areas
which he considered were undamaged and therefore did not need to be replaced.
Following receipt of MB’s final report, the FSP obtained an updated quotation from
SC for the repairs set out in MB’s scope of works. SC reiterated his original quotation
of $38,346. He advised that this quotation already included an allowance for some of
the additional works identified by MB.
The FSP also obtained a quotation from another builder (AB) for $54,671.10, based
on MB’s scope of works.
FSP is required to replace roofs in all areas with hail indentations
Having carefully reviewed the various reports provided, I consider that MB’s scope of
works most accurately identifies the repairs required to address the hail damage to
the roofs.
As outlined above, MB’s report includes a detailed analysis of th e damage to the
roofs of each of the units. MB separately analysed the damage to each section of
each roof.
MB’s report also includes numerous close -up, colour photographs showing areas of
the roofs where he identified hail damage, as well as those portions which he
considered to be undamaged.
In his report, MB referred to a technical bulletin issued by the manufacturer of the
roof sheeting (BS). In this bulletin, BS advises that indentations from hail stones will
generally not affect the life of a roof, other than in two specific scenarios.
MB relied on the BS bulletin for the purpose of determining whether hail-damaged
sections of the roofs needed to be replaced – that is, he considered replacement was
only required where the hail dents to the roofs satisfied either of the criteria in the
technical bulletin.
On this basis, MB concluded that areas of the roofs which had suffered only minor
hail indentations did not need to be replaced.
The strata policy provides cover for accidental damage, being any physical loss or
destruction which is unintended and unexpected.
Given the broad scope of cover under the policy, I am not satisfied that it was
necessarily appropriate for the FSP to exclude cover for areas of the roofs which had
suffered only minor (rather than major) hail indentations.
Case No: 481861 Determination Page 4 of 5
Accordingly, MB’s scope of works potentially underestimates the extent of the repairs
for which the FSP is liable.
Having said that, based on MB’s report, I am satisfied that there are parts of the roofs
(and associated components) at some of the units which did not sustain any hail
indentations due to their location.
While the applicant’s builder (AB) has advised that a complete roof replacement is
required, this is not consistent with the condition of the various sections of the roofs
as shown in the photographs included in MB’s report.
Settlement should be based on AM’s quotation subject to adjustments
As outlined above, the FSP has obtained quotations from two builders (SC and AM)
for the repairs set out in MB’s scope of works .
The first builder (SC) prepared its original quotation (for $38,346) on the basis that
only the south west facing sections of the roofs needed to be replaced.
SC did not increase its original quotation after being provided with the revised scope
of works prepared by MB. SC maintained its original quotation, despite MB’s scope of
works providing for the replacement of a considerably greater portion of the roof.
In these circumstances, I am not satisfied that SC’s quotation reflects the fair and
reasonable cost of undertaking the necessary repairs.
The FSP’s second builder (AM) provided a quotation for $54,671.10, based on MB’s
scope of works (as compared to the cost of a full roof replacement, which it quoted at
$59,532). AM has confirmed it is willing to undertake the repairs.
The fact that the applicant’s contractors (AB and MR) have quoted significantly
higher amounts for the repairs does not of itself establish that AM’s quotation is
insufficient.
Given AM’s quotation was based on MB’s scope of works, I consider it reflects the
reasonable and necessary cost of repairing the hail damage to the roofs at the
property, subject to the following comments:
for the reasons outlined above, AM’s quotation should be increased to allow for
the additional cost of replacing roofing which has sustained minor hail
indentations (as identified in MB’s report)
AM’s quotation does not appear to include any allowance for the repair of the
internal water damage to Unit 2, for which the FSP has accepted liability
AM’s q uotation is over twelve months old and therefore the cost of undertaking
the repairs is likely to have increased.
In the circumstances, I consider that the FSP should be required to cash settle the
claim for the amount of $62,000. In determining this amount, I have taken into
account the passage of time. Accordingly, the FSP is not required to pay interest.
Alternatively, the FSP has offered to arrange for its contractors to carry out the
necessary repairs. Accordingly, the insured body corporate may elect to have the
claim settled on the basis that AM (or an equivalent contractor) will complete the
repairs (as outlined above).
Case No: 481861 Determination Page 5 of 5
3 Supporting information
3.1 FOS approach to this dispute
FOS has considered it appropriate to expedite this dispute in accordance with the
Operational Guidelines to the Terms of Reference, due to the nature of the dispute.
Accordingly, this dispute has not been the subject of a FOS Preliminary View and
has proceeded directly to Determination.
This dispute has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues which are
considered directly relevant to the outcome only.
During the course of this dispute, the insured body corporate has been represented
by the applicant and her building consultant (JC). For the purpose of this
determination, submissions made by JC have been taken as if they had been made
by the applicant herself.
3.2 Relevant policy wording
Subject Policy wording
Scope of
cover
We will cover Your Insured Property for any Damage occurring during the Period
of Insurance not excluded by this Section …
Damage means any Accidental physical loss or destruction …
Settlement of
claims
REINSTATEMENT AND REPLACEMENT
When Damage not excluded by this Section occurs to Your Building(s), We will
pay the reasonable and necessary cost of rebuilding Your Building(s) or repairing
the Damaged portions to the same condition as when they were new. We decide
which one We will do .. .
CASH SETTLEMENT …
If you choose not to repair or replace Your Insure d Property, We will at Our
option:
Cash settle your claim based on the cost to repair or replace Your Insured
Property, or
Pay Your claim based on Indemnity Value …
UNDAMAGED PROPERTY
We will not pay any costs for replacing, repairing, altering or modifyin g any
undamaged Insured Property or undamaged sections of Your Insured Property.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.