Dispute over cash settlement amount for hot water service leak damage to heritage property
Text of the determination
Determination
Case No: «reference_id» Determination Page 1 of 10
Case number: 481488 26 June 2018
1 Overview
1.1 Dispute
The applicant held a landlord insurance policy with the financial services provider
(FSP) which provided cover for his tenanted investment property (a heritage listed
building constructed in approximately 1885).
The applicant lodged a claim under the policy for damage to the property caused by
a leak from the hot water service in December 2015.
The FSP accepted the applicant’s claim and offered to cash settle him for
$30,393.88, being the estimated cost of repairs based on a scope of works and
quotation prepared by the FSP’s builder (AJ) .
The applicant says the amount offered by the FSP is not sufficient to carry out the
necessary repairs to the property. Among other things, the applicant says AJ’s
quotation does not take into account the heritage status of the building.
The applicant has rejected the FSP’s proposal to provide a revised offer, following a
further assessment of the property. He says the FSP should be required to cash
settle the claim for $214,940, based on a quotation provided by his builder (GF). The
applicant is also dissatisfied with the manner in which the FSP has handled his claim.
1.2 Issues and key findings
Is the FSP required to cash settle the claim for $214,940?
Based on the information provided, the panel is not satisfied that the quotation for
$214,940 provided by GF accurately reflects the cost of repairing the claim-related
damage to the property. Accordingly, the FSP is not required to cash settle the claim
for this amount.
How should the dispute be settled?
A further, comprehensive assessment is required to accurately determine the cost of
the claim-related repairs. However, given the circumstances, the applicant should be
offered the alternative of cash settling the claim for $130,000.
Is the applicant entitled to compensation for non-financial loss?
The FSP is required to pay the applicant the amount of $2,000 as compensation for
non-financial loss due to the manner in which his claim has been handled.
Case No: 481488 Determination Page 2 of 10
1.3 Determination
This determination is partly in favour of the FSP and partly in favour of the applicant.
The FSP is to cash settle the claim by, at the election of the applicant:
paying the applicant the amount of the lowest quotation obtained by the FSP
based on the revised scope of works prepared in accordance with the
reassessment process set out in sections 2.2 and 3.2 below, or
paying the applicant the amount of $130,000.
The FSP is required to pay the applicant the amount of $2,000 as compensation for
non-financial loss.
Case No: 481488 Determination Page 3 of 10
2 Reasons for determination
2.1 Is the FSP required to cash settle the claim for $214,940?
FSP has accepted applicant’s claim for escape of water
The applicant’ s policy provides cover for damage to his property caused by the
events listed in the policy (including the insured event of ‘water and oil leaks’),
subject to the conditions and exclusions set out in the policy.
The FSP accepts that the applicant’s proper ty was damaged by water from a leaking
hot water service on the first floor in December 2015.
The applicant says the entire contents of the hot water service escaped, leaking
through the ceiling and into the living area, front entry and cellar underneath. He says
water continued to flow as the system attempted to refill the tank.
The damage was not discovered for some days, as the tenant was overseas at the
time the leak occurred.
Dispute concerns extent of damage and cost of repairs
Between January 2016 and June 2016, the FSP and the applicant attempted to
agree on the works required to repair the damage to the property caused by the
water leak in December 2015.
In May 2016, the FSP engaged an engineer (BC) to review certain ite ms of damage
claimed by the applicant and confirm whether or not they had been caused by the
escape of water.
BC concluded that the disputed items of damage had not been caused by the escape
of water in December 2015, but by factors which were excluded under the policy
(such as gradual deterioration, and naturally occurring earth movement).
After the applicant disputed the findings in BC’s report, the FSP engaged a second
engineer (MP) to inspect the property.
MP concluded that some of the additional damage claimed by the applicant may
have been caused by the leak from the hot water service (for example, cupping and
peaking of the parquetry floor in the entry area and staining damage to the
balustrades). However, MP considered that other items of damage were pre-existing.
In January 2017, the FSP advised the applicant that it had decided to cash settle the
claim rather than undertake repairs, due to concerns about pre-existing damage to
the property.
The FSP offered to cash settle the applicant for $30,390.88, based on a scope of
works and quotation provided by its builder (AJ) for repairing the claim-related
damage to the property.
The applicant disputes the amount of the cash settlement offer. Among other things,
the applicant says that AJ’s scope of works and quotation :
does not include all of the damage to the property caused by the water leak
Case No: 481488 Determination Page 4 of 10
does not include any allowance for the remediation of mould affecting the
property
does not take into account the significantly higher costs associated with repairing
heritage listed buildings, and
includes a number of provisional sum amounts, which do not accurately reflect
the cost of repairs (given AJ’s lack of expertise in relation to heritage buildings) .
The applicant says the FSP should be required to cash settle the claim for $214,940,
based on a quotation obtained from his builder (GF) in March 2017.
During the course of the dispute, the FSP acknowledged that the heritage nature of
the applicant’s property was such that it required specialist repairers.
Accordingly, the FSP arranged a further inspection of the property in May 2017,
which was attended by the applicants, the builders (AJ and GF) and an architecture
firm that specialises in heritage listed buildings (CA).
The FSP subsequently proposed that CA be appointed (at the FSP’s cost) to assist
with the resolution of the dispute by:
drafting and submitting the required documentation to obtain heritage and
planning approvals
preparing a detailed scope of works (in consultation with specialist contractors)
overseeing the appointment of contractors to undertake the works, and
carrying out regular quality inspections during the course of the repairs.
The applicant declined to proceed with the FSP’s proposal and advised that he was
no longer willing to communicate with the FSP.
The applicant says that a further assessment is not appropriate as the FSP has
already had a sufficient opportunity to resolve the claim. He is also concerned that,
under the FSP’s proposal, AJ would still h ave primary responsibility for co-ordinating
the repairs.
Neither quotation accurately reflects the cost of the claim-related repairs
Having carefully reviewed the available information, the panel is satisfied that the
quotation of $30,390.88 provided by the FSP’s builder ( AJ) significantly
underestimates the cost of the claim-related repairs.
The panel notes that AJ’ s quotation does not include any amount for obtaining
planning approvals. However, CA’s proposal includes an amount of approximately
$30,000 for preparing and lodging the planning application (including heritage
approvals), together with providing a revised scope of works.
Further, AJ’s quotation does not include an y amount for mould remediation.
However, the applicant has provided a report by a mould specialist (GC) which
identifies mould in the areas where the water leak occurred. Mould growth is not
unexpected given the fact the leak was not identified until several days after it
occurred and no repairs have been carried out to date.
Case No: 481488 Determination Page 5 of 10
The quotation provided by the applicant’s builder (GF) includes a prime cost
allowance of $22,000 (including GST) for mould remediation, based on the works
recommended by GC.
The panel is also not satisfied that AJ’s quotation makes sufficient allowance for t he
additional costs associated with repairing a heritage building such as the applicant’s
property (for example, the estimates for repairing the plaster and lathe ceiling and
repairing the parquetry flooring appear particularly low).
However, the panel is not satisfied that the quotation provided by the applicant’s
builder (GF) for $214,940 accurately reflects the cost of the repairing the damage
which was caused by the water leak in December 2015.
The cover letter to GF’s quotation states that it has been prepared based on the
scope of work supplied by the applicant’s tenant. However, it is unclear exactly what
items of damage this scope of works includes.
The applicant says that GF’s quotation only covers the repair of damage which was
caused by the water leak. However, the FSP disputes that all of the damage included
in GF’s quotation is claim -related, based on the findings of its engineers (BC and
MP).
The disputed damage includes:
masonry deterioration to the north wall of the cellar (which GF advised had
‘accelerated’ deterioration of the masonry)
cracking to the internal walls in various areas
sinking of the tiled bathroom floor
transverse cracking to the stairs
movement damage to parquetry floor in the entry area.
The applicant has disputed the findings of the FSP’s engineers regarding the cause
of damage to these items. He says that information provided to the FSP’s engineers
during their inspection was not reflected in their reports. He also says that additional
damage to the property was caused during initial make safe works.
However, the applicant has not provided a report from an equivalently qualified
engineer which refutes these findings.
Further, the quotation provided by GF is not itemised and therefore it is not possible
to determine how much of the total amount relates to the repair of the disputed
damage.
FSP is not required to cash settle claim for $214,940
For the reasons outlined above, the panel is not satisfied that the quotation for
$214,940 provided by GF accurately reflects the cost of repairing the claim-related
damage to the property.
Accordingly, the FSP is not required to cash settle the claim for this amount.
Case No: 481488 Determination Page 6 of 10
2.2 How should the dispute be settled?
Further assessment is necessary to confirm cost of repairs
At various stages during the course of the dispute, both parties have confirmed their
preference that the claim be cash settled. The panel agrees that a cash settlement is
appropriate, given the breakdown in the relationship between the parties.
However, for the reasons outlined above, the panel is not satisfied that either of the
quotations provided by the parties accurately reflect the scope of works required to
repair the claim-related damage and/or the cost of undertaking those repairs.
Given the considerable difference between the two quotations, the panel considers
that the FSP should be required to arrange a further, comprehensive assessment to
be carried out by appropriately qualified contractors, to prepare a revised scope of
works and arrive at an accurate cash settlement amount.
A further assessment has the benefit of taking into account any worsening of the
initial damage which has occurred as a result of the delay in repairs being
undertaken (noting that the most recent inspection of the property occurred
approximately twelve months ago).
Section 3.2 sets out the details of the process by which the further assessment is to
be undertaken and the revised scope of works and updated quotation prepared.
Following completion of this process, the FSP is to cash settle the applicant for the
amount of the lowest quotation provided by the nominated builders.
Applicant may elect cash settlement of $130,000
As outlined above, the panel considers that a further assessment is necessary to
accurately determine the cost of the repairs.
However, the panel also recognises that the claim has already taken a significant
period of time to resolve, given the water leak occurred in December 2015.
Limited information has been provided about the early stages of the claim.
Accordingly, it is not entirely clear what caused the initial delays (eg six months
befor e an engineer’s report was obtained and almost twelve months before a scope
of works were repaired).
However, the panel accepts the applicant’s position that a significant proportion of
the delays experienced during this period were caused by the FSP appointing
contractors who did not have sufficient knowledge and experience of heritage
buildings.
The panel acknowledges that the applicant is frustrated with the FSP’s failure to
obtain an accurate scope of works and quotation. The panel also acknowledges t hat
the proposed reassessment process will further extend the time taken to resolve the
claim.
In light of this, the panel considers the applicant should be offered the option of
accepting a potentially lower settlement amount than that which might be determined
through a comprehensive reassessment process, in the interests of achieving finality.
Case No: 481488 Determination Page 7 of 10
In considering the alternative amount to be offered, the panel has had regard to the
issues discussed in section 2.1 above.
In particular, the panel has taken into account the significantly higher costs
associated with repairs to heritage listed buildings.
Such costs are reflected in the fact that CA quoted $39,670 (plus GST) for the limited
services to be provided under its consultancy proposal (which did not include
carrying out the repairs themselves).
The panel has also had regard to the fact that AJ’s quotation did not provide for
significant aspects of the works such as mould remediation (the cost of which is likely
to have increased due to the passage of time).
On this basis, the panel considers that the cost of undertaking repairs to the areas for
which the FSP has accepted liability is likely to exceed $100,000 (that is, putting
aside the areas where liability is disputed).
In the circumstances, the panel considers it is appropriate to include an additional
allowance for:
any unforeseen variations required during the course of the works
the additional risk assumed by the applicant due to the absence of the lifetime
guarantee provided under the policy in situations where the FSP undertakes the
repairs.
Accordingly, the panel considers it is fair in all the circumstances that the applicant
be offered a cash settlement of $130,000 as an alternative to a further reassessment
and preparation of a revised scope of works.
2.3 Is the applicant entitled to compensation for non-financial loss?
Applicant is entitled to compensation of $2,000
Under the Terms of Reference, FOS may award compensation (capped at $3,000)
for non-financial loss where an applicant has suffered an unusual degree or extent of
physical inconvenience, time taken to resolve the situation or interference with their
expectation of enjoyment or peace of mind.
As outlined above, the panel is satisfied that the FSP’s failure to deal with the claim
appropriately during the early stages has significantly contributed to the delays which
have been experienced.
The FSP’ s failure to appoint contractors with the appropriate expertise has caused
additional stress and inconvenience to the applicant, who has been forced to deal
with numerous contractors and arrange multiple inspections.
The FSP is expected to be able to access contractors with the skills and experience
required to undertake repairs to heritage listed properties, in circumstances where it
offers to insure these types of properties.
The panel acknowledges that the applicant declined to participate in the
reassessment process proposed by the FSP in June 2017.
Case No: 481488 Determination Page 8 of 10
However, as noted above, this process was based on the FSP’s builder (AJ) being
involved in the repairs process, in circumstances where AJ’s quotation had been
shown to be manifestly inadequate.
In the circumstances, the panel considers the applicant is entitled to compensation of
$2,000 for non-financial loss.
Case No: 481488 Determination Page 9 of 10
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS recommendation. Due to the nature
of the dispute, it has been referred directly to a panel for determination, in line with
the Operational Guidelines to the FOS Terms of Reference. The panel consists of an
Ombudsman and two representatives with consumer and insurance experience.
The panel has decided this case based o n what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
The panel has reviewed and considered all of the material provided by the parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, the panel has restricted its commentary to those issues that it
considers directly relevant to the outcome only.
During the course of this dispute, the applicant has been represented by a family
member. For the purposes of this determination, submissions made by the
applicant’ s family member have been treated as if they had been made by the
applicant himself.
3.2 Process for further assessment
The proposed further assessment referred to in section 2.2 above is to be
undertaken at the FSP’s cost on the following basis:
the FSP will appoint CA to prepare a scope of works for the repair of the damage
to the property caused by the leak from the hot water service in December 2015
(including consequential mould issues) and/or any make safe repairs previously
carried out by the FSP’s contractors
if CA is not available to commence work within six weeks from the date the
applicant accepts this determination, then the FSP will appoint an architect with
equivalent qualifications and experience in projects involving heritage listed
buildings to prepare the scope of works as outlined below
the scope of works prepared by CA will take into account any applicable building,
planning and heritage listing requirements which apply to the property
if CA requires specialist advice or other services (for example, a report from a
structural engineer) to identify the extent of the claim-related damage, then:
- the FSP (in consultation with CA) will identify three appropriately qualified
contractors who have not been involved with the claim to date
- the FSP will provide their names and curriculum vitae of the three
identified contractors to the applicant
- the applicant will select which of the three contractors will be engaged to
provide the advice or other services
Case No: 481488 Determination Page 10 of 10
the FSP will obtain quotations for the repairs set out in the scope of works from
at least two builders with extensive experience in undertaking repairs to
heritage listed properties, one of which must be GF
the FSP is to cash settle the applicant for the amount of the lowest quotation
provided by the nominated builders.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.