Home / Financial Firm (Unknown - Insurer) / Determination 481154
Determination 481154
Declined vandalised brick fence claim
Summary
An owners' corporation claimed for a brick fence damaged by vandals, and the insurer declined the fence claim as caused by long-term deterioration. AFCA accepted vandalism occurred but found poor condition was the proximate cause, so the decline stands.
Where vandalism acts on a pre-existing gradual deterioration, the dominant cause is the deterioration, which is excluded from cover.
Issues
- Claim denial primary · not upheld“the proximate cause of the damage was wear, tear and gradual deterioration over time; the FSP is entitled to deny the claim”
- Delay secondary · not upheld“it is not fair or reasonable to hold the FSP responsible for further deterioration to the fence”
- Incorrect fees or charges secondary · unclear“If this is the case, the FSP should refund one of the excess charges to the applicant.”
Subjects and remedies
home or building damageno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 481154 Determination Page 1 of 3
Case number: 481154 1 1 April 2018
1 Overview
1.1 Dispute
In August 2015, vandals damaged the property insured by the owners‟ corporation
under a residential strata insurance plan with the financial services provider (FSP),
and the owner‟s corporation (represented in this dispute by one of the unit owner s)
lodged a claim under the policy.
The owners‟ corp oration arranged repairs to a damaged door, and for a collapsed
brick fence to be made safe. The FSP met the claim for the damaged door, but a
dispute has arisen over cover for the brick fence. The FSP denied that part of the
claim as it says the damage was due to causes excluded from cover, such as wear,
tear and gradual deterioration.
The applicant (on behalf of the owners‟ corporation) disagrees, and maintains the
damage was caused by vandals. She says it took the FSP more than 12 months to
assess the d amage, and in this time the fence‟s condition deteriorated. She wants
the FSP to pay for the entire fence replacement and for damage to a neighbouring
property caused by the fence.
The case manager issued a recommendation on the issues in dispute in favour of the
FSP. A copy of the recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct and are adopted in this
determination. Further submissions provided after the recommendation have been
considered. The FSP is entitled to deny the claim for the brick fence because the
available evidence shows, on balance, the proximate cause of the damage was
wear, tear and gradual deterioration, all of which is excluded from cover. There is
nothing to show a claim was lodged with the FSP for the fence damage prior to
August 2016, or that the FSP should reasonably be held responsible for any further
deterioration in its condition or damage it caused to neighbouring property.
1.3 Determination
This determination is in favour of the FSP. I agree with the case manager‟s reasons
for the recommendation and the recommended outcome. The FSP is entitled to
decline the claim for the damage to the brick fence.
Case No: 481154 Determination Page 2 of 3
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
recommendation. I am satisfied that the documentation I have relied on has been
provided to both parties.
I am satisfied that the case manager‟s recommendation contains an accurate
summary of the dispute, the issues to be determined, any applicable paragraphs of
the Terms of Reference and any relevant law.
In rejecting the case manager‟s recommendation, the applicant indicated she would
be providing further expert evidence, but that has not been received.
In the meantime, she has sent in information indicating urgent action is required to
the damaged fence, on the basis of an emergency order issued by the local authority;
and so this determination has been expedited and issued based on the evidence that
is currently available.
Applicant has established a valid claim, but exclusions apply
I am satisfied the applicant has established a valid claim. The evidence supports the
conclusion that there was vandalism to the fence, as well as to other insured
property.
However, as set out in the recommendation, the material provided also shows that
the pre-existing condition of the fence was poor, with signs of long-term deterioration.
I am satisfied, on the available evidence, that if it was not for the poor condition of the
fence (due to wear, tear and gradual deterioration, and likely developing flaws), then
the vandalism would not have caused the damage that did occur. In other words, the
vandalism was not the proximate cause (that is, the dominant, operative or effective
cause) of the damage.
The policy specifically excludes cover for loss or damage caused by:
…Wear, Tear,…gradual deterioration…developing flaws…failure to maintain Your Insured
property in a reasonably good state of repair.
Because the FSP has been able to establish, on balance, that the damage was the
result of excluded factors, then it is entitled to decline the claim for damage to the
fence.
FSP not responsible for delays or further damage
The FSP says the applicant did not notify it of the fence damage itself until August
2016, which is about a year after the claim for vandalism was lodged.
The applicant has provided evidence which indicates that the damage to the fence,
as well as the door, was referred to the body corporate property manager in 2015.
Case No: 481154 Determination Page 3 of 3
However, there is no evidence to show that the FSP was made aware of the claim in
respect of the fence until 2016, as it has said.
So it is not fair or reasonable to hold the FSP responsible for further deterioration to
the fence (if any) in that period, nor for any other damage which might have occurred
to the neighbouring property or otherwise, because of its condition.
Recommendation
Case No: 481154 Recommendation Page 1 of 11
Case number: 481154 16 January 2018
3 Overview
3.1 Dispute
The applicant is an Owner‟s Corporation of a strata plan, represented in this dispute
by an Owner‟s Corporation member. Any reference to the applicant in this
recommendation will include representations made by the member.
In August 2015, vandals damaged the applicant‟s property. The body corporate
lodged a claim under a strata insurance policy held with the financial services
provider (FSP).
The body corporate arranged repairs to a damaged door and for a collapsed brick
fence to be made safe. The FSP met the claim for the damaged door but a dispute
has arisen over coverage for the brick fence. The FSP denied the claim for the brick
fence, as it says the damage was due to causes excluded from cover such as wear,
tear and gradual deterioration.
The applicant disagrees with the FSP‟s decision and maintains the damage was due
to the actions of vandals. She says it took the FSP more than 12 months to assess
the damage, and in this time the overall condition of the fence deteriorated. She
wants the FSP to pay for the entire fence replacement and for damage to a
neighbouring property.
The FSP says the applicant did not notify it of the fence damage until August 2016.
3.2 Issues and key findings
Is the FSP entitled to deny the applicant’s claim for the brick fence?
The FSP is entitled to deny the claim for the brick fence because:
although the applicant has established a valid claim, the available material
suggests the proximate cause of the damage is wear, tear and gradual
deterioration, all excluded from cover
there is no material to show a claim was lodged for the fence damage prior to
August 2016
even if there was, there is nothing to suggest the unrepaired damage caused or
contributed to the wear, tear and gradual deterioration identified as the
proximate cause.
Case No: 481154 Recommendation Page 2 of 11
3.3 Recommendation
This recommendation is in favour of the FSP.
The FSP is entitled to deny the claim for damage to the brick fence.
Case No: 481154 Recommendation Page 3 of 11
4 Reasons for recommendation
4.1 Is the FSP entitled to deny the claim for the brick fence?
Initial onus on applicant to establish a valid claim
The applicant‟s policy is a residential strata policy providing cover for accidental loss
and damage subject to a number of exclusions. Whilst the policy does not define the
term „ accidental ‟ , it is generally accepted to mean „ unintended and unexpected‟ .
It is accepted insurance law that the insured carries the initial onus to establish the
loss and damage claimed is covered by the terms and conditions of the policy. Once
an insured achieves this, the onus moves to the insurer to establish any exclusions it
wishes to rely upon in order to deny or limit its liability for the claim.
In this case, the applicant‟s claim relates to damage to a brick fence at the insured
property caused by vandals. There is nothing to suggest the applicant intended or
expected the fence damage to occur.
On the basis of the material presented, I am satisfied the applicant has met the initial
onus to establish the loss and damage is covered by the terms and conditions of the
policy.
However, the coverage provided by the policy is still subject to any of the listed
exclusions, if they can be established by the FSP.
Applicant’s engineer confirms vandalism to fence but notes poor condition
The applicant maintains the fence damage was due to the actions of vandals. In
support, she has provided evidence from engineer ME.
ME undertook a visual inspection of the building exterior on 12 April 2016 as well as
examining a number of photos provided. Following his assessment, ME reported the
following to the applicant:
the existing boundary brick fence was vandalized causing a panel to collapse
the current structural condition of the fence away from the area of vandalism is
poor and shows signs of weathering and deterioration
the vertical brick piers were not constructed in a robust fashion as they are not
engaged with the brick wall but rather built as a skin in front - the panels around
the collapsed portion shows signs of separation between the wall and the piers
structural distress as a result of the vandalism was noted as the panels and the
supporting vertical piers were observed to have a lean towards the property
behind
the entire length of the existing fence is potentially unsafe, and is required to be
demolished and rebuilt to the current Building Code of Australia, and related
material codes
the extent of damage due to the vandalism extends the panels both sides of
where the wall has collapsed
investigation of the existing footings is required to determine if any additional
strengthening is required
Case No: 481154 Recommendation Page 4 of 11
FSP’s engineer indicates poor condition the proximate cause of damage
The FSP disagrees with the applicant‟s position and says the proximate cause of the
damage was the poor condition of the fence, rather than the vandalism. In forming
this view, the FSP relies on evidence provided by engineer HE, who inspected the
fence on 2 September 2016.
In his report dated 9 September 2016 to the FSP, HE noted the following:
the adjoining areas of fence showed considerable movement was occurring in
the other panels of brickwork and considerable weathering was also occurring
the east end showed different brickwork and it was indicated this section was
replaced as damage had occurred to the fence some time ago
the junction where the new brickwork met the old brickwork showed out of level
in the adjoining original brickwork where the old butted up to the new
the collapse of the section of fence is typical of problems that occur due to long
term deterioration of the brickwork and previous movement
deterioration was evident in the brickwork which can occur when exposed to the
weather for a long period of time and previous movement was evident.
HE considered problems and movement in the brickwork had been occurring for
years. He believed the stress on the brickwork from long term deterioration and
inadequate design when added to a minor stress such as a person jumping or
leaning on the fence, could result in the section of fence collapsing as reported
HE‟s view was a person jumping or leaning on the fe nce would not result in the
damage had the fence been in good condition.
It is important to identify the proximate cause
The proximate cause of a loss is the question of fact depending upon the
circumstances of each case. It is not necessarily the first or last or the sole cause of
the loss, but the effective or dominant or operative cause of the loss.
If there are several causes operating contemporaneously, then each must be
examined for the qualities of predominance and efficiency as the active efficient
cause that sets a relevant train of events in motion.
Courts have said that if one cause would have resulted in the harm in any case and
the other would not have done so in the absence of the first, then the first is the
proximate cause.
FSP entitled to deny the claim
The expert evidence provided by both parties indicates the fence was in poor
condition at the time of the partial collapse. Both engineers note sections away from
the collapse showed signs of weathering and deterioration. HE‟s material also
indicates part of the fence had been previously replaced.
I accept vandals interfered with the fence. However on balance, I consider the
proximate cause of the partial collapse was its poor condition, due to wear, tear and
gradual deterioration over time.
Case No: 481154 Recommendation Page 5 of 11
I am satisfied, had the fence been in good condition, the actions of vandals would not
have led to the collapse.
The applicant says the deteriorated condition noted by the FSP‟s engineer was due
to the nearly 12 month delay in the assessment taking place.
The material provided by the applicant shows the managing body corporate first
notified the FSP of the fence claim in August 2016. There is no documentation to
suggest the FSP was aware of the fence claim before this time. Furthermore, there is
nothing to link the deteriorated condition of the fence to any delay in effecting repairs.
In conclusion, having considered the available material, I am satisfied the proximate
cause of the damage was wear, tear and gradual deterioration. As the policy
excludes these causes of damage, the FSP is entitled to deny the claim.
The applicant is concerned the FSP may have charged two excesses for the one
vandalism event. If this is the case, the FSP should refund one of the e excess
charges to the applicant.
Case No: 481154 Recommendation Page 6 of 11
5 Supporting information
5.1 Key documents
Record Key points
App’s Engineer ( ME )
Letter
07 - 02 - 2017
Visual inspection of building exterior on 12 April 2016.
From the information and photos provided, the existing boundary
brick fenc e at the rear of the apartment complexes was
vandalized, causing a panel (i.e. the brick wall section between
the supporting vertical brick piers) of the wall to collapse .
The current structural condition of the boundary brick wall away
from the area of vandalism is poor and shows signs of
weat hering and deterioration. This is evident as the mort ars in
the joints of the brick wall are crumbling as it was scratched off
with relative ease.
Furthermore, the vertical brick piers do not appear to have been
constructed in a robust fashion as t hey are not engaged with the
brick wall but rather built as a skin in front. This is evident as the
panels around the collapsed portion of the brick wall shows signs
of separation between the brick wall and the vertical piers.
Further evidence of structur al distress as a result of the
vandalism was noted as the brick wall panels and the supporting
vertical brick piers were observed to have a lean towards the
property behind.
The entire length of the existing brick wall and vertical brick piers
is potential ly unsafe, and is required to be demolished and rebuilt
to the current Building Code of Australia, and relat ed material
codes.
We understand that the vandal damage may give rise to an
insurance claim. In our professional opinion we believe the extent
of d amage due to the vandalism extends the panels both sides of
where the wall has collapsed.
A n exploratory trench along the boundary brick wall is required to
investigate the existing footings in order to determine if any
additional strengthening to the foo tings is required.
App’s Engineer ( ME )
Letter
21 - 07 - 2017
From a desktop study of the photos provided and those that were
previously taken during ME‟s site inspection on 12 April 2016 ,
suggest the following repairs (not limited to):
• Safely demolish the damaged brick fence panel (from brick pier
to brick pier) and neighbouring panels which are showing
distress caused by the vandalism. Any bricks that are not broken
or chipped can be reused to construct the new boundary brick
wall.
• Excavate exploration t renches at numerous locations (where
the brick fence has been demolished) to investigate the existing
footings to determine its as constructed condition and adequacy.
If the existing footings are found to be not structurally adequate,
Case No: 481154 Recommendation Page 7 of 11
strengthening of the existing footings will be required (to future
details and after investigation of the existing footings).
• R eplacement of the existing brick fence will need to be a „like
for like‟ construction i.e. a brick fence. The design and document
of the new brick fence will need to be to the current Australian
Standards for masonry structures (AS3700). Due to changes and
updates to the Australian Standards for masonry structures, the
location of brick piers maybe at closer c ent res to comply with
current s tandards.
• In addition, a geotechnical investigation and report will be
required to identify the material underlying the existing footings
for design purposes.
FSP’s Assessor ( AG )
1 st Report
07 - 09 - 2016
The insured risk is four storey building featuring 12 resident ial
units. Enquiries focussed on a brick fence located on the
northern boundary of the property.
Fence is a single skin construction measuring approximately
1600mm in height and 19 metres in length. It is supported by
brick piers approximately 1500mm apar t. The fence was
constructed at the time of the original construction of the building
in 1970.
Our general impression was that the fence appeared to be in a
derelict state.
Applicant informed unknown offender/s gained access to the
property from an adjac ent property by knocking down a section
of the brick fenc e, breaking the padlock of the met er room and
forcing open the door. No damage was sustained to the meters.
The broken padlock has since been removed and replaced.
Applicant explained there was delay in lodging the claim for the
fence as she was liaising with all the ot her unit owners and
collating all the relevant information and documentation required
to reinstate same.
At the time of our inspection, we observed several vines and
other plants growin g on both the sides of the fence. It appeared
the foundations had been invaded by the plant and vine roots
and the fence appeared to have been patched in some areas,
including the south - western corner which appeared to have been
more recently reinstated. T he fence generally appeared to be
bowing and we observed large gaps between the brick piers and
fence which appear unrelat ed to impact damage. We also
observed „keying‟ or „zig zags‟ cracks on a section of the fenc e in
the south - eastern corner, which would suggest earth movement.
In terms of the alleged damage the subject of the claim, we
observed a section of the fence, approximately 2000mm in
length, had collapsed and was secured with plastic tape. Taking
into account the condition of the overall fence, we are unable to
conclusively infer it had indeed been caused solely by impact
damage.
We also question whether the offender/s were indeed capable of
knocking down a section of brick fence, particularly if it was
otherwise in sound condition.
Case No: 481154 Recommendation Page 8 of 11
Obtaining eng ineer opinion.
FSP’s Engineer (HE)
Report
09 - 09 - 2016
S ite inspection on 2 September 2016.
I nspection of the brick fence showed it is of single skin
construction with brick piers at various centres. The cent res of
the brick piers varied between 3.8m to 2.3m. The height of the
fence varied bet ween 1.6m and 1.4m.
An inspection of the cent ral area of the fence showed collapse of
t he bri ckwork between two brick piers. Movement has also
occurred at adjoining sections. Temporary hoarding mesh has
been provided around the area where the collapse occurred.
A timber extension has been added to the brick wall and this
extends up 600mm above the height of the brickwork. Timber
supports have been bolted to the brickwork. This timber
extension is in the area where collapse occurred.
I nspection of the adjoining areas of fence showed considerable
movement was occurring in the other panels of brickwor k.
Considerable weathering was also occurring in the mortar.
I nspection at the east end showed different brickwork has been
provided to this area and it was indicated this section was
replaced as damage had occurred to the fence some time ago.
I nspection of the junction where the new brickwork met the old
brickwork showed out of level was evident in the adjoining
original brickwork where it butted up to the new brickwork.
The collapse of the section of fence is typical of problems that
occur due to long te rm deterioration of the brickwork and
previous movement.
Considerable deterioration was evident in the brickwork which
can occur when brickwork is exposed to the weather for a long
period of time.
Previous movement was evident – i.e. the east end was rebu ilt
and the lean is evident in the original fence at this junction.
Problems and movement of the brick work has been occurring for
years. This can result in high stress concentrations in the
brickwork.
It is possible minor stresses can occur if a person tries to jump
the fence or pushes the fence. If the combinations of stresses,
due to long term deterioration and inadequate design, combined
with minor stresses due to a person jumping or leaning on the
fence, this can result in the section of fence collap sing as
reported.
If the fence had been in condition then a person jumping or
leaning on the fence would not result in the damage.
C onc erned about the condition of the remaining sections of the
fence as it is possible that collapse can occur of these secti ons a
well.
T he collapse of the one small section of fence in the central area
of the fence has res ulted due to long - term det erioration of the
fence and in our opinion is not directly related to malicious
damage.
It is not possible to repair the one sectio n of fence due to
Case No: 481154 Recommendation Page 9 of 11
considerable out of level in adjoining areas.
R ecommend the whole brick fence be demolished and a new
fence rebuilt to engineer design including new footings .
Soil testing will also need to be carried out to confirm the design
as a large number of trees are growing near this area.
N ew fence needs to be constructed on new footings which have
been designed by an engineer. The brick fence will require
reinforced brick piers which are also designed by an engineer.
The final design of the fence can only be completed after soil
testing has been carried out.
App’s insurance valuation
report
09 - 2013
“other improvements include: … Brick and timber paling
boundary fencing”
“This report and any services provided in conjunction therewith
are based, in part, on information provided by or at the direction
of the client and/or applicant, any inaccuracy in that information
or subsequent change thereto may render this report
inappropriate. Unless otherwise agreed to in writing by us, this
report and any ser vice provided in conjunction therewith, are
provided for the client‟s sole use and no responsibility, other than
to the client, is or shall be accepted for the contents of this report
or any action that may be taken on the basis thereof, or in
respect of a ny services provided in conjunction therewith. Except
as specifically set out, this report is given on the basis that:
* [the valuation co] is independent of the lending transaction
involved and has no interest financial or ot herwise in the property
valued herein or with the parties wit h whom the bank/lending
institution is dealing, including the selling agent, if any;
* the client and/or applicant has made a full and frank disclosure
of all mat erial information;
* the improvements, if any, comply with the requirements of all
relevant authorities;
* liability limited by a scheme approved under Professional
Standards Legislation;
* [the valuation co] states that it does not have a pecuniary
interest that could conflict with the proper valuation of the
propert y. ”
FSP’s builder (TB)
Invoice
22 - 09 - 2015
A s requested by [body corporate] attend ed to report of damage
to meter room door as a result of vandalism by unknown
persons.
Damage to met er room door. Vandalism – malicious damage.
Removed and replac ed door $1,1 62.00.
Customer satisfaction report signed by applicant 5/9/15.
Body Corporate to FSP
Email
16 - 08 - 2016
“As per the above claim number can you pleas e confirm the
process that will be followed. The relevant Police report details
are as follows [########]. C an you please provide guidance on
the attached? Also as a matter of cours e can you please clarify if
the entire cost of the fence reinstatement would be covered
under the OC insurance policy? Thanks for arranging an
assessor so promptly and could you pleas e them cont act
Case No: 481154 Recommendation Page 10 of 11
[applicant] to gain access. Thanks for you guidance and
assistance .”
App to Body Corporate
Email
16 - 08 - 2016
“Please find attached receipts from [neighbour] for repairs to the
damages to their chicken house (result ant damages) from the
title boundry fence falling onto it on their property, directly
resulting from the malicious act of vandalism generated/caus ed
by an illegal trespasser on [insured property] that caused
structural damages to the title boundary fence, for your
information and reference. Could you pleas e forward the receipts
on to [FSP] under the current claim number [########] , for their
review and for their formal response in writing before Thursday
25th August, 2016, as soon as possible. ” (sic)
Vic Police
Letter to Body Corporate
28 - 02 - 2016
On 27/02/2016 reported criminal damage (intent
damage/destroy).
Property maintenance (SP)
Invoice 02 - 09 - 201 5
Attendance by operatives to make safe the brick fence at the rear
of the property after it had fallen.
FSP claim form completed
by Body Corporate
14 - 10 - 2016
Date of loss 4/09/16
Alleged malicious/impact damage to fence
Body Corporate to SP
Email
31 - 08 - 2015
“We act as manager of the above Owners Corporation. Pleas e
attend to make safe to the vandalised/damaged brick fence panel
at rear of [insured property]. Please arrange to store bricks in
rear storage area. Site Contact: [applicant] . We confirm that the
Owners Corporation is the principal in this contract and [body
corporate] acts as the agent for the Owners Corporation. Your
invoic e made out to [owner‟s corporation] should be forwarded to
this office on completion of the work for approval by th e Owners
Corporation. Our office address is [address] . [Body corporat e] is
not liable in any way for payment of this invoice. .. . ”
App to Owner’s Corp
Email
11 - 09 - 2015
“…the vandalised/malicious damages to the title boundary fence
panel (section of damage d fenc e panel) has been made safe via
a temporary 'make safe' installation and measures are now in
place to the vandalised/ damaged fence panel installed by [SP],
for your information and referenc e… [Body Corporate] confirmed
she reported the vandalism/dama ges to property title boundary
brick fenc e panel and door to police authorities and
advis ed/confirmed that she will be lodging an insurance claim
with [FSP] for and on behalf of the Owners Corporation. [Body
Corporate] advised all the repairs to the vandal ism/damages to
the title boundary fence panel and door caused by
vandalism/malicious damage/B&entry damage can only be
repaired by [FSP]‟s approved repairers [SP] and they will directly
send their paid invoices for complet ed repairs to [FSP] for
processing upon completion of repairs .. . ” (sic)
Body Corporate “… the denied claim for the brick fence please note that from a
Case No: 481154 Recommendation Page 11 of 11
Notice to FOS
Undated
comprehensive review of the 2015 correspondenc e within the
data holding service; no clear instruction was pres ente d by the
previous manager through to [FSP] for the claim [########] .
[TB] i n September 2015 lodged a direct claim with [FSP] as per
below and attached. ”