Determination 479847

Claim declined for front gable collapse under structural defect and deterioration exclusions

FirmFinancial Firm (Unknown - Insurer)
Decided2018-03-22
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

After the front gable of the applicant's home collapsed, the FSP denied the claim under structural defect and corrosion exclusions. AFCA found the exclusions applied, that claim handling was reasonable, and that no compensation was payable.

The insurer must show the dominant cause of loss was an excluded factor, and the engineering evidence showed inadequate brick ties and corrosion, a structural defect, caused the collapse.

Issues

Subjects and remedies

no remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 479847 Determination Page 1 of 5 Case number: 479847 21 March 2018 1 Overview 1.1 Dispute The applicant holds a home and contents policy with the financial services provider (FSP). The applicant suffered a loss when the front gable to her house collapsed on 6 February 2015 while her builder and roofer were replacing the roof tiles behind the gable. The FSP assessed the damage and denied the claim based on its engineer ’s report . The FSP said it does not cover any loss or damage due to ‘gradual deterioration’, ‘structural defects’ and/or ‘failure to keep the building in good repair’. The applicant does not agree with the FSP’s decision. The applicant is also claiming compensation for non-financial loss because she said the FSP took too long to deny the claim and the FSP’s ‘make safe’ of the building was not satisfactory. The case analyst provided the parties with a recommendation on the issues in dispute. The recommendation was in favour of the FSP. A copy of the recommendation is attached to this determination. 1.2 Issues and key findings Were the findings of the recommendation correct? The findings contained in the recommendation were correct and are adopted in this determination. Further submissions provided after the recommendation have been considered. However, these do not warrant a change to the outcome. Was the FSP entitled to deny the claim? The FSP was entitled to rely on policy exclusions to deny the claim. Is the applicant entitled to compensation for non-financial loss? The applicant has not established an entitlement to compensation. 1.3 Determination This determination is in favour of the FSP. I agree with the case analyst ’s reasons for the recommendation and the recommended outcome. The FSP is not required to undertake any further action in relation to this claim. Case No: 479847 Determination Page 2 of 5 2 Reasons for determination 2.1 Were the findings in the recommendation correct? I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied the documentation I have relied on has been provided to both parties. I am satisfied the case analyst ’s recommendation contains an accurate summary of the dispute, the issues to be determined, any applicable paragraphs of the Terms of Reference and any relevant law. 2.2 Was the FSP entitled to deny the claim? Applicant has established a valid claim The applicant suffered a loss on 6 February 2015 when the entire front gable to her home collapsed. The applicant’s builder and roofer were replacing the existing roof tiles behind the gable when it collapsed. The applicant’s policy cove rs accidental damage and defines ‘accident’ or ‘accidental’ as a: ‘ sudden, external, violent, visible, unusual and specific event which includes fortuitously and is unforeseen or unintended by you and which occurs at an identifiable time and place.’ The FSP sent a builder to assess the damage. He formed the view that a very strong wind had caused the front gable to collapse: information subsequently proved there had been no strong wind at the time. The damage was unforeseen and, based on the preliminary view of the FSP’s builder, the applicant had established a valid claim or a prima facie claim to which the policy responds. The onus shifts to the FSP to establish the application of a policy exclusion or condition which enables it to deny the claim. FSP relied on general exclusions The FSP relied on general exclusions in maintaining the initial decision to deny the claim. Its final decision letter, dated 6 May 2015, cited ‘gradual deterioration including wear and tear, rust, corrosion, depreciation, fading or deterioration from exposure to light’. The FSP also referred to ‘i nherent or structural defects, faulty design or workmanship’ and ‘inadequate maintenance or failure to keep the building in good repair’. The initial denial of the claim as made on 25 March 2015. The FSP considered there had not been an unreasonable delay before making a decision to deny the claim Case No: 479847 Determination Page 3 of 5 FSP obtained an expert’s assessment Following the claim the FSP arranged an engineering company (H) to assess the damage to the property. H carried out a site inspection on 13 February 2015. H noted the temporary tarpaulin had been installed over the front gable end of the residence. H also noted the roof tile replacement works were carried out progressively so the roof space was not exposed to the elements for any significant period of time. H said there had been no damage to the interior (front living room and front bedroom). H said there was no additional timber framing to support the gable brickwork. H said the single skin brickwork of the front gable end was not adequate to resist normal loads applied to the brickwork. H indicated the brickwork needed to be adequately tied back, which meant regularly spaced ties needed to tie the brickwork wall to the timber stud framing. H indicated the timber stud framing had not been extended upwards (as had the front gable). This meant the gable brickwork could only be tied to the end of the timber framing. H said the timber roof framing had not provided adequate structure for tying the brickwork. H indicated long term corrosion to the inadequate brick ties further compromised the gable’s stability. H concluded the damage resulted f rom inadequate construction because the brickwork had not been adequately tied to the timber framing of the residence. Long term corrosion to the ties had also contributed to the collapse of the gable. FSP entitled to rely on exclusions to deny claim The applicant had provided a number of comments as to why the exclusion clauses should not apply to this claim. However, the FSP, through its expert (H), provided sufficiently compelling information in support of its reliance on the general deterioration and structural defect exclusions. It has not established the application of the lack of maintenance exclusion. The parties made submissions in relation to the building standards existing at the ti me of the house’s construction in 1946. Nevertheless, H had fully explained why the gable’s collapse was due to a combination of two factors. One factor was the inadequate brick ties, given there was only the end of the timber frame to which the brickwork could be tied. The other factor was the corrosion to the ties that were installed. The FSP was entitled to rely on the exclusions to deny the claim, as the damage resulted from excluded factors under the policy. Applicant provided additional submissions The applicant rejected the recommendation that was in the FSP’s favour. She provided further submissions in support. In particular, the applicant referred to the 1945 building regulations and suggested the house did meet the building standards at that time. The applicant concluded this meant there were no structural defects Case No: 479847 Determination Page 4 of 5 because the local council would not have permitted occupancy of the house when it was built. The applicant reiterated her position with respect to compensation for non-financial loss. She said her family continued to live in the house, despite rainwater gaining entry (her time line notes indicated rain on 8 February resulting in water running down the inside walls and blinds). The applicant provided copies of invoices showing the repairs undertaken as a result, although these invoices do not prove these are related to rainwater damage. The applicant reiterated her contention the claim was unduly delayed, because the FSP did not operate within its prescribed time frames. She also indicated how the claim process adversely impacted on her. Additional submissions do not warrant change in outcome The applicant indicated she had not known there was a problem with respect to the gable. However, the relevant exclusions contained in the policy upon which the FSP relies do not require the insured to be aware or should reasonably be aware of a defect. The FSP and the applicant and the FSP have conflicting views whether the house’s construction may have complied with the building regulations when built in 1945. Leaving that aside building standards have changed over time with the advent of new products and knowledge gained from experience. H was of the opinion had identified the problem with the applicant’s house was typical of problems that could occur with such houses. H provided a full explanation for the conclusions reached . The applicant has not obtained an expert’s input to counter H’s findings. Instead, the applicant has chosen to provide comment on various matters. Despite the applicant’s su bmissions H’s findings still are compelling with respect to the application of the exclusion clauses. The information still indicates the damage to the house resulted from factors which the policy does not cover. 2.3 Is the applicant entitled to compensation for non-financial loss? FOS may award compensation for non-financial loss Compensation for non-financial loss is limited. FOS may decide an FSP should compensate an applicant for such loss only where there has been an unusual amount of physical inconvenience, time taken to resolve a situation or interference with the applicant’s expectation of enjoyment or peace of mind. FOS takes a conservative approach to compensation for non-financial loss. FOS considers compensation should not be provided where an applicant merely suffers inconvenience that is a normal part of doing business. FOS expects an applicant to be moderately robust and bear the normal degree of inconvenience experienced when a problem occurs and take reasonable steps to reduce inconvenience. Case No: 479847 Determination Page 5 of 5 Applicant has not established entitlement to compensation The applicant indicated in her letter to FOS (dated 28 June 2017) and her additional submissions (dated 11 November 2017) she had been under undue stress, as opposed to having been inconvenienced because of the claim process. The applicant’s home suffered further damage due to storms in February and March 2015 because the FSP’s builder had failed to properly place the tarpaulin over the gable end. The applicant said th is meant there was ‘ internal flooding and water runni ng down the inside of the walls’ . However, the applicant has not provided proof in support of her assertions, such as photographs that show an inadequately fastened tarpaulin and resultant damage to the interior. H noted during the site visit on 13 February 2015 there was no damage to the front two rooms where the tarpaulin was in place. The applicant also said the house lacked security, being effectively ‘open’ with only the tarpaulin in place. The applicant only achieved peace of mind when the repairs were carried out. Given the entire front gable collapsed, a tarpaulin, positioned at roof height, was the only practical temporary solution to the problem. The applicant also said the FSP took an unreasonably long time (six weeks) to make a decision on the claim. The applicant provided time line notes with respect to the claim process. Although the FSP’s initial denial was made on 25 March 2015, her notes show she kept in contact with the FSP on a number of occasions prior to that date. The FSP needed to ascertain the cause of damage. Its builder provided information which was at odds with the engineer’s report. The FSP indicated to the applicant on 3 March 2015 it was seeking additional information from the builder. The available information shows the matter was not a straight forward claim. It was reasonable for the FSP to have carried out further enquiries to establish the cause of the damage. It is understandable the tarpaulin’s presence would have been a disruption and an inconvenience to the applicant. However, the information does not show there was an excessive delay in the claim process or that the applicant suffered an unusual degree of inconvenience as a result. This means the applicant has not established an entitlement to compensation for non-financial loss. Recommendation Case No: 479847 Recommendation Page 1 of 6 Case number: 479847 12 October 2017 3 Overview 3.1 Dispute On 6 February 2015, the applicant lodged a claim under his building and contents insurance policy held with the financial services provider (FSP) for damage to his property. The FSP denied the claim in its entirety, saying the damage to the property appears to be structure related, which the policy specifically excludes. The applicant disagrees with the FSP’s decision. In addition, the applicant says the FSP caused unreasonable delays during the claim and complaint process. 3.2 Issues and key findings Is the FSP entitled to deny the applicant’s claim? The available information shows:  the gable wall’s structure does not meet the building regulations applicable at the time of its construction  on balance, expert report established if the gable wall had been structured properly the collapse would not have occurred  the FSP has successfully established an operation of a policy exclusion. For these reasons , the FSP is entitled to deny the applicant’s claim . Is the applicant entitled to compensation? Upon review, the applicant is not entitled to compensation. This is because:  the FSP handled the claim and complaint in a reasonable timeframe  the applicant has not established the FSP’s makesafe works was inadequate or caused him further loss. 3.3 Recommendation This recommendation is in favour of the FSP. The FSP is not required to take any further action. Case No: 479847 Recommendation Page 2 of 6 4 Reasons for recommendation 4.1 Is the FSP entitled to deny the applicant’s claim? Policy provides cover for accidental damage subject to exclusions The applicant is required to show that, on balance of probabilities, he has suffered a loss caused by a risk insured against under the policy. This is known as a prima facie (or valid) claim. If the applicant is able to establish a valid claim, then the onus shifts to the FSP to show that, on balance of probabilities, it is entitled to rely on an exclusions under the policy or is otherwise entitled to deny the claim. The applicant’s policy provides cover for accidental damage to his property. As a result, in absence of any information indicating the damage was foreseeable, the applicant is considered to have established a valid claim. Accordingly, the FSP bears the onus of establishing that, on the balance of probabilities, it is entitled to rely o n a policy exclusion to deny the applicant’s claim. FSP must show excluded factor is the dominant cause of damage The FSP says it is not liable for the claimed damage because the cause of the damage was inadequate brick ties and corrosion of the same. The applicable product disclosure statement (PDS), contains general exclusions for loss or damage caused by or arising as a result of:  structural defects  corrosion. In order to be entitled to deny the applicant’s claim, the FSP must show that the proximate cause of damage (that is the real, effective or dominant cause) was one or both the excluded factors referred to above. On balance, available material shows structural defect The review of the available reports shows the damage was assessed by the FSP appointed builder (J) and an engineer (H). The reports offer conflicting views on the cause of damage. In particular, J says strong winds caused a nearby tree to collapse on a power line attached to the subject wall and subsequent collapse of that wall. Both the applicant and the FSP agree there was no tree impact at the property. On the other hand, H found the gable end brickwork was inadequately tied and the ties had corroded over time. Specifically, H says the stud framing (to which the bricks should have been tied) was not extended to the roof. The applicant has not provided any material to show the stud framing was extended to the roof. As a result, on balance, I am satisfied the stud framing was as described in H’s report. Case No: 479847 Recommendation Page 3 of 6 The applicant’s home was bui lt in 1946. The building regulations applicable at the time of construction were the uniform building regulations dated 1945 (UBR 1945). In support of its position, the FSP says the applicant’s property is built against clause 2608 (d) of the said regulation, which states: Construction of outer veneer of external walls – the outer veneer of external walls shall consist of masonry or reinforced concrete, which shall be bonded to the timber framework with approved galvanized wire or other approved galvanized wall ties, spaced not further apart that 18 inches horizontally and 24 inches vertically. In absence of horizontal and vertical stud framing, the property would not have met the said building regulations. As a result, on balance, I am satisfied the gable end wall was not built in accordance with the relevant building regulations. On balance, proximate cause of damage is a structural defect Although the applicant is not aware of the exact cause of damage, he believes one or the combination of the below factors contributed to the collapse:  the uncovered area of the roof ( at the time of the loss the applicant’s roof was being replaced) allowed the wind to push the wall outwards and cause the damage  the tension loads from the power line (attached to the subject gable wall) caused it to collapse. In response, H says the strength of the wind force within the roof space must be high to be able push the brickwork out. Furthermore, with regards to tension loads from the power line, H says hypothetically in such instance (had the brickwork been tied properly) only a localised collapse of the brickwork could have occurred, not entire wall as is the present case. The meteorological data for the day before and after the loss shows absence of string winds (less than 50 km/h). According to the Beauford Wind Scale (BWS), winds of 40 – 50 km per hour are classified as ‘strong wings’ and the following is likely to be experienced:  large branches in motion  whistling heard in telephone wires  umbrellas used with difficulty. For ‘slight’ structural damage to occur, according to the BWS, winds of 76 – 87km per hour would need to be experienced. Given the low wind strength and the fact that entire wall had collapsed, on balance, it is more likely the structural defect (referred to above) caused the damage. FSP entitled to deny the claim For the reasons outlined above, I am satisfied the proximate cause of the damage was a structural defect. Given damage caused this way is excluded from the policy, it follows the FSP is entitled to deny the claim. Case No: 479847 Recommendation Page 4 of 6 I note the FSP says an additional cause of damage was corroded brick tiles. However, given the FSP is otherwise entitled to deny the claim, there is no need for me to consider this aspect of the dispute further. 4.2 Is the applicant entitled to compensation? FOS may award compensation for non-financial loss Under the terms of reference, FOS may award compensation (capped at $3,000) for non-financial loss. FOS will consider compensation in situations where:  the FSP has caused unreasonable delays in the processing of the applicant’s claim, and  the applicant has (as a result of that delay) suffered an unusual degree or extent of inconvenience. Applicant is dissatisfied with the FSP’s claim and complaint handling The applicant says the FSP took too long process his claim, and subsequently deal with his complaint, for which he should be paid compensation. In particular, the applicant says the six week period taken to conclude the outcome of his claim caused undue stress and affected his ability to maintain his peace of mind. Amongst other things, during the period of time when the house was secured by tarpaulin, the applicant says he experienced stress from fear of burglary. FSP handled the claim reasonably overall When handling a claim, an insurance company is required to comply with the Code. In the instances where an FSP appoints an external assessor, the Code entitles the FSP to a 12 weeks period to obtain the report. Given the nature of the damage, I consider the appointment of an external assessor reasonable in the circumstances. Considering the claim was finalised within six weeks from the applicant’s lodgement, I am satisfied the FSP has not caused any unreasonable delays to the applicant’s claim. In addition, based on the content of the FSP’s internal file notes, the FSP provided the applicant with a copy of H’s report on 19 February 2015, which is 17 calendar days after the claim lodgement date. The FSP responded to the applicant’s complaint in a reasonable timeframe The Code says the FSP is required to finalise a complaint made to it within 45 calendar days. The available information establishes the:  applicant raised the complaint to the FSP on 10 April 2015  FSP responded to the complaint in writing on 5 May 2015. Given this timeframe, I consider the FSP responded to the applicant’s complaint in a reasonable timeframe. Case No: 479847 Recommendation Page 5 of 6 Insufficient material to show defective makesafe The applicant says the FSP failed to provide watertight make safe of the property which allowed water into the property during the storms of February and March 2015. The applicant says t he FSP’s make safe was not waterproof, causing water leaks during the assessment of the claim. In support, the applicant provided a copy of social media comments showing discussion about storm weather. I accept the applicant’s property was affected by the changing weather conditions during the six weeks period, however the applicant has not provided any material to show defective make safe and resultant damage. Compensation not warranted in the circumstances As explored above, I find that:  the FSP handled the claim and complaint in a reasonable timeframe  the applicant has not established the FSP’s makesafe works was inadequate or caused him further loss. For these reasons, compensation is not warranted in the circumstances. Case No: 479847 Recommendation Page 6 of 6 5 Supporting information 5.1 How we assessed the dispute There has been a full exchange of all the information relied on for the purpose of this recommendation, and each party has had the opportunity to address any issues raised by the other. I have reviewed and considered all of the material provided by the parties. While the parties have raised numerous issues in their submission, for the purpose of this recommendation, I have restricted commentary to those issues directly relevant to the outcome. 5.2 Beauford Wind Scale (BWS) BWS no. Descripti ve term Units in km/h Description 6 Strong winds 40 – 50 km/h Large branches in motion; whistling heard in telephone wires; umbrellas used with difficulty. 9 Strong gale 76 – 87 km/h High waves; dense streaks of foam; crests of waves begin to to pple, tumble and roll over; spray may affect visibility Source: Bureau of Meteorology (Australia) website

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.