Text of the determination
Determination
Case No: 479757 Determination Page 1 of 8
Case number: 479757 15 May 2018
1 Overview
1.1 Dispute
The applicant lodged a claim under her landlord insurance policy with the financial
services provider (FSP) for damage to her tenanted investment property caused by a
fire in September 2014. The fire started in a structure at the rear of the property,
which has been described by the parties as a ‘sunroom’ .
The FSP accepted the applicant’s claim and appointed its contracto rs to undertake
the necessary repairs. However, during the preliminary stages of the repairs, the FSP
discovered that the sunroom did not comply with the planning permit obtained when it
was originally built. This led to a dispute about the extent of the F SP’s liability to
repair the sunroom.
A FOS determination (415953) was issued in October 2016, which found that the
FSP was required to rebuild the sunroom to comply with current building
requirements or cash settle the applicant for the cost of doing so (less certain
professional fees payable as a result of the sunroom being an illegal construction) .
The FSP obtained an updated scope of works and a quotation of $57,098.28 from its
builder (JB) for the rebuild of the sunroom. However, the applicant says the scope of
works and quotation is not sufficient to rebuild the sunroom in accordance with the
previous FOS determination. She says the sunroom should be rebuilt in accordance
with a quotation provided by her builder (CC) for $83,930.
The applicant is also dissatisfied with the way in which the FSP has handled her
claim and seeks compensation for various losses suffered as a result.
1.2 Issue and key findings
Is the FSP required to increase the settlement offer?
The FSP is liable for the cost of rebuilding the sunroom as a Class 10a
(non-habitable) structure, which complies with current building requirements (that is,
as an enclosed veranda). However, the FSP is not liable for the additional costs
required to rebuild the sunroom as a Class 1a (habitable) structure.
The claim should be cash settled for $59,822.11, to reflect the reasonable cost to the
applicant of carrying out the necessary works .
Case No: 479757 Determination Page 2 of 8
Is the applicant entitled to compensation?
The FSP is responsible for some (but not all) of the additional delays experienced
since the earlier determination was issued. On this basis, the FSP is required to pay
the applicant the amount of $750 as compensation.
1.3 Determination
This determination is partly in favour of the applicant.
The FSP is required to pay the applicant the amount of $59,822.11 in full and final
settlement of her claim. The FSP is not required to pay interest on this amount.
The FSP is required to pay the applicant an additional amount of $750 as
compensation for losses incurred due to the manner in which the FSP handled her
claim since the previous determination was issued.
Case No: 479757 Determination Page 3 of 8
2 Reasons for determination
2.1 Is the FSP required to increase the settlement offer?
Dispute concerns application of previous determination
In its submissions to FOS during the earlier dispute (415953), the FSP accepted that
the sunroom needed to be demolished and rebuilt. However, the applicant and the
FSP disagreed about the form the rebuild should take, given the sunroom was (at
least in part) an illegal construction.
The sunroom was built by the previous owner of the property in or around 1976. At
that time, a permit was obtained for an open-sided veranda comprising an aluminium
roof attached to the main building, supported by three poles e ncased in concrete.
However, the front and sides of the ‘veranda’ were subsequently enclosed with infill
panels and glass windows, thereby converting the open-sided veranda into an
enclosed ‘sunroom’.
The terms of the policy require the FSP to rebuild the sunroom to comply with
‘ current building r egulations’ . However, the policy provides that the FSP is not liable
for any additional costs required to meet building regulations which were already i n
place when the sunroom was originally constructed.
These provisions are intended to make the policyholder bear the risk of any costs
associated with historical non-compliance, while the FSP bears the risk of any
additional costs which arise due to changes in building standards.
In the previous determination, I accepted that the sunroom was an illegal
construction, to the extent that it exceeded the scope of the planning permit for the
open-sided veranda obtained in 1976.
However, I also found that the FSP had failed to identify the extent to which any
additional rebuilding costs arose from historical non-compliance (as opposed to
subsequent improvements in building standards).
For this reason, I found the FSP was unable to rely on the exclusion for
non-compliance and therefore was required to rebuild the s unroom ‘to comply with
current building requirements’.
However, a further dispute has arisen between the parties about how the previous
determination should be applied in practice.
FSP seeks to rebuild sunroom as non-habitable structure
In January 2017, the FSP appointed a building consultant (CR) to prepare a scope of
works to rebuild the sunroom in accordance with the previous FOS determination.
In the background to the scope of works, CR advised that the existing sunroom was
a Class 10a structure (within the meaning of the building code). A Class 10a
structure is a non-habitable structure, such as a garage, carport or shed.
Case No: 479757 Determination Page 4 of 8
The scope of works prepared by CR provided for the rebuilding of the sunroom as a
Class 10a structure which complied with current building requirements (effectively, an
‘enclosed veranda’) .
The need to comply with current building requirements meant that the rebuilt
structure would have a number of additional features which the existing sunroom did
not have, including:
a new, flat concrete slab floor (with incorporated foundation thickenings) raised
off the existing paved finish to create perimeter freeboard
window head trims to seal the interior of the room from the outside atmosphere
an insulated ceiling
sealing of the toilet window (which faced into the sunroom) and provision of
adequate ventilation.
The FSP obtained quotations from two builders (JP and AG) to carry out the works
set out in CR’s scope of works. JR provided the more competitive quote of
$57,098.28 and confirmed that he was willing to undertake the works.
Applicant says FSP’ s proposal is inadequate
The applicant says that the quotation provided by JP (based on the scope of works
prepared by CR) does not provide for the rebuilding of the sunroom ‘in accordance
with current building requirements’ (as specified in the previous FOS determination).
The applicant says that, among other things, the rebuilt sunroom needs to have a
waterproof membrane installed under the concrete slab and brick veneer walls (with
insulation) on the front and sides.
The applicant says these requirements were confirmed by the building surveyor (FD)
who was engaged by the FSP during the early stages of the claim process. She has
provided a quotation from her builder (GC) for $83,930 for the rebuild of the sunroom
in this manner.
FSP’s scope of works is appropriate
Having carefully reviewed the available information, I consider that the scope of
works prepared by CR complies with the FSP’s obligations under the policy (as
expressed in the previous FOS determination).
As outlined above, CR’s scope of works provides for the rebuilding of the enclosed
sunroom as a Class 10a (non-habitable) structure which complies with current
building requirements.
This is consistent with the nature of the sunroom at the time it was built. The permit
obtained for the sunroom was not consistent with the room being used as a habitable
space.
The additional features prescribed by the FSP’s building surveyor (FD) in 2015 were
identified in the context of the sunroom being rebuilt as a Class 1a (habitable)
structure. This is clear from the report by the FSP’s builder (UB) dated 13 August
2015 which summarises FD’s advice.
Case No: 479757 Determination Page 5 of 8
The FSP’s building consultant (CR) confirmed in his report that additional measures
(including waterproofing and insulated walls) would be required if the sunroom was to
be rebuilt as a Class 1a (habitable) dwelling.
As outlined above, the sunroom never met the requirements for a habitable dwelling.
The FSP is required to upgrade the existing Class 10a structure to comply with
current requirements for a structure of that nature. However, it is not required to
upgrade the sunroom so it can be used as a habitable space.
Claim should be cash settled
Under the policy, the FSP may settle a claim by repairing the damage to the
applicant’s property or by paying her the reasonable cost of doing so. As outlined
above, in the present case, the FSP initially elected to repair the damage.
Once an insurer makes an election to repair the insured property (rather than to cash
settle the policyholder for the cost of the repairs), it is generally obliged to complete
the repairs in accordance with the terms of the policy.
However, particular circumstances may arise which make the conduct of repairs by
an insurer untenable. In such cases, it is appropriate that the insurer cash settle the
claim.
Having carefully reviewed the claim history, I consider the relationship between the
applicant and the FSP has broken down. The correspondence between the parties
refl ects that the applicant has lost confidence in the FSP’s management of the claim
and believes it is not acting in good faith.
In these circumstances, I consider a cash settlement is the only feasible way to
resolve the claim in a manner which provides certainty and finality for both parties.
However, the amount of the cash settlement should be sufficient to allow the
applicant to engage her own contractors to rebuild the sunroom in the manner set out
above (that is, as an enclosed veranda).
FSP is required to cash settle claim for $59,822.11
The FSP has previously offered to cash settle the applicant for $54,112.22, being the
amount of JP’s quotation ($57,098.28), reduced by the policy excess ($500) and the
sum of certain professional fees ($2,486) for which the applicant is responsible in
accordance with the previous determination.
I accept that the amount of JP’s quotation represents a reasonable basis for
determining the cash settlement amount, given JP confirmed he was willing to carry
out the works.
The applicant has raised concerns about reference in JP’s quotation to a ‘shed
installation’. However, I am satisfied that this express ion was used in the context of
the materials which will be used to rebuild the shed as a non-habitable structure (and
was appropriate in that context).
I consider the cash settlement amount should be increased by 10% (prior to
deductions) to allow for:
Case No: 479757 Determination Page 6 of 8
the additional risks assumed by the applicant due to the absence of the lifetime
guarantee
the passage of time (including any increase in costs since JP’s quotation was
provided in January 2017).
On this basis, the FSP is required to cash settle the applicant for $59,822.11.
Given the nature of the works required to rebuild the sunroom, I am satisfied that the
property will remain inhabitable while these works are carried out.
2.2 Is the applicant entitled to compensation?
FOS may award compensation
Under the Terms of Reference, FOS may award compensation (capped at $3,300)
for consequential financial loss suffered by an applicant in connection with their
claim.
FOS may also award non-financial loss (capped at $3,000) where an applicant has
suffered an unusual degree or extent of physical inconvenience, time taken to
resolve the situation or interference with the applicant’s expec tation of enjoyment or
peace of mind.
The applicant is dissatisfied with the manner in which the FSP handled her claim.
Among other things, she says the FSP has unreasonably delayed the resolution of
her claim and has tried to bully her into accepting a lower settlement amount.
The applicant seeks compensation for financial and non-financial losses suffered due
to the FSP’s claims handling . She says that, while the property was tenanted (after
the remaining repairs were completed), she had to reduce the rent by $60 per week
because the sunroom could not be used.
Applicant is entitled to compensation of $750
The previous FOS determination dealt with the applicant’s entitlement to
compensation for the period to October 2016. Accordingly, the scope of this
determination is limited to any further entitlement she might have after that date.
Having carefully reviewed the history of this dispute, I consider the FSP has been
responsible for some of the additional delays which have occurred since the previous
determination was issued.
In particular, the FSP obtained a consultant’s report in December 2016, following
which it sought to argue that the outstanding damage to the sunroom could be
addressed by cleaning (despite having previously accepted on multiple occasions
that the structure needed to be demolished).
Accordingly, the FSP did not obtain an updated scope of works from CR until
January 2017, which unnecessarily delayed the progress of the claim.
However, I consider that the bulk of the further delays since that date have been due
to the applicant seeking to have the sunroom rebuilt as a habitable structure. For the
Case No: 479757 Determination Page 7 of 8
reasons outlined above, I do not consider the FSP is obliged to do so under the
terms of the policy.
In these circumstances, I consider it is appropriate that the FSP be required to pay
the applicant the amount of $750 as compensation for non-financial loss.
Case No: 479757 Determination Page 8 of 8
3 Supporting information
3.1 FOS approach
This dispute has not been the subject of a FOS recommendation. Due to the nature
of the dispute, it has been referred directly to an Ombudsman for determination, in
line with the Operational Guidelines to the FOS Terms of Reference.
This dispute has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues which are
considered directly relevant to the outcome only.