FSP sought to cash settle cracked granite benchtop repairs under lifetime guarantee instead of rectifying
Summary
The applicants' granite kitchen benchtop cracked after FSP-directed repairs, and the FSP offered a cash settlement rather than repairs. AFCA ordered the FSP to rectify the benchtop with a new contractor, reimburse geotechnical report costs, and pay $3,000 for non-financial loss.
The FSP elected to repair the damage, so under the 2011 policy's lifetime guarantee for workmanship it must rectify failed repairs rather than cash settle.
Issues
- Repairs or contractors primary · upheld
“The Panel does not accept the FSP has established a valid basis for refusing to repair the benchtop and offering the cash settlement, so the FSP should complete the rectification works.”
- Claim amount dispute secondary · upheld
“The FSP's offer to cash settle the applicants does not fulfil its obligations under the policy terms, which provide a lifetime guarantee for repairs.”
- Delay secondary · upheld
“The repairs have still not been satisfactorily completed since the claim in 2011, almost seven years and after two attempts to repair the damage.”
Subjects and remedies
home or building damagepay compensationpay non financial lossrepair or rectify
Text of the determination
Determination
Case No: 479598 Determination Page 1 of 13
Case number: 479598 27 April 2018
1 Overview
1.1 Dispute
The applicants hold an insured events policy with the financial services provider
(FSP). The applicants‟ kitchen was repaired under the policy due to the discovery of
a slow leak in June 2011. The repairs failed in the first instance as the subfloor had
not properly dried out. This resulted in further repairs which the FSP undertook. This
included replacing the benchtop.
Shortly after this latest repair, the applicants‟ new granite benchtops cracked. The
applicants say the FSP is required to rectify this.
The FSP believes the benchtops have cracked as the applicants failed to undertake
underpinning works. The FSP therefore seeks to cash settle the repairs as it cannot
guarantee the work.
1.2 Issues and key findings
Has the FSP fulfilled its obligations under the policy?
The FSP‟s offer to cash settle the applicants does not fulfil its obligations under the
policy terms. The FSP is liable to undertake repairs under its lifetime guarantee.
Are the applicants entitled to additional compensation?
The FSP should reimburse the applicants the cost of the geotechnical reports subject
to production of tax invoices. The FSP should also pay $3,000 in non-financial loss.
1.3 Determination
This determination is in favour of the applicants.
The FSP is to arrange repairs to the granite benchtop with a new contractor.
The FSP shall reimburse the applicants for the geotechnical expert report costs
within 7 days of being provided with the relevant tax invoices
The FSP is also to pay $3,000 non-financial loss within 7 days of recei ving
notification that the applicants accept this determination.
Case No: 479598 Determination Page 2 of 13
2 Reasons for determination
2.1 Has the FSP fulfilled its obligations under the policy?
The FSP originally accepted the claim
This claim dates back several years and can be summarised as follows:
a leaking pipe caused damage to the kitchen and the FSP accepted the claim
the FSP elected to repair the damage to the kitchen
after repairs were completed to the kitchen, further damage occurred as the
subfloor had not sufficiently dried out
the FSP elected again to arrange for repairs to the kitchen after also requiring
sub-floor works to be completed
the FSP agreed that the subfloor required “jacking and packing” the stumps in
the area of the kitchen rather than underpinning
the subfloor works were completed and then the kitchen repairs were
undertaken
the subfloor works assisted to close the gaps between the kitchen cabinets and
the wall
the replaced granite benchtop cracked shortly after repairs were finished.
There is no dispute between the parties that the granite cracked post repairs or that
the FSP was responsible for the kitchen repairs, including the granite benchtop.
The FSP previously elected to repair the damage rather than cash settle
The FSP twice elected to repair the damage rather than cash settle. The last works
to the kitchen cabinets and benchtops were conducted by the FSP‟s nominated
repairer and under direction of the assessor.
The FSP currently wishes to cash settle as it believes underpinning, tree root action
and/or drainage issues will cause further damage to the kitchen.
The relevant policy wording provides a lifetime guarantee for repairs
The FSP elected to undertake repairs and accordingly, under the policy terms, it
must also provide a lifetime guarantee on the repairs.
The relevant wording is the 2011 policy terms. This was the applicable policy when
the damage and first repairs arose. The wording of the policy means the FSP is
responsible for any repairs that fail due to workmanship or faulty materials as long as
those repairs were undertaken at the direction of the FSP.
There is evidence that the granite benchtop has failed due to installation
The following experts have provided evidence that the benchtop installation was
faulty:
several internal assessor reports from July 2016 onwards provide an opinion
that the damage to the granite benchtop did not occur from ground movement
but from the installation method. The reports raised concerns over a lack of
support to the granite
Case No: 479598 Determination Page 3 of 13
the FSP‟s own engineering expert (F) was of the opinion that the damage to the
granite kitchen benchtop was due to inadequate installation of the stone
benchtop
the applicants‟ geotechnical engineer (DL) concluded the granite benchtop
cracking was not the result of soil/footings movement.
A lat er assessor opinion by PW did not accept F‟s opinion about the faulty
installation. PW considered this issue fell outside F‟s expertise. PW noted that three
builders originally stated they could not guarantee the works unless underpinning
was undertaken. T his included PP. PW also accepted PP‟s opinion that the crack to
the benchtop was due to the level of the floor in the kitchen rather than faulty
installation.
PW therefore said repairs should never have been authorised. PW concluded that
the repairs should be cash settled and the applicant re-directed to do the
underpinning works.
The FSP chose to rely on PW‟s evidence in these circumstances.
PW’s position is not accepted
The Panel does not accept PW‟s evidence should be accepted given the following.
First, a review of the original building quotes dating back to 2014 (at the time of the
original leak) does not suggest the builders made unequivocal statements for
warranting the works to the benchtop. Further, armed with this information, the FSP
still elected to undertake the repairs through PP. Therefore, it cannot be said the FSP
did so due to a lack of information or understanding of the situation.
Second, shortly after installing the benchtop, it cracked. Two engineers, one of which
was engaged by the FSP, were not satisfied this was caused by ground movement.
This is plausible given:
the crack occurred shortly after installation
the previous benchtop lasted quite a period of time
the lack of other damage that should have occurred if the kitchen was affected
by such movement.
It is particularly unclear why the FSP would prefer PP‟s evidence on this point when
this type of issue clearly falls within the expertise of an engineer.
Third, the majority of the experts say that given its recent cracking, the likely cause is
faulty installation of the benchtop. This is plausible given its timing and the engineers‟
opinion that ground movement cannot be the cause.
Fourth, the geotechnical engineer (DL) engaged by the applicants said underpinning
was not required and would cause long term damage if it occurred. DL believed the
actions of trees were not related to the cracked benchtop. The applicants have
demonstrated the existence of site drainage and no new report addresses this issue.
Additionally, DL raised no concerns regarding the moisture content of the soil or any
site specific drainage issue.
The applicants provided DL‟s background. This shows extensive skills and
experience in site investigation. DL‟s evidence clearly falls within the scope of these
Case No: 479598 Determination Page 4 of 13
ski lls and experience and is consistent with the available evidence. Therefore, DL‟s
evidence is preferred on this point.
The FSP has not fulfilled its obligations under the policy
Given the above, the Panel does not accept the FSP has established a valid basis for
refusing to repair the benchtop and offering the cash settlement. Particularly given
the FSP elected to repair the damage and the evidence does not show a compelling
reason for it to reverse this position.
Therefore, the FSP should complete the rectification works to the benchtop.
Further given the history of this claim, the possible concerns with PP‟s works and
PP‟s current position, it is fair in all the circumstances t he FSP assign a different
contractor to complete the works. In addition, any scope of works should take into
account the issues raised by prior assessors and the engineer.
2.2 Are the applicants entitled to additional compensation ?
The applicants are entitled to the reimbursement of expert reports
The applicants have provided two geotechnical expert reports which have assisted
FOS in determining these disputes. It is further noted that the applicants were
required to obtain these reports despite the FSP possessing engineering reports
which supported the applicants‟ position.
Under paragraph 9.4 of FOS‟s Terms of Reference (TOR), FOS can determine that
the FSP contribute to an applicant‟s professional costs of pursuing the dispute.
It is appropriate in the circumstances to allow the reimbursement of these report
costs subject to the provision of tax invoice(s) by the applicants to the FSP.
Further, any amount payable should not be subject to the general limit of $3,000.
This is because exceptional circumstances apply as:
DL conducted an extensive investigation that involved taking samples of the soil
it was appropriate to engage an expert of substantive skills and experience to
review this long and complicated claims history
the issue in question plainly required the assistance of an expert
DL‟s evidence was clear, logical, plausible and persuasive
The applicants are entitled to non-financial loss
Under 9.3(b) of the Terms of Reference (TOR) there must be an unusual degree or
extent of physical inconvenience, time taken to resolve the situation or interference
with the applicants ‟ expectation of enjoyment or peace of mind before compensation
for non-financial loss may be determined.
There is no dispute the applicants‟ experience satisfies this criteria given:
the repairs have still not been satisfactorily completed since the claim in 2011 –
this is almost seven years and after two attempts to repair the damage
the kitchen is a highly utilised room of the home
Case No: 479598 Determination Page 5 of 13
the FSP‟s position was to prefer PP‟s evidence, whos e works were being
questioned, rather than an assessor and an independent engineer
Given these factors, particularly the timeframe that has passed and the area affected,
the Panel considers the maximum amount of $3,000 of non-financial loss should be
awarded.
Case No: 479598 Determination Page 6 of 13
3 Supporting information
3.1 Relevant Policy Wording from relevant 2011 policy
“Repair your building
When we establish that your home building can be properly repaired, we will decide to:
Repair it, or
Pay the cost of repairing it
..
The quality of workmanship and the materials used in any repair or rebuilding of your home
and contents that we arrange and authorised will be guaranteed for the life of the property.”
3.2 Expert and Assessor Reports
Record Key points
FSP Assessor
Reports
Various dates
Assessor report dated 30 July 2014. Assessor concluded
damage resulted from stump and footing movement and the
water leak. A leak detection report was recommended as it
could not be determined if it was due to a new or old leak. It
was the o pinion of the assessor that the stumps/footings may
have been water affected. The assessor recommended a
jacking and packing and underpinning of foundations. Then
after allowing for a settlement period, repainting and
replacement of the granite bench top.
Assessor report 22 August 2014. Confirmed damage to the
kitchen. In particular the crack to the granite benchtop to the
right hand corner of the gas cooktop. Another report by “R”
provided photographs of the damage.
R provided a report dated 19 September 2014. The report
recommended the acceptance of resultant damage. The work
required was to re - level the floor and remove/replace cracked
granite stone benchtop. Install suitable surface drainage
system to direct all water away from foundations and address
tree proximity.
R report dated 16 Marc h 2015 recommended that quotes be
provided for repairs to areas deemed the result of inadequate
drying time. The Policy did not allow for damage caused by
ground movement or the effects of tree roots and the
additional areas are denied on these exclusions.
Assessor Reinspection Report dated 2 June 2015. Applicant
and assessor agreed for re - blocking to be completed and that
the floors should not be sanded. The scope of works to repair
the kitchen will then proceed after re - levelling the floor.
Assessor report dated 13 July 2016. The report confirms that
there is a crack through the marble top near the cook top.
The marble top needs to be replaced.
Assessor Reinspection Report dated 20 July 2015. The floor
has been re - l evelled and the end panel which had come
Case No: 479598 Determination Page 7 of 13
away from the wall has gone back into place. Applicant was
happy with the results and accepted that the remainder of the
floor area still grades away from the kitchen.
R report dated 22 July 2016. It is unusual for a granite
benchtop to crack. Assessor tends to agree with insured
concerns about lack of support to the granite benchtop and
PP does not explain how it was installed. Sometimes granite
benchtops can crack if they are not support ed over cabinet
installed flat rails or dishwasher gaps. The crack appears to
be a “poor installation issue”.
R report 21 July 2016 records the „engineer advises the
questioned movement in the subfloor (by Builder) as a cause
of damage has been ruled out.‟ F advised R that if there had
been deflection in floor it would have damaged sink side
section of stone top as well. The floor movement is not the
proximat e cause of damage to the benchtop. There is a
discussion as to whether the builder „PP‟ will make a
contribution to the repair s.
Assessor Report dated 23 March 2017. Assessor made the
following findings:
- 3 engineer reports state footings and stumps require
underpinning and re - stumping.
- Works to the kitchens were carried out against 3 builders‟
recommendations being unable to wa rrant repairs due to
ongoing settlement movement issues.
- The report by F is “not credible” as it references
standards which do not exist in the industry to qualify
poor workmanship.
- The assessor maintained PP‟s position that the benchtop
differs in height by 10mm which means the benchtop will
continue to crack if a new one is installed.
- The applicant needs to address the underpinning and
restumping issues raised in the three engineers‟ reports.
- The benchtop has cracked due to ongoing settlement
issues.
- T he applicant has undertaken jacking and repacking
works but has not addressed the well documented
maintenance issues which are ongoing.
Assessor report dated 11 October 2017, the assessor
responds to DL‟s report as follows:
- No soil class type was identifi ed or any engineering
assessment, a conclusion which connects the two cannot
be drawn.
- The assessor considers that if the soil type has caused
the damage then it would need to be a class A or S site.
- DL states the damage was caused by workmanship but
has confirmed this is outside the scope of expertise.
FSP builder (JPF)
Report
30/7/2014
Consisted of 10 pages of photographs showing cabinets
pulling away from the wall, crack in the granite benchtop and
floors out of level.
Believes the damage is as a result of a water leak
Case No: 479598 Determination Page 8 of 13
FSP’s engineering
expert (C)
Report
16/8/2014
The property likely sits on a reactive clay site with the
foundations being a combination of stumps and strip footings.
The residenc e is approximately 88 years old with the rear
extensio n being approximat ely 20 years old.
The kitchen was repaired after a slow leak was discovered in
March 2013. The leak was repaired and the kitchen cabinets
damaged by the leak were reinstated. The kitchen cabinets
began to separat e from the wall, the gran ite benchtop
commenced cracking and the cabinet shelves commenced
separating.
C made the following observations:
- the internal kitchen and dining room floors were uneven.
- There was a 1mm wide crack in the granite bench top
adjacent to the cooktop.
- The top of the kitchen cabinet had separat ed from the
East wall of the kitchen by approximately 25mm.
- A shelf containing a row of drawers had separated from
the underside of the wall cabinet by approximately 5mm.
- There was a stepped crack 10mm wide in the nort h
ex ternal wall at the interface of the original and extension
portions of the residence. No articulation joints were
installed in the external walls.
- No concrete paving or surface drainage system was
installed adjacent to the north elevation of the residence.
A number of brick vents were located at the surface of
the external ground.
- Trees up to 10m high were located in close proximity to
the North - West corner of the residence. The location of
damage to the residence coincided with the location of
the trees.
C noted the following building defects and compliance issues:
- The ground beneath suspended floors must be graded so
that the area beneath the building is above adjacent
external finished ground level and surface water is
prevented from ponding under the b uilding.
- Planting of trees near the foundation of a house on
reactive sites can cause damage due to drying of the
clay.
- The brick walls of the residence do not contain
articulation joints which allows some degree of differential
foundation movement. The use of articulation joints was
not a common practice at the time of construction.
C concluded that the cause of damage to the residence was
differential ground movement due to:
- Drying of the subfloor soils over time (after the leak in
2013)
- Poor site drai nage
- Close proximity of trees to the North - West corner of the
residence
- Seasonal changes in soil moisture content due to
changes in climatic conditions.
C noted that prior to reinstatement works the Applicants
Case No: 479598 Determination Page 9 of 13
would need to install suitable drainage and ad dress the close
proximity of trees to the home.
C suggested the following reinstatement works:
- Re - level the subfloor timber frame in the kitchen and
dining areas (jack and pack bearers and stumps)
- After re - levelling the gap between the kitchen cabinet and
East wall is expected to close
- Remove and reinstall the shelves containing the row of
drawers.
- Remove and replace the cracked granite countert op.
FSP leak detection
(LD)
Report
19/8/2014
All tests passed the relevant pipe lines.
Inadequate room under subfloor to inspect suspended
kitchen wastes.
Inspection of ground storm water fittings around kitchen area
(including down pipes, guttering etc) show the system has
been renewed at some stage and is in good working
condition. The below ground system is no t known.
FSP’s engineering
expert (I )
Report
12/11/ 2014
Floor levels confirm the entire extension area at the rear of
the dwelling was significantly lower than the original section
of the structure.
Floor levels were higher along the connection between t he
extension and original dwelling.
Minor heave of reactive clay soil visible to the kitchen area
where the insured reported a leaking pipe.
The primary cause of movement is differential settlement
between two different footing systems.
Localised underpinning and re - blocking will result in further
cracking to the extension.
IL recommends the entire extension be re - stumped and
underpinned to bring the two sections level and prevent
further movement/cracking.
Builder “T”
Report
8/12/2014
T cannot guarantee repair works to the above property.
T believes the concrete footings holding the back extension
has not settled or has not settled correctly causing cracking
brick work.
T “cannot guarantee the repairs we undert ake will stop the
cracking to the brick work and cause further cracking”.
FSP ’s engineering
expert ( F )
Report
5/3/2015
There is evidence of a number of stepped mas onry cracks
and prior repairs to the Nort h - West corner of the lounge room
and the Northern wall of the kitchen. There is further general
degradation of the mortar bedding along the Northern
perimeter wall and evidence of re - pointing.
The internal damage included:
- In the kitchen there was cracking to the North - West
corner, cracking to the granite benc htop, movement to
th e kitchen cupboards at the North - East and Sout h - East
corners of the kitchen and cracking behind the cupboards
in the South - East corner of the kitchen.
- Cracking in the hallway adjacent to the kitchen and to the
south wall adjacent to a bedroom.
Case No: 479598 Determination Page 10 of 13
- The subfloo r appeared to be dry and adequately
ventilated.
Floor level surveys indicate a pattern of settlement towards
the North - West corner of the lounge room and South - West
corner of bedroom 3.
Based on the geological survey of Victoria, the residence is
situated on moderately reactive clay foundation soils (Class
M).
There is no structural damage to the home. The damage
viewed is not unexpected for homes situated on reactive
soils.
There are a number of trees located close to the home and F
believed the tree root s could be drying the soil. This would
lead to soil shrinkage and differential settlement movement of
the footings supporting the building structure. F concluded
that the zone of influence of the trees was to the Northern
and Western parts of the home. Thi s has led to amplified
shrinkage and drying and subsequent differential settlement
movement of the foundation soils.
The floor levels did not indicate footing heave within the
kitchen area where the leak occurred. The leak detection
report also indicates t here are no further leaks. There is
insufficient evidence to suggest the leak has resulted in
foundation movements.
The initial repairs were carried out only several weeks prior to
the repair of the leak . F was of the opinion that the time frame
was insuff icient to have allowed the foundation soils to
adequately dry out . It is likely the drying out period following
the repair of the leak has contributed to the localised
settlements and observed damage within the vicinity of the
leak. F notes that it could n ot confirm that the leak had
manifested in foundation movement (due to subsequent
drying) as there was insufficient evidence.
F considers all other damage to the building to be the result
of long term differential foundation movements as a result of
expect ed ongoing soil moisture content variation.
The scope of works provided suggests the following:
- After repairs have been complet ed, ongoing building
movements and associated distress may continue to
occur.
- In relation to the kitchen bench an epoxy resin t o match
existing colour was suggested. If this was not achievable
then replacement of the entire marble benchtop to match
existing was recommended .
FSP Expert F
Report
13/5/2015
F confirms that the second site visit did not impact the
accuracy of the dat a collected on site.
F was not of the opinion that packing was required as the soil
should have returned to pre - leak levels. It therefore does not
recommend underfloor works as the kitchen levels are higher
when compared to floor levels on the Sout hern si de of the
house and the meals/lounge areas towards the North -
Case No: 479598 Determination Page 11 of 13
Western side of the house.
FSP Expert F
Report
12/12/2016
F understood the works included re - levelling of the floors
within kitchen areas, total replacement of cracked stone
benchtop, re - adjustment of the kitchen cabinetry as well as
patching and painting of both int ernal and external cracks.
The cracking to the kitchen bencht op occurred 2 mont hs
following its installation.
No notable damage was observed to the external areas.
There was cracking to the stone benchtop around the cut out
for the stove top.
Floor levels indicate a general pattern of settlement tow ards
the Western side of the house. The floor levels of the
extension are slightly lower to the original floor levels
identified by F at a previous inspection
The original granite benchtop was installed 20 years ago as
part of the rear extension constructi on and no crack was
noted prior to the leak. The crack was noted 2 months after
its installation.
There are no installation guidelines provided by the supplier
of the granite benchtop.
The damage is consistent with typical uncontrolled cracking
due to str ess relief mechanism. F understands the usual
minimum distance between the edge of the cook top and the
outer bencht op edge should have been 80mm rather than
65mm. This is to provide adequate strengt h to resist cracking
due to normal thermal expansion and cont raction, differential
movement between granite stone and supporting substrate
and frame and any potential differential movements.
Further, there were no control joints provided around the
opening edges of the stove. F recommends installation of a
new benc htop be done in accordance with manufacturer
specifications as well as including 80mm distance and/or
provision of cont rol joints around opening edges.
F‟s opinion is that the damage to the granit e kitchen benc htop
was due to inadequate installation o f the stone bencht op.
FSP expert F
Report
28/2/2017
F relied on manufacturer‟s installation guidelines found during
desktop study to inform and supplement F‟s engineering
expertise.
F relied on another granite providers‟ guidelines as the
specific prov ider of the applicants‟ benchtop does not provide
any.
F understands the industry practice to allow for 80mm
distance in marble and granite benchtops.
It is common to install control joints to control direction and
location of cracking.
Case No: 479598 Determination Page 12 of 13
Applicant expert (DL)
Geotechnical report
29/9/2017
DL is an engineering geologist
A number of trees were observed but there is no evidenc e of
any kind to indicate that these trees were having any impact
on the kitchen area of the building.
Soil moisture analysis indicate s the clay in the area was not
being affected by the drying action of trees to the North West.
DL found no evidence to suggest the cracking in the
benchtop was due to soil/footing movements. The soil
moisture analysis and lack of brickwork cracking in the vicinity
of the kitchen or North wall and lack of distress to plaster in
the area indic ate little or no footing/soil movement beneat h
this section of the building.
DL considered it reasonable to conclude that there could be
installation insufficiencies af fecting the benchtop which is
outside of DL‟s expertise.
DL strongly disagrees with the recommendation to underpin
the entire North wall of the building prior to repairing the
granite benchtops. Underpinning a perimet er wall that is in
good condition is l ikely to be “highly det riment al to the long
term performance of this building”. The underpinning will lead
to differential movement between the underpinned sections
and non - underpinned sections.
DL did not raise an issue of site drainage in the report but
maintenance of good site drainage was noted in
recommendations.
Applicant expert (DL)
Geotechnical report
18/10/ 2017
DL reviewed the FSP‟s assessor comments on his report.
DL points out that under the relevant Australian Standard
AS2870 2011 the site rat her than soil is classified. This does
not include simply classifications such as “Class M”.
Notwithstanding this, the most appropriate classification in
accordance with AS2870 2011 would be Class P. In the
absence of abnormal soil moisture conditions and filling that
does not comply with Clause 6.4.2 of AS2870 2011, the site
would be classified as Class M.
The assessor was incorrect when he suggested Class M soils
were only effected by excessive wetting. First, the soil should
more properly be referred to as moderately reactive clay soil.
Second, moderately reactive clay soils typical of a Class M
site are a ffected by both wetting and drying of the soil.
The assessor was incorrect when he stated the leak would
only have caused damage if the soil type was consistent with
a Class A or S site.
DL‟s statement that the installation of the benchtop was
outside his scope of expertise is consistent with the Codes for
Expert Witnesses.
DL attached his CV to confirm that he is qualified to provide
expert opinion on the bearing capacity of soil to enable
engineers to design footing structures. This also takes into
acco unt the susceptibility of the structure to settlement.
Further, issues such as soil bearing capacity are best
determined by geot echnical engineers rather than civil
Case No: 479598 Determination Page 13 of 13
engineers.
3.3 Miscellaneous
Email from PP to the FSP stating that the crack was due to the different flooring
levels which stressed the stone. It was not due to incorrect installation. PP
claims it had detailed conversations with the FSP about the ability to warrant
repairs given the need to re- stump. PP states it “pushed for a cash settlement”
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.