Determination 479362
Dispute over calculation of business interruption and stock loss after flood
Summary
A bespoke cabinet business claimed under its business policy after a burst pipe flood, and the parties disputed business interruption, stock valuation and claim preparation costs. AFCA ordered the FSP to pay further business interruption loss, stock, accounting and repair amounts, less amounts already paid, in part reducing the amounts claimed.
Business interruption is assessed on general accounting principles using the certified accountant statement, and an absorption cost method was accepted for custom stock where labour could not be reliably allocated by materials.
Issues
- Claim amount dispute primary · upheld
“The Panel is satisfied that the applicant has established a loss of gross profit and the FSP is liable to pay an additional $7,174.74 for showroom stock.”
- Delay secondary · unclear
“The applicant maintains his business has suffered as a result of the FSP's delays in completing repairs to the property.”
Subjects and remedies
business interruptionsmall businesspay claim
Text of the determination
Determination
Case No: 479362 Determination Page 1 of 8
Case number: 479362 8 May 2018
1 Overview
1.1 Dispute
The applicant held a business insurance policy with the FSP commencing on 5
August 2016. He lodged a claim with the FSP on 18 November 2016 after a burst
pipe caused a flood at the premises.
The FSP has accepted the applicant’s claim but a dispute has ari sen as to the
calcu lation of the applicant’s loss, in particular, relating to business interruption and
loss of stock. This dispute has been subject to a recommendation. Both parties have
rejected the recommendation.
1.2 Issues and key findings
What is the ext ent of the FSP’s liability for business interruption?
The FSP is liable to meet the applicant’s claim for business interruption for a period
of 12 months from 18 October 2016 to 18 October 2017. The FSP is to pay the
applicant $45,656.27 for loss of income for the period 18 October 2016 to 31 July
2017. The FSP is entitled to deduct from this amount any sum already paid by way of
loss of income.
The FSP must further pay the applicant loss of income for the period 31 July 2017 to
18 October 2017 subject to the provision of a certified statement of loss of income
from the applicant’s accountants for that period.
What is the extent of the FSP’s liability for the showroom stock?
The Panel is satisfied that the FSP is liable to pay an additional $7,174.74 based o n
the applicant’s calculation using the absorption cost method.
Is the FSP liable for the applicant’s accounting fees?
The Panel is satisfied that the FSP is liable to meet the accounting fees of $11,050,
such fees being reasonably incurred in relation of the claim preparation costs.
Is the FSP liable for the cost of repairing the damaged stock?
It is fair in the circumstances that the FSP pay an additional $6,372.56 to cover the
cost of repairing the damaged stock.
Case No: 479362 Determination Page 2 of 8
1.3 Determination
This determination is in favour of the applicant. The FSP is to settle the applicant’s
claim in accordance with the terms and conditions of the policy and pay the applicant:
loss of income of $45,656.27 less any amount paid to date for loss of income
until 31 July 2017
pay the applicant any further loss of income as confirmed by a certified
statement from the applicant’s accountant for the period 31 July 2017 to
18 October 2017
pay the applicant a further $7,174.74 for loss of stock
pay the applicant a total of $11,050 (less any amount already paid) for claims
preparation costs
pay the applicant $6,372.56 to cover the cost of repairing damaged stock.
Case No: 479362 Determination Page 3 of 8
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity to address the issues arising from the information exchanged.
Following the recommendation, further detailed submissions were made by both
parties. All information has been exchanged and both parties have had the
opportunity to address the issues raised in the further submissions.
Due to the complexities involved in this matter, it has been referred to a Panel for
determination.
In reaching this determination, the Panel has had access to all information
exchanged. The determination is based on what is fair in all the circumstances,
having regard to the relevant legal principles, terms of the policy, good industry
practice including codes of practice and prior determinations where applicable.
2.1 What is the extent of the FSP’s liability for business interruption
loss?
Policy provides cover for loss of income due to business interruption for up to
12 months
There is no dispute that the applicant’s business suffered insured damage on or
about 17 October 2016 when a burst water pipe flooded the premises. There is no
dispute that the applicant has a valid claim.
The applicant’s policy is a business insurance policy. Included in the policy is cover
for business interruption (consequential loss of profits - revenue protection). Cover
under this section is limited to the period of insurance indicated in the certificate of
insurance. The certificate of insurance indicates the applicant took business
interruption cover for a period of 12 months.
Cover includes:
loss of income resulting from insured damage during the period of insurance
additional expenditure necessarily incurred for the purpose of reducing loss of
income
claims preparation costs.
The policy provides that the FSP will accept as proof of loss of income, a certified
statement from the insured’s accountants or auditors that shows the financial details
requested by the FSP.
Applicant has established a claim for business interruption
There is no dispute that the applicant’s business was interrupted as a result of the
insured damage.
The FSP has provided an assessment of business interruption for the period ending
31 July 2017 from FAS, a specialist forensic accounting division of the FSP’s loss
adjuster.
Case No: 479362 Determination Page 4 of 8
FAS assessed the business interruption at $42,891 (exclusive of GST). The applicant
provided an assessment of business interruption for the period to 31 July 2017 from
its accountants, SU, totalling $45,656 (exclusive of GST).
Both assessments appear to be based on the information prov ided by the applicant’ s
accountants and on standard accounting methodology used to calculate business
interruption. The Panel acknowledges that general accounting principles are
applicable when assessing the business interruption under the terms of the policy.
There is no dispute about this between the accountants that the rate of gross profit is
calculated at 75.28%.
The Panel in this instance has preferred the assessment by the applicant’ s
accountant, SU. The Panel notes that SU has explained the variation between
estimates by explaining that it disagrees with the FSP’s calculation of
savings/increase costs of working that are required as part of the overall calculation.
The Panel notes the policy provides that the FSP will accept as proof of loss of
inc ome a certified statement from the applicant’s accountants. The Panel is satisfied
that the applicant has established a loss of gross profit for the period from 18 October
2016 to 31 July 2017 of $45,656.27.
The FSP has already paid the applicant for business interruption of at least $27,511.
From the information provided to the Service, it is unclear whether the FSP has paid
any additional amounts beyond this. The FSP is entitled to deduct those payments
made by way of business interruption loss of income from the $45,656.27 payable for
the period to 31 July 2017.
FSP liable to pay business interruption for period between 31 July 2017 and 18
October 2017
The policy clearly provides cover for business interruption for a period of 12 months.
The applicant maintains that his business has continued to suffer as a result of the
insured damage and further suffered as a result of the FSP’s delays in completing
repairs to the property.
The Panel has not been provided calculations to establish the full extent of the
applicant’s loss of income due to business interruption for the remaining period from
31 July 2017 to 18 October 2017.
The FSP says that as the applicant’s turnover in June 2017 and July 2017 exceeded
the expected sales for these months, then there was no further liability for business
interruption. The Panel does not accept that this is necessarily the case. The
indemnity period is for a period of 12 months.
The FSP remains liable for the potential business interruption up till 18 October 2017.
The Panel is satisfied that the FSP is liable to pay the applicant for loss of income
until 18 October 2017 subject to the applicant providing a certified statement from his
accountant SU as proof of loss. The FSP is also liable to meet the cost of SU in
providing such a statement.
Case No: 479362 Determination Page 5 of 8
2.2 What is the extent of the FSP’s liability of the showroom stock ?
The applicant’s policy provides cover for accidental damage including damage to
contents and stock. Stock is defined in the policy to include all work in progress and
property of others held on consignment.
Damaged showroom stock should be assessed using absorption cost method
The FSP calculated the value of this showroom stock damage at $32,588. In
reaching this figure, the FSP calculated the average correlation between the
materials and payroll to determine the rate of payroll expense when compared to the
material expenses across the 12 month period. Based on this analysis, the FSP
determined that for every $1 spent on materials, 1.2817 was spent on labour. That is
the labour cost of production was 128.17% of the cost of production materials.
The Panel acknowledges that this is a common method of assessing loss of stock
and contents, however the Panel does not accept that it is appropriate to use this
method in the current claim.
The applicant says that the more appropriate method to assess the loss of the
showroom stock was to do so by using the absorption cost method. The absorption
cost method looks at the full cost of manufacturing. It calculates the cost of the
finished unit including direct materials, direct labour, variable and fix manufacturing
overheads and arguably provides a more comprehensive and accurate view of how
much an item has actually cost.
The applicant’s business is a bespoke cabinet business. The cost of preparing the
showroom stock given the nature of the items is different to the cost that might
normally be incurred. The applicant has assessed the actual hours and average
labour rates for each of the items. The applicant notes each job’s labour requirement
is substantially different and to attempt to allocate the labour amount based on a
percentage of materials would not give an accurate cost for those items.
The Panel accepts that this is not an unreasonable proposition in this case. The
applicant maintains the products manufactured were custom products. A more
complex job requires a more qualified tradesperson to do the majority of the work.
The apprentices would be able to do little work on these jobs. Each job’s labour
requirement was substantially different.
The applicant says that the labour component of the showroom stock valuation
calculation should be calculated by splitting the labour hours between tradespeople,
apprentice labour hours and multiplying by the respective average labour rate per
hour.
Allowing for these calculations, the applicant has assessed the value of the
showroom stock damaged at $40,420.50. Salvage of $657.82 is to be deducted from
this. Allowing for the deduction of payments received to date for the showroom
furniture and salvage, the balance payable is $7,174.74.
The Panel accepts that it is fair in the circumstances that the FSP pay the applicant
the additional $7,174.74 with respect to the damaged showroom stock.
Case No: 479362 Determination Page 6 of 8
2.3 Is the FSP liable for the claims preparation costs?
The policy provides cover for claims preparation costs. The applicant has claimed
cost of $11,050 (exclusive of GST or x GST). The FSP has offered $8,800 arguing
that part of the work performed by SU was normal accounting work required in the
running of the business.
The Panel notes from the invoice provided that each item claimed by SU is in relation
to the preparation and submission of reports to the FSP’s forensic accountant. The
invoice also includes meetings with the applicant with respect to the claim. The FSP
has not provided any information to dispute SU’s claim that the work related to
preparation and submission of reports to the FSP.
Whilst the Panel accepts that there are certain fees and returns such as monthly
management accounts, the Panel is satisfied that the amounts charged are
reasonable. The Panel accepts the FSP should pay the applicant $11,050 for claim
preparation costs, being the amount claimed by SU of $12,155, less applicable GST
of $1,105.
Other matters
The applicant has claimed for the cost to replace a number of blackbutt chairs. The
FSP has agreed to pay for the cost of the blackbutt chairs, subject to the provision of
relevant invoices. The applicant has now provided those invoices.
The applicant has also requested the FSP pay:
$2,136 for the cost to repair a table panel saw, wide belt sander and dovetailer
$2,112.72 for additional timber used for rework jobs
$1,732.71 to remake work benches
$1,523.54 for a new computer.
The Panel notes that the FSP has either paid or agreed to pay for these costs. The
Panel accepts that these issues are no longer in dispute.
The applicant has also claimed the costs of labour and materials and overheads for
the rework jobs completed. The applicant claims that the cost of the rework jobs was
$10,612.06 as trades staff were used to complete 100% of the rework jobs.
The applicant has provided a quotation marked ‘ reworks job work paper ’ and
claiming labour rates at $80/hr. It is not a detailed quotation and the Panel is unable
to determine from the work paper the reasonableness or otherwise of the amount
claimed.
The Panel accepts the custom nature of the work performed by the applicant and it is
likely a mix of trade skills would be required to complete the work. In the Panel ’ s
view, it would be fair in these circumstances to allow the applicant’s claim at an
hourly rate similar to that assessed for the replacement of the showroom stock of
$20.48 per hour. Calculated on the hours claimed of 178.25 hours at $20.48 per
hour, this comes to $3,650.56. Materials claimed total $2,722.
In the Panel’s view, it is fair in the circumstances that the FSP pay an additional
$6,372.56 to cover the costs of repairing the damaged stock.
Case No: 479362 Determination Page 7 of 8
3 Supporting information
3.1 Business interruption key policy terms
Policy term Key points
Business Interruption –
Income: Cover
We will pay in accordance with the Basis of Settlement, for Loss of
Income that results from an interruption of Your Business caused by
any Insured Damage that happens at the Premises. Provided that this
Insured Damage happens during the Period of Ins urance shown for
this Business Interruption.
Basis of Settlement 1. Loss of Income
Loss of Income will be calculat ed by subtracting the Income earned
during the Indemnity Period from the Income You would have
earned during the Indemnity Period had the Damage not occurred.
Provided that the Income You would have earned during the
Indemnity Period had the Damage not occurred:
(a) will be calculate d by reference to the Income for:
(i) a period of the same duration as the Indemnity Period that
starts a Year prior to the date of the Damage; or
(ii) a period of Your normal Business operations that
corresponds most closely to the Indemnity Period if Y our
Business has operated for less than a Year at the start of the
Indemnity Period; and
(b) will be adjusted to take into account any:
(i) trends of the Business and other influences that would
vary the Income;
(ii) variation of normal trading whereby Income is maintained
during the Indemnity Period from increased sales of low
margin goods;
(iii) changes to how Stock, materials, finished goods or
partially finished goods are used, purchased or sold including
sal vage sales of Stock following Insured Damage; and
(iv) savings made during the Indemnity Period that reduce the
cost of running Your Business.
2. Additional Expenditure
We will also pay for additional expenditure necessarily incurred for
the sole purpo se of reducing Loss of Income that is covered by this
Cover Section and/or resuming and/or maintaining Your normal
Business operations or services.
Provided that this expenditure is limited to the amount of Income
that would otherwise be lost had the addi tional expenditure not
been incurred.
4. Auditors and Accountants
We will accept as proof of the Loss of Income a certified statement
from Your accountants or auditors that shows the financial details
requested by Us.
Case No: 479362 Determination Page 8 of 8
Indemnity period The period that starts on the dat e of the Damage and ends not later
than the number of weeks or months stated in the Schedule after the
date of the Damage during which the results of Your Business is
affected as a consequence of the Damage
Loss of Income Loss or reductio n of Your Income that occurs during the Indemnity
Period.
Income Income means:
1. … and
2. income from Your Business at the Premises for goods sold, work
done, electrical power generated and sold, services rendered or
any Government approved incentives, s ubsidies or market
development allowances You are entitled to in relation to Your
Business, less:
(a) working expenses for freight, packing, bad debts, and the
purchase of goods, materials, components, or Stock;
(b) any other Uninsured Working Expenses sho wn in the Schedule;
and
(c) payroll if this is shown in the Schedule.
3.2 Contents and stock loss key policy terms
Policy term Key points
Damage or Damaged means accidental physical damage, destruction or loss.
Stock - Basis of Settlement For Damage to Stock We will at Our option:
(i) replace or repair the Damaged Stock with property or mat erials
of equal quality, standard and specification unless the Stock has
become obsolet e; or
(ii) where the Stock is Obsolete Stock at the time of the Damage,
We will pay You its value as Obsolete Stock but no more than its
original cost to You; or
(iii) if You request a cash settlement and Reinstatement or repair is
not carried out, and the Stock is not Obsolete Stock, We will pay
the original cost to You of the Stock that is Damaged beyond repair
plus an amount commensurate wit h the cost of repairing Damaged
Stock, but not exceeding its Pre - Damaged Value at the time of the
loss.
Pre - Damage Value means the value of the Property that is Damaged immediately before
the Damage has occurred. This value must take account of wear and
tear, maintenance, construction, general condition and the anticipated
future useful life of the Property.