Home / Financial Firm (Unknown - Insurer) / Determination 479020
Determination 479020
Scope of floor tile replacement after tenant fall disputed
Summary
A tenant fall damaged a staircase and tiles, and the parties disputed whether the insurer must replace undamaged tiles in the adjoining room. AFCA found the policy only covered the hallway, ordered repairs or cash settlement of the insurer's $19,520.22 quote plus 25 days loss of rent, and $200 for claim experience.
The PDS does not allow combining a hallway with an adjoining room for uniformity, so the insurer's hallway-only scope is correct, though its handling and communication warranted $200 compensation.
Issues
- Claim amount dispute primary · not upheld
“The FSP is only required to replace tiles in the hallway and not in the adjoining kitchen-living/dining room”
- Poor communication secondary · upheld
“The FSP's assessor said the FSP would replace the tiles in the kitchen-living/dining room, contrary to its internal notes”
Subjects and remedies
pay claimpay non financial loss
Text of the determination
Determination
Case No: 479020 Determination Page 1 of 7
Case number: 479020 11 January 2018
1 Overview
1.1 Dispute
The applicant lodged a claim with the financial services provider (FSP) when a tenant
fell down the stairs of the applicant’s property. The fall damaged the staircase and its
balustrade, the plaster of the wall opposite and chipped two floor tiles.
The FSP accepted the claim and the parties agreed to all components of the claim,
save for how many tiles the FSP must replace to match undamaged tiles.
The applicant says the FSP must replace the tiles in the open plan kitchen and living
area which starts at the end of the hallway containing the damaged tiles. The FSP
says the policy wording only requires it to replace tiles in the hallway.
1.2 Issues and key findings
What is the FSP’s liability to replace tiles ?
The policy documents provide:
the FSP is obliged to replace undamaged flooring to create a uniform
appearance in the same room
a hallway and a room cannot be combined.
The FSP is only required to replace tiles in the hallway and not in the adjoining
kitchen-living/dining room.
Is the applicant entitled to compensation?
The FSP must pay the applicant $200 in recognition of his claim experience.
1.3 Determination
This determination is substantially in favour of the FSP.
Within 30 days of each party accepting the determination the FSP will:
arrange and commence repairs according to the quote date 24 February 2017
pay the applicant a sum for 25 days loss of rent.
If the applicant instead prefers to be cash settled, the FSP will pay him for both the
repairs and loss of rent within seven days of the applicant notifying it of his decision.
Case No: 479020 Determination Page 2 of 7
2 Reasons for determination
2.1 What is the FSP’s liability to replace tiles ?
The parties agree damaged tiles are only in the hallway
The available information confirms the insured building was damaged when the
tenant fell from the staircase, damaging the glass balustrade, the staircase itself,
plaster on the wall adjacent and chipping two tiles in the hallway.
The parties agree on the extent of damage, but disagree whether the FSP’s liability is
to replace only tiles in the hallway or also in the adjacent kitchen-living/dining room.
The policy wording does not permit combining a hallway and a room
The product disclosure statement (PDS) describes in detail the FSP ’s obligations to
meet any claim it accepts. In the first instance, if an exact match for the damaged
material is not available, the FSP is entitled to use the closest match available.
The PDS states the FSP will only pay to achieve uniformity in specific circumstances:
We will pay extra to replace continuously joined undamaged floor coverings of the same
material in the same room, stairs, hallway or passageway where the damage occurred
A hallway next to a room is not the same room, even if it has the same floor or wall covering as
the room.
A passageway or a hallway has the same meaning as a room. We will not combine a hallway
and a room.
The FSP confirmed exactly matching tiles were unavailable, meaning tiles around the
two damaged tiles must be replaced to create a uniform appearance.
The PDS includes specific examples with diagrams and explanations to further clarify
the extent of the FSP’s obligations under this benefit. A copy of the relevant
provisions of the PDS are contained in 3.2 of this determination.
The FSP’s assessment of its liability is correct
The applicant’s position is :
the combined hallway is connected to the laundry, kitchen-living/dining room in
one continuous flow
there are no doorways, arches, breaks in continuity, changes in floor level or
changes in wall covering between the hallway and the kitchen-living/dining
room.
The applicant provided a copy of the building’s floor plan and the FSP provided a
series of colour photographs showing the internal configuration. I agree with the
applicant’s statements as set out above.
However, the policy provides the FSP will only pay to create a uniform appearance in
the same room. Therefore, the issue in dispute is whether the adjoining hallway is the
same room as the kitchen-living/dining room.
Case No: 479020 Determination Page 3 of 7
I consider the relevant information to be:
the two damaged tiles are in the hallway
there are no damaged tiles in the kitchen-living/dining room
the policy expressly states two adjacent rooms can be combined, but not a
room and an adjoining hallway.
If there were damaged tiles in the kitchen-living/dining room, the policy would require
replacing the tiles in that room. That is not the case here.
I am satisfied the FSP correctly concluded that meeting its obligation under the policy
benefit requires only replacing tiles in the hallway and not in the kitchen-living/dining
room.
The most recent scope of works, dated 24 February 2017, costs $19,520.22,
including GST and builder’s mark -up.
The FSP is entitled to either conduct repairs itself, or, if the applicant would prefer,
the FSP will cash settle the applicant using this quotation.
The FSP’s quotation is preferred to the quote provided by the applicant because:
the FSP’s quote is costed to replace only the tiles in the hallway
the applicant’s quote includes replacing tiles in the kitchen and other costs
arising from the same
the work quoted for in the applicant’s quote is therefore beyond the FSP’s
liability to meet this claim.
The applicant is also entitled to 25 days loss of rent payment as the work required
will make the building unliveable while it is ongoing.
2.2 Is the applicant entitled to compensation?
The FSP must pay the applicant $200 for his claim experience
FOS is able to award compensation, up to a maximum of $3,000, in recognition of
the seriousness, unusual degree or extent of physical inconvenience, stress, impact
on the insured’ s peace of mind or enjoyment or time taken to resolve the situation.
An award of compensation should not follow any justified delay by the FSP, or
necessary further investigation. Unless exceptional circumstances apply, two to three
months would be a reasonable timeframe wherein an FSP can consider its liability to
meet a claim.
The applicant says:
the claim was handled with extreme delay
the tenant was inconvenienced
the FSP’s assessor told the applicant the FSP would replace the tiles in the
kitchen-living/dining room, which in turn would necessitate replacing structures
in that room built on top of the tiles and could not be salvaged
the FSP failed to obtain a quote for this level of work, despite agreeing to do so.
I have closely reviewed the available information and note:
the claim was received on 5 December 2016
Case No: 479020 Determination Page 4 of 7
the initial property assessment was delayed while the applicant was overseas
assessment occurred on 7 February 2017
the FSP’s internal notes indicate it was aware it would not repl ace tiles in the
kitchen-living/dining room from 10 February 2017
this is contrary to what the FSP’s assessor informed the applicant: the assessor
said the FSP would replace tiles in the kitchen-living/dining room
the FSP learned an exact match for the existing tiles was unavailable on 27
February 2017
the FSP communicated its position to the applicant via phone call on 6 March
2017
the claim escalated to complaint management following this call.
Given the applicant was overseas for a time and the claim occurred across the
Christmas and New Year’s periods, the time taken by the FSP to complete its
investigation and offer an outcome was reasonable.
However, the claim management itself leaves room for improvement. I note:
the FSP failed to follow up on obtaining a quote for replacing tiles throughout
the property after telling the applicant it would do so
the FSP’s assessor telling the applicant the FSP would replace all of the tiles if
it could not obtain an exact match would have contributed to the dispute arising.
I am satisfied $200 is appropriate compensation for the applicant’s claim experience.
Case No: 479020 Determination Page 5 of 7
3 Supporting information
3.1 FOS approach
As advised to the parties, FOS considers it appropriate to expedite this dispute in
accordance the Operational Guidelines to our Terms of Reference, due to the nature
of the dispute. Accordingly, this dispute was not subject to a FOS recommendation
and proceeded directly to determination.
I have decided this dispute on its merits, having regard to relevant law, good industry
practice, codes of practice and previous FOS decisions. I have taken into account all
the material submitted by the parties and am satisfied the parties received the
materials relied upon.
3.2 Policy excerpts
When we authorise the repair or rebuilding of your property
If we need to source material in order to repair or rebuild your property, we will do our best to
obtain new materials that are the same type, standard and specification. If the same is not
available, we will us e new materials of a similar type, standard and specification that are
commercially available and compliant with current building regulations.
When we cannot match materials
If we cannot find new materials to match undamaged parts, we will use the closest available
match to us.
If you are not satisfied with the mat erials we find as the closest match before we repair your
property:
If we agree, you can pay the extra cost of replacing undamaged parts of your property to
achieve a uniform appearance
Or we will pay you what it would have cost us to repair or rebuild the damaged part.
Repairing or rebuilding damaged parts
We will only repair or rebuild the parts that are damaged in the incident covered by your policy.
You cannot claim to replace undamaged parts of your property to create a uniform
appearance…
For the limited circumstances where we will repair or rebuild undamaged parts read the secti on
below.
When we will repair or rebuild undamaged parts
If we cannot match the mat erials with the undamaged parts, we will pay extra to create a
uniform appearance when:
…
floor coverings are damaged (including tiles): we will pay extra to replace continuously
joined undamaged floor coverings of the same material in the same room, stairs, hallway or
passageway where the damage occurred.
Case No: 479020 Determination Page 6 of 7
Case No: 479020 Determination Page 7 of 7
3.3 Property floor plan
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.