Home / Financial Firm (Unknown - Insurer) / Determination 478483

Determination 478483

Insurer declined storm-related swimming pool damage claim as gradual deterioration and faulty workmanship

FirmFinancial Firm (Unknown - Insurer)
Decided2018-01-22
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$200
Amount claimed—
SourceAFCA PDF

Summary

The applicant's in-ground pool was damaged over successive storms and the insurer declined the claim on exclusions for gradual deterioration, faulty workmanship and hydrostatic pressure. AFCA upheld the denial but accepted that the claim decision was slow, and the insurer had already paid $200 compensation.

The storms were not the effective cause of the pool damage, which was driven by pre-existing deficiencies, so the policy exclusions apply.

Issues

Subjects and remedies

natural disasterpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 478483 Determination Page 1 of 4 Case number: 478483 22 January 2018 1 Overview 1.1 Dispute The applicant made a claim under her home and contents insurance policy held with the financial services provider (FSP). This was after her in-ground swimming pool was damaged following a series of storms over a twelve month period. The FSP said the damage was the result of gradual deterioration, faulty workmanship and a build-up of hydrostatic pressure, and declined the claim on that basis. The case manager provided the parties with a recommendation on the issues in dispute. The recommendation was substantially in favour of the FSP. A copy of the recommendation is attached to this determination. 1.2 Issues and key findings Were the findings of the recommendation correct? The findings contained in the recommendation were correct and are adopted in this determination. Further submissions provided after the recommendation have been considered. Does the applicant’s additional submission change the outcome ? The applicant‟s additional submission after the issue of the recommendation does not change the outcome of the dispute. 1.3 Determination This determination is substantially in favour of the FSP. I agree with the case manager‟s reasons for the recommendation and the recommended outcome. The FSP is not required to undertake any further action, as it has already paid the applicant the case manager‟s recommended $200 compensation for non-financial loss. Case No: 478483 Determination Page 2 of 4 2 Reasons for determination 2.1 Were the findings in the recommendation correct? I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. I am satisfied that the case manager‟s recommendation contains an accurate summary of the dispute, the issues to be determined, any applicable paragraphs of the Terms of Reference and any relevant law. 2.2 Does the applicant’s additional submission change the outcome? Applicant has established a prima facie claim for storm damage The FSP acknowledged there had been a series of severe storms in April 2015, January 2016 and June 2016. It also acknowledged the storms, along with the excluded factors, led to damage to the pool. I am satisfied the applicant has established a prima facie claim for damage arising from the insured event of „storm…‟. The applicant also raised the possibility that excavation work on a neighbouring property may have contributed to the pool damage. However, the insured event of „impact‟ under the policy does not cover loss or damage resulting from vibrations originating on neighbouring property, and so this does not apply in this case. FSP entitled to deny the claim The FSP relied on the information provided by a pool expert, an engineer and an assessor in concluding the effective cause of the damage to the pool was gradual deterioration and faulty workmanship. I am satisfied the available evidence shows, on balance, that despite the acknowledged impact of the various storms, the damage to the pool would not have occurred had the pool complied with relevant standards, and appropriate rectification been undertaken after early storm events. In line with the recommendation, and as further explained below, I consider the FSP has established the application of the policy exclusions upon which it relies, and so it is entitled to deny the claim on that basis. Applicant is entitled to $200 compensation The recommendation concluded the applicant is entitled to compensation for her experience in the course of the claims process. While noting the applicant may have contributed to the delay, the recommendation was that the FSP‟s decision to deny the claim in December 2016 was too long after the claim was lodged in June 2016. Case No: 478483 Determination Page 3 of 4 The recommendation indicated $200 was an appropriate level of compensation, and inconvenience, I agree it is fair in the circumstances. The FSP has now paid this amount to the applicant. Applicant ’s objections to recommendation do not change outcome The applicant objected to the recommendation. She maintained her position that the storm was what prompted the damage. Compensation Her objection included her dissatisfaction with the $200 compensation, which she felt was insufficient to address her experience in the course of the claim. She says she had difficulty lodging the claim online when she first attempted that, as well as having issues accessing the assessor reports. The recommendation outlines the timeline for the claims process. After initially attempting to lodge her claim online in March 2016, the applicant lodged it by phone in June 2016 and, after carrying out an investigation into the cause of the damage, the FSP denied the claim in December 2016. The FSP relied on three reports, which meant three pool inspections. It is reasonable for the FSP to undertake comprehensive investigations into the cause of the damage to the pool. Nevertheless, the case manager did conclude the FSP had taken longer than necessary to make a decision on the claim; although it was not established that any delay by the FSP in making a decision should reasonably be regarded as having contributed to the final damage to the pool, which had already collapsed before the 3 rd inspection. The applicant said she had also experienced difficulties in managing her commitments assisting her husband who was undergoing medical treatment, and arranging for someone to attend when the FSP‟s contractors inspected the pool. I would like to acknowledge the difficulties the applicant reported in the course of the claim, particularly given her husband‟s ongoing illness; and the inconvenience of having other family members taking time off work to be available when the FSP‟s assessor attended. While this no doubt added to the inconvenience and stress of having to deal with the claim, those are not in themselves matters for which the FSP can reasonably be held responsible. Damage to the pool The FSP relied on reports provided by appropriately qualified parties. These reports indicated the various storms had an impact on the pool and the surrounding area. However, the dominant or effective cause of the damage was the inadequate drainage around the pool, along with other deficiencies with respect to the pool‟s installation. The damage had progressively worse ned with the occurrence of each storm. This is because the ground/drainage surrounding the pool could not effectively deal with the rainfall that had occurred over time. Case No: 478483 Determination Page 4 of 4 Each of the three reports provided a comprehensive explanation as to the effective cause of the damage. While the applicant obtained a very brief handwritten report, that did not provide any reason for its conclusion that the damage may have been caused predominantly by recent weather of storms, flooding, excess water. Although the storms are accepted as having contributed to the damage, that does not make „storm‟ the effective cause of the loss. Instead, the evidence supports the conclusion that the storm water over successive periods simply highlighted pre- existing deficiencies and problems, without which the storms would not, in all likelihood, have had the same (if any) effect. That means, I am satisfied the FSP was entitled to deny the claim, as it has established the proximate (that is, the dominant, operative or effective) cause of the damage was faulty workmanship, gradual deterioration and build-up of hydrostatic pressure, which are specifically excluded under the policy. Accordingly, for the reasons outlined above, the applicant‟s additional submissions do not warrant a change to the outcome of this dispute. Recommendation Case No: 478483 Recommendation Page 1 of 9 Case number: 478483 21 July 2017 3 Overview 3.1 Dispute The applicant lodged a claim with the financial services provider (FSP) when her pool collapsed following a series of storms during the preceding 12 months. The FSP refused the claim and says the collapse results from gradual deterioration, faulty workmanship and a build-up of hydrostatic pressure. The applicant maintains the claim is one for acceptance and says the FSP took an unreasonably long time to investigate the claim. 3.2 Issues and key findings Has the applicant established a claim? The FSP accepts the four storms contributed to the pool‟s failure. Accordingly, the applicant satisfied her burden of proof to establish a claim for loss within the terms of the policy. Can the FSP refuse the claim? The FSP can refuse the entirety of the claim because:  cover is provided subject to exclusions  the information provided shows the proximate cause of the pool‟s collapse is gradual deterioration and faulty workmanship  the available submissions indicate the pool would not have collapsed only as a result of the storms, rather the collapse primarily arose from excluded factors. Is the applicant entitled to compensation for her claim experience? In the circumstances, the time taken by the FSP to review and decide the claim was slightly excessive. The FSP is required to pay the applicant $200 in respect of this delay. 3.3 Recommendation This recommendation is substantially in favour of the FSP. Within seven days of each party accepting the recommendation, the FSP will pay the applicant $200 to finalise this dispute. Case No: 478483 Recommendation Page 2 of 9 4 Reasons for recommendation 4.1 Has the applicant established a claim? The applicant has a valid claim for damage caused by storm The applicant holds a home and contents policy, providing cover for loss or damage occurring during the period of cover, caused by the „insured events‟ listed in the policy documents. Conditions and exclusions apply. When making a claim under a contract of general insurance, the initial burden of proof is with the applicant to show, on the balance of probabilities, an event covered by the policy caused the claimed loss (called a prima facie ). If the applicant can do so, the burden of proof shifts to the insurer to show, on the balance of probabilities, the policy will not cover or excludes the claim. The FSP says:  there were severe storms in April 2015, January 2016 and June 2016  the storms were all of extreme intensity  the storms caused the pool to fail in conjunction with excluded factors such as: gradual deterioration, faulty workmanship and failure due to hydrostatic pressure  it intends to refuse the claim on the basis of these exclusions. Because the FSP accepts the storms contributed to the pool‟s failing, it follows the applicant satisfies her initial burden to establish a prima facie claim. Policy will not cover any damage caused by excavation works During the course of the dispute, the applicant mentioned excavation work conducted by heavy machinery occurred on the neighbouring property, in close proximity to the pool. The applicant says vibrations due to the excavations may have contributed to the pool failing. As mentioned, the policy is a defined events policy, covering claims arising from 10 insured events only. Only loss or damage caused by a listed event is covered. After close review of the 10 insured events, the only event possibly providing cover is „impact‟, which covers, “Impact caused by a falling tree, branch, power or communication pole, a motor vehicle or trailer, an aircraft or watercraft, debris falling from space, or a satellite dish, televis ion or radio aerial which breaks or collapses.” The policy does not define „impact‟, so it takes on its ordinary common meaning. The Macquarie Dictionary defines „impact‟ as, “1. the striking of one body against another 2. an impinging 3. forci ble contact or impinging…” I am satisfied the insured event „Impact‟ does not cover damage resulting from vibrations originating on the neighbouring property. To the extent any loss or damage can be attributed to this source, the policy will not respond because an insured event did not cause the damage. Case No: 478483 Recommendation Page 3 of 9 4.2 Can the FSP refuse the claim? FSP must show the proximate cause of the loss is an excluded risk Cover is subject to exclusions. To refuse the claim, the FSP must show the proximate cause of the pool failing was an excluded risk, rather an insured event. When determining whether an insured event or an excluded risk caused the damage, courts have held the proximate cause of the loss is not the first, last or sole cause of the loss; it is the effective or operative cause. If there were several causes operating when the loss occurred, each are reviewed for qualities of reality, predominance and efficiency, to determine which actively caused the loss. While not always possible, the courts stress the importance of s triving to identify the proximate cause. The FSP says the proximate causes of the pool failing were:  gradual deterioration, including wear and tear, on account of the length of time over which the pool failed and the number of storms required to induce collapse  inherent defects and faulty workmanship, specifically the pool‟s design not complying with AS1839-1994 or AS1839-1989 (further details below)  damage to swimming pools due to hydrostatic pressure. Circumstances of the loss The applicant says:  the first storm occurred in April 2015, after which the applicant noticed some pool tiles cracking or delaminating  by October 2015 damage was more easily observable  the applicant obtained assistance from an engineer (L) in April 2016, who recommended the applicant lodge a claim  the applicant originally tried to lodge a claim online with the FSP in March 2016 but gave up after finding this too difficult  the applicant called the FSP to lodge a claim in June 2016 after another storm led to the rapid collapse of the pool  the pool was in place for about 20 years without issue. Both parties provided submissions from an engineer. For the applicant, L explained the collapse may have resulted from recent storms, flooding or excess water. L‟s letter is undated and very b rief. For the FSP, its engineer (IE) states:  no hydrostatic relief valve was evident  no coping or strengthening was evident across the top of the pool  damage slowly worsened after the first storm in April 2015, before rapid failure followed the storm in June 2016  the drainage is insufficient given the backfill is comprised of non-granular clay soils, which drain poorly and expand when wet  over time, undrained clay backfill becomes heavy, the pressure surrounding the pool‟s shell increased causing a build -up of hydrostatic pressure Case No: 478483 Recommendation Page 4 of 9  the pool does not have a stand up pipe installed, which would have allowed for a pump to assist alleviating the rising water content  these factors mean the pool does not comply with the relevant design standard at the time of construction, either AS1839-1994 or AS1839-1989  the storms probably caused the pool to finally fail but this only occurred due to the unsuitability of the backfill and the lack of suitable sub soil drainage. On the strength of this submission, I am persuaded fa ulty workmanship was a relevant factor in the pool‟s collapse. The FSP‟s assessor (C) submitted:  damage results from the pool‟s hydrostatic valve failing, inadequate drainage surrounding the pool inducing movement and settlement in the founding soils and a build-up of pressure surrounding the pool shell  a properly operating hydrostatic valve in the pool floor would have prevented the collapse  the applicant‟s failure to investigate and mitigate damage when first noticing issues around October or November 2015 significantly increased repair costs  wall movement and backfill settlement over time left gaps between the wall and surrounds and cracked the tiles, enabling further water ingress  movement and settlement occurring over time would not recover and the stress remained in the wall as a sustained load. Future loads would cause additional movement, settlement of backfill, and additional sustained loads  fibreglass loses tensile strength with time under a sustained load and has a linear stress strain curve so failure can occur suddenly. From a review of the material provided, it appears since the June 2016 storm event there has been a sudden failure of the top of the pool wall on the left hand side at the corner where it is cracked. The proximate cause was gradual deterioration and faulty workmanship Given the information provided by IE, I am satisfied that while the storm in June 2016 directly led to the pool‟s collapse, failure could not have occu rred if not for the preceding storms, lack of site drainage, lack of a functioning hydrostatic pressure valve and the unsuitable backfill material used. In my view, the proximate cause of the pool collapsing is gradual deterioration and faulty workmanship because:  collapse followed initial issues arising from the first storm in April 2015, reinforced by subsequent storms and then finalis ed by a storm in June 2016. This indicates a slow failure over time, rather than a complete failure following a single eve nt and is consistent with the failure mechanism for fiberglass articulated by C  the policy is intended to cover losses arising out of a single event, rather than multiple events occurring over time, which is „gradual deterioration‟  IE and C speak to a build- up of pressure around the pool‟s shell over time, due to the inadequate drainage and insufficient hydrostatic relief. These forces take time to build to a level sufficient to crack the pool shell Case No: 478483 Recommendation Page 5 of 9  nothing in any of the information provided indicates the J une 2016 storm could have caused the collapse independently of the existing gradual deterioration and other issues, meaning the June 2016 cannot be the proximate cause. I am satisfied, given the reports provided by IE and C, that while the storms were necessary for the pool to collapse, failure would not have occurred if the pool complied with the relevant standards and if intervention were taken following one of the earlier storms. The FSP is entitled to refuse the entirety of the claim, applying the exclusions for gradual deterioration and faulty workmanship. 4.3 Is the applicant entitled to compensation for her claim experience? The applicant is entitled to $200 compensation Under paragraph 9.3 of the Terms of Reference, FOS may decide an FSP should compensate an applicant for their non-financial loss, where an applicant experiences an unusual degree of stress, physical inconvenience or time taken to resolve a claim. Compensation is limited to $3,000 per claim. An award of compensation should not follow any justified delay by the FSP, for example due to a need for further investigation. Unless exceptional circumstances apply, three or four months would be a reasonable timeframe wherein an FSP can consider its liability to meet a claim of this nature. I have closely reviewed the claim history and note:  the applicant attempted to lodge a claim with the FSP on 11 March 2016 and was requested to obtain a claim form. Following this conversation the applicant decided to lodge her claim online  the applicant called the FSP again on 15 June 2016 to lodge a claim, advising she had failed to lodge the claim online previously  the applicant advised her engineer was inspecting and would provide a report  the FSP reviewed the applicant‟s submission on 2 July 2016  the FSP‟s asses sor attended on 9 September 2016 but did not provide a report until about 20 October 2016  on 4 November 2016 the FSP decided it would require an engineer report too  the FSP completed review of the engineer‟s report by 29 November 2016  the FSP communicated to the applicant the claim was denied around 2 December 2016. I do believe the time taken by the FSP to review and decide the claim to be slightly excessive. While I accept the applicant may have contributed to the delays experienced, taking until December to decide a claim lodged in July is too long. I note the pool had already collapsed when C attended on 9 September, which is well within the reasonable timeframe the FSP is permitted to consider the claim. Accordingly, to the extent the FSP caused any delay, this did not contribute to the pool‟s total collapse. I am satisfied $200 is appropriate recognition of the applicant‟s claim experience. Case No: 478483 Recommendation Page 6 of 9 5 Supporting information 5.1 Policy terms “Event means a single occurrence which you did not intend or expect that results in loss or damage. Any series of events consequent upon or attributable to any one source or originating cause, including continuous or repeated exposure to substantially the same general conditions, are deemed to be one event. Your Home and Contents Insurance policy covers your home and/or contents when the loss or damage is caused by one of the following „Insured Events‟:  Storm, rainwater and flood. Exclusions You are not covered for any loss or damage caused by or resulting from, or the costs incurred from or of:  gradual deterioration, including wear and tear, rust, corrosion, depreciation, fading or deterioration from exposure to light;  inherent defects, structural faults, faulty workmanship or faulty design;  poor maintenance and failure to maintain the property in good repair;  any earth movement or vibration not caused by earthquake, including erosion, subsidence, landslide, mudslide, collapse, earth shrinkage and expansion;  damage to swimming pools, spas, septic tanks, water tanks (and other in ground structures or their surrounds) caused by hydrostatic pressure ” 5.2 Expert reports Record Key points FSP’s technician (P) Insuranc e Report and Quote 1.10.2016  According to the tenant, damage evident from over 12 months ago and wors ening over time.  Movement of this type is usually caused by both poor drainage around the pool and/or the failure of the hydrostatic valve in the pool.  It then manifests during a heavy rain or storm event, where the ground around the pool becomes saturated wit h water and pushes in the sides and floor of the pool. A properly working hydrostatic valve would prevent this.  The failure of the hydrostatic valve would appear to be the issue in this instance, however due to the lengthy time bet ween the initial failure and time of inspection it is difficult to be certain. FSP’s engineer (IE) Preliminary Report 24.11. 2016  Inspection carried out on 7 November 2016.  Instructions received, “inspect pool to determine the proximate cause of damage to the swimming pool”.  No hydrostatic relief valve was evident through the murky green water of the pool.  There is no coping and no significant strengthening of the top of the pool.  The pool has been in situ for at least 20 years.  The claim is ongoing from a series of storms commencing with a severe storm event that occurred on 21 April 2015. It appears minor damage was noticed after the storm which increased/worsened after subsequent storms, in particular the Case No: 478483 Recommendation Page 7 of 9 storm of 6 June 2016, after which wall bowing bec ame extensive.  Structure showed no s ignificant damage until two weeks after the storm on 6 June 2016. Minor damage was noticed in April 2015, but bulging occurred from 6 June 2016 and the pool rapidly deteriorated until then.  Relevant storm dates: 21 April 2015 (156mm), 22 April 2015 (153mm) , 6 January 2016 (208mm) and 6 June 2016 (104mm).  The left hand side of the pool has grossly bulged inwards, with the backfill slumped towards the bottom and pushing the wall inwards. There are corresponding voids under the pool surrounds slab. The backfil l has a high clay content and there is no sign of drainage.  There is a large crack in the top left hand side of the pool at the front corner. This corresponds to wall failure due to excessive bowing. There is no coping and no significant strengthening of the top edge of the pool.  The age of the pool indic ates it should have been installed in accordance with „AS1839 - 1994 Swimming Pools Pre - moulded Fibre - reinforced Plastics Installation.‟ These provide standards for the backfill, whic h are consistent with th e earlier 1989 standards (in case the pool is older).  In this pool there does not appear to be select non - granular backfill. Rather, it is clay based which would drain poorly and increase density when saturated.  “It is our opinion that without the stabilis ation assistance provided by the cement to be mixed with the backfill material as specified by AS1839, water entering this area and saturating the soil would be causing the backfill material to become heavier and slump towards the bottom of the pool wall. Undrained clay backfill will also lose shear strength, adding pressure to the wall, and there will also be hydraulic pressure on the wall. This increased concent rated weight then pushes the side of the pool in causing damage such as is present to this pool ”.  As the soils on the site are clay based they are not free - draining and so a drainage system should have been installed.  AS1839 requires a stand pipe to be installed next to the pool but none was observed. The purpose of the stand pipe is to measure the in - ground water table height and to allow the insertion of a small pump to remove in ground water if the water content becomes too high.  “It is therefore our opinion the pool is not installed in accordance with the requirements of AS1839. Had all the items and measures outlined above been completed then it is our opinion the damage to this pool would not have occurred.”  “The damage is considered to be related primarily to the unsuitable backfill for the strength of the pool and the lack of drainage provisio ns around the pool. The subject events have probably caused the final failure but this has been facilitated by the unsuitability of the backfill and the lack of suitable sub soil drainage.” FSP’s assessor ( C )  Attended site on 9 S eptember 2016. Case No: 478483 Recommendation Page 8 of 9 Report and SOW 25.11. 2016  Recommended claim to be declined.  Event description: rain has gone between the concrete and pool, damaging the fibreglass shell, which is starting to move away from the concrete, causing the tiles to crack.  Advised by the applicant approxima tely 12 - 18 months previously (approx. April 2015) following severe storms with strong winds and heavy rain, noticed coping tiles around the pool starting to crack and delaminate.  Applicants believed damage res ulted from the storm and tried to lodge a claim online but could not figure out how so gave up.  Damage continued to worsen and the fibreglass shell began to bulge inwards. Pool specialist was engaged who advis ed earth movement as a result of water penetrating through the tiles surrounding the pool into the ground below caused the pool to bulge inwards and the coping tiles to crack.  Damage caused by failure of the hydrostatic valve connected to the pool, inadequate drainage to the paved area surrounding the pool which resulted in movement and settlement occurring in the founding soils and a build - up of pressure around the pool shell.  A properly operating hydrostatic valve in the pool floor would have prevented this issue by releasing pool.  As a result of the applicant failing to investigate and mitigate further damage when first noticing issues 12 - 18 months previously, resultant damage and subsequent repair costs have significantly increased given the fibreglass shell is now cracked.  The storm events were all of extreme intensity. Unless the backfill was very efficiently draining, cement stabilised and correct drainage provisions installed, there would not have been any time for water to draining from the backfill before building up hydrostatic pressure behind the walls. It is observed the backfill is not free draining granular material and there are no signs of additional drainage.  Wall movement and backfill settlement with storms over time may have left gaps between the wall and surrounds and cracked the tiles, enabling further water ingress.  Movement and settlement would not recover and the stress would remain in the wall as a sustained load.  Future loads exceeding this would cause additional movement, settlement of backfill, and additional sustained loads. It is considered this was happening over the lif e of the pool which is over twenty years old.  Fibreglass loses tensile strengt h with time under a sustained load and has a linear stress strain curve so failure can be sudden. The extreme events occurring over the last 18 months may have occurred to a pool with reduced tensile strength.  Since the June 2016 storm event there has been a sudden failure of the top of the pool wall on the left hand side at the corner where it is cracked. Applicant’s engineer ( L ) Letter  “I believe damage may have been caused by storms / flooding / excess water due to recent weather.” Case No: 478483 Recommendation Page 9 of 9 Undated 5.3 Other documents relied upon  Written submissions from the applicant and the FSP.  Photographs of the damaged pool.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.