Insurer declined storm-related swimming pool damage claim as gradual deterioration and faulty workmanship
Text of the determination
Determination
Case No: 478483 Determination Page 1 of 4
Case number: 478483 22 January 2018
1 Overview
1.1 Dispute
The applicant made a claim under her home and contents insurance policy held with
the financial services provider (FSP). This was after her in-ground swimming pool
was damaged following a series of storms over a twelve month period.
The FSP said the damage was the result of gradual deterioration, faulty workmanship
and a build-up of hydrostatic pressure, and declined the claim on that basis.
The case manager provided the parties with a recommendation on the issues in
dispute. The recommendation was substantially in favour of the FSP. A copy of the
recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct and are adopted in this
determination. Further submissions provided after the recommendation have been
considered.
Does the applicant’s additional submission change the outcome ?
The applicant‟s additional submission after the issue of the recommendation does not
change the outcome of the dispute.
1.3 Determination
This determination is substantially in favour of the FSP.
I agree with the case manager‟s reasons for the recommendation and the
recommended outcome.
The FSP is not required to undertake any further action, as it has already paid the
applicant the case manager‟s recommended $200 compensation for non-financial
loss.
Case No: 478483 Determination Page 2 of 4
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
recommendation. I am satisfied that the documentation I have relied on has been
provided to both parties.
I am satisfied that the case manager‟s recommendation contains an accurate
summary of the dispute, the issues to be determined, any applicable paragraphs of
the Terms of Reference and any relevant law.
2.2 Does the applicant’s additional submission change the outcome?
Applicant has established a prima facie claim for storm damage
The FSP acknowledged there had been a series of severe storms in April 2015,
January 2016 and June 2016. It also acknowledged the storms, along with the
excluded factors, led to damage to the pool.
I am satisfied the applicant has established a prima facie claim for damage arising
from the insured event of „storm…‟.
The applicant also raised the possibility that excavation work on a neighbouring
property may have contributed to the pool damage. However, the insured event of
„impact‟ under the policy does not cover loss or damage resulting from vibrations
originating on neighbouring property, and so this does not apply in this case.
FSP entitled to deny the claim
The FSP relied on the information provided by a pool expert, an engineer and an
assessor in concluding the effective cause of the damage to the pool was gradual
deterioration and faulty workmanship.
I am satisfied the available evidence shows, on balance, that despite the
acknowledged impact of the various storms, the damage to the pool would not have
occurred had the pool complied with relevant standards, and appropriate rectification
been undertaken after early storm events.
In line with the recommendation, and as further explained below, I consider the FSP
has established the application of the policy exclusions upon which it relies, and so it
is entitled to deny the claim on that basis.
Applicant is entitled to $200 compensation
The recommendation concluded the applicant is entitled to compensation for her
experience in the course of the claims process. While noting the applicant may have
contributed to the delay, the recommendation was that the FSP‟s decision to deny
the claim in December 2016 was too long after the claim was lodged in June 2016.
Case No: 478483 Determination Page 3 of 4
The recommendation indicated $200 was an appropriate level of compensation, and
inconvenience, I agree it is fair in the circumstances. The FSP has now paid this
amount to the applicant.
Applicant ’s objections to recommendation do not change outcome
The applicant objected to the recommendation. She maintained her position that the
storm was what prompted the damage.
Compensation
Her objection included her dissatisfaction with the $200 compensation, which she felt
was insufficient to address her experience in the course of the claim. She says she
had difficulty lodging the claim online when she first attempted that, as well as having
issues accessing the assessor reports.
The recommendation outlines the timeline for the claims process. After initially
attempting to lodge her claim online in March 2016, the applicant lodged it by phone
in June 2016 and, after carrying out an investigation into the cause of the damage,
the FSP denied the claim in December 2016.
The FSP relied on three reports, which meant three pool inspections. It is reasonable
for the FSP to undertake comprehensive investigations into the cause of the damage
to the pool. Nevertheless, the case manager did conclude the FSP had taken longer
than necessary to make a decision on the claim; although it was not established that
any delay by the FSP in making a decision should reasonably be regarded as having
contributed to the final damage to the pool, which had already collapsed before the
3 rd inspection.
The applicant said she had also experienced difficulties in managing her
commitments assisting her husband who was undergoing medical treatment, and
arranging for someone to attend when the FSP‟s contractors inspected the pool.
I would like to acknowledge the difficulties the applicant reported in the course of the
claim, particularly given her husband‟s ongoing illness; and the inconvenience of
having other family members taking time off work to be available when the FSP‟s
assessor attended. While this no doubt added to the inconvenience and stress of
having to deal with the claim, those are not in themselves matters for which the FSP
can reasonably be held responsible.
Damage to the pool
The FSP relied on reports provided by appropriately qualified parties. These reports
indicated the various storms had an impact on the pool and the surrounding area.
However, the dominant or effective cause of the damage was the inadequate
drainage around the pool, along with other deficiencies with respect to the pool‟s
installation.
The damage had progressively worse ned with the occurrence of each storm. This is
because the ground/drainage surrounding the pool could not effectively deal with the
rainfall that had occurred over time.
Case No: 478483 Determination Page 4 of 4
Each of the three reports provided a comprehensive explanation as to the effective
cause of the damage.
While the applicant obtained a very brief handwritten report, that did not provide any
reason for its conclusion that the damage may have been caused predominantly by
recent weather of storms, flooding, excess water.
Although the storms are accepted as having contributed to the damage, that does not
make „storm‟ the effective cause of the loss. Instead, the evidence supports the
conclusion that the storm water over successive periods simply highlighted pre-
existing deficiencies and problems, without which the storms would not, in all
likelihood, have had the same (if any) effect.
That means, I am satisfied the FSP was entitled to deny the claim, as it has
established the proximate (that is, the dominant, operative or effective) cause of the
damage was faulty workmanship, gradual deterioration and build-up of hydrostatic
pressure, which are specifically excluded under the policy.
Accordingly, for the reasons outlined above, the applicant‟s additional submissions
do not warrant a change to the outcome of this dispute.
Recommendation
Case No: 478483 Recommendation Page 1 of 9
Case number: 478483 21 July 2017
3 Overview
3.1 Dispute
The applicant lodged a claim with the financial services provider (FSP) when her pool
collapsed following a series of storms during the preceding 12 months.
The FSP refused the claim and says the collapse results from gradual deterioration,
faulty workmanship and a build-up of hydrostatic pressure.
The applicant maintains the claim is one for acceptance and says the FSP took an
unreasonably long time to investigate the claim.
3.2 Issues and key findings
Has the applicant established a claim?
The FSP accepts the four storms contributed to the pool‟s failure. Accordingly, the
applicant satisfied her burden of proof to establish a claim for loss within the terms of
the policy.
Can the FSP refuse the claim?
The FSP can refuse the entirety of the claim because:
cover is provided subject to exclusions
the information provided shows the proximate cause of the pool‟s collapse is
gradual deterioration and faulty workmanship
the available submissions indicate the pool would not have collapsed only as a
result of the storms, rather the collapse primarily arose from excluded factors.
Is the applicant entitled to compensation for her claim experience?
In the circumstances, the time taken by the FSP to review and decide the claim was
slightly excessive. The FSP is required to pay the applicant $200 in respect of this
delay.
3.3 Recommendation
This recommendation is substantially in favour of the FSP.
Within seven days of each party accepting the recommendation, the FSP will pay the
applicant $200 to finalise this dispute.
Case No: 478483 Recommendation Page 2 of 9
4 Reasons for recommendation
4.1 Has the applicant established a claim?
The applicant has a valid claim for damage caused by storm
The applicant holds a home and contents policy, providing cover for loss or damage
occurring during the period of cover, caused by the „insured events‟ listed in the
policy documents. Conditions and exclusions apply.
When making a claim under a contract of general insurance, the initial burden of
proof is with the applicant to show, on the balance of probabilities, an event covered
by the policy caused the claimed loss (called a prima facie ). If the applicant can do
so, the burden of proof shifts to the insurer to show, on the balance of probabilities,
the policy will not cover or excludes the claim.
The FSP says:
there were severe storms in April 2015, January 2016 and June 2016
the storms were all of extreme intensity
the storms caused the pool to fail in conjunction with excluded factors such as:
gradual deterioration, faulty workmanship and failure due to hydrostatic pressure
it intends to refuse the claim on the basis of these exclusions.
Because the FSP accepts the storms contributed to the pool‟s failing, it follows the
applicant satisfies her initial burden to establish a prima facie claim.
Policy will not cover any damage caused by excavation works
During the course of the dispute, the applicant mentioned excavation work conducted
by heavy machinery occurred on the neighbouring property, in close proximity to the
pool. The applicant says vibrations due to the excavations may have contributed to
the pool failing.
As mentioned, the policy is a defined events policy, covering claims arising from 10
insured events only. Only loss or damage caused by a listed event is covered.
After close review of the 10 insured events, the only event possibly providing cover is
„impact‟, which covers,
“Impact caused by a falling tree, branch, power or communication pole, a motor vehicle or trailer, an
aircraft or watercraft, debris falling from space, or a satellite dish, televis ion or radio aerial which
breaks or collapses.”
The policy does not define „impact‟, so it takes on its ordinary common meaning. The
Macquarie Dictionary defines „impact‟ as,
“1. the striking of one body against another
2. an impinging
3. forci ble contact or impinging…”
I am satisfied the insured event „Impact‟ does not cover damage resulting from
vibrations originating on the neighbouring property. To the extent any loss or damage
can be attributed to this source, the policy will not respond because an insured event
did not cause the damage.
Case No: 478483 Recommendation Page 3 of 9
4.2 Can the FSP refuse the claim?
FSP must show the proximate cause of the loss is an excluded risk
Cover is subject to exclusions. To refuse the claim, the FSP must show the
proximate cause of the pool failing was an excluded risk, rather an insured event.
When determining whether an insured event or an excluded risk caused the damage,
courts have held the proximate cause of the loss is not the first, last or sole cause of
the loss; it is the effective or operative cause.
If there were several causes operating when the loss occurred, each are reviewed for
qualities of reality, predominance and efficiency, to determine which actively caused
the loss. While not always possible, the courts stress the importance of s triving to
identify the proximate cause.
The FSP says the proximate causes of the pool failing were:
gradual deterioration, including wear and tear, on account of the length of time
over which the pool failed and the number of storms required to induce collapse
inherent defects and faulty workmanship, specifically the pool‟s design not
complying with AS1839-1994 or AS1839-1989 (further details below)
damage to swimming pools due to hydrostatic pressure.
Circumstances of the loss
The applicant says:
the first storm occurred in April 2015, after which the applicant noticed some pool
tiles cracking or delaminating
by October 2015 damage was more easily observable
the applicant obtained assistance from an engineer (L) in April 2016, who
recommended the applicant lodge a claim
the applicant originally tried to lodge a claim online with the FSP in March 2016
but gave up after finding this too difficult
the applicant called the FSP to lodge a claim in June 2016 after another storm led
to the rapid collapse of the pool
the pool was in place for about 20 years without issue.
Both parties provided submissions from an engineer.
For the applicant, L explained the collapse may have resulted from recent storms,
flooding or excess water. L‟s letter is undated and very b rief.
For the FSP, its engineer (IE) states:
no hydrostatic relief valve was evident
no coping or strengthening was evident across the top of the pool
damage slowly worsened after the first storm in April 2015, before rapid failure
followed the storm in June 2016
the drainage is insufficient given the backfill is comprised of non-granular clay
soils, which drain poorly and expand when wet
over time, undrained clay backfill becomes heavy, the pressure surrounding the
pool‟s shell increased causing a build -up of hydrostatic pressure
Case No: 478483 Recommendation Page 4 of 9
the pool does not have a stand up pipe installed, which would have allowed for a
pump to assist alleviating the rising water content
these factors mean the pool does not comply with the relevant design standard at
the time of construction, either AS1839-1994 or AS1839-1989
the storms probably caused the pool to finally fail but this only occurred due to
the unsuitability of the backfill and the lack of suitable sub soil drainage.
On the strength of this submission, I am persuaded fa ulty workmanship was a
relevant factor in the pool‟s collapse.
The FSP‟s assessor (C) submitted:
damage results from the pool‟s hydrostatic valve failing, inadequate drainage
surrounding the pool inducing movement and settlement in the founding soils and
a build-up of pressure surrounding the pool shell
a properly operating hydrostatic valve in the pool floor would have prevented the
collapse
the applicant‟s failure to investigate and mitigate damage when first noticing
issues around October or November 2015 significantly increased repair costs
wall movement and backfill settlement over time left gaps between the wall and
surrounds and cracked the tiles, enabling further water ingress
movement and settlement occurring over time would not recover and the stress
remained in the wall as a sustained load. Future loads would cause additional
movement, settlement of backfill, and additional sustained loads
fibreglass loses tensile strength with time under a sustained load and has a linear
stress strain curve so failure can occur suddenly.
From a review of the material provided, it appears since the June 2016 storm event
there has been a sudden failure of the top of the pool wall on the left hand side at the
corner where it is cracked.
The proximate cause was gradual deterioration and faulty workmanship
Given the information provided by IE, I am satisfied that while the storm in June 2016
directly led to the pool‟s collapse, failure could not have occu rred if not for the
preceding storms, lack of site drainage, lack of a functioning hydrostatic pressure
valve and the unsuitable backfill material used.
In my view, the proximate cause of the pool collapsing is gradual deterioration and
faulty workmanship because:
collapse followed initial issues arising from the first storm in April 2015, reinforced
by subsequent storms and then finalis ed by a storm in June 2016. This indicates
a slow failure over time, rather than a complete failure following a single eve nt
and is consistent with the failure mechanism for fiberglass articulated by C
the policy is intended to cover losses arising out of a single event, rather than
multiple events occurring over time, which is „gradual deterioration‟
IE and C speak to a build- up of pressure around the pool‟s shell over time, due to
the inadequate drainage and insufficient hydrostatic relief. These forces take time
to build to a level sufficient to crack the pool shell
Case No: 478483 Recommendation Page 5 of 9
nothing in any of the information provided indicates the J une 2016 storm could
have caused the collapse independently of the existing gradual deterioration and
other issues, meaning the June 2016 cannot be the proximate cause.
I am satisfied, given the reports provided by IE and C, that while the storms were
necessary for the pool to collapse, failure would not have occurred if the pool
complied with the relevant standards and if intervention were taken following one of
the earlier storms.
The FSP is entitled to refuse the entirety of the claim, applying the exclusions for
gradual deterioration and faulty workmanship.
4.3 Is the applicant entitled to compensation for her claim experience?
The applicant is entitled to $200 compensation
Under paragraph 9.3 of the Terms of Reference, FOS may decide an FSP should
compensate an applicant for their non-financial loss, where an applicant experiences
an unusual degree of stress, physical inconvenience or time taken to resolve a claim.
Compensation is limited to $3,000 per claim.
An award of compensation should not follow any justified delay by the FSP, for
example due to a need for further investigation. Unless exceptional circumstances
apply, three or four months would be a reasonable timeframe wherein an FSP can
consider its liability to meet a claim of this nature.
I have closely reviewed the claim history and note:
the applicant attempted to lodge a claim with the FSP on 11 March 2016 and was
requested to obtain a claim form. Following this conversation the applicant
decided to lodge her claim online
the applicant called the FSP again on 15 June 2016 to lodge a claim, advising
she had failed to lodge the claim online previously
the applicant advised her engineer was inspecting and would provide a report
the FSP reviewed the applicant‟s submission on 2 July 2016
the FSP‟s asses sor attended on 9 September 2016 but did not provide a report
until about 20 October 2016
on 4 November 2016 the FSP decided it would require an engineer report too
the FSP completed review of the engineer‟s report by 29 November 2016
the FSP communicated to the applicant the claim was denied around 2
December 2016.
I do believe the time taken by the FSP to review and decide the claim to be slightly
excessive. While I accept the applicant may have contributed to the delays
experienced, taking until December to decide a claim lodged in July is too long.
I note the pool had already collapsed when C attended on 9 September, which is well
within the reasonable timeframe the FSP is permitted to consider the claim.
Accordingly, to the extent the FSP caused any delay, this did not contribute to the
pool‟s total collapse.
I am satisfied $200 is appropriate recognition of the applicant‟s claim experience.
Case No: 478483 Recommendation Page 6 of 9
5 Supporting information
5.1 Policy terms
“Event means a single occurrence which you did not intend or expect that results in loss or
damage. Any series of events consequent upon or attributable to any one source or
originating cause, including continuous or repeated exposure to substantially the same
general conditions, are deemed to be one event.
Your Home and Contents Insurance policy covers your home and/or contents when the loss or
damage is caused by one of the following „Insured Events‟:
Storm, rainwater and flood.
Exclusions
You are not covered for any loss or damage caused by or resulting from, or the costs incurred from
or of:
gradual deterioration, including wear and tear, rust, corrosion, depreciation, fading or
deterioration from exposure to light;
inherent defects, structural faults, faulty workmanship or faulty design;
poor maintenance and failure to maintain the property in good repair;
any earth movement or vibration not caused by earthquake, including erosion, subsidence,
landslide, mudslide, collapse, earth shrinkage and expansion;
damage to swimming pools, spas, septic tanks, water tanks (and other in ground structures or
their surrounds) caused by hydrostatic pressure ”
5.2 Expert reports
Record Key points
FSP’s technician (P)
Insuranc e Report and Quote
1.10.2016
According to the tenant, damage evident from over 12 months ago
and wors ening over time.
Movement of this type is usually caused by both poor drainage
around the pool and/or the failure of the hydrostatic valve in the
pool.
It then manifests during a heavy rain or storm event, where the
ground around the pool becomes saturated wit h water and pushes
in the sides and floor of the pool. A properly working hydrostatic
valve would prevent this.
The failure of the hydrostatic valve would appear to be the issue in
this instance, however due to the lengthy time bet ween the initial
failure and time of inspection it is difficult to be certain.
FSP’s engineer (IE)
Preliminary Report
24.11. 2016
Inspection carried out on 7 November 2016.
Instructions received, “inspect pool to determine the proximate
cause of damage to the swimming pool”.
No hydrostatic relief valve was evident through the murky green
water of the pool.
There is no coping and no significant strengthening of the top of
the pool.
The pool has been in situ for at least 20 years.
The claim is ongoing from a series of storms commencing with a
severe storm event that occurred on 21 April 2015. It appears
minor damage was noticed after the storm which
increased/worsened after subsequent storms, in particular the
Case No: 478483 Recommendation Page 7 of 9
storm of 6 June 2016, after which wall bowing bec ame extensive.
Structure showed no s ignificant damage until two weeks after the
storm on 6 June 2016. Minor damage was noticed in April 2015,
but bulging occurred from 6 June 2016 and the pool rapidly
deteriorated until then.
Relevant storm dates: 21 April 2015 (156mm), 22 April 2015
(153mm) , 6 January 2016 (208mm) and 6 June 2016 (104mm).
The left hand side of the pool has grossly bulged inwards, with the
backfill slumped towards the bottom and pushing the wall inwards.
There are corresponding voids under the pool surrounds slab. The
backfil l has a high clay content and there is no sign of drainage.
There is a large crack in the top left hand side of the pool at the
front corner. This corresponds to wall failure due to excessive
bowing. There is no coping and no significant strengthening of the
top edge of the pool.
The age of the pool indic ates it should have been installed in
accordance with „AS1839 - 1994 Swimming Pools Pre - moulded
Fibre - reinforced Plastics Installation.‟ These provide standards for
the backfill, whic h are consistent with th e earlier 1989 standards (in
case the pool is older).
In this pool there does not appear to be select non - granular
backfill. Rather, it is clay based which would drain poorly and
increase density when saturated.
“It is our opinion that without the stabilis ation assistance provided
by the cement to be mixed with the backfill material as specified by
AS1839, water entering this area and saturating the soil would be
causing the backfill material to become heavier and slump towards
the bottom of the pool wall. Undrained clay backfill will also lose
shear strength, adding pressure to the wall, and there will also be
hydraulic pressure on the wall. This increased concent rated weight
then pushes the side of the pool in causing damage such as is
present to this pool ”.
As the soils on the site are clay based they are not free - draining
and so a drainage system should have been installed.
AS1839 requires a stand pipe to be installed next to the pool but
none was observed. The purpose of the stand pipe is to measure
the in - ground water table height and to allow the insertion of a
small pump to remove in ground water if the water content
becomes too high.
“It is therefore our opinion the pool is not installed in accordance
with the requirements of AS1839. Had all the items and measures
outlined above been completed then it is our opinion the damage
to this pool would not have occurred.”
“The damage is considered to be related primarily to the unsuitable
backfill for the strength of the pool and the lack of drainage
provisio ns around the pool. The subject events have probably
caused the final failure but this has been facilitated by the
unsuitability of the backfill and the lack of suitable sub soil
drainage.”
FSP’s assessor ( C ) Attended site on 9 S eptember 2016.
Case No: 478483 Recommendation Page 8 of 9
Report and SOW
25.11. 2016
Recommended claim to be declined.
Event description: rain has gone between the concrete and pool,
damaging the fibreglass shell, which is starting to move away from
the concrete, causing the tiles to crack.
Advised by the applicant approxima tely 12 - 18 months previously
(approx. April 2015) following severe storms with strong winds and
heavy rain, noticed coping tiles around the pool starting to crack
and delaminate.
Applicants believed damage res ulted from the storm and tried to
lodge a claim online but could not figure out how so gave up.
Damage continued to worsen and the fibreglass shell began to
bulge inwards. Pool specialist was engaged who advis ed earth
movement as a result of water penetrating through the tiles
surrounding the pool into the ground below caused the pool to
bulge inwards and the coping tiles to crack.
Damage caused by failure of the hydrostatic valve connected to
the pool, inadequate drainage to the paved area surrounding the
pool which resulted in movement and settlement occurring in the
founding soils and a build - up of pressure around the pool shell.
A properly operating hydrostatic valve in the pool floor would have
prevented this issue by releasing pool.
As a result of the applicant failing to investigate and mitigate further
damage when first noticing issues 12 - 18 months previously,
resultant damage and subsequent repair costs have significantly
increased given the fibreglass shell is now cracked.
The storm events were all of extreme intensity. Unless the backfill
was very efficiently draining, cement stabilised and correct
drainage provisions installed, there would not have been any time
for water to draining from the backfill before building up hydrostatic
pressure behind the walls. It is observed the backfill is not free
draining granular material and there are no signs of additional
drainage.
Wall movement and backfill settlement with storms over time may
have left gaps between the wall and surrounds and cracked the
tiles, enabling further water ingress.
Movement and settlement would not recover and the stress would
remain in the wall as a sustained load.
Future loads exceeding this would cause additional movement,
settlement of backfill, and additional sustained loads. It is
considered this was happening over the lif e of the pool which is
over twenty years old.
Fibreglass loses tensile strengt h with time under a sustained load
and has a linear stress strain curve so failure can be sudden. The
extreme events occurring over the last 18 months may have
occurred to a pool with reduced tensile strength.
Since the June 2016 storm event there has been a sudden failure
of the top of the pool wall on the left hand side at the corner where
it is cracked.
Applicant’s engineer ( L )
Letter
“I believe damage may have been caused by storms / flooding /
excess water due to recent weather.”
Case No: 478483 Recommendation Page 9 of 9
Undated
5.3 Other documents relied upon
Written submissions from the applicant and the FSP.
Photographs of the damaged pool.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.